You are on page 1of 6

ULTRA FILTRAT

Transmittal No:
Subject:
Originator:
To:
From:
Date of Issue:
Through:

Dear Sir,
Please find below mentioned drawings/documents :-

S.# Dwg / Doc.#

1 2645-CR-ST-003

11

12
13

21

22

Notes:__________________________________________

Issued By:______________________

Date 30/Dec/99

a: Please acknowledge receipt on attached copy


b: Notes' Discard all previsions if revisions and if you want to retain the old on
Document Control System
LTRA FILTRATION PROJECT TRANSMITTA
ORC-II / 001
OOOOOOOOOOOOOO
Mr.SYED HABIB ALI ZAIDI
CCCCCCCCCCC
NAME

BY HAND

gs/documents :-

Description
CONSTRUCTION OF STORAGE TANKS AT BOSICOR REFINERY PONTOON SEGMENT DETAILS FOR DIA
70Mx14.6M
_________________________________

Received By:

Date Document Received:

ched copy
ions and if you want to retain the old one clearly mark SUPERCEDED
RANSMITTAL

Pages Rev.# Rev.Date Remarks

1 OF 1 1 5/3/07

You might also like