Configuration of The SAP MRP Procedure Parameter PDF
Configuration of The SAP MRP Procedure Parameter PDF
NO YES
YES NO
MRP with Master Schedule items (critical items) SMI - Replenishment policy BOM explosion No disposition
• Material has significant influence on production performance demand-driven Material planning conducted for customer
• OR production technology highly influences the production process
• OR high share on overall turnover (A-item) AND top level BOM item
SM Replenishment Consumption-based X0, X1 ND
policy (normal)
NO YES
Internal or external
customer
Plan-driven + periodic review NO Continuous review applicable YES Plan-driven and Continuous review applicable Use of VMI-module Continuous review applicable
• technical and organizational continuous review • technical and organizational • technical and organizational
• Delivery at any date possible, no fixed intervals? • Delivery at any date possible, no fixed intervals? • Delivery at any date possible, no fixed intervals?
• A or B items only, if high control costs • A or B items only, if high control costs YES NO • A or B items only, if high control costs
Planning with fixing horizon: Planning with fixing horizon: Planning with fixing horizon: VI RE
high planning nervousness over BOM high planning nervousness over BOM high planning nervousness over BOM
YES NO
P1 (M1 with MPS items): P2 (M2 with MPS items) Consider external No consideration periodic reorder point periodic stochastic Delivery rhythm de-
• Order proposals within the fixing horizon get fixed • Order proposals are fixed withing fixing horizon requirements of ext. requirem. policy (T,s,S), R2 policy (s, S), VV pends on day of order
(but no new proposals) • No automatic setting of new order proposals
• A shortage situation in fixing horizon is not NO YES
balanced automatically Set reorder point Set reorder point Periodic policy Periodic with
P3: (M3 with MPS items) automatically automatically width range of delivery rhythm
• not automatic fixing of order proposals good forecast quality good forecast quality coverage profile
• necessary proposals are shifted to the end of P4 (M4 with MPS items)
the fixing horizon YES NO YES NO
• Order proposals are not generated automaticaly
• A shortage situation is not balanced V1 V2 VB VM
Taken from 'Automatic Parameter Configuration for Inventory Management in SAP ERP/APO' by David Bucher and Joern Meissner, available at: http://www.meiss.com