The following are some SAP PP Questionnaires which you can try:
1. During material master creation if you select "ND" in MRP type field.
a. None of the MRP dependent fields need be filled.
b. Schedule Margin Key is Must.
c. Strategy group filed is must
10. If two similar materials are to be produced in the same production line
a. a single routing can do the purpose
b. Two separate routings are must
11. Sales order is just for display Purpose & it will not disturb PIR's in MRP Run
a. Strategy group 10
b. Strategy group 20
c. Strategy group 40
16. If a material has MRP type manual reorder point &used as a component of a product BOM.
a. In MRP run dependent requirement for this materials will be considered for planning.
b. In MRP run dependent requirement for this materials will not be considered for planning.
23. To create the production order from the planned order Tcode is
a. CO40
b. CO 01
c. CO 02
10. If two similar materials are to be produced in the same production line
a. a single routing can do the purpose
11. Sales order is just for display Purpose & it will not disturb PIR's in MRP Run
a. Strategy group 10
c. Strategy group 40
16. If a material has MRP type manual reorder point &used as a component of a product BOM.
a. In MRP run dependent requirement for this materials will be considered for planning.
23. To create the production order from the planned order Tcode is
a. CO40