SCHEDULE OF LEVELS FOR PILE FOUNDATIONS OF MCRT

GROUND LEVEL TOP OF PILE CAP BOTTOM OF PILE CAP PILE CUT OFF LEVEL EXPECTED INTERMEDIATE REQUIRED MINIMUM
PIER (CENTER) (M) (M) (M) (M) GEO MATERIAL LEVEL (M) SOCKET LENGTH FOUNDING LEVEL (M)

SECTION AT A-A

TRAFFIC
DIRECTION

DESIGN CONSULTANT PROOF CHECKER

A A

NOTE:
SAFETY CONSULTANT AUTHORITY ENGINEER
1) EXPECTED IGM LEVEL MENTIONED IN THE TABLE ABOVE
IS CALCULATED BASED ON NEAREST BOREHOLE AND
THIS DESIGN OR DRAWING IS THE PROPERTY OF FORCE STRUCTURAL ENGINEERS PVT LTD. IT IS SUBJECT TO THEIR RECALL,

IS SUBJECT TO VARY DURING EXECUTION.


2) IN CASE IGM LEVEL IS OBSERVED AT A LOWER LEVEL
THAN SHOWN IN TABLE ABOVE, PILE SHOULD BE CONTINUED
BELOW OBSERVED IGM LEVEL TO A DEPTH OF REQUIRED
SOCKET LENGTH.
3) IN CASE IGM LEVEL IS OBSERVED AT A HIGHER LEVEL
THAN SHOWN IN TABLE ABOVE, MINIMUM FOUNDING LEVEL
PLAN SHOWING DIMENSION DETAIL OF PILE CAP GIVEN IN ABOVE TABLE SHOULD BE ATTAINED.
AND MUST NOT BE LENT, COPIED OR REPRODUCED WITHOUT THEIR WRITTEN PERMISSION.

NOTES: REFERENCE DRAWINGS: LEGEND:- CONSTRUCTION JOINT TREATMENT:-

CLIENT: PROJECT MANAGEMENT CONSULTANT CONSULTANT FOR ELEVATED CORRIDOR JOB No. : 18B061 PROJECT DESIGN, DEVELOPMENT, OPERATION & MAINTENANCE OF
FORCE STRUCTURAL ENGINEERS SMART STREETS & ELEVATED SMART CORRIDOR IN TIRUPATI
TIRUPATI SMART CITY CORPORATION LTD. AECOM INDIA PVT. LTD. DESIGNED HC UNDER SMART CITIES MISSION
PVT. LTD.
DRAWN HPD TITLE : DIMENSION DETAIL OF PILE & PILE CAP
EPC CONTRACTOR : PROOF CHECKER : CONSULTANT FOR SMART STREETS CHECKED DP FOR STANDARD PIERS OF MCRT

R0 23.10.19 FOR APPROVAL HC HPD DP PJ AFCONS INFRASTRUCTURE LTD. INDIAN INSTITUTE OF TECHNOLOGY BOMBAY AAKAR ABHINAV CONSULTANTS PVT. LTD. APPROVED PJ DRG NO : 18B061-SDG-MCRT-FDN-DD-001
REV DATE DESCRIPTION DSND. DRN. CHKD. APPD. DATE 23.10.2019 SCALE: AS SHOWN SHEET: (1 OF 1) REV : R0 SIZE: A2