2.1 Water Supply

2.1.1 Countable Items

Count qty of items by tag


Record the qty in hard
no wise/capacity wise/Size Compare the takeoff
copy and xls sheet as
wise from the drawing and qty with BOQ qty.
floor/zone wise.
schedule.

If any deviation in
Find out difference in
items qty,RFI to be
items qty.
raised.

Basic unit of measurement – nos,set

3
SAGUBAR SATHIKALI

2.1 Water Supply

2.1.2 Measurable Items

Note down the


Record the qty in
Scale of drawing Measure qty of items Compare the
hard copy and xls
and use size wise from the takeoff qty with
sheet as
particular drawing. BOQ qty.
floor/zone wise.
scale/conversion.

If any deviation
Find out
in items qty,RFI
difference in qty.
to be raised.

Basic unit of measurement – meters

4
SAGUBAR SATHIKALI

2.1 Water Supply

2.1.3 Assumable Items

Connect these items


Calculate the qty
List of out the to primary
from primary items
assumable items. measure/Count
qty respectively.
items qty.

Compare the Record the qty in


Finalize the takeoff qty hard copy and xls
qty with BOQ qty sheet as floor/zone
(if avail) wise.

Basic unit of measurement – nos, meters,rolls,liters

5
SAGUBAR SATHIKALI

2.1 Water Supply

2.1.3.1 Assumable Items-Pipe Insulation

Note down the thickness of


Arrive and Segregate the pipes
List out dia wise pipes insulation as per
insulation qty based on
take off qty. specification ,drawing
locations and specification
,BOQ.

Compare the takeoff qty


with BOQ qty and finalize
the qty.

Application(in general)
Exposed location
All Hot Water Pipes

6
SAGUBAR SATHIKALI

2.1.3.1 Assumable Items-Pipe Insulation

Example
Pipe dia in
S.No Items Pipe qty in mtr Pipe Insulation qty in mtr
mm
25 mm thick
1 Hot Water Pipes 25 25 25
All Roof/Exposed
2 Cold Water Pipes 25 53 53

7
SAGUBAR SATHIKALI

2.1 WATER SIDE

2.1.3.2 Assumable Items-Pipe Cladding

Indentify the
Arrive the qty of Record the qty in hard
requirement of cladding
cladding(sq.m) over pipe copy and xls sheet as
on pipe insulation as per
insulation. floor/zone wise.
speciation.

Compare the takeoff qty


with BOQ qty if
available and finalize
the qty.

Application In general
Cladding in Exposed area
Pipe insulation thick 25 mm

8
SAGUBAR SATHIKALI

2.1.3.2 Assumable Items-Pipe Cladding


Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe ins qty in Perimeter m Surface Area
dia in mm in mm side in mm ins in mm mtr (3.14 x D) Cladding(Sq.m)

a a' b c=a*b d e=c*3.14 f=d*e

15 20 50 70 50 0.22
11.0
20 25 50 75 50 0.24
11.8
25 32 50 82 50 0.26
12.9

Note 25mm thick insulation

Perimeter calculation
Perimeter = 3.14 * D

Where D- Diameter of pipe with insulation

Assume 25mm insulation thickness

9
SAGUBAR SATHIKALI

2.1 Water Supply

2.1.3.3 Assumable Items-Pipe Supports

List out pipes qty size


Find the supports Arrive the supports
wise “with /without
distance by specification qty size wise from
insulation "from the
and drawing. the support distance.
take off qty.

Compare the takeoff


Finalize the
qty with BOQ qty (if
qty
available.)

10
SAGUBAR SATHIKALI

2.1.3.3 Assumable Items-Pipe Supports


Pipe Supports

Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Support Clamps in
dia in mm in mm side in mm ins in mm mtr spacing m Nos

a a' b c=a*b d e f=d/e

15 20 50 70 50 25.0
2
20 25 50 75 60 30.0
2
25 32 32 70 35.0
2
32 40 40 50 2 25.0

Note 25mm thick insulation

11
SAGUBAR SATHIKALI

2.1 Water Supply


2.1.3.4 Assumable Items-Insulation vapor barrier

List out pipes qty size


Arrive the qty of
wise “with Find out pipes surface
vapor barrier from
insulation” from the area
the surface area.
take off qty.

Finalize the Record in xls or hard


qty copy .

