PART I - CONTEXT AND ANALYSIS
This section describes the Hackney Central Masterplan area and
summarises the analytical work undertaken to date, which serves as a
foundation for the Masterplan.
Where a masterplan allocates land, as in the • The quality of the public realm through a
case of this masterplan, it must be prepared as focus of investment in key routes and spaces,
an Area Action Plan. introducing areas of new public open space, and
means of access to facilities.
The overall purpose of the Hackney Central
Masterplan will be to establish the basis for The Masterplan will meet these objectives by:
shaping the regeneration of the area. It will ensure • identifying the key strengths and weaknesses of
the continued and enhanced role of Hackney the town centre;
Central as an important Town Centre and civic • ascertaining the issues that currently affect the
heart to the borough, responding to the needs town and may influence the town’s future;
of future communities and housing growth over • setting out the principles and parameters for
the coming years. new development to take place - site design,
capacities, uses, funding and phasing;
The regeneration of Hackney Central will seek • defining the principles for environmental
to address: enhancement to take place identification of
• Town Centre liveability: through social and local distinctiveness, character areas,
physical regeneration, including better streets improvement areas;
and linkages, buildings, housing, community and • identifying areas to improve the public realm and
cultural facilities as well as providing new public introduce new public open space and community
open spaces, especially enhanced green and facilities; and,
play spaces; • assessing the practicalities of co-ordinated
development and land assembly.
• Strengthened local character and enhanced
heritage: by encouraging community-led The Masterplan guides the overall regeneration of
development and facilitating an integrated and Hackney Central, providing more specific detail than
balanced town centre that is attractive as a place the emerging Core Strategy. An important aspect of
to live, work, visit and invest; the Masterplan is the promotion of high quality,
sustainable mixed-use development.
The Civic heart, Mare Street shops and wealth of historic character capture much of the essence that is Hackney Central.
5
Hackney Central Masterplan Steering Group (Council officers, key
Stage 1: Masterplan Scoping
Sustainability Appraisal
Stage 3: Consultation Draft Masterplan
(current stage)
Stage 4: Consultation
Formal Consultation with Community, Stakeholders, Ward Members
1.2 Who is it for how can it be used? and assess planning applications. Developers, land
The Council will use the Masterplan to: owners, stakeholders, residents; neighbourhood
• identify potential for growth including residential organisations and community organisations can use
in mixed-use development; this document to:
• co-ordinate development within the town • identify suitable locations for new developments;
centre area; • identify what density is appropriate and how
• ensure an appropriate mix of land uses, and they can integrate developments into the
thus allocate land; surrounding context;
• assess developer proposals; and, • identify what land uses are suitable on
• forecast future service and community specific sites;
facility needs. • identify what types of developments the Council
is planning for the area as a whole as well as
This draft Masterplan establishes a strategic specific sites; and
framework identified through a series of policies and • to forecast future service needs.
principles, setting out the policy context (in addition All developers, individuals and organisations should
to the emerging Core Strategy) for development work with the Council to achieve the principles
proposals coming forward within Hackney Central set out in this document to inform proposals. The
town centre. These principles will be used to inform Policy/Design Principles are set out in a higlighted
development and proposals throughout the area box throughout each theme and character area.
6
1.3 Method and Approach 1.4 Status of the Masterplan
The project programme so far has been structured This document has been prepared during a time
in the following stages: of change within the current planning system. The
Unitary Development Plan (UDP) is progressively
Stage 1: Masterplan Scoping & Initial Consultation being replaced by the Hackney Local Development
Stage 2: Initial Options Framework (LDF). Hackney’s Core Strategy
Stage 3: Consultation Draft Masterplan Preferred Options Report has undergone statutory
(current stage) public consultation in April and May 2008.
Stage 4: Public Consultation/Public Participation
Stage 5: Finalise Masterplan (Phase 1 AAP) This Masterplan has been prepared as a Draft
Area Action Plan (Phase 1) process as part of the
These stages have resulted in two document Local Development Framework (LDF). It provides
parts, namely Part 1 – Hackney Central Masterplan policy and design guidance to be used as part
Scoping and Baseline Report which consists of of the development control process and to help
background supporting material which informed inform investment decisions. As a Development
Part 2 – the Draft Hackney Central Area Action Plan Plan Document, this Masterplan will be a material
(Phase 1) – Masterplan (this document). consideration in the assessment of planning
applications, and will be able to allocate land use.
