SCHOOL READINESS VERIFICATION GUIDE

In preparation for the opening of classes this incoming SY 2018-2019, a nationwide inventory of school readiness is b
the EBEIS and NSBI were examined in terms of the availability of teachers, classrooms, seats, toilets, water supply, an
support using standard ratios as parameters. However, as recent developments may have occurred after the cut-off p
to verify the data for ENROLLMENT, TEACHERS, CLASSROOMS, TOILET, SEATS, WATER SUPPLY, and ELECTRICITY SUPPL

1. For data elements that are updated and do not need corrections, please leave the cells as is.
2. For other data elements that need updating, please encode the correct quantity in the appropriate column labe
3. For Enrollment, please provide updated counts based on learner movements such as dropping out or transfer t
4. For Water and Electricity Supply, if there is presence of water or electricity tag as [1]. If no water or electric con
5. Please ensure that the verified number is consistent with the data definition provided.

DATA SOURCES
Enrollment: Based on March 31, 2018
Teachers: PSI-POP teaching positions based on March 31, 2018
Classroom: Pre-identified instructional rooms based on Apr 30, 2017 NSBI reports
Based on allocation provided by EFD indicated in a separate column
Seats: Based on March 31, 2018
Toilets: Based on March 31, 2018
Water Supply: Based on March 31, 2018
Electricity Supply: Based on March 31, 2018

SCHOOL INFORMATION

Region Division School ID School Name Municipality Brgy

VIII NAASIN CITY 313402 Tigbawan Integrated School Tigbawan

Prepared by: Certified True and Correct by:


CHONA A. JERVOSO

NAME NAME
Designation Designation
ntory of school readiness is being conducted in all public schools. To determine school readiness, data from
eats, toilets, water supply, and electricity supply. Schools were classified as ready, nearly ready, and needing
e occurred after the cut-off period of EBEIS updating and submission of reports for NSBI, you are requested
PPLY, and ELECTRICITY SUPPLY.

cells as is.
the appropriate column labeled as "Verified Number."
as dropping out or transfer that occurred after the cut-off.
1]. If no water or electric connection is available, tag as [0].
ded.

DATA DEFINITIONS
Enrollment: No. of learners officially enrolled in the school for each educational level as of the date o
Teachers: No. of teachers based on actual plantilla of teaching items assigned to the school, regar
or engaged in actual teaching or not
Classrooms: No. of classrooms in permanent or semi-permanent buildings/structures actually used fo
Seats: Kinder chairs, arm chairs, usable two-seater school desks, and other classroom chairs
Toilets: Functional urinals and toilet bowls (regardless whether for male, female or shared) for a
Water Supply: Availability or presence of at least one water source
Electricity Supply: Availability or presence of electricity regardless if grid or off-grid

ENROLLMENT TEACHERS CLASSROOMS

Modified ES JHS SHS ES JHS SHS ES SS


Street
Classification (Elementary (Junior High (Senior High TOTAL (Elementary (Junior High (Senior High (Elementary (Secondary
School) School) School) School) School) School) School) School)

227 11 7

Date Accomplished:
nal level as of the date of reporting
ned to the school, regardless whether filled or unfilled,

ructures actually used for instruction. Do not include makeshift structures.


ther classroom chairs
female or shared) for all usages

CLASSROOMS TOILET SEATS WATER SUPPLY


2017 ALLOCATION
from EFD

SHS ES SS SHS ES SS ES JHS SHS


(Senior High TOTAL (Elementary (Secondary (Senior High TOTAL (Elementary (Secondary TOTAL (Elementary (Junior High (Senior High
School) School) School) School) School) School) School) School) School)

7 4 159 None

A A
WATER SUPPLY ELECTRICITY SUPPLY

Verified ES JHS SHS Verified


TOTAL TOTAL (Elementary (Junior High (Senior High TOTAL TOTAL
School) School) School)

GRID

A A A A