Professional Documents
Culture Documents
Review & Accepted by GEC Senior Team Member (IOSH Managing Safely Certified):
RA Validity Start
Name Position Signature
Date
Distribution List
1. 2. 3. 4. 5.
Note: This activity Risk Assessment is valid for ONE month from GEC approval or less if the original activity location/surrounding/environment/hazards
changes (new Risk Assessment is required)
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
1 Activities –
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 2 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
Ensure all drivers and installation crew are inducted
by the HSE trainer and are familiar with the Al-
Ghanim traffic management plan
Ensure drivers observed the site speed limit.
2)Activity:
Ensure EMI driver has appropriate valid operating
Transporting of GMS materials to the
license for equipment driven
site using boom truck
Ensure loaded ground mounted signage’s, posts,
baseplates and other materials are properly secured
Hazards:
on the truck using suitable belt or chain and locked
Boom truck Vehicle
Ensure trucks and other equipment has site vehicle
collision, death or serious Site project
pass issued by the Lusail
injuries coordinator.
Ensure heavy vehicle has valid istimara and
Over speeding could lead EMI
insurance
to traffic accident and Supervisors,
vehicle damages and
3 3 9 Ensure daily drivers’ inspection is carried out as per 1 3 3 Daily
Al-Ghanim
serious body Injuries /death the checklist and record kept. H&S
GMS materials falling off Ensure no vehicle revers without a trained flagman Inspectors &
from the truck could lead to Ensure flagmen are properly trained and are familiar Contractor
traffic accident with Al-Ghanim traffic management plan
Oil leakages /spill from Ensure adequate site supervision by EMI competent
equipment could lead Soil site supervisor
contamination Ensure spill containment emergency procedure in
Unfamiliar with site route place and drivers are trained on how to use the spill
could lead to traffic accident kits
EMI Supervisor to ensure PRE-STARRT meeting
is conducted prior to daily work commencement
3) Activity: 3 2 6 EMI to ensure the forklift have valid inspection 1 2 2 , Site project Daily
Unloading and storing of standard certification coordinator.
traffic signages/GMS EMI to ensure boom truck lifting accessories have EMI
necessary certifications and daily inspected on the Supervisors,
lifting belts by the driver prior to usage Al-Ghanim
Hazards EMI to ensure the boom truck driver and forklift H&S
operators has appropriate driving license as per Inspectors &
Trip and falls hazards cold Qatar Law. Contractor
lead to body injuries, Ensure PRE-STARRT inspection is conducted on
dislocation and bone the equipment as per the Al- Ghanim checklist by
fractures the operator prior to daily work commencement and
GMS materials falling report back to the supervisor if deviation found.
during unloading and EMI to follow Lusail mobile equipment preventive
possibly damages. maintenance regime on site
Damage to the boom truck EMI to ensure the forklift operator is trained on the
lifting sling safe use of the forklift
Overturn and collapse of EMI to ensure forklift operator adheres to the safe
forklift equipment could operating procedure while using the forklift.
lead to property damage or EMI to ensure traffic signages/ materials are
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 3 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
property stored and out of the pedestrian access
route
Ensure all personnel for the installation wears
crushing of persons
proper PPE ie visibility jack
EMI to ensure storage area for the traffic signages
are barricaded properly with warning signage in
place
5) Activity: 3 3 9 Hazard/ Risk associated with working at height shall 1 3 3 Site project Daily
Installation of GMS; be discussed in daily Task Talks prior to start coordinator.
Use of scaffolding for access/egress activity; EMI
Ensure the scaffold is erected by a competent Supervisors,
scaffolding erector, inspected and colour tagged Al-Ghanim
with green tag prior to use H&S
Hazards: Provide safe working platform fitted with guardrail, Inspectors &
Collapse of scaffolding toe-boards and secured planks; Contractor
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 4 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
Provide safe access and egress (scaffold staircase
and straight ladder) to the scaffold
Ensure that workers wearing full body harness with
structure double lanyard and properly hooked up and properly
inspected.
Scaffolding structure being
hit by a vehicle Don’t push the mobile scaffolding if workers are on
the working platform and ensure the ground was
Openings holes;
free from any obstruction to prevent the toppled
Fall from height;
over.
Falling of materials and
Install safety net for protection against falling
tools;
materials;
Working under overhead
Ensure scaffolding is re-inspected after a high wind,
works
or heavy rain or after being hit by an equipment.
Slip, trip and fall. This is to ensure stability of the scaffolding structure
Impact injuries Ensure periodic inspection on the scaffold especially
after any rain, high wind and when there is high
impact on the scaffolding structure
Ensure TBT meeting is conducted on use of
scaffolding prior to initial use
7) Activity : 3 2 6 EMI to avoid manual handling where possible 1 2 2 Site project Daily
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 5 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
EMI supervisor to ensure that mechanical handling
is employed wherever practicable.
Ensure that personnel are trained in the correct
techniques for manual handling and are aware of
the associated risks.
Ensure (wherever practicable) that sign post and
signages are delivered in load denomination that
can be handled safely by one or several personnel.
Manual Handling: (Shifting and Ensure that suitable hand protection is provided
Installation of GMS) (leather and cotton gloves). coordinator.
Ensure training of personnel in body positioning: EMI
Bend knees, keep chin in, and keep back straight Supervisors,
Hazards: and elbows by side. Al-Ghanim
Back pain, back injury Ensure the way is free from wet, uneven floor and H&S
Body pain, muscle pain tripping hazards Inspectors &
EMI Supervisor to ensure two operatives to carry Contractor
traffic signage material over 25kg
Supervisor to conduct STARRT briefing prior to start
the work.
