You are on page 1of 1

TIPPL-GRD (JV)

RFI SUMMARY SHEET


Name of the Project :- Development of NH-31 to 4 lane configuration from km 551.360 to km 563.260 (Ghoshpukur to Bihar More, Bagdogra) in Darjeeling District,West Bengal under EPC Mode''
(Project length-11.90 km.)
RFI SUMMARY DATE :
Submission Chainage Chainage Proposed Proposed
Sl No. RFI No. Side Description of Work Submitted By Status
Date (Km) (Km) Inspection Inspection
5711 TIPPLGRDJV/NH-31/HW/ 5869 3-Dec-19 LHS HIGHWAY BC Tack Coat MR. SATYAKI SARKAR 4-Dec-19 11:30
5712 TIPPLGRDJV/NH-31/HW/ 5870 3-Dec-19 LHS HIGHWAY BC BC MR. SATYAKI SARKAR 4-Dec-19 12:30
5713 TIPPLGRDJV/NH-31/HW/ 5871 3-Dec-19 LHS HIGHWAY MEDIAN Kerb Laying MR. SATYAKI SARKAR 4-Dec-19 12:30
5714 TIPPLGRDJV/NH-31/HW/ 5872 3-Dec-19 RHS HIGHWAY BUS BYE Laying 1st MR. SATYAKI SARKAR 4-Dec-19 01:30
5715 TIPPLGRDJV/NH-31/HW/ 5873 3-Dec-19 RHS HIGHWAY BUS BYE wmm 1st MR. SATYAKI SARKAR 4-Dec-19 02:30
Reinforcement & Shuttering checking
5719 TIPPLGRDJV/NH-31/STR/ 5874 3-Dec-19 553+990 554+010 20 RHS STRUCTURE DRAIN reinf. Of deck slab MR. ARINDAM SINHA 4-Dec-19 12:30
of Deck slab of Side Drain.
5720 TIPPLGRDJV/NH-31/STR/ 5875 3-Dec-19 553+990 554+010 20 RHS Concreting of Deck Slab of Side Drain STRUCTURE DRAIN Concreting of Deck slab MR. ARINDAM SINHA 4-Dec-19 01:30

5722 TIPPLGRDJV/NH-31/STR/ 5876 3-Dec-19 552+480 LHS Reinforcement checking of RE Pannel STRUCTURE RE PANNEL reinf. Of RE Pannel MR. ARINDAM SINHA 4-Dec-19 02:30
5723 TIPPLGRDJV/NH-31/STR/ 5877 3-Dec-19 552+480 LHS Concreting of RE Pannel STRUCTURE RE PANNEL concreting of RE Pannel MR. ARINDAM SINHA 4-Dec-19 02:45
Excavation for ret. Wall of
5724 TIPPLGRDJV/NH-31/STR/ 5878 3-Dec-19 560+654 LHS STRUCTURE CULVERT Excavation MR. ARINDAM SINHA 4-Dec-19 03:00
Reconstruction type Box CULVERT
PCC of ret. Wall of Reconstruction
5725 TIPPLGRDJV/NH-31/STR/ 5879 3-Dec-19 560+654 LHS STRUCTURE CULVERT PCC MR. ARINDAM SINHA 4-Dec-19 03:15
type Box CULVERT
RETAINING
5731 TIPPLGRDJV/NH-31/STR/ 5880 3-Dec-19 553+870 553+940 70 RHS Excavation for ret. Wall STRUCTURE Excavation MR. ARINDAM SINHA 4-Dec-19 04:15
WALL
RETAINING
5733 TIPPLGRDJV/NH-31/STR/ 5881 3-Dec-19 553+870 553+940 70 RHS PCC of ret.Wall STRUCTURE PCC MR. ARINDAM SINHA 4-Dec-19 04:20
WALL
Reinforcement & Shuttering checking
5731 TIPPLGRDJV/NH-31/STR/ 5882 3-Dec-19 562+405 LHS STRUCTURE CULVERT Excavation MR. ARINDAM SINHA 4-Dec-19 04:15
of Haunch of box culvert
5733 TIPPLGRDJV/NH-31/STR/ 5883 3-Dec-19 562+405 LHS Concreting of Haunch of Box culvert STRUCTURE CULVERT PCC MR. ARINDAM SINHA 4-Dec-19 04:20