You are on page 1of 138

WEEKLY HSE INSPECTION REPORT

Project : Location: Week :

PROJECT HSE DOCUMENTATION LIFTING OPERATIONS PERSONAL PROTECTIVE EQUIPMENT


Induction training records maintained (all personnel) 10 Lifting plan available covering all lifting activities (include load chart) 10 Mandatory PPE worn correctly by everyone in the work zone

Tool box talks delivered, including RA/MS (everyone present) 10 Operators competency cards (training) 10 Task specific PPE worn (risk assessed as appropriate)

HSE actions closed out following previous reports 10 Lifting equipment /lifting gear /hoists /Elevators (certified / checked) 10 Harnesses / lanyards checked by competent person - check records

HSE Comms (signage, notice boards, reports, policy, awards, etc.) 10 Crane segregation - safe working zone established and demarcated 10 Sufficient supplies of PPE available

Permits in use (properly completed, signed off and approved) 10 Mobile Crane stability (secure outriggers and pads), firm foundation 10 PPE in good condition (clean and without visible defects)

Hazardous substance assessments complete - current MSDS available 10 Competency (banksman/slinger/signaller) - safe lifting practiced 10 PPE storage areas / facilities provided and suitable

Contractors HSE inspections completed and recorded 10 Tag lines used (load swing - set down areas prepared and controlled) 10 PPE manufactured to a recognised standard (e.g. BS EN, ANSI)

CONSTRUCTION PLANT ENVIRONMENTAL MANAGEMENT WELFARE ARRANGEMENTS


Plant in good repair (certified conformance) 10 Waste management (segregation, legal compliance) 10 Toilets kept clean and supplied (water, soap, paper, etc.)

Trained personnel (competence checks - cards) 10 Fuel / Chemical storage / refuelling (controlled, spillages prevented) 10 Lighting and temperature levels acceptable

Warning beacons, lights, hazard lights, mirrors, reversing alarms 10 Spill kits available (clean up procedure displayed, training) 10 Food prep areas (clean, storage, pest control/prevention)

Plant checks (planned, recorded - suitable frequency) 10 Pollution control (concrete washout, septic tanks, water, air) 10 Seating and resting facilities clean and maintained

Drip trays provided and used (static plant/compressors/generators) 10 Energy efficiency (water usage - electricity, compressors) 10 Drinking water (clean - filtered - wholesome)

Plant segregation, traffic mgmt (pedestrian access/site security) 10 Environmental tool box talks; campaigns, other initiatives 10 Are suitable first aid arrangements in place (clinic, kits, staff)

WORK AT HEIGHT WORK EQUIPMENT EXCAVATIONS


Scaffolding (designed, access, edge protection, toeboards) 10 Fit for purpose (in good repair without significant defects) 10 Excavations fenced off (solid edge protection) and signage

Mobile towers (guardrails, access, stable, outriggers) 10 Inspected regularly (faults recorded and actioned) 10 Rebar capped off (or bent over) and safe from impalement

Scaffold/Tower Inspections (recorded/ handover/ tagging) 10 Operatives trained (competent - risk assessment) 10 Suitable access and egress into excavations

Ladders (registered, suitable, stable, 75° angle, condition) 10 Guards, interlocks, emergency stops and switches all ok 10 Spoil heaps safely back from excavation edges

Floor/platform openings, manholes, shafts - protected 10 Cable control / protection (trip hazard - electrocution risk) 10 Excavations benched, battered, or shored (as appropriate)

Housekeeping (clear access routes, free from obstruction) 10 Storage, handling, and transportation arrangements in place 10 Risk of falling vehicles controlled (chocks / stop blocks)

ELECTRICAL SAFETY OCCUPATIONAL HEALTH EMERGENCY ARRANGEMENTS


Connections (plugs, sockets, terminals, cable joints) 10 Noise control (maintenance, isolation, barriers, signage, PPE) 10 Fire detection and fire fighting arrangements in place

Distribution boards locked (earthed, circuit breakers, ELCBs) 10 Dust control (water suppression, extraction, ventilation, RPE) 10 Flammable materials (storage, protection, segregation)

