Professional Documents
Culture Documents
:PR~
~J
~
~
PROPEL
BERHAD
SAFETY
MANAGEMENT SYSTEM
Page 1 of 2
PROPEL-FLW
Installation of Chain Link
Fence for Package A,B,C
D,E
Conducted by
Major (Rtd) Mohd Salahuddin
Yaakob
Approved by
Hassan Samian
~~
~OHD SALAHUDD1N HJ YAAl 01
~AFETY OFFtCi::R
PROPEL BHD
Date
Review Date :
2. Risk Analysis
3. Risk Control
No
Work
Activity
Hazard
Which can
cause/effect
Existing Risk
Control
Likely
hood
Severity
Risk
Recommende
d Control
Measures
1.
Site
Vehicular
Vehicular
Safe work
TMP stage 1 to
Preparation
traffic
traffic rammed
practice from
(Mediu
be adhered.
onto.
traffic mgt
m)
plan. Site
preparation to
be carried out
during lane
closer on day
time.
2.
Mobilization
Slow
Traffic
To followMHA
of the
moving
conjunction.
heavy
machineries
machineries
permit able
-
4 (1ow)
To adhere with
existing rqmts.
PI
@\'&I~
m
~
PROPEL
BERHAD
1.Hazard Identification
No
Work
Activity
Hazard
SAFETY
MANAGEMENT SYSTEM
Page 2 of 2
2. Risk Analysis
Which can
cause/effect
Existing Risk
Control
Likely
hood
Severity
3. Risk Control
Risk
Recommends
d Control
Measures
period.
3.
Installation of
To be
Vehicular
Machineries
Emergency
machineries on
parked on
traffic rammed
parking area
emergenc
onto
site.
to be
lane to be
y lane.
protected with
closed.
Danger
lMP.
towards
vehicular
traffic.
4.
Erection of
Manual
Proper PPE to
Chain fence
handling
be adhered.
All applicable
signages to be
installed prior
link.
work
commences.
be manned.
5.
-
PIC