1
9 Solenoid Valve Yearly * Apr-15
Installed Quantity Frequency
S.No. Instrument Description Unit Q1
(Nos.)
Total 209
ETP 1
Inst Air Plant 34
10 Temperature Elements (RTD&TC) CWTP 2 Yearly -
DM Plant 2
Total 39
RWTP 4
11 Turbidity Analyzer Half Yearly * Apr-15
Total 4
ETP 4
12 Oil in Water Analyzer CWTP 1 Half Yearly * Apr-15
Total 5
CWTP 3
13 Hazardous Gas Detector Half Yearly * Apr-15
Total 3
CWTP 3
14 HC Detector Half Yearly * May-15
Total 3
ETP 6
RWTP 2
15 pH Analyzer CWTP 1 Half Yearly * Apr-15
DM Plant 9
Total 18
ETP 3
CWTP 1
16 Conductivity Analyzer Half Yearly * Apr-15
DM Plant 7
Total 11
DM Plant 3
17 Silica Analyzer Half Yearly * May-15
Total 3
DM Plant 1
18 Sodium Analyzer Half Yearly * May-15
Total 1
CWTP 1
19 Chlorine Analyzer Half Yearly * Apr -15
Total 1
ETP 2
20 TOC Analyzer Half Yearly * May-15
Total 2
Inst Air Plant 2
21 Moisture analyzer Half Yearly * May-15
Total 2
Inst Air Plant 2
22 Oxygen analyzer Half Yearly * Apr-15
Total 2
RWTP 2
23 Chlorine Detector CWTP 3 Quarterly * May-15
Total 5
Note :
1 * Activities are completed
2
Installed Quantity Frequency
S.No. Instrument Description Unit Q1
(Nos.)
Apart from above Planned Maintenance, Visual Inspection, Routine Health checks and Housekeeping is be
2 addition to that, Condition based Corrective Maintenance also being carried out as and when required.
3 Task list against each Schedule Maintenance is enclosed.
Prepared by
P.Prasad Babu
Sr. Manager Inst Maint
3
2. FIELD
UMENTS - UTILITIES
Q2 Q3 Q4
- - Jan-16
- - Feb-16
- - Mar-16
- Dec-15 -
- - -
- - -
- Nov-15 -
- - -
- Sep-15 -
4
- Sep-15 -
Q2 Q3 Q4
- Dec-15 -
- Sep-15 -
- Sep-15 -
- Sep-15 -
- Oct-15 -
- Sep-15 -
- Sep-15 -
- Oct-15 -
- Oct-15 -
- Sep-15 -
- Oct-15 -
- Oct-15 -
- Sep-15 -
5
Q2 Q3 Q4
tion, Routine Health checks and Housekeeping is being done on daily basis. In
nce also being carried out as and when required.