12
SAGUBAR SATHIKALI

2.1.3.4 Assumable Items-Insulation vapor barrier

Vapour
Perimeter in
Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Surface Area Barrier-
m
dia in mm in mm side in mm ins in mm mtr (Sq.m) ltr(2sq/ltr/c
(3.14 x D)
oat)

a a' b c=a*b d e=c*3.14 f=d*e g=f/2*2coat

15 20 50 70 200 0.22 44.0 44.0


20 25 50 75 200 0.24 47.1 47.1
25 32 50 82 200 0.26 51.5 51.5
note pip insulation thick 25 mm

13
SAGUBAR SATHIKALI

2.1 Water Supply


2.1.3.5 Assumable Items-Insulation Adhesive Glue

List out pipes qty size


Arrive the qty of Glue
wise “with Find out pipes surface
from the surface
insulation” from the area
area.
take off qty.

Finalize the Record in xls or hard


qty copy .

14
SAGUBAR SATHIKALI

2.1.3.5 Assumable Items-Insulation Adhesive Glue

Perimeter in Glue-
Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Surface Area
m ltr(5sqm/ltr
dia in mm in mm side in mm ins in mm mtr (Sq.m)
(3.14 x D) )

a a' b c=a*b d e=c*3.14 f=d*e h=f/5

15 20 50 70
200 0.22 44.0 8.8
25 50 75
20 200 0.24 47.1 9.4
25 32 50 82 200 0.26 51.5 10.3
note pip insulation thick 25 mm

15
SAGUBAR SATHIKALI

2.1 Water Supply


2.1.3.6 Assumable Items-Self adhesive tape

List out pipes qty size Arrive the qty of self


wise “with Find out pipes surface adhesive tape from
insulation” from the area the surface area &
take off qty. length of pipe.

Finalize the Record in xls or hard


qty copy .

16
SAGUBAR SATHIKALI

2.1.3.6 Assumable Items-Self adhesive tape

Perimeter in Al foil 3" in


Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Surface Area
m roll(50
dia in mm in mm side in mm ins in mm mtr (Sq.m)
(3.14 x D) mtr/roll)

a a' b c=a*b d e=c*3.14 f=d*e j=(d/1.2*e+d)


/50
15 20 50 70 200 0.22 44.0 5
20 25 50 75 200 0.24 47.1 5
25 32 50 82 200 0.26 51.5 5
note pip insulation thick 25 mm

17
SAGUBAR SATHIKALI

2.1 Water Supply


2.1.3.7 Assumable Items-Insulation Canvas cloth

List out pipes qty size


Arrive the qty of
wise “with Find out pipes surface
Canvas cloth from
insulation” from the area
the surface area.
take off qty.

Finalize the Record in xls or hard


qty copy .

18
SAGUBAR SATHIKALI

2.1.3.7 Assumable Items-Insulation Canvas cloth

Perimeter in
Pipe nominal Pipe outer dia Ins thick both Pipe dia with Pipe qty in Surface Area Oven cloth 30 yard
m
dia in mm in mm side in mm ins in mm mtr (Sq.m) roll(70 sq.m/roll)
(3.14 x D)

a a' b c=a*b d e=c*3.14 f=d*e i=f/70

15 20 50 70 200 0.22 44.0 1


20 25 50 75 200 0.24 47.1 1
25 32 50 82 200 0.26 51.5 1
note pip insulation thick 25 mm

19
SAGUBAR SATHIKALI

2.1 Water Supply


2.1.3.8 Assumable Items-Final Connections

List out final


connection with Find out final
respect to main connections Arrive the total qty
equipments from the qty/equipment
take off qty.

Finalize the Record in xls or hard


qty copy .

20
SAGUBAR SATHIKALI

2.1.3.8 Assumable Items-Final Connections

Final connection Total F.C qty


S.No size Primary item Qty F.C/Item
Item in nos
Water closet 10 1 10
Wash Basin 10 2 20
Bidet 10 2 20
Bath tub 10 2 20
1 Angle valve 1/2'' x 1/2 '' Shower tray 10 2 20
Kitchen sink 10 2 20
Janitor sink 10 2 20
Abultion hose 10 1 10
Water Heater 10 2 20
Wash Basin 10 1 10
2 Bottle trap 1.1/4'' x 1.1/4''
Bidet 10 1 10
Kitchen sink 10 1 10
3 Bottle trap 1.1/2'' x 1.1/2''
Janitor sink 10 1 10
Water closet 10 1 10
Wash Basin 10 2 20
4 Flexible Hose 1/2'' x 30 cm Bidet 10 2 20
Kitchen sink 10 2 20
Janitor sink 10 2 20
5 Flexible Hose 1/2'' x 60 cm Water Heater 10 2 20
6 Abultion hose 1/2 " X 1.5M Water closet 10 1 10
7 WC Connector 110 mm Water closet 10 1 10

