Professional Documents
Culture Documents
TABLE OF CONTENTS
2. COMPANY PROFILE
1.1 Company Identity
Name of company : PT JTD Jaya Pratama
Type of Business Entity : PT ( Perseroan )
Address of company : Kantor Taman Bintaro Jaya Gedung B, Jalan Bintaro Raya
Jakarta, Indonesia
No. Telephone : (021) 7453105
No. Fax : (021) 736 3959
Email : info@jtd.co.id
Zip code : 12330
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 4 of 35
5.3 Leadership
5.3.1 All Leaders must strive to the fullest, demonstrate leadership and participate actively in
determined to continuously prioritize and place the fulfillment of HSE Management System
and corporate culture as a very important goal in the company's business.
5.3.2 Demonstrating leadership includes placing employees who are able to work and actively
contribute to the HSE Management System and corporate culture. The head of the work unit
must be responsible for maintaining care for the HSE Management System and the corporate
culture that is an important part of daily activities, thereby preventing and reducing the
number of events that can harm humans, the environment, equipment, finance, and the
cessation of the company's business.
5.3.3 All leaders are responsible and must encourage the involvement of their subordinates and
empower them to build and practice solving problems related to HSE Management System
and corporate culture wherever the company operates.
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 7 of 35
QHSE POLICY
Management and all employees of Tol Dalam Kota are fully committed to;
1. Improve the quality of methods and results of work and prevent non-conformity at all stages
according to predetermined work standards and procedures, predetermined plans and
budgets;
2. Carry out and strive for efforts in the field of health, work safety and environmental
management systems that are integrated with all work processes to maximize the prevention
of work accidents, occupational diseases and environmental pollution in all environments and
work activities;
3. Comply with government legislation and other stipulated requirements to increase satisfaction
and trust in relevant stakeholders and the community;
4. Develop human resources who are competent and professional in their fields through
continuous development efforts;
5. Develop effective communication and coordination channels both internally and externally for
the effectiveness of the quality, health, safety and environmental management systems; and
6. Conduct an evaluation and review of the quality, health, safety and environmental
management systems for continuous improvement.
This policy is made to be understood and implemented by all employees, implemented in every work
process and business unit to create a Safe, Healthy, Beautiful and Professional Tol Dalam Kota
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 8 of 35
7.3.1 Ensure that suitable and qualified personnel are available / employed to implement HSE
7.3.2 Implement an introduction program to recognize good behavior towards HSE
7.3.3 Ensure that work method statements are developed, potential hazards are identified with safe
work practices developed
7.3.4 Ensure that all employees for the project in their area of responsibility are trained in HSE
orientation and are able to carry out the tasks assigned.
7.3.5 Attend supervisor training and responsibilities.
8. DEFINITION
1.5 List of Abbreviations
ANSI : American National Standards Institute
APD : Alat Pelindung Diri
B3 : Bahan Berbahaya dan Beracun
HOD : Head of Department
HR : Human Resources
HRGA : Human Resources dan General Affairs
HSE : Health, Safety and Environment
HSEA : Health, Safety and Environment Administration
HSED : Health, Safety and Environment Department
HSEP : Health, Safety and Environment Personnel
HSEM : Health, Safety and Environment Manager
HSEMS : Health Safety Environment Management System
JSA : Job Safety Analysis
LA : Lead Auditor
MCU : Medical Check Up
MR : Management Representative
MSDS : Material Safety Data Sheet
PM : Project Manager
SCO : Security Coordinator
SDP : Security Department
SNI : Standar Nasional Indonesia
SPV : Supervisor
TSP : Tujuan, Sasaran, dan Program
OTP : Objective, Target, and Program
WI : Work Instruction
1.6 List of Terms / Definitions
Accident : An unwanted event that can be detrimental to property, property, environment
and operations
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 12 of 35
List of Master Documents: A list that records and loads all document title names and their
identification.
Emergency drill : Periodic exercises to evaluate preparedness, teams and equipment are in accordance
with needs
Ergonomics : The study of complex interactions between aspects of work including work
equipment, work procedures, work systems or systems and work environment with
human physical, physiological and psychological conditions of employees to adjust
aspects of work to the conditions that employees can work safely, efficiently and
more efficiently productive
Evacuation :Direct and rapid movement of people who move away from threats or actual events
from danger to safe places
Flammable and Combustible: Material that can burn and ignite
Grounding : Security system for devices that use electricity as a source of energy, from electrical
surges, lightning etc.