Following public consultation of this draft
Masterplan, the Council will take into account all On advice from the Government Office for London,
comments received to produce a final Phase 1 Hackney Central Area Action Plan will follow the
Area Action Plan to be endorsed by Cabinet. Core Strategy process to ensure consistency and
Following the endorsement of Phase 1 and the conformity. This document therefore is Phase 1
adoption of the Core Strategy, a Phase 2 Draft of this AAP process; it replaces the existing Issues
Hackney Central Area Action Plan will be prepared and Options Hackney Central Area Action Plan
to reflect the adopted Core Strategy which will then (2005). Once the Core Strategy is adopted, the
be consulted on. Following public consultation and AAP will be developed from this Phase 1 stage
subsequent amendments made to the document into a consultation document, and taken forward
resulting from comments received during the as a development plan document for full adoption.
consultation period, the Phase 2 AAP will be Consultation feedback from earlier stages and
adopted by Council as the final Hackney Central baseline information has therefore been fed into the
Area Action Plan. production of this Masterplan.
7
develop based upon strategic urban design and already exists. Detailed development proposals are
development principles. envisaged and illustrated on a site-by-site basis.
The document is presented in four parts: Some sites are shown as having different ‘scenarios’
to indicate different possibilities for development,
PART I – Context and Analysis dependent on land assembly, viability, cost, etc. The
This section describes the Hackney Central development proposals are indicated in both plan
Masterplan area site and summarises the analytical form and three-dimensionally, to provide a general
work undertaken to date, which serves as a sense of the overall massing of the proposed
foundation for the Masterplan. development on site.
8
02 Context: the place and its people
2.1 Taking the wider view centres (and to a much lesser extent smaller
Masterplans are being prepared in parallel for both centres) and so it is important that a complementary
Dalston and Hackney Central town centres to retail strategy is pursued in each location.
ensure that a complementary planning strategy is
pursued for each location. Dalston and Hackney Each centre has much in common in terms of
Central are the Borough’s two main existing town future planning provision but also it is important
centres and as such will be the focus for new retail, to recognise the ‘unique selling points’ that sets
commercial, leisure and other related development each place apart and gives its special character. In
over the coming years. Dalston is the Borough’s Dalston, there are three fundamental influences that
foremost centre and is designated a Major Town shape the dynamic of the area:
Centre in the London Plan. Whilst Hackney Central
is designated as a lower order District Town Centre,
• Kingsland High Street, a lively thoroughfare that
with the area a major focus for regeneration over the
is in parts somewhat run-down characterised by
plan period, it is possible that growth will lead to it
small, independent shops and services, many
becoming elevated in planning policy terms.
catering to the area’s ethnically diverse population
in terms of food and other specialist products;
Both Masterplans also need to capitalise on
major new planned rail infrastructure, such as • Ridley Road Market, a bustling street market that
the remodelling of both Dalston Kingsland and draws from a wide catchment area; and
Hackney Central North London Line stations as part • the prevalence of creative industries and
of the Overground Network. In Dalston, planned organisations that are located in the area,
extensions to the East London Line are potentially including a lively evening economy of clubs
to be accompanied by a new Hackney-Chelsea and bars.
line station, transforming the way that the centre
is connected to the London rail network. The Although there are overlapping characteristics,
development pressures that this new infrastructure Hackney Central is notable for:
will bring provides both challenges and • the Town Hall, Hackney Empire Theatre and other
opportunities for considering how each centre related facilities establishing this as the civic heart
is to evolve in the future. of the borough;
Whilst both centres are major focal points for • the intimate qualities of the Narrow Way, flanked
shopping, Dalston is primarily a comparison by St John’s-at-Hackney Church and churchyard,
shopping destination (i.e. non-food such as clothing) an area with a distinctive feel, though undermined
and Hackney Central is largely a convenience at present by all day traffic congestion; and
shopping centre (i.e. food). At present too much • like Dalston, the area is increasingly becoming
spending power leaves the borough. It is therefore a focus for cultural and creative activities, some
necessary to encourage the provision of more and transferring from Shoreditch.
higher quality shopping and services to encourage
local residents to shop more locally for a wider range The strategic intention is to ensure a well-balanced
of goods and services. However, there is a finite offer, with two complementary poles of regeneration
quantum of such development that can be spread activity, each specified to strengthen local
in market economic terms between the two distinctiveness and character.
