3- BC =Before Commissioning) 4- BFW= Boiler Feed Water 5- CAN= Calcium Ammonium Nitrate 6- CPR= Cardiopulmonary resuscitation 7- CCR= Central Control Room 8- CI= Competence Index 9- CSR= Corporate Social Responsibilities 10- CS= Confined space 11- CSEP= Confined Space Entry permit 12- CW= Cooling water 13- CWO= 14- D.E= Day Engineer 15- DCS= Distributed Control System 16- DM= Department Manager 17- E&I= Electrical and Instrumentation 18- EFERT= 19- EHC Chairman= 20- EHSE Committee= 21- EHSEC Executive HSE Committee 22- ELCB= Earth-leakage circuit breaker 23- EPA= Environmental Protection Agency 24- ERP= Enterprises Resource Planning 25- ERT= Emergency Response Team 26- ESD= Emergency Shutdown 27- FTA= Fault Tree Analysis 28- FFL Fatima Fertilizer Company Limited 29- FAO= First available opportunity 30- FAC= First-Aid Case 31- GLG= 32- HAZOP= Hazard and Operability Study 33- HHP= Higher Hazard Process 34- HPWJ machines 35- HSE= 36- HWP Hot Work Permit 37- IDLH= Immediately dangerous to life and health 38- IR= Incident Report 39- JQP= Junior Qualification Program 40- JSA= Job Safety Analysis 41- KPI= Key Performance Indicators 42- KI= Knowledge Index 43- LEL= Lower Explosivity Limit 44- LOPE= Lifting Over Process Equipment 45- LTI= Lost Time Injury 46- LWI= Lost Workday Injury (LWI) 47- LOTO= Lock Out / Tag Out and Try Out 48- LOTOTO Lock Out Tag Out Try Out 49- LHO= Lower Hazard Operations 50- MSA= Management Safety Audits 51- Mari= Mari Site NG compression Station 52- Material Safety Data Sheets (MSDS) 53- MCC= 54- MCS = Master Control Sheet 55- MI= Mechanical Intergrity 56- MTC= Medical Treatment Case 57- MOC= Management of Change 58- MWR 59- NEQS= National Environmental Quality Standards 60- NP= Nitro Phosphate 61- O & U= Offsite and Utilities 62- OHTL Over Head Transmission Lines 63- OSHA 64- OST’s 65- PHA= Process Hazard Analysis 66- PHS= Product Handling and Storage 67- PHT 68- P&ID= Piping and instrument diagrams 69- PLC= Programmable Logic Controller 70- PC= Portable Cabins 71- PPE= Personal Protective Equipment 72- PSSR= Pre Start up Safety Review 73- PM= Predictive and Preventive Maintenance program 74- PDS= Process Design Specification 75- PHR= Process Hazard Review 76- PSI= Process Safety Information 77- PSM= Process Safety Management 78- PSV= Pressure safety valve 79- PTW= Permit to Work 80- QAQC 81- Quality Assurance= QA 82- REMS 83- RWC= Restricted Workday Case 84- S. E= Shift Engineer 85- S.H = Section Head 86- SBM= Stand By Man 87- SC= Safety Critical 88- SCARP= Salinity Control and Reclamation (Effluent Drainage) 89- SCBA= Self-Contained Breathing Apparatus 90- SCDs= Safety critical devices 91- SCE Shift Coordination Engineer 92- SEIH= Safety, Environment and Industrial Hygiene rules and procedures 93- SOC Chairman 94- SMART= Specific, Measurable, Attainable, Result Oriented, Time Bound 95- SOP= Standard operating procedures 96- TA= Turn Around 97- TDC= 98- TAs= Technical assistants 99- TWI= Time-Weighted Index
TNA survey= Training needs analysis
Total Recordable Incidence Rate (TRIR) UM Unit Manager 20 Unit Manager= UM Unsafe Acts Index= UAI Verbal Correction Contact (VCC) Verbal Recorded Contact (VRC) Written Correction Contact (WCC) – Advisory Note Written Reprimand (WR) Probation YTD= Failure Mode and Effect Analysis (FMEA)