The above mentioned was awarded to M/s. M.G. Construction on Rate List
Basis vide work order under reference.
The agency has completed the work as per satisfaction of Engineer-in-
charge within the stipulated time period.
The 1st & Final Bill for the same is prepared for an amount of Rs.43,956/-
in favour of M/s. M.G. Construction. The I.T., S.C. & Edu.cess is deducted as
per the rules in force. The net amount of Bill is Rs.42,960/-.
Submitted for payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
August 29, 2008.
Sub : Providing Civil & interior work for establishing SWM Cell
office at Balkum, Thane.
1. The sealed tenders for the above mentioned work were invited by
publishing tender notice in daily news paper daily Mumbai Sakal,
Mid Day & Nav Bharat Times on dated 31.07.08.
2. The notice period was 2 weeks i.e. upto 14.08.08. as per Government
G.R.
3. The time period for the work is Four month, from the date of issue of Work
Order.
4. Total Six (6) nos. of tenders were issued to various agencies between the
issue period of 08.08.08 to 09.08.08. The last date of submission of tender
was 14.08.08. upto 13.00 hrs. The total (3) Three nos. of sealed tender was
received.
5. The post - qualification criteria for bidders has to complete similar type of
work in Government organization for not less than 40 Lakhs in any one
year during last 3 years.
6. The sealed tenders were opened on 14.08.06 by Shri. S.S.Borse, Executive
Engineer, Shri. M.S. Raikar, Deputy Engineer – I and
Shri. J.R. Dabhadkar (A.C.A.O.) and contractor's representative. The
comparative statement for the same is prepared and kept at page c/s.
From the comparative statement it is seen that M/s. Omkar Engineers &
Contractors., has quoted the rate 29.00% above the estimated rates which
is lowest amongst all the bidders. Seems to be higher side. Therefore,
contractor has called for negotiation on dated 18/08/08. The contractor has
reduced their offer by 0.50% and given the revised offer of 28.50% above
the estimate cost along with the justification supported by Rate Analysis
vide their letter dt.26.08.08. kept at Pg. c/s.
7. Tender validity is 120 days from date of opening of tender i.e. upto
13.11.08.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid
meeting was held.
R(L)
9. The registration requirement as per PWD is upto 50 Lakhs. The lowest
bidder is registered with the Executive Engineer, MJP, in Class – II (Two)
category and is entitled to quote for works for Rs.750 Lakhs.
10. The details specifications for each items is included in the tender in
Chapter – XIV tender document.
11. The work site is in possession of MMRDA and work can start immediately
after completion of the formalities like payment of Security Deposit and
signing of agreement etc.
12. M/s. Omkar Engineers & Contractors., who is the lowest is full filling
qualification criteria i.e. bidder has carried out the similar type of work in
MCGM ‘K’ East Ward, amount to 80 Lakhs in year 2007 & also in
MMRDA office.
13. The rates offered by Contractor @ 28.50 % above the estimated cost seems
to be reasonable @ Rs.43,14,387=50 (Rupees Forty Three Lakhs Fourteen
Thousand Three Hundred Eighty Seven and Paise Fifty only).T
14. The tender proposal is for Interior furnishing work for office premises of
Solid Waste Management, Cell at Balkum, Thane to have better aesthetic
view.
15. Considering the above offered by the lowest bidder is @ 28.50% above the
estimated rate is reasonable & competitive. The lowest offer of
M/s. Omkar Engineers & Contractors., @ Rs.43,14,387=50 (Rupees Forty
Three Lakhs Fourteen Thousand Three Hundred Eighty Seven and Paise
Fifty only) is submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(SSB)
A.C.A.O.(D)
S.E.(JCG)
C.E.(SRN)
R(L)
Engineering Division.
April 8, 2008.
1. The sealed tenders for the above mentioned work were invited by
publishing tender notice in daily news paper daily DNA & Lokmat & Nav
Bharat on dated 29.02.08.
2. The notice period was 4 weeks i.e. upto 02.04.08.
6. As per the guide lines pre-bid meeting is held on 18.03.08 and compliance
is made to he queries raised by contractors and necessary Addendum is
issued to all contractors.
7. The time period for the work is 9 (Nine) months excluding monsoon, from
the date of issue of work order.
8. Total Twelve (12) nos. of tenders were issued to various agencies between
the issue period of 11.03.08 to 26.03.08. The last date of submission of
tender was on 02.04.08. The total (4) Four nos. of sealed tenders were
received.