9
Figure 2.1 Hackney Central and Dalston town centres context
10
2.2 The Hackney Central Masterplan Study Area 2.3 Masterplan Development
The Hackney Central Masterplan Area comprises The draft Hackney Central Masterplan has evolved
and area of 36.7 hectares and is situated centrally through various meetings and consultation events
within the London Borough of Hackney and east with key stakeholders and the local community. In
of Dalston town centre. The Masterplan site area December 2007 the London Borough of Hackney
was identified to incorporate what is commonly organised a steering group for the Masterplan,
identified as the town centre area, including the which included members from the Council, TfL,
principal shopping length of Mare Street and the the GLA and the LDA. Throughout the project
Narrow Way, the Town Hall, Amhurst Road and the there have been informal and formal meetings with
stretch of Morning Lane that includes the Tesco site. (amongst others): the Masterplan Steering Group;
The Marcon and Trelawney Estates are also included the local community (see Section 2.4); Crossrail;
along with St John-at-Hackney church and gardens. Network Rail; LBH Streetscene; St John-at Hackney
Figure 2.2 illustrates the study boundary. church; Tesco; and, Arriva.
11
Figure 2.2 The Masterplan boundary
12
baseline. The report forms a background document
to accompany the Masterplan.
• Character Areas;
• Site and Context Analysis e.g. land use, open
space etc.;
• Access and Movement;
• Energy;
• Planning Policy and Initiatives;
• Constraints and Opportunities; and,
• Opportunity Sites.
13
Figure 2.5 Constraints summary
14
• Important Settings - Key public buildings and • Areas for tall buildings - The Hackney Tall
streets are viewed within a wider setting or Buildings Strategy (2005) has previously identified
particularly well-defined area. Hackney several areas where taller buildings might be able
Town Hall Square and St John-at-Hackney to be accommodated. The tower blocks on the
churchyard and gardens are notable ‘set piece’ Trelawney Estate are already visually prominent
spaces that emphasise the importance of structures in one of these areas.
these public buildings.
• Opportunity Sites - A range of opportunity sites
• Gateways and nodes - These denote important have been identified where there may be scope
points of entry into the Masterplan area, such as for change or refurbishment of existing buildings.
Town Hall Square, signaling that you have ‘arrived’ The two single largest areas are the Tesco’s and
in the town centre. Minor nodes also indicate Bus Garage sites and these potentially offer the
other places of activity or locations of significance greatest scope for change.
such as secondary junctions or crossings. Many
would benefit from improvements to reinforce their • Edges - Many streets are well-defined by strong
function. building lines, creating clear edges to the street.
Other areas contain weakly-defined edges,
• CTRL and Proposed Chelsea Hackney line particularly on Morning Lane.
(Crossrail 2 - CR2) safeguarded land - Large
parts of the area are safeguarded for the future • Frontages - Many building frontages include
CR2 project. This means that proposals for positive lively facades, such as along Mare Street,
development within this area will need to with shops and businesses generating activity.
consult with Crossrail to ensure they do not Others are inactive or ‘dead’ frontages and create
compromise the project. poor streets that can feel unsafe. Where possible
these should be addressed.
• The Narrow Way and Amhurst Road junction -
The Narrow Way is a distinctive meandering street As part of the baseline analysis, a group of
but the quality of the environment is compromised opportunity sites within the Masterplan area
by heavy bus congestion. The junction with were identified where development and/or
Amhurst Road and Mare Street would benefit improvements are most likely. Some of these
from significant improvements sites present opportunities for new development
of its public spaces. and others are more suited for refurbishment or
other site improvements. Some of the sites
• Public Transport - Hackney Central is well served included have been granted planning permission
by two railway stations and numerous bus routes. and the schemes planned for these sites are
Development in this area should maximise its included within the Masterplan for the purposes
relationship with these public transport assets, of completeness and providing the development
improving their viability. context for the Masterplan.