Hand tools : Hand tools that are used manually and not by machines. Some examples of hand
tools are hammers, spanners, pliers, screwdrivers and chisels. Hand tools are
generally not too dangerous when compared to electric tools.
Highly Toxic : Highly toxic substances produced by high doses can be deadly
Hazard identification: The process of knowing the existence of a hazard and determining its
characteristics
Incident: An event that arises from, or during a trip, work that can or does not result in injury and poor
health
Work Instructions: Description of the implementation of a work carried out by one or more personnel.
Permission (Verguning): A determination that is a dispensation rather than a prohibition by law.
Emergencies : A sudden situation or an undesirable situation / condition that develops and can
cause harm or harm to the company, employees or damage to the environment that
requires immediate action to reduce the consequences arising, and if possible take
action to control the situation
Policy : Intention and direction of the organization, as formally stated by top management
Noise : All unwanted sounds originating from production process equipment and / or
working tools at a certain level can cause hearing loss
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 14 of 35
Fatigue : Reduction of work capacity & endurance (Efficiency & Resilience) Non-compliance:
Fulfillment of requirements
Competence : The ability to apply knowledge and skills to achieve the desired results
Contractor : An external organization that provides services to the organization in accordance
with agreed specifications, terms and conditions
This manual : Documents that contain the scope of the HSE management system, including
details of exceptions and reasons for exclusion, documented procedures and
descriptions of interactions between processes.
MSDS : A guidance sheet containing information on chemicals including physical, chemical
properties, types of hazards caused, methods of handling, special actions in an
emergency and other information needed
NAV (Threshold Value): The standard hazard factor is fired as the level of average intensity that can be
received by the workforce without causing illness or health problems in daily work
Workers : People who carry out work or activities related to work that are under the control
of the Inner City Toll Project
Traffic Arrangement: The process of regulating the movement of vehicles on the road for certain
purposes
Traffic Maintenance: Efforts to maintain the situation of traffic management conditions to remain
smooth, safe and comfortable from disruption due to road maintenance work, road
widening, operation and maintenance or due to accidents.
Work on the Road: All activities or physical work that takes place on the road or regional property that
has the potential to disrupt road traffic both physically and non-physically. Included
in this sense are road maintenance work, road widening, operation and
maintenance carried out by certain parties.
Appointment Manual: Activity of a person or group to move an object manually or by using a tool.
Activities included in the manual appointment include lifting, pulling, pushing,
launching, rolling, stacking, carrying and holding
Road Users : Drivers of two-wheeled vehicles, four or more.
Risk Assessment: The process of evaluating risks caused by the existence of hazards by taking into
account the adequacy of the controls owned and determining whether the risks are
acceptable or not
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 15 of 35
Special medical team care: Accidents that require special (medical) team help
Legal requirements and other requirements: Legal requirements that the organization must comply
with and other requirements that the organization must or must comply with
First aid : Small accidents that do not involve special handlers
Phase 1 : The electricity network that uses only two connecting wires as the phase wire (L)
and the second as the neutral wire (N). Generally 1 phase electricity has a voltage of
220-240 volts which is used by many people.
Phase 3 : Electric networks that use three Phase wires (R, S, T) and one neutral (N) wire or
often called ground wire. According to the term Electricity 3 Phase consists of 3
electric cables and 1 neutral cable. Generally electricity 3 Phase 380 volt electricity
that is widely used by industry or factories.
Power Tools : Equipment that is driven or operated using energy derived from a source of power
supply, Power Tool Power sources include using electric motors sourced from
electric current, internal combustion engine ICE ignition and compressed air.
Procedure : a method determined to carry out an activity or process
Static projects: Projects where the work location does not move with a period of more than 3
months
Movable Projects : Projects for the location of work move around to do work on the road
RCD (Residual Current Device): Electrical Installation Device (Gawai) which functions to detect the
occurrence of electric current in an imbalance between phase and neutral
conductors caused by overcurrent and / or leakage current through body contact
Records : All records or data obtained from the results of implementing HSE Management
System activities
Risk : Effects of uncertainty (Uncertainty is a condition, even in part, of a lack of
information related to, understanding or knowledge of an event, its consequences,
or possibilities.