R(L)
9. The envelop – I was opened on 07.04.08 and the documents submitted by
contractor was scrutinized by the P.M.C. M/s. STUP Consultant Pvt. Ltd.
along with MMRDA officers. The evaluation report prepared by
Consultant for the same is kept @ Pg. c/s. From the evaluation report
it was observed that all 4 (Four) contractors has submitted the document
as per tender requirement. Therefore the 4 (Four) sealed tenders i.e.
Envelop – II, Financial Bid was opened on 08.04.08 by Chief T&C Shri
.P.R.K. Murthy, in presence of Shri. A.P. Athawale, Executive Engineer,
Shri. Dabhadkar, J.A.O. and the undersigned along with contractor's
representative. The comparative statement for the same is prepared and
kept at page c/s. From the comparative statement it is seen that M/s.
Relcon Infraprojects Pvt. Ltd., has quoted the 2.79% below the estimated
rates which is lowest amongst all the bidders.
10. M/s. Relcon Infraprojects Pvt. Ltd., which is lowest tenderer who has
quoted below 2.79% full filling qualification criteria as per Bid document.
11. Rates offered by the lowest bidder is 2.79% below and are competitive.
Considering above the lowest offer of M/s. Relcon Infraprojects Pvt. Ltd.,
@ Rs.25,82,86,970/- i.e. 2.79% below the cost put to tender.
The Budget provision in the current year 2007 – 2008 MMRDA has made
Rs.575 Crores for MUIP work (Phase – I, II, III).
As the powers to accept the tenders are with Executive Committee the
necessary Item Note will be prepared and put up after approval to this proposal.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.
Chief T&C
R(L)
R(L)
Engineering Division.
February 7, 2008.
Sub : Construction of road from petrol pump in ph-1 of T.T. Wadala to Sion –
Koliwada connector Road in Wadala Truck Terminal.
1. The sealed tenders for the above mentioned work were invited by publishing tender notice
in daily news paper daily Dainik Lokmat & Free Press Journal on dated 08.01.08.
2. The notice period was 4 weeks i.e. upto 31.01.2008.
3. The time period for the work is Three months, from the date of issue of work order.
4. Total Seven (7) nos. of tenders were issued to various agencies between the issue period of
15.01.08 to 25.01.08. The last date of submission of tender was 31.01.08. The total
(3) Three nos. of sealed tender was received.
5. The post - qualification criteria for bidders shall have successfully completion of similar
type of work in past for an amount of Rs.50 Lakhs.
6. The sealed tenders were opened on 01.02.08 by Shri .G.R. Duseja, Superintending
Engineer, in presence Shri. A.P. Athawale, Executive Engineer, Shri. M.S. Raikar,
Deputy Engineer-I and J.A.O.(D) and contractor's representative. The comparative
statement for the same is prepared and kept at page 101 c/s. From the comparative
statement it is seen that M/s. ESSBEE ENTERPISES., has quoted the rate 5.40% above the
estimated rates which is lowest (i.e. Rs.1,19,87,194=70).
7. Tender validity is 120 days i.e. upto 01.06.08.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 300 Lakhs. The lowest bidder is
registered with the MCGM Mumbai AA category and is entitled to quote for works for no
limit.
10. The rates offered by contractor @ 5.40% above seems on higher side therefore Contractor
is asked to submit their justification for their offer. As per the justification by contractor it
is seems to be rates quoted by contractor is reasonable
11. M/s. ESSBEE ENTERPISES., who is the lowest bidder is full filling qualification criteria
i.e. bidder has carried out the similar type of work in MCGM of Pune Mahanagarpalika
amounting to Rs.1,24,30,923/- & Rs.5,87,22,881/- in the last five years.
12. The Local Corporator and user of Truck Terminal has force to carryout this missing link to
ease for traffic. As there is a tremendous pressure from various local leaders and agencies,
it is necessary to complete the work as early as possible before current monsoon.
13. The rates offered by Contractor @ 5.40% above the estimated cost seems to be reasonable
@ Rs.1,19,87,194=70 (Rupees One Crore Nineteen Lakhs Eighty Seven Thousand One
Hundred Ninety Four & Paise Seventy Only).
R(L)
14. Considering the above offered by the lowest bidder is @ 5.40% above the estimated rate is
reasonable & competitive. The lowest offer of M/s. ESSBEE ENTERPRISES
@ Rs.1,19,87,194=70 (Rupees One Crore Nineteen Lakhs Eighty Seven Thousand One
Hundred Ninety Four & Paise Seventy Only) is submitted for approval please.
Submitted please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(JRD)
C.E.(SMR)
R(L)
Engineering Division.
July 04, 2008.
Sub : Providing Civil & interior work for establishing office in Unit No.115
on 1st floor, in Building A-1, at Wadala Truck Terminal.