15
Figure 2.6 Opportunity sites
16
2.6 Summary SWOT Analysis
Hackney Central Masterplan The issues and considerations emerging from
Scoping Report Opportunity Sites the Hackney Central Scoping Report reveal that
Site
17
Strengths
• Historic buildings
• Cultural diversity
• Strong local landmarks
• Good open spaces and trees
• Excellent public transport links
• A clear High Street character
• A clear focus for civic activities
• A good mix of uses in the town centre
• Areas of positive historic and architectural character
• A variety of independent traders and national chains
Weaknesses
• Traffic congestion i.e. bus and car congestion, especially bus congestion on the Narrow Way
• Poor connections to railway stations
• Low quality of pedestrian environment
• Limited uses within existing public open spaces
• Inactive frontages and weakly defined streets in some areas
• Restricted north-south connections
• Limited connections east of Mare Street
• Railways divide the area
• Areas of poor architectural quality / townscape
• Low perception of safety
• Limited retail offer
Opportunities
• A range of locations and potential for change / improvement, including sites within the heart of
the town centre
• Potential improvements to connections through the area, both east-west and north-south
• More improved shopping facilities
• Enhanced pedestrian environment / streetscape
• Reduced traffic dominance
• New and improved public open spaces
• Opportunities to improve connections to and enhance existing stations
• Enhance areas of weak townscape / character
• Potential to address the perceived safety of some areas
• Good potential for sustainable forms of development
Threats
• Ad hoc “piecemeal” development
• Missed opportunities through uncoordinated development of key opportunities sites
• Continued traffic congestion
• Inappropriate/poorly designed development could harm existing character
• Low perceptions of safety
18
Understanding the Place
2.7 Key Issues 2.8 Options Development and Summary
Key issues and themes emerging from the Scoping Four preliminary options were developed based on
Report study were: the key issues arising out of the Masterplan Scoping
Report. They represented a holistic response to
• Retention and enhancement of the Conservation the over-arching issues of the current lack of a
areas with specific attention to those areas that high quality public realm, open space, accessibility,
exhibit clear character settings economic vitality, and active frontage.
(e.g. the Narrow Way);
Each option was developed in sufficient detail to
• Opportunities for taller buildings are influenced by: indicate block layouts and building footprints. The
• areas along rail alignments where the CTRL and options were also tested in terms of site needs,
Crossrail will constrain development potential; transportation and energy implications. The options
• backland areas within existing housing estates; were illustrated in plan form to convey the massing
and and form.
• areas where sensitivity to existing traditional
housing will be required and character; The four options have been prepared as the basis of
discussion and a comprehensive evaluation has yet
• Key local and strategic view corridors; to be applied. They seek to convey a sliding scale -
from the ‘do minimum’ to the ‘do maximum’. Option
• Reinforcing of a number of major nodes across 1 - the minimum option - represents a way forward
the area and attention to more local gateways as with no planning-led intervention, whilst Option 4
shown; seeks more significant redevelopment to re-integrate
parts of the town centre with the existing fabric. With
• Areas requiring significant public realm greater levels of change comes a greater ability to
enhancement, especially aligned with key routes create a shift in overall character and introduce new
into the town centre (e.g. Amhurst Road, uses into the area.
Mare Street);
Clearly at the lower end of the scale, policy
• Reinforcing of connections into the open green objectives relating to such issues as open space and
spaces to the northeast of the area around St play facilities, for example, will fail to be met. There
John-at-Hackney church and improvements to will also be fewer planning obligations generated
the grounds themselves; to invest in community infrastructure. However,
the upper end of the scale raises major delivery
• Addressing the key intersection at Mare Street, questions - both from a policy perspectives (e.g. the
Amhurst Road and the Narrow Way including the quantum of retail floor space and the impact of this)
intersecting rail infrastructure; and, and in terms of funding and logistics. Comprehensive
change will require significant land assembly and
• Addressing comprehensively the Tesco and bus establishing co-ordinated solutions such as an
garage locations. integrated town centre - wide energy solution will be
far from easy.