Risks Can Be Accepted: Risks that have been reduced to a level that can be tolerated by the
organization to meet HSE regulations and policies
Risk Register : Tool to document all risks and actions to manage each risk
Controlled copy : A copy of the master document whose circulation is controlled by the Document
Controller.
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 16 of 35
Uncontrolled copy: a copy of the document given to another party who needs information opinion,
but does not have to be notified when a change occurs.
Management System: Regulates interrelated or interacting elements of an organization to establish
policies and objectives and processes to achieve these objectives
HSEMS : Management system or part of the management system used to achieve
Occupational Safety and Health policies
Guests : everyone who comes from outside parties, who visits the Inner City Toll Project for
a short duration
TBM / P5M : Tool box meetings or 5-minute talks are carried out before starting work
Workplace : A place under the control of an organization where someone must or goes for work
purposes
Change or Revision: changes made to the content or material of the document.
Project area : the area or work area of the Inner City Toll Project
Road Area : Coverage area which includes traffic lanes, road shoulder, road-owned area to road
supervision area, connecting road, including rest area, pedestrians as determined by
Presidential Decree
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 17 of 35
9. BUSINESS PROCESS
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 18 of 35
11. PLAN
11.1 Risk Management
11.1.1 All Managers act as risk owners, who are responsible for managing the risks associated
with the work site that they are responsible for.
11.1.2 Every aspect of the activities and facilities related to the scope of the application of the
HSE Management System must be identified with its impact on finance, company
image, productivity, occupational diseases, workplace accidents, environmental
pollution, and social impacts on surrounding community.
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 19 of 35
11.1.3 Appropriate controls are applied to reduce the impact that can occur at any time which
can lead to financial losses, declining company image, occupational diseases, workplace
accidents environmental pollution and social impacts on surrounding community.
11.1.4 All relevant Managers must ensure all personnel in their part understand the work risks
at their work location before starting work and how to overcome them.
11.1.5 The results of the related risk assessment must take control measures in accordance
with the level of risk and continuously monitor their effectiveness.
Related document:
TDK-HSE-WP-001 Risk and Opportunity Management
11.3.3 The goals made must be measurable, achievable, and realistic and have a period of
achievement. If necessary, setting targets also involves existing contractors and sub-
contractors.
11.3.4 Targeting must prioritize actions that prevent the occurrence of hazards that can occur
(if not addressed immediately, can potentially cause occupational diseases, accidents,
environmental pollution, customer complaints and cessation of business processes).
Targeting also takes into account the financial conditions and available resources. Goals
can be changed by following developments and changing conditions of the company
and external parties.
11.3.5 In the context of achieving the target, the Proyek Tol Dalam Kota prepares an annual
program taking into account the resources needed (finance, human and infrastructure)
and the activities carried out to achieve the program.
11.3.6 11.3.6 To ensure that the program that has been prepared can be managed properly,
the Proyek Tol Dalam Kota establishes program responsibility, namely that each
Department Manager is involved, including the time of achievement and periodically
evaluated to ensure compliance.
Related document:
TDK-HSE-WP-003 Objective, Target and Program of HSE
12. SUPPORT
12.1 Management of Resources
12.1.1 Tol Dalam Kota ensure that all employees who play a role in the fulfillment and
supervision of risk, information, occupational health, safety and the environment that
support the achievement of company policies, objectives, targets and programs have
appropriate competencies based on their work descriptions, responsibilities and
authorities.
12.1.2 The qualifications of employees are determined to include education, skills and
experience requirements. The competencies prepared take into account industry
requirements, customer demand, legislation and also the company's internal needs. For
the qualifications that require training, the Proyek Tol Dalam Kota ensures that the
training is included in the company's priorities.
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 21 of 35
12.1.3 In Tol Dalam Kota stipulate that only competent employees can carry out high-risk
work. Competencies related to company requirements are compiled and maintained in
an integrated manner with other competency requirements.