1. The sealed tenders for the above mentioned work were invited by
publishing tender notice in daily news paper daily Loksatta & Indian
Express on dated 04.06.08.
2. The notice period was 2 weeks i.e. upto 24.06.08. as per Government
G.R.
3. The time period for the work is Four month, from the date of issue of Work
Order.
4. Total Three (3) nos. of tenders were issued to various agencies between the
issue period of 12.06.08 to 19.06.08. The last date of submission of tender
was 24.06.08. upto 13.00 hrs. The total (3) Three nos. of sealed tender was
received.
5. The post - qualification criteria for bidders has to complete similar type of
work in Government organization.
6. The sealed tenders were opened on 25.06.06 by Shri. S.V.Arlikar,
Executive Engineer, Shri. M.S. Raikar, Deputy Engineer – I and
Shri. J.R. Dabhadkar (A.C.A.O.) and contractor's representative. The
comparative statement for the same is prepared and kept at page c/s.
From the comparative statement it is seen that M/s. M. Devang
Construction Co., has quoted the rate 6.99% above the estimated rates
which is lowest amongst all the bidders. Seems to be higher side.
Therefore, contractor has called for negotiation on dated 26/06/08. During
the negotiation contractor has reduced their offer and given the revised
offer of 5.00 % above the estimate cost.
7. Tender validity is 120 days from date of opening of tender i.e. upto
23.10.08.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid
meeting was held.
R(L)
9. The registration requirement as per PWD is upto 50 Lakhs. The lowest
bidder is registered with the Executive Engineer, PWD, Mumbai in
Class – I-C category and is entitled to quote for works for Rs.15.00 Crores.
10. The details specifications for each items is included in the tender in
Chapter – XIV tender document.
11. The work site is in possession of MMRDA and work can start immediately
after completion of the formalities like payment of Security Deposit and
signing of agreement etc.
12. M/s. M. Devang Construction Co., who is the lowest is full filling
qualification criteria i.e. bidder has carried out the similar type of work in
University Mumbai, Vidyanagari campus, amount to 84 Lakhs in year
2007.
13. The rates offered by Contractor @ 5.00 % above the estimated cost seems
to be reasonable @ Rs.41,59,463=70 (Rupees Forty One Lakhs Fifty Nine
Thousand Four hundred Sixty Three and Paise Seventy only).T
14. The tender proposal is for Interior furnishing work for office premises on
1st floor of A-1 Building to have better aesthetic view.
15. Considering the above offered by the lowest bidder is @ 5.00% above the
estimated rate is reasonable & competitive. The lowest offer of
M/s. M. Devang Construction Co., @ Rs.41,59,463=70 (Rupees Forty One
Lakhs Fifty Nine Thousand Four hundred Sixty Three and Paise Seventy
only) is submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(SVA)
A.C.A.O.(D)
Chief T & C
R(L)
Engineering Division.
July 03, 2008.
Sub : Providing Civil & interior work for establishing office in Unit No.201
& 202 on 2nd floor, in Building A-1, at Wadala Truck Terminal.
1. The sealed tenders for the above mentioned work were invited by
publishing tender notice in daily news paper daily Loksatta & Indian
Express on dated 04.06.08.
2. The notice period was 2 weeks i.e. upto 24.06.08. as per Government
G.R.
3. The time period for the work is Four month, from the date of issue of Work
Order.
4. Total Three (3) nos. of tenders were issued to various agencies between the
issue period of 12.06.08 to 19.06.08. The last date of submission of tender
was 24.06.08. upto 13.00 hrs. The total (3) Three nos. of sealed tender was
received.
5. The post - qualification criteria for bidders has to complete similar type of
work in Government organization.
6. The sealed tenders were opened on 25.06.06 by Shri. S.V.Arlikar,
Executive Engineer, Shri. M.S. Raikar, Deputy Engineer – I and
Shri. J.R. Dabhadkar (A.C.A.O.) and contractor's representative. The
comparative statement for the same is prepared and kept at page c/s.
From the comparative statement it is seen that M/s. Mahendra Sanitation.,
has quoted the rate 6.75% above the estimated rates which is lowest
amongst all the bidders. Seems to be higher side. Therefore, contractor
has called for negotiation on dated 26/06/08. During the negotiation
contractor has reduced their offer and given the revised offer of 5.00 %
above the estimate cost.
7. Tender validity is 120 days from date of opening of tender i.e. upto
23.10.08.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid
meeting was held.
R(L)
9. The registration requirement as per PWD is upto 50 Lakhs. The lowest
bidder is registered with the Executive Engineer, PWD, Andheri in
Class – II category and is entitled to quote for works for Rs.750 Lakhs.
