MANUFACTURING PROCESS OF CEMENT

INDUSTRIAL VISIT REPORT

Submitted by
G.PRASANNA RAJ Register No: 15TA0243

Under the guidance of


Dr.S.Jayakumar M. Tech., Ph.D.,
Head of the department
In partial fulfillment of the requirements for the degree

of

BACHELOR OF TECHNOLOGY
in
PONDICHERRY UNIVERSITY

in the

DEPARTMENT OF CIVIL ENGINEERING

SRI MANAKULA VINAYAGAR ENGINEERING COLLEGE


MADAGADIPET, PUDUCHERRY – 605107

FEBRUARY 2019

1
SRI MANAKULA VINAYAGAR ENGINEERING COLLEGE
PONDICHERRY UNIVERSITY
DEPARTMENT OF CIVIL ENGINEERING
BONAFIED CERIFICATE

This is to certify that the industrial visit reportentitled “CHENNAI


METROPOLITAN WATER SUPPLY & SEWERAGE BOARD” is an
authentic record of our work done by G.PRASANNA RAJ [15TA0243] in partial
fulfilment of the requirement for the award of B.Tech, Degree in the
Department of Civil Engineering of Pondicherry University during the academic
year 2019.

Head of the Department Signature of Guide


Dr.S.Jayakumar Dr.S.Jayakumar
Professor and head Professor and head
Department of Civil Engineering Department of Civil Engineering

Submitted for the University Project Report Examination held on………………

INTERNAL EXAMINER EXTERNAL EXAMNIER

2
TABLE OF CONTENTS
CHAPTER NO TITLE PAGE NO

1. INTODUCTION1

1.1 General information 1


2. PURPOSE OF VISIT
3. WHAT WE LEARN
4. STAGES OF WORKING
4.1 Screening 2
4.2 Primary Treatment
4.3 Secondary Treament 1
4.4 Aeration Tank 1
4.5 Disinfection unit 1
4.6 Sludge Digestion 1
5. CONCLUSION 1

3
1. INTRODUCTION
Industrial visit to chennai metropolition water supply & sewerage board at koyambedu at
chennai on monday July 31,2017 .

Fig 1.1.Entrance of chennai metropolition water supply & sewerage board at koyambedu at
Chennai.

1.1 General information

 There are two sewage treatment plants at Koyambedu and they jointly have the
capacity to treat 94 million litres a day (mld) of sewage generated in localities such as
T.Nagar, Kodambakkam, Anna Nagar, Virugambakkam and Mogappair.
 The sewage treatment capacity of the city is set to be enhanced with Chennai
Metrowater preparing to float tenders for construction of another plant to treat 20 mld
at Koyambedu.
 The new plant will facilitate treating of more sewage - generated in the neighboring
suburbs. The ₹ 1,160-million project, which was sanctioned under Jawaharlal Nehru
National Urban Renewal Mission, will come up at a 25-acre site in the existing
facility at Koyambedu
 . It was planned to isolate the system of collection, transmission and disposal of
sewage in each zone in order to obviate the difficulties of the relay system. Presently
the sewerage network in Chennai city has covered 98% of its area Koyambedu
214mld (34+60+120)
1

4
CHAPTER 2
2. PURPOSE OF VISIT
Our main purpose for this visit was to give the practical knowledge about water treatment
plant process. By this visit I can be familiar with industrial environment and get knowledge
of different units of waste water treatment plant. Also in 6th semester subject like
Environmental Engineering requires knowledge about how components of sewage plant are
constructed, so it is very much convenient to see all the practical and components in real time
work environment

Fig 2.1.Layout of chennai metropolition water supply & sewerage board at koyambedu at
Chennai.

5
CHAPTER 3

3. WHAT WE LEARN
On 31th July, 2017 at 9:30 A.M. we reached at sewerage treatment plant at chennai. The
visit started from the initial tank where the waste water of Chennai collected. Mr. Prasanna,
the in charge officer of water treatment plant guided about the entire process of water
treatment plant.

6
CHAPTER 4

4. STAGES OF WORKING
4.1 Screening 1
First unit of water treatment plant is screening,this is first step in wastewater treatment
process. screening involves the removal of large objects for example cotton buds, plastics,
diapers, rags, sanitary items, face wipes, broken bottles or bottle tops that in one way or
another may damage the equipment

4.2 Primary Treatment


This process involves the separation of macrobiotic solid matter from the wastewater.
primary treatment is done by pouring the wastewater into big tanks for the solid matter to
settle at the surface of the tanks which is removed by large scrappers at the center of the
cylindrical tanks. the remaining water is then pumped for secondary treatment.

7
4.3 Secondary Treament
The next step of the treatment process is secondary clarifier. The water from the primary tank
is transported to the secondary clarifier for adding chemicals such as lime and alum to reduce
the PH of water. 1

4.4 Aeration Tank


The settled wastewater enters aeration tanks where air is blown into the liquid to provide
oxygen for mixing and to promote the growth of micro-organisms. Some of this sludge is
recycled to the inlet of the aeration tank to maintain the biomass, hence the name for the
process activated sludge. The remainder is pumped to anaerobic digester for further
treatment.

8
4.5 Disinfection unit
The next steps for wastewater treatment plants use disinfection for treatment to
reduce pathogens, which are micro-organisms which can pose a risk to human
health. 1

4.6 Sludge Digestion


Now again to remove the sludge particles the water is passed through the belt filter press. The
purified water is obtained by chemically treating the water coming out of the belt filter press.
In which Chlorine is usually dosed into the treated wastewater stream for disinfection.

9
Anaerobic digestion

10
5. CONCLUSION

From this visit, we get the information and practical knowledge about the treatment of waste
water and components used in treatment plant. and got the knowledge about detailed process
of sewage treatment.