Signage (danger voltage - buried cables) PtW / LOTO used 10 Vibration levels (exposure risk assessment) HAVS, WBV 10 Assembly points provided (visible signage, safe locations)
Lighting (task lighting, festoon, floodlights) electrically safe 10 Manual handling (risk assessment, mechanical aids, health) 10 Emergency drills conducted and recorded (min. 6-monthly)

Trained personnel (certified installers), handover certificates 10 Medical surveillance programme (hearing, vision, skin, etc.) 10 Access / egress routes kept clear (especially escape routes)

Extension reels/leads in good condition - protected by RCD/GFCIs 10 Chemical agents (liquids, dusts, fumes, gases, solvents, etc.) 10 Fire marshalls (appointed - trained - identified)

Power tools double-insulated or properly earthed; inspected 10 Skin care (awareness training, health checks, dermatitis, UV) 10 Designated smoking areas provided, managed, enforced.
BARGE/BOAT/SHIP MARINE SAFETY SEGMENT LIFTING AND INSTALLATION
Plant in good repair (certified conformance, bunker hoses) 10 Anchor rope chain 10 Lifting plan available covering all lifting activities (include load chart)

Electrical connections(barge to ship) 10 PPE -lifebuoy, Life jacket, Harnesses. 10 Operators competency cards (training)

Access between barges (clear access routes, free from obstruction) 10 Boat speed limits enforced 10 Lifting equipment /lifting gear /hoists /Elevators (certified / checked)

Effective communications (VHF/UHF transceivers and AIS equipment ) 10 Diver Two-way Radio, Diver lines secured 10 Crane segregation - safe working zone established and demarcated

Fire detection and fire fighting in place (Naked light regulations) 10 Rescue operations in place, adequate flotation devices 10 Mobile Crane stability

scupper plugs are in place 10 Debris control in Water 10 Competency (banksman/slinger/signaller) - safe lifting practiced

Drip trays and spill kits are provided and used 10 Emergency procedures, rescue boat in standby. 10 Tag lines used (load swing - set down areas prepared and controlled)

Radio transmitter aerials are earthed, and radars are switched off. 10 Gangways(No obstructions, illuminated, handrails, secured) 10 Condition of Rail

Skiff with oars or motor 10 Curbs at waterside edges 10 Third party Certification

Barge load capacity verified 10 Fall protection 10 Operators fitness certificate

Housekeeping,Deck openings covered,slippery surface 10 communications and access by emergency services 10 Anti collision mechanism (if applicable)

Ladders, Gangways & platform 10 10 Site Tidiness

Illumination 10 10 Limit switches for long and cross travel for gantry crane

Weather Condition (wind, rain, hot whether, fog, sea mist) 10 10 work platform, handrails & toe boards

Life saving appliances / Personal Floatation Devices (PFD) 10 10 Segment Transportation

Average Score 100% Continual Improvement Sought


Month : Year :

ONAL PROTECTIVE EQUIPMENT


y PPE worn correctly by everyone in the work zone 10
cific PPE worn (risk assessed as appropriate) 10
s / lanyards checked by competent person - check records 10
supplies of PPE available 10
ood condition (clean and without visible defects) 10
age areas / facilities provided and suitable 10
ufactured to a recognised standard (e.g. BS EN, ANSI) 10
ARE ARRANGEMENTS
pt clean and supplied (water, soap, paper, etc.) 10
and temperature levels acceptable 10
p areas (clean, storage, pest control/prevention) 10
nd resting facilities clean and maintained 10
water (clean - filtered - wholesome) 10
ble first aid arrangements in place (clinic, kits, staff) 10
VATIONS
ons fenced off (solid edge protection) and signage 10
pped off (or bent over) and safe from impalement 10
access and egress into excavations 10
ps safely back from excavation edges 10
ons benched, battered, or shored (as appropriate) 10
lling vehicles controlled (chocks / stop blocks) 10
GENCY ARRANGEMENTS
ction and fire fighting arrangements in place 10
le materials (storage, protection, segregation) 10
y points provided (visible signage, safe locations) 10
cy drills conducted and recorded (min. 6-monthly) 10
egress routes kept clear (especially escape routes) 10
halls (appointed - trained - identified) 10
ed smoking areas provided, managed, enforced. 10
ENT LIFTING AND INSTALLATION
n available covering all lifting activities (include load chart) 10
s competency cards (training) 10
uipment /lifting gear /hoists /Elevators (certified / checked) 10
gregation - safe working zone established and demarcated 10
ane stability 10
ncy (banksman/slinger/signaller) - safe lifting practiced 10
used (load swing - set down areas prepared and controlled) 10
of Rail 10
y Certification 10
s fitness certificate 10
ion mechanism (if applicable) 10
ess 10
ches for long and cross travel for gantry crane 10
orm, handrails & toe boards 10
Transportation 10
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref
Safety report/
clause no.3/3.4