10. The details specifications for each items is included in the tender in
Chapter – XIV tender document.
11. The work site is in possession of MMRDA and work can start immediately
after completion of the formalities like payment of Security Deposit and
signing of agreement etc.
12. M/s. Mahendra Sanitation., who is the lowest is full filling qualification
criteria i.e. bidder has carried out the similar type of work at MTNL
Department.
13. The rates offered by Contractor @ 5.00 % above the estimated cost seems
to be reasonable @ Rs.43,95,003=90 (Rupees Forty Three Lakhs Ninety
Five Thousand Three and Paise Ninety only).T
14. The tender proposal is for Interior furnishing work for office premises on
1st floor of A-1 Building to have better aesthetic view.
15. Considering the above offered by the lowest bidder is @ 5.00% above the
estimated rate is reasonable & competitive. The lowest offer of
M/s. Mahendra Sanitation, @ Rs.43,95,003=90 (Rupees Forty Three Lakhs
Ninety Five Thousand Three and Paise Ninety only) is submitted for
approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(SVA)
A.C.A.O.(D)
Chief T & C.
R(L)
T & C Division.
Dt.
Sub : Annual Maintenance of 5 (Five) Buildings namely A1, B1, B2, D2 &
Amenity Building in Ph – I of Truck Terminal Wadala.
1. The sealed tenders for the above mentioned work were invited by
publishing tender notice in daily news paper daily Dainik Lokmat & Asian
Age on dated 11.04.08.
2. The notice period was 2 weeks i.e. upto 30.04.08. as per Government
G.R.
3. The post - qualification criteria for bidders was the completion of Water
proofing work for minimum 1800 sq.m. which shall include preparing
surface by chemical treatment for minimum 1800 sq.m as a single work in
presiding 3 years and agency should be authorised applicator of the
manufacturer of chemicals to be used for the proposed work.
6. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid
meeting was held.
7. The time period for the work is Six months, from the date of issue of work
order.
8. Total Seven (7) nos. of tenders were issued to various agencies between the
issue period of 10.12.07 to 18.12.07. The last date of submission of tender
was 20.12.07. The total (3) Three nos. of sealed tenders were received.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.
R(L)
Engineering Division.
December 26, 2007.
1. The sealed tenders for the above mentioned work were invited by publishing
tender notice in daily news paper daily Dainik Lokmat & Free Press Journal on
dated 05.12.07.
2. The time period for the work is 12 months, from the date of issue of work order.
3. Total Four (4) nos. of tenders were issued to various agencies between the issue
period of 10.12.07 to 18.12.07. The last date of submission of tender was
20.12.07. The total (4) Four nos. of sealed tender was received but one has not
paid the EMD therefore Envelop – II was not opened.
4. The post - qualification criteria for bidders shall have successfully completion of
similar type of work in past.
5. The sealed tenders were opened on 20.12.07 by Shri .A.P. Athawale, Executive
Engineer (TTW), in presence of the undersigned and Shri. Minde. J.O. from
Account Division and contractor's representative. The comparative statement for
the same is prepared and kept at page c/s. From the comparative statement it
is seen that M/s. Parimal Nursery, has quoted the rate AT PAR the estimated rates
which is lowest (i.e. Rs.17,97,000/-).
6. Tender validity is 120 days i.e. upto 19.03.08.
7. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid
meeting was held.
8. The registration requirement as per PWD is upto 30 Lakhs. The lowest bidder is
registered with the PWD, Andheri Divn., Class-4A category and is entitled to
quote for works for Rs.90 Lakhs.
9. M/s. Parimal Nursery., who is the lowest bidder is full filling qualification criteria
i.e. bidder has carried out the similar type of work in MMRDA amounting to
Rs.12 Lakhs in the year 2006-07.
R(L)
Since the tender offer is “AT PAR” i.e. Rs.17,97,000/- the power to accept
the tender is with the Superintending Engineer.
Submitted please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.
R(L)
T & C Division.
November 18, 2008.
Sub : Annual Maintenance of 5 (Five) Buildings namely A1, B1, B2, D2 &
Amenity Building in Ph – I of Truck Terminal Wadala.
1. The sealed tenders for the above mentioned work were re-invited by publishing tender
notice in daily news paper daily DNA, Sakal and Yasobhumi on dated 26.09.08.
2. The notice period was kept Two weeks as per PWD G.R. upto 08.10.08.
3. The time period for the work is twelve months, from the date of issue of work order.
4. Total Sixteen (16) nos. of tenders were issued to various agencies between the issue
period of 01.10.08 to 08.10.08 he last date of submission of tender was
13.10.08. The total (3) three nos. of sealed tenders were received.
5. The post – qualification criteria for bidders shall have successfully completion of
similar type of work in past.