19
The SA assisted in the assessment of Options and railway and fronting onto Morning Lane in
led to the propositions for the site scenarios set out accord with current Tesco proposals tabled
in Part III. at ‘pre-application’ discussions. Development
includes new 80,000 sq.ft (7,400sq.m) store
A combination of Options 2 and 3b was selected, with 100 residential flat units above. Localised
subject to further refinement, modifications and improvements to the streetscape and highways
more detailed proposals. This combination puts along Morning Lane.
forward the most significant positive change for the
town centre whilst maintaining and strengthening • Redevelopment of a number of mixed use
the existing character and providing a new and sites along the southern and northern edges
improved public realm network. of Morning Lane towards the junction with
Mare Street.
2.8.1 Option 1 Overview
Option 1 sets out a development scenario that • Sites granted planning permission or under
could emerge where there to be no significant construction that include Sutton Place,
planning-led intervention. Design development is Richmond Road and 239-257 Graham Road.
predominantly based on a ‘sites-led’ approach
where sites likely to come forward through the Option 1 was discarded because it does not
market are the key drivers. facilitate significant positive change for the town
centre. By not proposing any significant new
This option does not therefore capture the potential public open space or enhancements to major
of Hackney Central as would a comprehensive road arteries. As such, it does not redress the
approach. It does, never the less, allow for known inadequacies of the public realm quality
sites to be brought forward and, where possible, identified in the Scoping Report.
seeks to recycle value for wider public realm
improvements (e.g. along Morning Lane). Furthermore, the residential development capacity
is low, significantly less than that identified if London
The key development proposals include: Plan density recommendations were applied
• Development of the ‘Tesco’ site south of the (see Masterplan Scoping Report).
20
Figure 2.7 Option 1 Vision
21
2.8.2 Option 2 Overview • Refurbished Town Hall to include environmental
Option 2 examines the development scenario technologies as exemplar for retro-fitting existing
that could result from a ‘moderate’ amount of buildings.
intervention. The proposal therefore identifies a
greater number of ‘peripheral’ sites that could • The Rectory site, adjacent Learning Trust
come forward (e.g. the site west of the railway buildings and yard are comprehensively
off Richmond Road) as well as considering a addressed.
reconfigured Tesco development south of the
railway along Morning Lane. A key proposal is • 3-13 Lower Clapton Road and 2-20 Morning
also the proposition to relocate the bus garage Lane are comprehensively developed with mixed
to a basement facility, allowing a new residential retail and residential development.
development at grade with high quality public realm.
• Sites on Wilton Road/Sylvester Street are
The key development proposals include: comprehensively developed around existing
• Development of the ‘Tesco’ site south of the buildings to be retained.
railway and fronting onto Morning Lane.
Development includes a new 9,300sq.m store • Sites on Reading Lane developed for mixed
over 2 levels, delivery/storage of 2,600sq.m. with residential/commercial uses.
180 residential flat units above.
Option 2 was considered in part because there would
• Redevelopment of the bus garage site to a better provision of public realm improvements
basement facility to allow for new at-grade throughout the town centre and the new public link
residential-led development with an element of proposed off Morning Lane connecting through to the
office use. arches would facilitate greater pedestrian permeability.
• Additional smaller scale retail units (with residential In addition, the residential development capacity in
units above) addressing the new link between Option 2 is a significant increase on Option 1. The
Morning Lane and Mare Street/the railway. retail floor space delivers over the amount of provision
These screen the unsightly backs of the existing in the Hackney Retail and Leisure Capacity Study
buildings along Mare Street. (9,200sqm net additional in the Borough).
22
Figure 2.8 Option 2 Vision
23
2.8.3 Option 3a Overview • A new public space is created in front of the
Option 3a envisages significant change around Trelawney Estate with enhanced pedestrian
the area of major potential - focusing on the connections and links south to Paragon Road.
Tesco and Bus Garage sites with an improved
Hackney Central station entrance. Under this • The public space adjacent to the Old TownHall is
scenario, there will be major public open space remodelled.
improvements along the southern edge of
St John-at-Hackney gardens and much • The Rectory site, adjacent Learning Trust
greater east-west permeability. buildings and yard are comprehensively
addressed.
