Project HSE Plan
Name of the Project
CONTENTS
1 Objective ........................................................................................................................................................... 3
2 Project Highlights ........................................................................................................................................... 3
3 Leadership and Commitment ....................................................................................................................... 3
3.1 Visibility ........................................................................................................................................................ 3
3.2 Proactive in target setting............................................................................................................................. 4
3.3 Company Culture .......................................................................................................................................... 4
3.4 Involvement of Senior Management.............................................................................................................. 5
4 HSE Policy ........................................................................................................................................................ 5
5 ISO 9001 Certification .................................................................................................................................... 5
6 RESOURCES MANAGEMENT & Organisation Chart ............................................................................. 5
7 Responsibilities ............................................................................................................................................... 6
7.1 Project Manager ........................................................................................................................................... 6
7.2 Regional HSE Manager ................................................................................................................................ 6
7.3 HSE Engineer/Officer ................................................................................................................................... 7
7.4 Section / Area In-charges ............................................................................................................................. 8
7.5 All Employees ............................................................................................................................................... 8
7.6 Site Engineers ............................................................................................................................................... 9
7.7 Project HSE Committee Members ................................................................................................................ 9
7.8 Sub-Contractors.......................................................................................................................................... 10
8 Project HSE Committee ............................................................................................................................... 10
9 GROUP RISK ASSESMENT (GRA) ............................................................................................................ 10
9.1 Purpose ....................................................................................................................................................... 10
9.2 Matrix for Group Risk Assessment ............................................................................................................. 10
9.3 Severity of hazard (Consequence) .............................................................................................................. 11
9.4 Likelihood of occurrence (Probability)....................................................................................................... 11
10 General HSE Rules & Regulations ........................................................................................................ 11
11 Work Permit Systems ............................................................................................................................... 12
12 Check-lists and Reports .......................................................................................................................... 12
13 Statistics & Reports .................................................................................................................................. 12
14 Contingency Plan For Emergency Situations .................................................................................... 12
15 List of Job Specific PPE to be used in the Site ................................................................................. 12
16 TRAINING .................................................................................................................................................... 12
17 Communication and Reporting .............................................................................................................. 12
17.1 Cascading Information............................................................................................................................ 12
18 Any other information relevant to Project HSE Plan ........................................................................ 12
19 Annexure A ................................................................................................................................................. 13
20 Annexure B ................................................................................................................................................. 14
Page 2 of 15
Project HSE Plan
Name of the Project
1 OBJECTIVE
1. To determine broad parameters of HSE management at site.
2. Establish & define chain of command for resolution of all hazard prevention issues.
3. Define individual hazard prevention & safety promotion responsibility at each level of the
construction team.
4. Identify highly hazardous operations within the scope of work and specify integrated
preventive measures to mitigate the same.
5. To ensure compliance with relevant applicable legislation.
6. Continual HSE performance improvement by directing focus on the key areas for
improvement in a consistent manner.
2 PROJECT HIGHLIGHTS
This chapter shall address the brief details of the project such as:
3.1 Visibility
The management will provide strong demonstrable visible leadership and commitments towards
HSE by personal example and action. The Management will participate in HSE meetings, conduct
site Inspections and HSE Audits, to encourage a positive attitude towards HSE.
COMPLIANCE VERIFICATION
No. TASK ACTION BY
TARGET DOCUMENT
Page 3 of 15
Project HSE Plan
Name of the Project
COMPLIANCE VERIFICATION
No. TASK ACTION BY
TARGET DOCUMENT
COMPLIANCE VERIFICATION
No. TASK ACTION BY
TARGET DOCUMENT
1. Putting HSE as number 1 on the agenda of all EVP / Sector All time MOM
review meetings at Head quarters, regions & Heads / RM /
project sites Project
Managers
2. Empowerment to Stop Work
Employees are empowered to stop work when All All time Verbal
the situation warrants immediate action in view Verification
of imminent danger to life / property /
environment.
Project Managers must appreciate and reward
those employees whose prompt action helps
avoid potential incident.
Page 4 of 15
Project HSE Plan
Name of the Project
COMPLIANCE VERIFICATION
NO. TASK ACTION BY
TARGET DOCUMENT
1. Review Project HSE Performance and HSE plan SPM Half yearly MOM – Sector
implementation in consultation with Project Management
Manager & HSE Engineer / Officer. Review
Meeting
2. Ensure adequate professional HSE support is RHSEM Project No evidence
available for effectively implementing the HSE Duration of HSE
plan, fulfilling HSE targets and attaining HSE discrepancies
objectives. due to lack of
resources
3. Ensure sufficient support and resources are Project Project No evidence
available to meet HSE targets (eg Infrastructure, Manager Duration of HSE
vehicle, safety steward, communication, PC, etc ) discrepancies
due to lack of
resources
4. Imparting necessary HSE training for the Staff & Project As required HSE Training
workmen of the project. Manager record
4 HSE POLICY
A copy of HSE Policy shall be attached.