6. The sealed tenders were opened by Shri. H.N. Nimsarkar, Superintending Engineer, in
presence of the undersigned and J.A.O. (T) and contractor's representative on
14.10.08. The comparative statement for the same is prepared and kept at
page 233 c/s. From the comparative statement it is seen that M/s. M.G. Constructions
has quoted the rate 16.90% above the estimated rates which is lowest
(i.e. Rs.57,99,409/-).
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 50 Lakhs. The lowest bidder is
registered with the PWD Thane in Class III category and is entitle to quote for works
upto Rs.300 Lakhs.
10. M/s. M.G. Constructions who is the lowest is full filling qualification criteria i.e. bidder
has carrying out the similar type of work in Wadala Truck Terminal & MMRDA office
Building.
11. The rates offered by the lowest bidder is @ 16.90% above seems on higher side
therefore the contractor is asked to reduced their offer. Accordingly the contractor has
submitted letter that he is willing to carryout the work on 16.00% above estimated rate
i.e. Rs. 57,54,760/-.
R(L)
12. It is necessary to appoint new agency for this work immediately as there are many
miscellaneous work to be carried out.
13. Rates offered by Contractor M/s. M.G. Constructions @ 16.00% above i.e.
Rs.57,54,760/- seems to be reasonable & competitive.
(S.P. Padikar)
Deputy Engineer - I
D.E.-I (MSR)
E.E.(APA)
ACAO (J)
S.E.(HNN)
Chief T & C
R(L)
T & C Division.
7th Oct., 2009.
Sub : Supplying Bisleri (mineral) water at the office premises in A-1 bldg. @
Truck Terminal Wadala.
The quotation notice for the above mentioned work was called on 23.09.2009. The
notice has been sent to other Government Department like P.W.D., M.H.A.D.A., Notice Board
etc.
The Three quotations were received on 05.092009 same is opened by Executive
Engineer on 07.10.2009 at 15.30 hrs. in presence of A.C.A.O.(J) and the undersigned.
The Comparative Statement for the same is prepared and kept at page c/s.
From Comparative Statement is it observed that M/s M.G. Construction, has quoted AT
PAR the estimated rates which is lowest among all the three quotations.
The cost of lowest quotation works out to Rs. 56,000=60.
Quotation from M/s. M.G. Construction, seems to be reasonable and competitive. The
work will be carried out on Rate List basis.
Submitted for approval please.
(S. P. Padikar)
Deputy Engineer - I
E.E.(MSR)
ACCO.(SMT. JOSHI)
R(L)
Engineering Division.
December 12, 2007.
(S.P. Padikar)
Deputy Engineer - II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
January 10, 2008.
(Arjun G.K.)
Deputy Engineer
E.E.(PSN)
J.A.O.(D)
R(L)
Engineering Division.
September 23, 2008..
Sub : Printing of Measurement books, and forms of bill of Supply, R.A. Bill, 1 st
& Final Bill..
The quotation notice for the above mentioned work was called on . The notice
has been sent to other Government Department like P.W.D., M.H.A.D.A., Notice Board etc.
The Three quotations were received on 08.09.08 and same is opened by Executive
Engineer on 22.09.08 at 15.30 hrs. in presence of A.C.A.O.(D) and the undersigned.
The Comparative Statement for the same is prepared and kept at page c/s.
From Comparative Statement is it observed that M/s. Devendra Offset Printers, has
quoted below the estimated rates which is lowest among all the three quotations.
The cost of lowest quotation works out to Rs.1,85,000/-
Quotation from M/s. Devendra Offset Printers, seems to be reasonable and competitive.
The work will be carried out on A-1 / A-2 Agreement.
Submitted for approval please.
(M.Y. Patil)
Deputy Engineer - I
E.E.
A.C.A.O.(D)
R(L)
Engineering Division.
April 17, 2006.
Sub : Desilting of nallas, SWD's, cleaning of pipes in Ph-I, II, IV & transit camp
Area at Truck Terminal, Wadala.
1. The sealed tenders for the above mentioned work were invited by publishing tender
notice in daily news paper daily Dainik Lokmat on dated 13.03.2006.
3. The time period for the work is Twelve months, from the date of issue of work order.
4. Total four (4) nos. of tenders were issued to various agencies between the issue period
of 20.03.06 to 07.04.06. The last date of submission of tender was 13.04.06. The total
(3) Three nos. of sealed tenders were received.
5. The post - qualification criteria for bidders was the completion of similar type of work
and having ownership & J.C.B, Poclain & Dumper.
