Professional Documents
Culture Documents
Tutorial Sheet 2 575 - Railway Track Engineering
Tutorial Sheet 2 575 - Railway Track Engineering
Description Detail
1. Length of Channel Tunnel
2. When did England and France entered into the Treaty of Canterbury
3. Length of channel tunnel under water
4. Construction Begins in France
5. Construction Begins in England
6. Breakthrough Point
7. All three tunnels complete
8. Opens to the public
9. Final cost
10. Percent of cost overruns caused by poor planning at inception phase
11. Interest costs through 2013 have pushed the cost
12. People ride it every year, cars per hour
13. It only takes ______ hours to travel from Paris to London
14. No. Of Companies
15. No. Of banks financed
1|Page
MASTERS IN TRANSPORTATION ENGINEERING
CE-575 RAILWAY TRACK ENGINEERING-FALL 2019
Tutorial sheet 2 Pavement Materials and types Prof. Dr. Adnan Qadir: profadnanqadir@gmail.com
Name E-mail/ Cell
Student Roll Number
No._________________
2|Page