All staff and employees shall be made aware of the existence of this policy by discussing in HSE
meetings, displaying at site offices, notice boards, workmen camp, canteen and conspicuous
locations
This ISO recognition, effective 7th December 1999, has been awarded by Det Norske Veritas (DNV).
It is the accredited unit in India of Holland-based RvA, one of the few organisations empowered to
confer product/service certification in the ISO series, which enjoys international acceptance.
Page 5 of 15
Project HSE Plan
Name of the Project
7 RESPONSIBILITIES
HSE management is a line responsibility requiring active participation of all levels of management
and supervision.
Individual HSE roles and responsibilities, along with task and target shall be distributed to the
individuals for action, as described below.
VERIFICATION
NO. TASK TARGET
DOCUMENT
1. Supplement Site HSE inspections & relevant HSE training at Once in Six RHSEM Site
the jobsites in co-ordination with HSEE. Months Visit Report
2. Investigate all fatal accidents / dangerous occurrences & As and when Accident
recommend preventive actions at sites. required Investigation
Report
3. Co-ordinate purchase and quality control activities related to After Approved
PPE / safety gadgets. receiving MR Vendor List
4. Monitor all HSEO activities & co-ordinate with Clients, Site In As and when No
charges, RM, SPMs, RPMs, RPLM, Regional Heads and HSE required documentary
Engineers evidence
Page 6 of 15
Project HSE Plan
Name of the Project
9. Convene HSE Committee meeting & minute the Min Frequency MOM –
proceedings for circulation & follow-up action. – Once in a Project HSE
month Committee
Meeting
10. Advice & co-ordinate for implementation of Work Permit When ever Completed
Systems. work requiring Work Permit
WPS is
executed
11. Plan procurement of PPE & safety devices and inspect Project As & when
before use as per laid down norms. Duration required
12. Report to RHSEM on all matters pertaining to status of HSE Regular basis
and promotional programme at site level.
13. Facilitate screening of workmen and conduct HSE Project Screening &
induction. Duration Induction
Records (PM-
19)
14. Monitoring administration of First Aid. Project First Aid
Duration Register
15. Conduct Fire Drill, Procure, inspect and arrange to As scheduled in Fire Drill
maintain Fire Extinguishers. the monthly Register
activity plan
Page 7 of 15
Project HSE Plan
Name of the Project
16. Organise campaigns, competitions & other special As and when Record of
emphasis programmes to promote HSE in the workplace. required Safety
Campaign &
Competition
17. Register Customer complaints and take corrective action. Project Customer
Duration Compliant
Register
18. Record, analyse and cascade lateral learning points from Monthly First Aid
First Aid Cases, Near Miss Cases & Accidents to all project Register;
personnel and analyse the trends & effectiveness. Accident
Investigation
Report
19. Maintain all HSE related documents Continues HSE related
Update HSE training records Documents
1. Ensure that all the workmen engaged under him are selected Project Screening &
through the screening system & have undergone site HSE duration HSE induction
Induction before assigning any task at site. records
2. Ensuring compliance of L&T ECCD basic HSE rules and HSE
applicable specifications by Inspection
Taking prompt action of site inspection and hazard report
Project
findings. Risk
duration
Closing all the points identified in inspection reports Assessment
Record
Ensure Group Risk Assessment is done for all the critical
jobs under him.
3. Ensure that all near miss cases / Reportable LTI / Dangerous As & when reports
Occurrence / Fatality are reported promptly. notified
4. Participate regularly in HSE meetings. As MOM
schedule
Page 8 of 15
Project HSE Plan
Name of the Project
1. Understanding the HSE requirements of the Project from this Continuous No of findings
Plan, HSE Management Systems, HSE Manual & following the in the HSE
same in execution of the work Inspection
2. Give Pep talk to the workmen under him Daily PEP Talk Report
3. Ensuring the workmen under him wear the necessary Continuous Subcontractor
personal protective equipments respective to the job Evaluation
Report
4. Eliminating all unsafe conditions in their work area Continuous HSE Inspection
Report
5. Keeping the work area neat & clean Continuous HSE Inspection
Report
6. Know the critical activities of his job based on the Group Risk Project Risk
Assessment and ensure implementation of the Risk control Duration Assessment
measures. Report & Safe
work method
7. Participating with the HSE Engineer / Officer or the As per HSE Inspection
committee Members in the Project HSE Inspection schedule Report
8. To follow all work permit system as per client requirements As and Work Permit
or L&T ECCD HSE Management System before starting of when System
similar work required
9. To report all near miss cases / reportable LTI /dangerous As and Preliminary
occurrences / fatality to HSE Engineer immediately verbally when Accident Report
& submitting the preliminary accident report within 12 hours. required
10. Informing the concerned authority as per the emergency As and Emergency
response plan. when Response Plan
required
COMPLIANCE VERIFICATION
NO. TASK
TARGET DOCUMENT
1. Attend meeting regularly as per schedule to discuss and Minimum MOM – HSE
decide the ways and means of eliminating the factors once in a Committee
affecting HSE. month Meeting
2. To analyse all the activities of the forthcoming period and Minimum MOM – HSE
identify the possible hazards and finalizing the precaution to once in a Committee
be taken. month Meeting
3. To monitor the HSE Performance of the project and Minimum MOM – HSE
suggesting improvements whenever needed. once in a Committee
month Meeting
4. Actively participate in the HSE Committee Inspections As per HSE Inspection
Schedule Report
Page 9 of 15
Project HSE Plan
Name of the Project
7.8 Sub-Contractors
All Subcontractors/Vendor/Supplier/Third Party performing services at the Project site shall be
subject to this plan requirement.