6. The sealed tenders were opened by Shri .A.P. Athawale, Executive Engineer (TTW), in
presence of the undersigned and J.A.O.(D) and contractor's representative. The
comparative statement for the same is prepared and kept at page c/s. From the
comparative statement it is seen that M/s. S.K. Construction has quoted the rate 7.99%
above the estimated rates which is lowest amongst all the bidders.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 20 Lakhs. The lowest bidder is
registered with the Executive Engineer, M.J.P., Thane in Class - 4A category and is
entitle to quote for works upto Rs.90 Lakhs.
10. The details specifications for each items is included in the tender in Chapter - X tender
document.
11. The work site is in possession of MMRDA and work can start immediately after
completion of the formalities like payment of Security Deposit and signing of
agreement etc.
R(L)
12. M/s. S.K. Constructions who is the lowest is full filling qualification criteria i.e. bidder
has carried out he similar type of work in last three years.
13. Rates offered by the lowest bidder is @ 7.99% above and are competitive. Considering
above the lowest offer of M/s. S.K. Construction @ Rs.18,75,786=30 i.e. @ 7.99%
above cost put to tender is submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.
R(L)
Engineering Division.
May 09, 2008.
Sub : Desilting of nallas, SWD's, cleaning of pipes in Ph-I, II, IV & transit camp
Area at Truck Terminal, Wadala.
1. The sealed tenders for the above mentioned work were invited by publishing tender
notice in daily news paper daily Dainik Loksatta, Navshakti, Indian Express on dated
23.04.2008.
2. The notice period was 4 weeks i.e. upto 09.05.2008. as per Government G.R.
3. The time period for the work is Twelve months, from the date of issue of work order.
4. Total Ten (10) nos. of tenders were issued to various agencies between the issue period
of 28.04.08 to 05.05.08. The last date of submission of tender was 09.05.08. The total
(3) Three nos. of sealed tenders were received.
5. The post - qualification criteria for bidders was the completion of similar type of work
and having ownership & J.C.B, Poclain & Dumper.
6. The sealed tenders were opened by Shri .A.P. Athawale, Executive Engineer (TTW), in
presence of the undersigned and J.A.O.(D) and contractor's representative. The
comparative statement for the same is prepared and kept at page 47 c/s. From the
comparative statement it is seen that M/s. S.K. Construction has quoted the rate 61.00%
below the estimated rates which is lowest amongst all the bidders.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 90.00 Lakhs. The lowest bidder is
registered with the Executive Engineer, M.J.P., Thane in Class - II category and is
entitle to quote for works upto Rs.750 Lakhs.
10. The details specifications for each items is included in the tender in Chapter - X tender
document.
11. The work site is in possession of MMRDA and work can start immediately after
completion of the formalities like payment of Security Deposit and signing of
agreement etc.
R(L)
12. M/s. S.K. Constructions who is the lowest is full filling qualification criteria i.e. bidder
has carried out he similar type of work in last three years and ownership of J.C.B.,
Poclain, Dumper etc.
13. Rates offered by Contractor @ 61.00% below seems to be on lower side therefore the
contractor have called for justification. Accordingly contractor has given the
justification the letter for the same kept @ Pg.51 c/s.
14. The tender proposal is for desiltation of nallas in Wadala Truck Terminal. These nallas
receives flow up-stream catchment area of Pratiksha Nagar, Indira Nagar, Shanti Nagar.
The inefficient discharging of these nalla could cause Water logging problems in near
by slum. Hence the needed disiltation of these nallas before coming monsoon is really
urgent.
15. Considering the above, offered submitted by the lowest bidder is @ 61.00% below
reasonable & competitive. The lowest offer of M/s. S.K. Constructions
@ Rs.31,03,787=70 i.e. @ 61.00% below cost put to tender is submitted for approval
please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(N)
R(L)
No.ED/TTW/Desilt/06-07. April 26, 2006.
To,
M/s. S.K. Construction.,
Sarla Terrace,
Opp. Neelkamal,
S.T. Road,
Chembur,
Mumbai – 400 071.
Sub : Desilting of Nalla, Storm Water Drain, cleaning of pipes in Phase – I, II,
IV and Transit Camp, area at T.T. Wadala.
Sir,
Your tender dated 13.04.06 for the above mentioned work is proposed to be accepted by
this office. Your lowest offer 7.99% above the estimated cost put to tender, Rs.17,37,000/-
which worked out to Rs.18,75,786=30 (Rupees Eighteen Lakhs Seventy Five Thousand Seven
You are, therefore, requested to pay the initial Security Deposit of Rs.34,800/- (Rupees
Thirty Four Thousand Eight Hundred Only) within the 7 days from the date of issue of this
In case you intend to pay the Initial Security Deposit by way of Bank Guarantee, then
Yours faithfully,
(A.P. Athawale)
Executive Engineer
T.T. Wadala.
