Pre-Assessment Test

Time Limit: 30 Mins

1. When raw material is consumed to produce material as per Production order, to perform goods issue
movement type is?
A - 251
B - 101
C - 261
D - 103

2. Goods issue can be cancelled till order status is confirmed CNF in system?
A - True
B - False

3. To perform Goods issue reversal, what is the movement type?


A - 261
B - 262
C - 263
D - 264

4. Which of the following is correct about regenerative planning and net change planning?
A- Planning is performed online however in NETCH it is performed as background job.
B- Planning of material is as per demand, in other one it is based on previous productions.
C - Planning all material from planning file, you can plan for material for which planning file exists.
D - All of these

5. Which of the following report is used to collect information about hierarchy of work center of a shift?
A - Shift Transfer Report
B - Shift Report
C - Shift Work center Report
D - None of these

6. Material Requirement Planning can be performed at?


A - Single Item –single Level & Plant
B - Routing Level
C - None of the above
D - All of these

7. You can create a Production order from?


A - Directly from Stock Requirement List
B - Using Planned Order
C - Both of these
Pre-Assessment Test
8. Long term planning is almost similar to Material requirement planning in simulate version to predict
the production plan as per future requirements?
A - True
B - False

9. What is the usage type for BOM to be used in Production?


A-1
B-2
C-3
D-4

10. Which of the following Transaction can be used confirm a Production Order and for Goods movement?

A - CO01
B - CO02
C - CO15
D - MD16

11. To create routing it is mandate that you first define work center?
A - True
B - False

12. Which of the following statement is incorrect about Routing?


A - Only one material can follow single routing group at a time.
B - For Routing, it is mandate that you first define work center.
C - Routing is used for scheduling and costing of operation for raw and finished products.
D - You can calculation operation cost for finished product.

13. Which of the following Planning strategy is used to produce stock without Sales Order?
A - Make to Order
B - Make to Stock
C - Both of These
D - None of these

14. When you use Planning strategy 10, which of the following is correct?
A - Only PIR quantity is considered for MRP run & PIR requirement type is VSF.
B - Sales order are completely ignored.
C - For MRP run maximum of 2 PIR and Sales order can be considered
D - None of the above

15. SAP Production Planning is integrated with which of the following modules?
A - Material Management
B - Sales and Distribution
C - Controlling
D - SAP QM
E - All of the above
Pre-Assessment Test

16. For Make to Order process, which of the following Planning strategy is used?
A - 20
B - 25
C - 30
D - 35

17. Which of the following module in PP is used to fill demand and supply gap?
A - BOM
B - MRP
C - Work Center
D - Routing

18. Which of the following doesn’t represent an issue Material Requirement Planning element?
A - Sales Order
B - PIR
C - Transfer Order
D - Production Order

19. Which of the following movement type is used to transfer Posting to storage location?
A - 301
B - 302
C - 305
D - 311

20. After MRP run, which of the following gets created in Planning?
A - Production Order & Planned Order
B - Purchase Order
C - Scheduling Lines
D - None of the above

21. In which of the Production type, produced materials changed with each lot and costs are calculated as
per orders and lots?
A - Repetitive production
B - Discrete Production
C - Manufacturing Production
D - Material Requirement Planning

22. In SAP PP, which of the following object is at the top in an Organization structure?
A - Plant
B - Company Code
C - Sales Organization
D - Storage Location
Pre-Assessment Test

23. In SAP Production Planning, how many BOM’s can be created as per material type?
A - 100
B - 99
C - 50
D – Unlimited

24. When you create a Material BOM without a Plant, it is known as?
A - Reference BOM
B - Master BOM
C - Group BOM
D - Master group

25. In PP, which of the following is not a valid category for BOM?
A - Material BOM
B - Equipment BOM
C - Cost BOM
D - Inspection BOM

26. A BOM can be used for which of the following?


A - Costing
B - Material Requirement Planning
C - Sales and Distribution
D-A&B
E - All of the above

27. You can use Work center to monitor which of the following activities?
A - Scheduling
B - Production Costing
C - Capacity Planning
D - All of the above