21
SAGUBAR SATHIKALI

2.1 Water Supply


2.1.3.8 Assumable Items-Vibration pad/Inertia base

List out main


Find vibration pad and
equipments qty from Arrive the total qty
inertia base /unit
the take off qty.

Finalize the Record in xls or hard


qty copy .

22
SAGUBAR SATHIKALI

2.1.3.8 Assumable Items-Vibration pad/Inertia base

Toltal
Vibration Pad Inertia base Total Inertia
Pump qty in Vibration Pad
Item qty/Unit in qty/Unit in base qty/Unit
No qty/Unit in
no no in no
no

b c=a*b d e=a*d

4 20
Pump 5 1 5

per pump 4 no vibration pad


note assumed
per pump 1 no inertia base
assumed

23
SAGUBAR SATHIKALI

2.2 Drainage

2.2.1 Countable Items

Count qty of items by tag


Record the qty in hard
no wise/capacity wise/Size Compare the takeoff
copy and xls sheet as
wise from the drawing and qty with BOQ qty.
floor/zone wise.
schedule.

If any deviation in
Find out difference in
items qty,RFI to be
qty.
raised.

Basic unit of measurement – nos, set


24
SAGUBAR SATHIKALI

2.2 Drainage

2.2.2 Measurable Items

Note down the


Record the qty in
Scale of drawing Measure qty of items Compare the
hard copy and xls
and use size wise from the takeoff qty with
sheet as
particular drawing. BOQ qty.
floor/zone wise.
scale/conversion.

If any deviation Find out


in items qty,RFI difference in
to be raised. items qty.

Basic unit of measurement – meters

25
SAGUBAR SATHIKALI

2.2 Drainage

2.2.3 Assumable Items

Connect these items to Calculate the qty from


List of out the
primary measure/Count primary items qty
assumable items.
items qty. respectively.

Compare the
Record the qty in hard
Finalize the takeoff qty
copy and xls sheet as
qty with BOQ
floor/zone wise.
qty(if avail)

Basic unit of measurement – nos,sq.m,meters

26
SAGUBAR SATHIKALI

2.2 Drainage

2.2.3 .1 Assumable Items-Pipe Acoustic Insulation

Note down the insulation


List out size wise Find out surface area of
required pipe qty as per
pipe qty from take off pipe prom pipe perimeter.
specification ,drawing
qty.
,schedule.

Compare the
Record the qty in hard
Finalize the takeoff qty
copy and xls sheet as
qty with BOQ
floor/zone wise.
qty(if avail)

27
SAGUBAR SATHIKALI

2.2.3 .1 Assumable Items-Drainage Pipe Acoustic Insulation

Pipe outer dia in Pipe outer dia in Perimeter m (3.14 x


Pipe qty in mtr Acoustic ins areaSq.m)
mm m D)
a a' b c=a'*3.14 d=c*b
82 0.082 100 0.26 25.7
110 0.11 150 0.35 51.8
160 0.16 100 0.50 50.2

note assume normally acoustic insulation on basement& ground

28
SAGUBAR SATHIKALI

2.3 Drainage

2.2.3.2 Assumable Items-Pipe Supports

List out pipes qty size Find the supports Arrive the supports
wise from the take distance by specification qty size wise from
off qty. and drawing. the support distance.

Compare the takeoff


Finalize the
qty with BOQ qty (if
qty
available.)

29
SAGUBAR SATHIKALI

2.2.3.2 Assumable Items-Pipe Supports

Pipe nominal dia in


Pipe qty in mtr Support spacing m Clamps in Nos
mm

a b c d=b/c
82 50 2 25.0
110 60 2 30.0
160 70 2 35.0

180 50 2 25.0

30
SAGUBAR SATHIKALI

2.3 Fire Fighting

2.3.1 Countable Items

Count qty of items by tag


Record the qty in hard
no wise/capacity wise/size Compare the takeoff
copy and xls sheet as
wise from the drawing and qty with BOQ qty.
floor/zone wise.
schedule.