This option builds upon the development sites likely
to come forward under Option 2 which are also • 3-13 Lower Clapton Road and 2-20 Morning
envisaged to occur under this option. The south- Lane are comprehensively developed.
eastern end of Amhurst Road is redeveloped to
provide higher quality and higher density residential • Sites on Wilton Road/Sylvester Street are
development, greatly improving the streetscene of comprehensively developed around existing
this street. buildings.
Public realm enhancements are more significant • Sites on Reading Lane developed.
but focused primarily on improvements to the areas
surrounding the core area and associated junctions Option 3a was dismissed because of the
to assist pedestrian movement. complexities of the land swap between Tesco and
the bus garage, but also because of the scale of
The key development proposals include: the development. It was not felt to be appropriate to
introduce a large format retail development adjacent
• Tesco’s is relocated to the north side of the railway to the sensitive setting of the church gardens.
above a newly constructed bus garage located
beneath the store. This option however delivers a major residential-led
mixed-use offer along Morning Lane.
• The existing Tesco site is redeveloped.
24
Figure 2.9 Option 3a Vision
25
2.8.4 Option 3b Overview with a new 8,400sq.m store.
Option 3b focuses on a variation to the major
opportunity area east of Mare Street and focusing • The bus garage moves south of the railway.
on the Tesco and Bus Garage sites. Under this
scenario development is re-organised to resolve • A new high quality public route is provided to
access constraints currently impacting on the bus connect Trelawney Estate to the bottom of
garage (bottle neck with single access in/out). narrow Way.
The bus garage is located south of the railway
under a ‘land swap’ arrangement with Tesco. The • A new public space is created in front of the
Garage benefits from better access off Morning Trelawney Estate with active ground floor uses.
Lane, better internal circulation and a new exemplar
town centre facility. • The public space adjacent to the Old Town Hall is
enhanced.
The benefits to Tesco include a much more visible
frontage onto the primary shopping route (Mare • Key ‘peripheral’ sites are developed.
Street / the Narrow Way) and frontage onto what will
become a new high quality public open space at the • The Rectory site, adjacent Learning Trust
Old Town Hall. buildings and yard are addressed.
This option also builds upon the development sites Elements of Option 3b were dismissed (as with
likely to come forward under Option 2 which are also Option 3a) because of the complexities of the land
envisaged to occur under this option. swap between Tesco and the bus garage. Similarly
it was not felt to be appropriate to introduce a large
Public realm enhancements are more significant format retail development adjacent to the sensitive
but focused primarily on improvements to the areas setting of the church gardens.
surrounding the core area and associated junctions
to assist pedestrian movement. Option 3b was, however, partly selected for
the treatment to the backs of Mare Street and
The key development proposals include: the design of the new pedestrian routes through
• Tesco relocated to the north side of the railway the arches.
26
Figure 2.10 Option 3b Vision
27
2.8.5 Option 4 Overview the Old Town Hall open space.
Option 4 seeks to radically transform the character
of retail and public realm offer. At present the centre • New public piazza at junctions of Narrow Way/
has a well established civic quarter but no clearly Mare Street/Amhurst Road.
defined retail heart. This lack of retail centrality
results in a dispersed rather than consolidated • New Hackney Central station.
retail-focus. A new large retail development
co-located with a new high quality urban piazza • The Rectory site, adjacent Learning Trust
at the junction of Narrow Way, Mare Street and buildings and yard are addressed.
Amhurst Road is proposed. Existing retailers (e.g.
M&S) would be re-provided in the new retail centre • 3-13 Lower Clapton Road and 2-20 Morning
with the bus garage located in basement. Lane are comprehensively developed.
The key development proposals include: • Sites on Wilton Road/Sylvester Street are
comprehensively developed.
• Redevelopment of the bus garage site
• Sites on Reading Lane developed.
• Significant new retail accommodation (19,000sq.
m) that would provide for 2 new anchor stores. Option 4 was discarded primarily because of the
scale of the proposed new piazza described above.
• Development of the Tesco site south of the railway It was felt that the character of the area - that of
to allow for new north-south pedestrian route. tight-knitted development should be retained. It was
also not deemed appropriate to introduce a large
• New mixed use retail/residential addressing the quantum of new retail (new anchor stores) adjacent
new north-south link between Morning Lane and to the church gardens.
28
Figure 2.11 Option 4 Vision