INVITATION TO TENDER
FOR
DREDGING AND SCOUR PROTECTION
WORK
Contract No. :
Document No. :
Project Title : MARINE AND GENERAL CIVIL WORKS FOR SHIP LIFT & TRANSFER
SYSTEM AT KARACHI
Location : SLTS Project, Karachi Shipyard & Engineering works, West Wharf,
Karachi Pakistan
Client : KARACHI SHIPYARD & ENGINEERING WORKS LTD.(KSEW)
0 22nd Jan. 2019 FOR BID Obaid A. IN, Sungyoon KIM, Jangmook
INVITATION TO BID
Dear Sirs,
POSCO Engineering & Construction Company Limited invites your company to bid
for Dredging & Scour Protection Works of MARINE AND GENERAL CIVIL WORKS
FOR SHIP LIFT & TRANSFER SYSTEM AT KARACHI PAKISTAN. You are
requested to submit a Proposal for the works mentioned above as well as the
followings.
- Bid Closing Date : 9th of April, 2019 AM 10:00 (Pakistan Local Time)
We expect your kind endeavors to competitive quotation and appreciate any queries
from you to the undersigned.
Marine and General Civil Works
for Ship Lift and Transfer System
DOC.NO:P120029-CM-50-G04-030
Project
REV. :1
INVITATION TO TENDER FOR P a g e : 4 | 12
DREDGING & SCOUR
PROTECTION WORK
TABLE OF CONTENTS
1. DEFINITION.......................................................................................2
2. GENERAL..........................................................................................2
3. SUBMISSION OF PROPOSAL..........................................................2
4. TERMS OF PAYMENT.......................................................................2
5. DEVIATION FROM INQUIRY DOCUMENTS.....................................2
6. EVALUATION OF PROPOSAL..........................................................2
7. DISCLAIMER.....................................................................................2
8. FAMILIARIZATION WITH WORKING CONDITIONS.........................2
9. QUERIES...........................................................................................2
10. PROPOSED PRICE...........................................................................2
11. CONTENTS OF PROPOSAL.............................................................2
12. COST OF THE BIDS..........................................................................2
13. CONFIDENTIAL DATA AND INFORMATION.....................................2
14. TAXES AND DUTIES.........................................................................2
15. PUBLICITY.........................................................................................2
16. BID VALIDITY....................................................................................2
17. SITE INSPECTION AND INFORMATION...........................................2
18. ESCALATION.....................................................................................2
19. AWARD OF SUBCONTRACT............................................................2
1. DEFINITION
1.1 “OWNER” means KARACHI SHIPYARD & ENGINERING WORKS(KSEW)
1.2 “PMC” means NATIONAL ENGINEERING SERVICES PAKISTAN(NESPAK)
1.3 “PEC/EMPLOYER” means POSCO E&C Limited
1.4 “VENDOR/SUBCONTRACTOR” means successful Bidder
2. GENERAL
The Bidder is requested to submit to PEC a proposal based on the ITB
Documents for the work.
The Bidder's proposal must comply with all ITB Documents in all respects.
The Bidder is requested to confirm that all applicable documents stated herein
are in his possession, and if any of them prove to be missing, to inform PEC
promptly in order to obtain the same.
No claim will be entertained on the ground that the Bidder failed to see or
understand any of the documents in whole or in part.
3. SUBMISSION OF PROPOSAL
3.1 Number of copies and addressee
One electric file of the Bidder's proposal duly signed by the Bidder's executive
shall be submitted to the sender of this ITB.
Attention :
Mr. Chilsung Kim
Marine and General Civil Works
for Ship Lift and Transfer System
DOC.NO:P120029-CM-50-G04-030
Project
REV. :1
INVITATION TO TENDER FOR P a g e : 6 | 12
DREDGING & SCOUR
PROTECTION WORK
3.3 Language
The proposal and all related documents, including, such items as reports,
studies, correspondence, and drawings, shall be in the English language.
4. TERMS OF PAYMENT
Terms of payment shall be according to the conditions specified in the
CONTRACT Agreement.
