You are on page 1of 3

1- AC =After Commissioning)

2- APL= Ahamd Pur Lamma


3- BC =Before Commissioning)
4- BFW= Boiler Feed Water
5- CAN= Calcium Ammonium Nitrate
6- CPR= Cardiopulmonary resuscitation
7- CCR= Central Control Room
8- CI= Competence Index
9- CSR= Corporate Social Responsibilities
10- CS= Confined space
11- CSEP= Confined Space Entry permit
12- CW= Cooling water
13- CWO=
14- D.E= Day Engineer
15- DCS= Distributed Control System
16- DM= Department Manager
17- E&I= Electrical and Instrumentation
18- EFERT=
19- EHC Chairman=
20- EHSE Committee=
21- EHSEC Executive HSE Committee
22- ELCB= Earth-leakage circuit breaker
23- EPA= Environmental Protection Agency
24- ERP= Enterprises Resource Planning
25- ERT= Emergency Response Team
26- ESD= Emergency Shutdown
27- FTA= Fault Tree Analysis
28- FFL Fatima Fertilizer Company Limited
29- FAO= First available opportunity
30- FAC= First-Aid Case
31- GLG=
32- HAZOP= Hazard and Operability Study
33- HHP= Higher Hazard Process
34- HPWJ machines
35- HSE=
36- HWP Hot Work Permit
37- IDLH= Immediately dangerous to life and health
38- IR= Incident Report
39- JQP= Junior Qualification Program
40- JSA= Job Safety Analysis
41- KPI= Key Performance Indicators
42- KI= Knowledge Index
43- LEL= Lower Explosivity Limit
44- LOPE= Lifting Over Process Equipment
45- LTI= Lost Time Injury
46- LWI= Lost Workday Injury (LWI)
47- LOTO= Lock Out / Tag Out and Try Out
48- LOTOTO Lock Out Tag Out Try Out
49- LHO= Lower Hazard Operations
50- MSA= Management Safety Audits
51- Mari= Mari Site NG compression Station
52- Material Safety Data Sheets (MSDS)
53- MCC=
54- MCS = Master Control Sheet
55- MI= Mechanical Intergrity
56- MTC= Medical Treatment Case
57- MOC= Management of Change
58- MWR
59- NEQS= National Environmental Quality Standards
60- NP= Nitro Phosphate
61- O & U= Offsite and Utilities
62- OHTL Over Head Transmission Lines
63- OSHA
64- OST’s
65- PHA= Process Hazard Analysis
66- PHS= Product Handling and Storage
67- PHT
68- P&ID= Piping and instrument diagrams
69- PLC= Programmable Logic Controller
70- PC= Portable Cabins
71- PPE= Personal Protective Equipment
72- PSSR= Pre Start up Safety Review
73- PM= Predictive and Preventive Maintenance program
74- PDS= Process Design Specification
75- PHR= Process Hazard Review
76- PSI= Process Safety Information
77- PSM= Process Safety Management
78- PSV= Pressure safety valve
79- PTW= Permit to Work
80- QAQC
81- Quality Assurance= QA
82- REMS
83- RWC= Restricted Workday Case
84- S. E= Shift Engineer
85- S.H = Section Head
86- SBM= Stand By Man
87- SC= Safety Critical
88- SCARP= Salinity Control and Reclamation (Effluent Drainage)
89- SCBA= Self-Contained Breathing Apparatus
90- SCDs= Safety critical devices
91- SCE Shift Coordination Engineer
92- SEIH= Safety, Environment and Industrial Hygiene rules and procedures
93- SOC Chairman
94- SMART= Specific, Measurable, Attainable, Result Oriented, Time Bound
95- SOP= Standard operating procedures
96- TA= Turn Around
97- TDC=
98- TAs= Technical assistants
99- TWI= Time-Weighted Index

TNA survey= Training needs analysis


Total Recordable Incidence Rate (TRIR)
UM Unit Manager 20
Unit Manager= UM
Unsafe Acts Index= UAI
Verbal Correction Contact (VCC)
Verbal Recorded Contact (VRC)
Written Correction Contact (WCC) – Advisory Note
Written Reprimand (WR) Probation
YTD=
Failure Mode and Effect Analysis (FMEA)

You might also like