Related document:
TDK-HSE-WP-009 HSE Training & competence
12.3 Communication
12.3.1 Internal Communication
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 22 of 35
The Proyek Tol Dalam Kota ensures that all information related to performance and
information related to the company is informed to employees. Important
communication and information is done by using appropriate media to ensure its
effectiveness.
12.3.2 External Communication
All requests for information related to the HSE Management System are managed by
the company. Communication regulated by external parties, among others :
12.3.2.1 Communication and reporting carried out during an emergency.
12.3.2.2 Communication and reporting on accident / incident investigation result
and its corrective actions.
12.3.2.3 Communication and reporting to government institutions
12.3.2.4 Communication to shareholders, customers and the surrounding
community.
Related document:
TDK-HSE-WP-010 HSE Communication & Consultation
12.4.5.2 Tol Dalam Kota stipulates that all records relating to all activities including
risk, financial, occupational safety and environmental health aspects have
been identified, can be read, maintained and have a retention period.
12.4.5.3 Tol Dalam Kota ensure controlled records according to the level of
confidentiality and importance of the tape.
Related document:
TDK-HSE-WP-012 Control of Record & Recording
13. OPERATION
13.1 Change Management
Tol Dalam Kota manages and controls any changes that affect risk. These changes include
changes in processes, activities, material use facilities and so forth. Risk assessment is carried
out before the changes are approved and implemented..
Related document:
TDK-HSE-WP-018 Change Management
13.2 PPE
Use of Personal Protective Equipment for workers who because the character of the work does
not allow for control of the workings, tools, materials and workplace, so that Personal Protective
Equipment is the last choice to protect workers.
Related document:
TDK-HSE-WP-008 Personal Protective Equipment
13.3 Application of signs and safety signs on work tools, materials, facilities and workplaces. Signs and
signs of safety must meet the communicative element, which can be easily recognized and easily
understood by workers, visitors, customers or other interested parties regarding work safety
regulations and requirements in the Tol Dalam Kota.
Related document:
TDK-HSE-WP-021 Traffic Management
TDK-HSE-WP-026 Barricades and Safety Signs
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 25 of 35
ensuring that activities outside of working hours do not interfere with their fitness or ability to
perform tasks.
Related document:
TDK-HSE-WP-025 Fatigue Management
Pengukuran lingkungan memastikan kondisi lingkungan hidup dan buangan limbah yang
dihasilkan tidak melebihi baku mutu lingkungan hidup yang dipersyaratkan.
Related document:
TDK-HSE-WP-035 B3 waste management and non B3
TDK-HSE-WP-016 Monitoring & Measurement of HSE Characteristic
17. REPAIR
17.1 Continuous Improvement
Tol Dalam Kota continuously improve the effectiveness of the HSE Management System. The
improvement program will be focused on improving HSE Management System, infrastructure
and employee behavior
17.2 Events, Nonconformities, Corrective Actions and Corrective Actions
17.2.1 Tol Dalam Kota ensure the contribution of employees to the reporting system as a key
element in the management of the company to determine the underlying causes of
Doc. No. : TDK–HSE–MAN-001
Revision : 01
TOL DALAM KOTA JAKARTA Date : May, 6th 2019
Page No. : 29 of 35
18. REFERENCE
18.1 ISO 9001:2015
18.2 ISO 14001:2015
18.3 ISO 45001:2018
19. ATTACHMENT
1.11 Correlation ISO 14001 and 45001
No. Dok. : TDK–HSE–MAN-001
Revisi : 00
PROYEK TOL DALAM KOTA JAKARTA Tgl. Berlaku : 8 Februari 2019
Halaman : 29 Dari 35
Clause
Topic Work Procedure
ISO 14001 ISO 45001
4.3 4.3 The scope of the Management System Manual Item Number 4.1
4.4 4.4 Management System Manual Item Number 4.2
5.1 5.1 Leadership and commitment Manual Item Number 5.2, 5.3
5.2 5.2 Policy Manual Item Number 6
Organizational Roles, Responsibilities Manual Item Number 7
5.3 5.3
and Authorities
Consultation & participation of TDK-HSE-WP-005 Induksi, TDK-HSE-WP-006 Investigasi Kecelakaan, TDK-HSE-WP-
5.4 5.4 workers 010 Komunikasi HSE