1. When raw material is consumed to produce material as per Production order, to perform goods issue
movement type is?
A - 251
B - 101
C - 261
D - 103
2. Goods issue can be cancelled till order status is confirmed CNF in system?
A - True
B - False
4. Which of the following is correct about regenerative planning and net change planning?
A- Planning is performed online however in NETCH it is performed as background job.
B- Planning of material is as per demand, in other one it is based on previous productions.
C - Planning all material from planning file, you can plan for material for which planning file exists.
D - All of these
5. Which of the following report is used to collect information about hierarchy of work center of a shift?
A - Shift Transfer Report
B - Shift Report
C - Shift Work center Report
D - None of these
10. Which of the following Transaction can be used confirm a Production Order and for Goods movement?
A - CO01
B - CO02
C - CO15
D - MD16
11. To create routing it is mandate that you first define work center?
A - True
B - False
13. Which of the following Planning strategy is used to produce stock without Sales Order?
A - Make to Order
B - Make to Stock
C - Both of These
D - None of these
14. When you use Planning strategy 10, which of the following is correct?
A - Only PIR quantity is considered for MRP run & PIR requirement type is VSF.
B - Sales order are completely ignored.
C - For MRP run maximum of 2 PIR and Sales order can be considered
D - None of the above
15. SAP Production Planning is integrated with which of the following modules?
A - Material Management
B - Sales and Distribution
C - Controlling
D - SAP QM
E - All of the above
Pre-Assessment Test
16. For Make to Order process, which of the following Planning strategy is used?
A - 20
B - 25
C - 30
D - 35
17. Which of the following module in PP is used to fill demand and supply gap?
A - BOM
B - MRP
C - Work Center
D - Routing
18. Which of the following doesn’t represent an issue Material Requirement Planning element?
A - Sales Order
B - PIR
C - Transfer Order
D - Production Order
19. Which of the following movement type is used to transfer Posting to storage location?
A - 301
B - 302
C - 305
D - 311
20. After MRP run, which of the following gets created in Planning?
A - Production Order & Planned Order
B - Purchase Order
C - Scheduling Lines
D - None of the above
21. In which of the Production type, produced materials changed with each lot and costs are calculated as
per orders and lots?
A - Repetitive production
B - Discrete Production
C - Manufacturing Production
D - Material Requirement Planning
22. In SAP PP, which of the following object is at the top in an Organization structure?
A - Plant
B - Company Code
C - Sales Organization
D - Storage Location
Pre-Assessment Test
23. In SAP Production Planning, how many BOM’s can be created as per material type?
A - 100
B - 99
C - 50
D – Unlimited
24. When you create a Material BOM without a Plant, it is known as?
A - Reference BOM
B - Master BOM
C - Group BOM
D - Master group
25. In PP, which of the following is not a valid category for BOM?
A - Material BOM
B - Equipment BOM
C - Cost BOM
D - Inspection BOM
27. You can use Work center to monitor which of the following activities?
A - Scheduling
B - Production Costing
C - Capacity Planning
D - All of the above