COMPLIANCE VERIFICATION
NO. TASK
TARGET DOCUMENT
1. Shall understand the safety code of conduct for Before Safety Code for
subcontractors and sign the same as a token of acceptance starting the Sub contractors
before starting the activity. activity
2. Subcontractor, his Supervisor and his workmen shall adhere Continuous Monthly
all the laid down HSE rules & Regulations while working at Evaluation of
site, follow the instruction / advice of Site engineer & HSE Subcontractors
Engineer / Officer from time to time.
9.1 Purpose
To assess the risk of the activities to be executed, rate the risk levels as per the risk assessment
matrix, and identify the control measures so as to bring the risk level to ALARP.
ICONSEQUENCE
MPACT
1 2 3 4 5
P
R
O
2 LOW RISK
B
A
B 3 MEDIUM RISK
I
L
I
T
4 HIGH RISK
Y
Page 10 of 15
Project HSE Plan
Name of the Project
Probability Descriptions
(The highest category will always be used)
VALUE Status Description
5 Inevitable Happens regularly on this site
4 Most Likely Known to have occurred on this site in the
past
3 Likely Known to occur on other sites
2 Unlikely Known to occur in the industry
1 Most Unlikely Never known before
Page 11 of 15
Project HSE Plan
Name of the Project
16 TRAINING
This section shall give a matrix of applicable Training versus category of peoples. Typical Matrix is given in
Annexure B, shall be made site specific.
COMPLIANCE VERIFICATION
NO. TASK ACTION BY
TARGET DOCUMENT
Page 12 of 15
19 ANNEXURE A
PPE MATRIX
against
Hearing protection
Hand Protection
Body Protection
PPE
Welding helmet
Foot Protection
Organic mask
Safety glass
Face shield
Respiratory
Protection
Protection
Activities
Dust
Executives / Supervisors
Foreman
Unskilled workmen
Formwork
Scaffolding
Masonary works
Barbending works
Grinding/Polishing
Rigging
Welding/Cutting
Handling corrosive liquid
Painting
Liquid bitumen work
Sand blasting
Insulation work
Roof work
Work shop ( P&M, Carp)
Work at heights above 1.8 M.
Note: This is an indicative matrix, it shall be made site specific.
Project HSE Plan
Name of the Project
20 ANNEXURE B
TRAINING MATRIX
Occupational health
Managerial aspects
Structural erection
Abrasive Blasting
Material handling
HSE Plan Briefing
Confined Space
Electrical safety
Work at height
HSE Induction
Radiography
Environment
Safety signs
Road works
Excavation
Concreting
Demolition
Materials
Grinding
Blasting
Lighting
TRAINING
Piling
PPE
REQUIREMENT
PM / CM / RE
Site Engineers
Site Supervisors &
Foreman
HSE Officer
HSE Supervisors /
Steward
Sub-contractor
Manager, Engineer
& Supervisor
P&M Supervisor,
Technician &
Helper
Electrician &
Electrician Helper
Page 14 of 15
Project HSE Plan
Name of the Project
Occupational health
Managerial aspects
Structural erection
building Materials
Abrasive Blasting
Material handling
HSE Plan Briefing
Confined Space
Electrical safety
Work at height
HSE Induction
Radiography
Environment
Safety signs
Road works
Excavation
Concreting
Demolition
Grinding
Blasting
Lighting
TRAINING
Piling
REQUIREMENT
PPE
Drivers, Equipment
Operators &
Helpers
Electrical Workmen
Masonry workmen
Bar bending
workmen
Formwork /
Scaffold Workmen
Welder, Gas cutter
& Fitter
Riggers& Khalasis
Radiographers
Chemical handling
workmen /
Painters.
Security personnel
Visitor
Note: This is an indicative matrix, it shall be made site specific.