Ensure suitable training of personnel with regular
updates and toolbox talks.
Supervisor to ensure that all crews has appropriate
PPE’s at site as per job requirements ie helmet,
hand glove, safety shoe, goggle etc
8) Activity: 3 3 9 EMI to ensure to ensure only ANSI standard hand 1 3 3 Site project Daily
Working with hand tools: tools are used coordinator .
EMI to ensure task briefing is conducted prior to EMI
work commencement Supervisors,
Hazards: EMI to ensure tools provided are suitable for the Al-Ghanim
Cuts, abrasion, sprains due purpose intended and maintained in good working H&S
to wrong use of hand tools condition. Inspectors &
and hand tools failure EMI to ensure tools are inspected regularly in Contractor
accordance with manufacturer instruction
All operatives to be given instructions on the safe
use of the hand tools and to be trained.
EMI to ensure Screwdrivers, spirite level and square
and other sharp tools are to be used in a correct
manner so as not cause injury.
Damaged tools shall be immediately disposed off
from site.
Ensure workers only use hand tools that they have
been trained and authorized to use. Read carefully
specification & catalogue for use
EMI to ensure hand tools are visually checked by
competent person prior to use and must be colour
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 6 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
coded as per contractor colour coding system
Supervisor to conduct PRE-STARRT meeting with
all the crew prior to work commencement
All operatives shall wear their PPEs accordingly
9) Activity: 3 3 9 EMI Ensure proper housekeeping and maintain 1 3 3 Site project Daily
clean and tidy workplace at all time coordinator.
House Keeping Ensure all are wearing proper PPE. EMI
Ensure proper dust control management especially Supervisors,
in congested areas especially during windy Al-Ghanim
Hazards: moments H&S
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 7 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
Consider implementing the principle of Clean and
Go procedure
Consider the attitude of Clean and Go.
EMI to ensure all plastic wrapper used for the GMS
materials are collected at one point for onward
Slips, trips, sharp objects disposal at the designated skip daily
and dropped GMS
EMI to ensure good housekeeping is maintained on
materials Inspectors &
site and workers comply to Lusail Waste
Physical injuries / Damage Management plan
Contractor
to properties
EMI to ensure GMS materials are properly stored
out of the pedestrian walkways
EMI to ensure un-used GMS materials are
immediately put transferred back to the vehicle and
returned to the factory
10; Activity : 3 3 9 EMI to ensure compliance to Qatar ministerial 1 3 3 Site project Daily
decree of No. 16 of 2007, which stipulates that from coordinator.
Working during the adverse weather: June 15 to August 31, all work conduct under direct EMI
(summer & winter) sunlight or in an open area must not exceed five Supervisors,
hours. And no work must be conducted within the Al-Ghanim
Hazards: H&S
hours of 11:30 and 3:00 pm.
Exposure to direct Inspectors &
EMI to comply with Al-Ghanim summer working Contractor
sunlight /high humidity
arrangements where necessary.
Cold Stress (hypothermia) EMI to ensure stand by air condition vehicle on site
to serve as temporary rest shelter and emergency
High wind speed while working during the summer
EMI to ensure workers take regular breaks and job
driving during fog rotation as reasonably practicable.
EMI to Provide adequate supply of drinking water
and procedure for replenishment.
Ensure workers drink enough water to keep them
hydrated
Allow workers time to acclimatize to the hot weather
Workers shall be encouraged to take light breakfast
and hot drink such as tea and warm water during
winter season.
All personnel shall wear suitable PPE, with light
material coveralls and jacket during winter period.
EMI to ensure their operatives participate in the Al
Ghanim adverse weather management training
and emergency procedure (summer and winter)
EMI to ensure workers are provided with winter coat
during winter period
EMI to ensure hot drink are provided to the workers
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 8 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
on interval and provision for warm water on site
Ensure regular safety traffic advisories for drivers
during the winter & fog conditions
12) Activity : 2 2 4 EMI to ensure maintenance of equipment to keep 1 2 2 Site project Daily
Exposure of operatives within design performance parameters. coordinator.
to airborne dust EMI to ensure dust suppression/capture techniques EMI
where practicable. Supervisors,
Al-Ghanim
EMI to ensure exposure of personnel are limited by
Hazards: H&S
Inhalation of contaminated dust and time, distance and/or the use of suitable PPE/RPE. Inspectors &
subsequent health problem EMI to ensure training are provided to all personnel Contractor
involved in the installation work with regular updates
and toolbox talks.
EMI to ensure personnel undergo routine health
screening
EMI Supervisor to conduct STARRT briefing prior to
start of the installation work.
EMI Supervisor to ensure that all crews has
appropriate PPE as per Al Ghanim PPE site
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 9 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment Revision No. : 0
Issue Date : 23 April 2019
1 2 3 4 5 6 7 8 9
Control Control
Factors of Residual
Hazard Risk Control Measures Factors of Harm Measures Frequency
Harm Risk
Monitored by Check Rate
Likeli Severi
Likelihood Severity
hood ty
requirements
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 10 of 11
Document No. : PWA-RPD-HSS-FM-040
RPD Health & Safety Risk Assessment BRIEFING RECORD SHEET Revision No. : 0
Issue Date : 23 April 2019
10
11
12
13
THIS DOCUMENT IS UNCONTROLLED ONCE PRINTED - Last printed 20/01/2019 14:59 Page 11 of 11