R(L)
Engineering Division.
April 28, 2006.
Sub : Erecting temporary Sun proof Mandap, Stage and supplying Furniture,
Lighting, Sound system arrangement on hire basis for official function
anywhere in Mumbai.
M.M.R.D.A. has undertaken the prestigious project like M.U.T.P., M.U.I.P., Metro
Railway, Beautification of Nariman Point etc.
On many occasion these are official functions require to be arranged by this such as
inauguration of PAP’s building, laying foundation stone, opening ceremony etc. by the Hon’ble
Prime Minister or Hon’ble Chief Minister at various locations in Mumbai.
For this purpose there are requirement of various works such as to erection of
temporary pandal, stage lighting, sound system, decorative sinages, panels, sofas & chairs etc.
An estimate for the same is prepared considering provisional quantities for an
amounting of Rs.11,12,400/-. The rates adopted for estimate are approved rate for similar
works carried out previously.
An estimate is submitted for approval, after approval the tender notice will be published
in News paper for calling the tenders in B-1 form from the experience agencies, by giving 15 th
says notice.
The draft tender notice for the same is also prepared and kept at page c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
Engineering Division.
April 28, 2006.
M.M.R.D.A. has undertaken the prestigious project like M.U.T.P., M.U.I.P., Metro
Railway, Beautification of Nariman Point etc.
On many occasion these are official functions require to be arranged by this such as
inauguration of PAP’s building, laying foundation stone, opening ceremony etc. by the Hon’ble
Prime Minister or Hon’ble Chief Minister at various locations in Mumbai.
For this purpose there are requirement of various items related to official function such
as to Banners, Welcome Boards, VVIP Sign Boards, Parking No-Parking Boards, Laser show,
Colour Display of LED Screen, Multi Media Film, Plasma T.V’s etc.
An estimate for the same is prepared considering provisional quantities for an
amounting of Rs.44,31,000/-. The rates adopted for estimate are approved rate for similar
works carried out previously.
An estimate is submitted for approval, after approval the tender notice will be published
in News paper for calling the tenders in B-1 form from the experience agencies, by giving 15 th
says notice.
The draft tender notice for the same is also prepared and kept at page c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
Engineering Division.
April 22, 2007.
1. The sealed tenders for the above mentioned work were invited by publishing tender notice
in daily news paper daily Dainik Lokmat & Free Press Journal on dated 01.05.07.
2. The notice period was kept Two weeks as per PWD G.R.
3. The time period for the work is Twelve month, from the date of issue of work order.
4. Total Eleven (11) nos. of tenders were issued to various agencies between the issue period
of 07.05.07 to 11.05.07. The last date of submission of tender was 16.05.07. The total
(3) Three nos. of sealed tender was received.
5. The post - qualification criteria for bidders shall have successfully completion of similar
type of work in past.
6. The sealed tenders were opened on 17.05.07 by Shri .A.P. Athawale, Executive Engineer
(TTW), in presence of the undersigned and J.A.O.(D) and contractor's representative. The
comparative statement for the same is prepared and kept at page c/s. From the
comparative statement it is seen that M/s. Tulsiram Enterprises has quoted the rate 18.20%
above the estimated rates which is lowest (i.e. Rs.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 50 Lakhs. The lowest bidder is registered
with the PWD Thane in IV (A) class category and is entitled to quote for works up to
90 Lakhs cost.
10. M/s. Tulsiram Enterprises who is the lowest bidder is full filling qualification criteria i.e.
bidder has carried out the similar type of work in Wadala Transit Camp last three years.
11. The rates offered by contractor @ 18.20% above seems on higher side therefore Contractor
is asked for negotiation to reduce their offer. But contractor is not willing reduce their
offer. Therefore it is felt to cancel the tender and recall the same to have a reasonable rates.
R(L)
12. It is very necessary to appoint maintenance contractor before current monsoon. As such it
is proposed to re-invite tender by publishing tender notice in news paper as per norms. A
draft tender notice for the same is prepared & kept at Pg. c/s.
Submitted please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.
R(L)
Engineering Division.
May 10, 2007.
Sub : Repairing of Road with laying B.M., D.B.M., AC and Paver block from
Information booth to West side Compound wall at Truck Terminal Wadala.
1. The sealed tenders for the above mentioned work were invited by publishing tender
notice in daily news paper daily Dainik Lokmat & Free Press Journal on dated
14.04.2007.