4.1 Payment
Advance Payment : 20%
Progress Payment : 75% (According to PEC’s Payment Schedule with
OWNER based on Milestone)
Retention Payment : 5% (2.5% at issuance of completion certificate, 2.5%
at the end of Defect Liability Period)
4.2 Bond
Advance Payment Bond : Full amount of advance payment
Performance Bond : 10% of contract price
Warranty Bond : 10% of contract price
Marine and General Civil Works
for Ship Lift and Transfer System
DOC.NO:P120029-CM-50-G04-030
Project
REV. :1
INVITATION TO TENDER FOR P a g e : 7 | 12
DREDGING & SCOUR
PROTECTION WORK
6. EVALUATION OF PROPOSAL
The evaluation of the Bidder's proposal will not be limited to price but also take
into account technical capability, working experienced in the related field, time
schedule of works, reliability of execution plan, etc. It is therefore essential
importance that all the information requested in "Scope of Work" herein below be
constrained in the Bidder's proposal. The evaluation will be conducted under
PEC's sole discretion and judgment.
7. DISCLAIMER
Neither the OWNER nor the PEC will be responsible for, or reimburse, any
expenses or losses incurred by a Bidder in the preparation and submittal of its
bid. The PEC reserves the right to accept or reject any bid, and to annul the
bidding process and reject all bids at any time prior to award of Subcontract
without thereby incurring any liability to the affected Bidder or Bidders, or any
obligation to inform the affected Bidder or Bidders of the grounds for the PEC’s
action or determination.
accordance with the ITB Documents, including but not limited to working
conditions, location of work, and all other requirements, such as local conditions,
applicable laws and regulations, labor condition, environmental aspects, etc., in
order to submit a firm and comprehensive proposal. The Bidder shall also check
and verify the local information contained in the ITB Documents and is expected
to have fully satisfied himself thereon before submitting his proposal.
The Bidder shall make his own arrangements and inquiries with regard to the
loading, unloading and transport of all equipment and material required for the
works. The Bidder shall make all necessary investigations as to the heaviest
loads that can be handled at ports or transported to the work site by road, railway
or river, in particular with regard to the weight-bearing capacity or all bridges and
culverts, and the Bidder shall comply with all relevant regulations of the
government departments in connection therewith.
9. QUERIES
The Bidder is advised to carefully study the contents of the ITB Documents and
to obtain all such information it may require to submit its bid. The Bidder shall be
deemed to have satisfied itself as to the correctness and sufficiency of the bid
documents before submitting the Bid. No claims whatsoever will be entertained
arising out of Bidder’s failure to study the whole contents of the ITB Documents
or to make his proposal itself. No Bidder shall be conditional upon the availability
of labour, staff, equipment, material, funds, facilities or anything whatsoever the
Bidder is required to provide.
Should the Bidder believe there are discrepancies in, or omission from, the PEC
Documents, or have any doubts as to the meaning of any part thereof, the Bidder
shall at once notify the ITB by email as detailed below.
Any queries relating to the PEC Documents or submitting a bid must not be
raised by telephone or personal contact, but must be submitted by email, to
sender of this ITB:
Marine and General Civil Works
for Ship Lift and Transfer System
DOC.NO:P120029-CM-50-G04-030
Project
REV. :1
INVITATION TO TENDER FOR P a g e : 9 | 12
DREDGING & SCOUR
PROTECTION WORK
10.2 Currencies
The Bidder shall quote all prices in the currencies of PAKISTAN RUPEE.
11.1 Prices
The Bidder shall fill in the blanks of "Bill of Quantities” in Contract Agreement.
Bidder shall not use own form. Native file should be submitted.
The Bidder shall submit a manpower schedule for the work, which shall be
accompanied by:
Management & Supervisory Staff
The scheduled duration of assignment to site supervision for each
member describing local or foreigner shown in the Bidder's proposed
organization chart shall be shown in bar chart form.
Direct & Indirect Labor
The numbers of personnel identifying local or foreigner, up to and
including foreman level, which will be employed monthly shall be shown in
tabulated form. Indirect labors are to be shown separately.
11.8 QA / QC management
The Bidder shall submit his policy and management system established for
Company's QA / QC as well as the virtual practice in the project site.
15. PUBLICITY
15.1 Releases
Publicity releases shall not be made to the media or any other parties by
vendors or subcontractors without the approval of OWNER/PMC.
The text of any proposed announcement together with any illustrations shall
be submitted by Bidder for written approval.
15.2 Advertising
Advertising in connection with the contract between PEC and vendors or
subcontractors shall not take place without the prior approval of
OWNER/PMC.
A copy of any proposed advertising shall be submitted by Bidder for written
approval.
the Form of Bid. During this period no Bidder is to withdraw his bid, amend or
alter it or otherwise render it unsuitable for acceptance by the PEC.
18. ESCALATION
Bids shall be a Lump sum Price. The rates contained in the Schedule of Unit
Rates and lump sum price shall be fixed for the duration of the Subcontract
period and there shall be No Price Escalations considered for any reason
whatsoever.