ANNUAL MAINTENANCE PLANNER (2015-16)

INSTUMENTS - UTILITIES

Installed Quantity Frequency


S.No. Instrument Description Unit Q1
(Nos.)
RWTP 7
Inst Air Plant 41
1 Pressure Transmitter CWTP 8 Yearly -
DM Plant 5
Total 61
ETP 1
Inst Air Plant 34
2 Temperature Transmitter CWTP 2 Yearly -
DM Plant 2
Total 39
ETP 27
RWTP 25
3 Level Transmitter CWTP 7 Yearly -
DM Plant 37
Total 96
ETP 16
RWTP 12
Inst Air Plant 17
4 Flow Transmitter Yearly -
CWTP 12
DM Plant 14
Total 71
ETP 28
RWTP 15
Inst Air Plant 31
5 Control Valves & On/off Valves Yearly * May-15
CWTP 1
DM Plant 153
Total 228
ETP 11
CWTP 5
6 Level Gauge Yearly * Apr-15
DM Plant 13
Total 29
RWTP 2
7 Pressure Switch Yearly -
Total 2
Inst Air Plant 6
8 Vibration Sensor CWTP 3 Yearly * May-15
Total 9
ETP 24
RWTP 15
Inst Air Plant 20
9 Solenoid Valve Yearly * Apr-15
CWTP 18
DM Plant 132

1
9 Solenoid Valve Yearly * Apr-15
Installed Quantity Frequency
S.No. Instrument Description Unit Q1
(Nos.)
Total 209
ETP 1
Inst Air Plant 34
10 Temperature Elements (RTD&TC) CWTP 2 Yearly -
DM Plant 2
Total 39
RWTP 4
11 Turbidity Analyzer Half Yearly * Apr-15
Total 4
ETP 4
12 Oil in Water Analyzer CWTP 1 Half Yearly * Apr-15
Total 5
CWTP 3
13 Hazardous Gas Detector Half Yearly * Apr-15
Total 3
CWTP 3
14 HC Detector Half Yearly * May-15
Total 3
ETP 6
RWTP 2
15 pH Analyzer CWTP 1 Half Yearly * Apr-15
DM Plant 9
Total 18
ETP 3
CWTP 1
16 Conductivity Analyzer Half Yearly * Apr-15
DM Plant 7
Total 11
DM Plant 3
17 Silica Analyzer Half Yearly * May-15
Total 3
DM Plant 1
18 Sodium Analyzer Half Yearly * May-15
Total 1
CWTP 1
19 Chlorine Analyzer Half Yearly * Apr -15
Total 1
ETP 2
20 TOC Analyzer Half Yearly * May-15
Total 2
Inst Air Plant 2
21 Moisture analyzer Half Yearly * May-15
Total 2
Inst Air Plant 2
22 Oxygen analyzer Half Yearly * Apr-15
Total 2
RWTP 2
23 Chlorine Detector CWTP 3 Quarterly * May-15
Total 5

Note :
1 * Activities are completed

2
Installed Quantity Frequency
S.No. Instrument Description Unit Q1
(Nos.)
Apart from above Planned Maintenance, Visual Inspection, Routine Health checks and Housekeeping is be
2 addition to that, Condition based Corrective Maintenance also being carried out as and when required.
3 Task list against each Schedule Maintenance is enclosed.

Prepared by
P.Prasad Babu
Sr. Manager Inst Maint

3
2. FIELD
UMENTS - UTILITIES

Q2 Q3 Q4

- - Jan-16

- - Feb-16

- - Mar-16

- Dec-15 -

- - -

- - -

- Nov-15 -

- - -

- Sep-15 -

4
- Sep-15 -
Q2 Q3 Q4

- Dec-15 -

- Sep-15 -

- Sep-15 -

- Sep-15 -

- Oct-15 -

- Sep-15 -

- Sep-15 -

- Oct-15 -

- Oct-15 -

- Sep-15 -

- Oct-15 -

- Oct-15 -

- Sep-15 -

Jul-15 Oct-15 Dec-15

5
Q2 Q3 Q4

tion, Routine Health checks and Housekeeping is being done on daily basis. In
nce also being carried out as and when required.