If any deviation in
Find out difference in
items qty,RFI to be
items qty.
raised.

Basic unit of measurement – nos, set


31
SAGUBAR SATHIKALI

2.3 Fire Fighting

2.3.2 Measurable Items

Note down the


Record the qty in
Scale of drawing Measure qty of items Compare the
hard copy and xls
and use size wise from the takeoff qty with
sheet as
particular drawing. BOQ qty.
floor/zone wise.
scale/conversion.

If any deviation
Find out
in items qty,RFI
difference in qty.
to be raised.

Basic unit of measurement -meters

32
SAGUBAR SATHIKALI

2.3 Fire Fighting

2.3.3 Assumable Items

Connect these items


Calculate the qty
List of out the to primary
from primary items
assumable items. measure/Count
qty respectively.
items qty.

Compare the Record the qty in


Finalize the takeoff qty hard copy and xls
qty with BOQ qty sheet as floor/zone
(if avail) wise.

Basic unit of measurement – nos,liters,meters

33
SAGUBAR SATHIKALI

2.3 Fire Fighting

2.3.1 Assumable Items-Pipe Supports

List out pipes qty size Find the supports Arrive the supports
wise from the take distance by specification qty size wise from
off qty. and drawing. the support distance.

Compare the takeoff


Finalize the
qty with BOQ qty (if
qty
available.)

34
SAGUBAR SATHIKALI

2.3.3.1 Assumable Items-Pipe Supports

Support Support Length of C C Channel


Pipe nominal Pipe outer Pipe floor qty Pipe riser qty in U bolt in MS Plate qty
spacing in (hangers) channel in 100x50x6mm
dia in mm dia in mm in mtr mtr nos in nos
mtr qty in nos mtr in nos

a a' b b c d=b/c e=b/c f=a'+0.1+0.2 g=b/c*f h=b/c*2

20 26.7 50 15 2 25 7.5 0.33 2.450 15


25 33.4 60 20 2 30 10 0.33 3.334 20
32 42.2 80 30 2 40 15 0.34 5.133 30

assume 150x150x5mm plate


both side after u bolt 50mm
both side vertical dist 100mm

35
SAGUBAR SATHIKALI

2.3 Fire Fighting

2.3.3.2 Assumable Items-Clean Agent/Foam System

List out the required


Find and measure the Arrive and not down
location/rooms as
height, wide and height the qty based on
per specification and
of location. total no of floors.
drawing/schedule.

Compare the takeoff


Finalize the
qty with BOQ qty (if
qty
available.)

36
SAGUBAR SATHIKALI

2.3.3.2 Assumable Items-Clean Agent/Foam System

No of Cleant
Foam Req
Location/Rooms Length in m Wide in m Height in m No Of Rooms agent Req in
in nos
nos
a b c d e f=e g=e
LV Room 5 5 3.5 2 2
HV Room 5 5 3.5 1 1
Qtel Room 5 5 3.5 1 1
Fuel Tank Room 5 5 3.5 2 2

note assuem fulel tank -foam


assuem LV -clean agent
assuem HV -clean agent
assuem Qtel -clean agent

37
SAGUBAR SATHIKALI

2.3 Fire Fighting

2.3.3.3 Assumable Items-Pipe Painting

Indentify the
Record the qty in hard
requirement of Arrive the qty of paint(ltrs)
copy and xls sheet as
painting on pipe as per over pipe
floor/zone wise.
speciation.

Finalize the qty

38
SAGUBAR SATHIKALI

2.3.3.3 Assumable Items-Pipe Painting

Synthetic
Wash
Zinc chromate enamal glass ii
Pipe nominal Pipe outer dia Pipe qty in Perimeter m Surface Area primer(A+B)(1 Thinner(11s
primer(14sq.m 2 coat
dia in mm in mm mtr (3.14 x D) pipe(Sq.m) 1sq.m/ltr) q.m/ltr)
/ltr) in ltrs (14sq.m/ltr) in
in ltrs in ltrs
ltrs

a a' b c=a*3.14 d=c*b e=c/11 f=c/11 g=c/14 h=c/14*2


20 27 800 0.084 67 6 6 5 10
25 33 500 0.105 52 5 5 4 7
32 42 250 0.133 33 3 3 2 5
14 14 11 22
note assume 14 &11 sq.m per ltr
assume 2 coat of enamel

39

You might also like