Induction training records maintained (all personnel) High NA

Tool box talks delivered, including RA/MS (everyone


present)
High NA

HSE actions closed out following previous reports High NA


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

HSE Comms (signage, notice boards, reports, policy,


awards, etc.)
High NA

Permits in use (properly completed, signed off and


approved)
High NA

Hazardous substance assessments complete - current


MSDS available
High NA
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Contractors HSE inspections completed and recorded High NA

Plant in good repair (certified conformance)

Trained personnel (competence checks - cards)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Warning beacons, lights, hazard lights, mirrors, reversing


alarms

Plant checks (planned, recorded - suitable frequency)

Drip trays provided and used (static


plant/compressors/generators)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Plant segregation, traffic mgmt (pedestrian access/site


security)

Scaffolding (designed, access, edge protection, toeboards)

Mobile towers (guardrails, access, stable, outriggers)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Scaffold/Tower Inspections (recorded/ handover/ tagging)

Ladders (registered, suitable, stable, 75° angle, condition)

Floor/platform openings, manholes, shafts - protected


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Housekeeping (clear access routes, free from obstruction)

Connections (plugs, sockets, terminals, cable joints)

Distribution boards locked (earthed, circuit breakers,


ELCBs)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Signage (danger voltage - buried cables) PtW / LOTO


used

Lighting (task lighting, festoon, floodlights) electrically safe

Trained personnel (certified installers), handover


certificates
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Extension reels/leads in good condition - protected by


RCD/GFCIs

Power tools double-insulated or properly earthed;


inspected

Plant in good repair (certified conformance, bunker hoses)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Electrical connections(barge to ship)

Access between barges (clear access routes, free from


obstruction)

Effective communications (VHF/UHF transceivers and AIS


equipment )
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Fire detection and fire fighting in place (Naked light


regulations)

scupper plugs are in place

Drip trays and spill kits are provided and used


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Radio transmitter aerials are earthed, and radars are


switched off.

Skiff with oars or motor

Barge load capacity verified


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Housekeeping,Deck openings covered,slippery surface

Ladders, Gangways & platform

Illumination
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Weather Condition (wind, rain, hot whether, fog, sea mist)

Life saving appliances / Personal Floatation Devices (PFD)

Lifting plan available covering all lifting activities (include


load chart)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Operators competency cards (training)

Lifting equipment /lifting gear /hoists /Elevators (certified /


checked)

Crane segregation - safe working zone established and


demarcated
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Mobile Crane stability (secure outriggers and pads), firm


foundation

Competency (banksman/slinger/signaller) - safe lifting


practiced

Tag lines used (load swing - set down areas prepared and
controlled)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Waste management (segregation, legal compliance)

Fuel / Chemical storage / refuelling (controlled, spillages


prevented)

Spill kits available (clean up procedure displayed, training)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Pollution control (concrete washout, septic tanks, water,


air)

Energy efficiency (water usage - electricity, compressors)

Environmental tool box talks; campaigns, other initiatives


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Fit for purpose (in good repair without significant defects)

Inspected regularly (faults recorded and actioned)

Operatives trained (competent - risk assessment)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Guards, interlocks, emergency stops and switches all ok

Cable control / protection (trip hazard - electrocution risk)

Storage, handling, and transportation arrangements in


place
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Noise control (maintenance, isolation, barriers, signage,


PPE)

Dust control (water suppression, extraction, ventilation,


RPE)

Vibration levels (exposure risk assessment) HAVS, WBV


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Manual handling (risk assessment, mechanical aids,


health)

Medical surveillance programme (hearing, vision, skin,


etc.)

Chemical agents (liquids, dusts, fumes, gases, solvents,


etc.)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Skin care (awareness training, health checks, dermatitis,


UV)

Anchor rope chain

PPE -lifebuoy, Life jacket, Harnesses.


