Central-3 C3001
5898
Central-3 C3001
5828
Lundi Saedan
Bait SontrA
Rain water remains site premises as site level is lower than main road
Increased Fueling
Increased Fueling
Increased Fueling
Increased Fueling
Increased Fueling
Increased Fueling
Increased Fueling
Civil Work Required Civil work ( Flooring)
Increased Fueling
Increased Fueling
Increased Fueling
Increased Fueling
OMO DG power
Description
Fueling will be increase due to wapda prolong outage
Fueling will be increase due to wapda prolong outage
Sand Bags will be required for main gate
DG will be required during flood may wapda long shutdown
Civil work ( Flooring) required as ground level and drainage system as damaged
Fueling will be increase due to wapda prolong outage
Civil work ( Flooring) required as ground level and drainage system as damaged
All boundary walls are damaged in 2010 flood need repairing
Sand Bags will be required for main gate
Fueling will be increase due to wapda prolong outage
Civil work ( Flooring) required as ground level and drainage system as damaged
All boundary walls are damaged ( cracked)
Sand Bags will be required for main gate
DG will be required during flood may wapda long shutdown also site is Hub dapandant 8 sites
Fueling will be increase due to wapda prolong outage
Fueling will be increase due to wapda prolong outage
Fueling will be increase due to wapda prolong outage
All boundary walls are damaged ( cracked)
Main gate need to be replace as currently cage gate is installed
Fueling will be increase due to wapda prolong outage
Equipment PAD level is too much low need to increase hieght
Sand Bags will be required for main gate
Fueling will be increase due to wapda prolong outage
Civil work ( Flooring) required as ground level and drainage system as damaged
All boundary walls are damaged ( cracked)
Sand Bags will be required for main gate
DG will be required during flood may wapda long shutdown also site is Hub dapandant 3 sites
DG will be required during flood may wapda long shutdown also site is Hub dapandant 3 sites
Sand Bags will be required for main gate
Civil work (Flooring) required as ground level and drainage system damaged
Fueling will be increase due to wapda prolong outage
Civil work (Flooring) required as ground level and drainage system damaged
Fueling will be increase due to wapda prolong outage
Fueling will be increase due to wapda prolong outage
Civil work ( Flooring) required as ground level and drain system is damaged Also Ground Level Need to Up
All boundary walls and Drain System are damaged
Civil work ( Flooring) required as ground level and drainage system is damaged
All boundary walls are damaged and One Boundary Wall is near to Damage
Civil work ( Flooring) required as ground level and drainage system is damaged
Civil work ( Flooring) required as ground level and drain system is damaged Also Ground Level Need to Up
Civil work ( Flooring) required as ground level and drainage system is damaged
All boundary walls and Drain System are damaged
Civil work ( Flooring) required as ground level and drainage system is damaged
Civil work ( Flooring) required as ground level and drain system is damaged Also Ground Level Need to Up
Civil work ( Flooring) required drain system is damaged
Civil work ( Flooring) required and Ground Level Need to Up
Civil work ( Flooring) required drain system is damaged
Civil work ( Flooring) required and Ground Level Need to Up
Civil work ( Flooring) required as ground level and drainage system is damaged
Sun Shade Damaged and need to repaired
Civil work ( Flooring) required as ground level and drain system is damaged Also Ground Level Need to Up
Civil work ( Flooring) required drain system is damaged
Civil work ( Flooring) required and Ground Level Need to Up
Civil work ( Flooring) required and Ground Level Need to Up
Civil work ( Flooring) required and Ground Level Need to Up
Fueling will be increase due to wapda prolong outage
Site Need to Cover With Sand Bags and Sand
Fueling will be increase due to wapda prolong outage
Fueling will be increase due to wapda prolong outage
DG will be required during flood may wapda long shutdown also site is critical Hub
Equipment PAD level is too much low need to increase hieght
Fueling will be increase due to wapda prolong outage
Site Need to Cover With Sand Bags and Sand
All boundary walls are damaged in 2010 flood need repairing
DG will be required during flood may wapda long shutdown
DG will be required during flood may wapda long shutdown
Equipment PAD level is too much low need to increase hieght
Fueling will be increase due to Wapda prolong outage
Civil work (Flooring) required as ground level and drainage system damaged
Sand Bags will be required for main gate
DG will be required during flood may Wapda long shutdown
Civil work (Flooring) required as ground level and drainage system damaged
Civil work (Flooring) required as ground level and drainage system damaged
Civil work (Flooring) required as ground level and drainage system damaged
Civil work (Flooring) required as ground level and drainage system damaged
Civil work (Flooring) required as ground level and drainage system damaged
Civil work (Flooring) required as ground level and drainage system damaged
Sand Bags will be required for main gate
Civil work (Flooring) required as ground level and drainage system damaged
Fueling will be increase due to Wapda prolong outage
Civil work (Flooring) required as ground level and drainage system damaged
Civil work (Flooring) required as ground level and drain system is damaged Also Ground Level Need to Up
Civil work (Flooring) required as ground level and drain system is damaged Also Ground Level Need to Up
Civil work (Flooring) required as ground level and drainage system damaged
Civil work (Flooring) required as ground level and drainage system damaged
Upraising required of BTS PAD,DG PAD, plot/site level
Fueling will be increase due to wapda prolong outage & water pump for water exit
Site Level need to be raised,In Rain site is flooded with rain water