LIFTING A LIVE

POWER PYLON
WITHOUT
DISRUPTING
SUPPLY.

TENNET
THE NETHERLANDS
25.09.2015 25.09.2015 25.09.2015 BRINGING THE EXTENSION 25.09.2015 INSTALLATION OF EXTENSION
THE LIVE POWER PYLON JACKING OPERATION
07:00 12:00 13:00 FRAME INTO PLACE 14:00 FRAME

A Z

THE MOST DELICATE OF JACK-UPS, BEFORE WATER LEVELS ARE RAISED HIGH.
With 27% of the country below Operator TenneT manages a network Certainly not while under current. sate for the loss of compression and
sea level, working with water is comprising more than 22,000 Mammoet engineered a safe method tension, the pylon was unbolted from
a given in the Netherlands. Over kilometers of high voltage lines to raise the pylon, while keeping the its foundation. Jack-up units, beneath
the centuries the Dutch have throughout the Netherlands. A few electric current on. each corner, raised the pylon by four
RESOURCES
mastered a sophisticated water of its pylons were located in an area meters in careful synchronicity. The
management system. Nowadays, identified for occasional flooding. First, the foundations were laid to whole operation was remotely CRANES
2 hydraulic cranes
this includes a series of controlled At the time of the pylon’s construction, support the jacking operation and controlled, so the team could remain
flood zones. When the water in this was not foreseen. To keep the provide the necessary anchor points at a safe distance. Finally, the TRANSPORT
12 axle lines of conventional trailer
the rivers reaches certain heights, required safe distance between power for the raised pylon. In addition, the tall extension frame was installed
1 prime mover
these zones are flooded to relieve lines and high water levels one of the and delicate structure was reinforced underneath and the whole structure
SPECIAL EQUIPMENT
the pressure on the dikes. In one pylons needed to be raised. TenneT with tailor-made steel inserts to prevent was anchored to the new foundations.
Mammoet JS 500 push-up system
such zone, a 380Kv electricity engaged Mammoet to raise the pylon it from buckling, and withstand forces
CREW
pylon needed to be raised four without interrupting the power supply. it was not designed to encounter. In the end, one of the most delicate of
10 Mammoet professionals
meters to stay above predicted Something which had never been jack-ups ever undertaken by Mammoet
high-water levels. Mammoet had undertaken before. Then 60 tons of ballast was added at was executed perfectly, 100% safe
to carry out the job without each corner to provide balance and and without disruption to power
disrupting power supply to the While towering with strength when to counteract the pylon’s high center supply. As a result, the ‘low country’
millions of businesses and homes bolted to the ground, pylons are not of gravity. With the ballast in place to of the Netherlands is now even better
relying on it. designed to be lifted in one piece. stabilize the structure and compen- positioned deal with high waters.

Discover more on www.mammoet.com