REQUEST FOR INFORMATION

RFI No.: URS/DGC/SBTPL/PH - 02 / 03

CONTRACTOR : M/s. Shiva Build Tech TRANSMITTAL ATTN/FIRM DATE


Private Limited RECORD Mr. S. N. SENT REC'D DATE
Balaji,
INFORMATION REQUESTED BY : Rajashekhar M/s. DLF August
Reddy B PMC TO CLIENT Gayatri 28th,
Developers 2015
SUBJECT : Clarification of entry for Amenities areas ARCH  CM  TO
in DLF Garden city CONSULTANT(S)

DRAWING REF. CONSULTANT(S)


TO A/E
SPEC REF. A/E
TO CM
CONTRACT / LOI No: DGD/SBPL/LOI/GARDEN CLIENT
CITY NANDIGAMA/2015, Dated 15-06-2015 TO PMC

INFORMATION NEEDED

Request for :
Clarification of entry for Amenities
Problem Encountered at:
1. Entry is not provided for Amenities A6, A7, A8.
2.Need clarification for the provision of entry for all the amenities in the DLF Garden city, Nandigama.

DATE: SIGNATURE

REPLY

DATE: SIGNATURE

Note:
You are authorized to proceed with the work identified in the reply to this RFI on the assumption that no change in the contract amount,
completion date is required. If the RFI reply involves a change in the work affecting your contract amount or completion date, notify the CM
immediately.

452741392.xlsx Page 1
REQUEST FOR INFORMATION
RFI No.: URS/DGC/CLUB/MEP/04

CONTRACTOR : TRANSMITTAL ATTN/FIRM DATE


RECORD SENT REC'D DATE
Mr. S. N. Balaji,
INFORMATION REQUESTED BY : Mr. Sep 9th,
PMC TO CLIENT M/s. DLF Gayatri
Sivaprasadpokuri Developers
2015

SUBJECT : Club house drawings ARCH  CM  TO


CONSULTANT(S)

DRAWING REF.
SPEC REF. A/E
TO CM
CONTRACT / LOI No: CLIENT
TO PMC

INFORMATION NEEDED

Request for :
Fllowing Club house drawings
. 1.All MEP Schematic drawings. (Electrical,Fire,water
system,Plumbing)
. 2.Equipment installation location drwings with cross section detials.
. 3.All MEP individual all floors services drawings soft copy
. 4.Electrical Main SLD and DB Schematics.
.
. Kindly provide above
mentioned details and drawing to review the CLUB HOUSE BOQs

DATE: SIGNATURE

REPLY

DATE: SIGNATURE

452741392.xlsx Page 2
Note:
You are authorized to proceed with the work identified in the reply to this RFI on the assumption that no change in the contract amount,
completion date is required. If the RFI reply involves a change in the work affecting your contract amount or completion date, notify the CM
immediately.

452741392.xlsx Page 3