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Boat speed limits enforced

Diver Two-way Radio, Diver lines secured

Rescue operations in place, adequate flotation devices


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Debris control in Water

Emergency procedures, rescue boat in standby.

Gangways(No obstructions, illuminated, handrails,


secured)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Curbs at waterside edges

Fall protection

communications and access by emergency services


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Mandatory PPE worn correctly by everyone in the work


zone

Task specific PPE worn (risk assessed as appropriate)

Harnesses / lanyards checked by competent person -


check records
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Sufficient supplies of PPE available

PPE in good condition (clean and without visible defects)

PPE storage areas / facilities provided and suitable


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

PPE manufactured to a recognised standard (e.g. BS EN,


ANSI)

Toilets kept clean and supplied (water, soap, paper, etc.)

Lighting and temperature levels acceptable


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Food prep areas (clean, storage, pest control/prevention)

Seating and resting facilities clean and maintained

Drinking water (clean - filtered - wholesome)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Are suitable first aid arrangements in place (clinic, kits,


staff)

Excavations fenced off (solid edge protection) and signage

Rebar capped off (or bent over) and safe from impalement
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Suitable access and egress into excavations

Spoil heaps safely back from excavation edges

Excavations benched, battered, or shored (as appropriate)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Risk of falling vehicles controlled (chocks / stop blocks)

Fire detection and fire fighting arrangements in place

Flammable materials (storage, protection, segregation)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Assembly points provided (visible signage, safe locations)

Emergency drills conducted and recorded (min. 6-monthly)

Access / egress routes kept clear (especially escape


routes)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Fire marshalls (appointed - trained - identified)

Designated smoking areas provided, managed, enforced.

Lifting plan available covering all lifting activities (include


load chart)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Operators competency cards (training)

Lifting equipment /lifting gear /hoists /Elevators (certified /


checked)

Crane segregation - safe working zone established and


demarcated
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Mobile Crane stability

Competency (banksman/slinger/signaller) - safe lifting


practiced

Tag lines used (load swing - set down areas prepared and
controlled)
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Condition of Rail

Third party Certification

Operators fitness certificate


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

Anti collision mechanism (if applicable)

Site Tidiness

Limit switches for long and cross travel for gantry crane
WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref

work platform, handrails & toe boards

Segment Transportation

SWL (safe work load)


WEEKLY HSE INSPECTION REPORT
ACTION PLAN
MTHL-PK2- Locatio
Project ProjectNo. Ulwe ,Navi Mumbai
MTHL/GC/PK2/HSE/2019/001 n
Resident Inspected Positio
Hohsing Lee Rahul Ballal Sr. safety Engineer
Engineer by n
NCR
Inspected Item -(Non-Compliance) Reference Findingsand Action Required Priority
Ref
Inspector
Date
Signature
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
Week
Ulwe ,Navi Mumbai
Ending
04/01/202
Sr. safety Engineer
0

Picture Contractor
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e

1 High

3
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e

Flammable materials (storage, protection, segregation)

Assembly points provided (visible signage, safe locations)


HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e

Emergency drills conducted and recorded (min. 6-monthly)

Access / egress routes kept clear (especially escape routes)

Fire marshalls (appointed - trained - identified)

Designated smoking areas provided, managed, enforced.

Lifting plan available covering all lifting activities (include load


chart)
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e

Operators competency cards (training)

Lifting equipment /lifting gear /hoists /Elevators (certified /


checked)

Crane segregation - safe working zone established and


demarcated

Mobile Crane stability

Competency (banksman/slinger/signaller) - safe lifting


practiced
HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e

Tag lines used (load swing - set down areas prepared and
controlled)

Condition of Rail

Third party Certification

Operators fitness certificate

Anti collision mechanism (if applicable)


HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e

Site Tidiness

Limit switches for long and cross travel for gantry crane

work platform, handrails & toe boards

Segment Transportation

SWL (safe work load)


HSE INSPECTION REPORT ACTION PLAN
Week
Project ProjectNo. Location
Ending
Resident Inspected
Position 04/01/2020
Engineer by
Expected
Sr Dat Observation Time Unsafe Act/Unsafe Condition Complianc
Area Observation Photo HSE Observation & Recommendation Risk Compliance Photo
No e Category line
e
Inspector
Date
Signature
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance
Date of Remarks
Compliance

You might also like