3. The time period for the work is one month, from the date of issue of work order.
4. Total Three (3) nos. of tenders were issued to various agencies between the issue period
of 23.04.07 to 04.05.07. The last date of submission of tender was 09.05.07. The total
(3) Three nos. of sealed tender was received.
5. The post - qualification criteria for bidders shall have successfully completion of
similar type of work in past and should own the modern drum hot mix plant (within 60
Km from site) sensor paver, vibratory roller in working condition.
6. The sealed tenders were opened on 09.05.07 by Shri .A.P. Athawale, Executive
Engineer (TTW), in presence of the undersigned and J.A.O.(D) and contractor's
representative. The comparative statement for the same is prepared and kept at page
c/s. From the comparative statement it is seen that M/s. Relcon Infraprojects Pvt. Ltd.
has quoted the rate 30.69% above the estimated rates which is lowest (i.e.
Rs.1,30,62,465=50).
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 100 Lakhs. The lowest bidder is
registered with the PWD Mumbai 1A Class category and is entitled to quote for works
unlimited cost.
10. M/s. Relcon Infraprojects Pvt. Ltd. who is the lowest bidder who is full filling
qualification criteria i.e. bidder has carried out the similar type of work in BKC and
Wadala Transit Camp and also owner of modern drum hot mix plant, sensor paver,
vibratory roller in working conditon.
11. The rates offered by Contractor @ 30.69% above seem to be on higher side therefore
the contractor have asked to furnish justification for the same. Accordingly the
R(L)
contractor submitted the rate analysis for major items based on market. After going
through the rate analysis it is seen that the rates are reasonable and competitive.
12. Considering the heavy traffic such as trailors, dumpers, Transit mixer Buses etc. plying
on this road and considering the present site condition it is felt very necessary to
complete the work before current monsoon as there are many complaints from local
authorities. Also there is complaint from Road monitoring Committee to repair this
road surface.
13. Rates offered by the lowest bidder M/s. Relcon Infraprojects Pvt. Ltd. is 30.69% above
and are competitive. Considering the lowest offer of M/s. Relcon Infraprojects Pvt.
Ltd. at Rs.1,30,62,465=50 is reasonable.
Since the tendered cost is more than Rs.50.00 Lakhs the power to accept the tender is
with the Executive Committee, MMRDA.
A draft item note for the approval of tender proposal @ 30.69% above the estimated
rate of M/s. Relcon Infraprojects Pvt. Ltd. is submitted for approval please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.
R(L)
No.ED/MUIP/Road Impr./BKC/05. May 09, 2006.
To,
__________________________________
__________________________________
__________________________________
__________________________________
Sub : Improvement of road connecting Bandra – Kurla Complex and LBS Marg
including construction of balance portion of Bridge across Mithi River
Sir,
You may please note that Date of Submission for above mentioned work is postponed
and new Date of Submission is 16.05.2006 upto 14.00 Hrs. You may please note that the JV is
Thanking you,
Yours faithfully,
(N.M. Gambhir)
Executive Engineer
R(L)
DRAFT :
To,
Shri. Dinesh T. Gandhy.
Advocate High Court,
307 – 308, Comet, 3rd floor,
Station Road, Opp. Bandra Lake,
Bandra (W),
Mumbai – 400 050.
Sir,
With reference to your above letter I have to state that inspite of giving written
undertaking in Court your client has failed and neglected to handover the land as mentioned in
the notice impugned in the Suit No.550 of 2006 filed by your client by the said notice under
section 299 of BMC Act, your client was required to handover the set back on or before
07.02.06. However your client stated that she will hand over the open set back by demolishing
the Compound Wall and other structure willingly but sought time till her child’s examination
by end of March is over. But till today no action is seen from your client in this regard.
You will appreciate that the proposal submitted by your clients to BMC can be
considered by BMC only after the handing over of the land affected by S.V. Road R.L. by letter
No.ED/MUIP/S.V. Road/Notice 50/2006 dt. 24.02.06, addresses to Executive Engineer
Building proposal H & K (East), MCGM is already requested to consider the request / proposal
of your client on priority in accordance with rules.
The allegations contained in your letter are made by your client with ulterior motives.
Mere statement of your clients that she is ready & willing to cooperate in handing over the area
required for road widening is meaningless.
If your client fail to handover the land required for road widening as per the
undertaking given by your client, we will be constrained to take further steps in the matter as
the drain work is to be completed immediately as the monsoon is approaching in short period.
You are therefore requested to advice your client to handover the open set back by
demolishing the Compound Wall and other structure coming in the Road R.L. willingly.
Thanking you,
Yours faithfully,
(A.P. Athawale)
Executive Engineer
R(L)
No.ED.MUIP/SWD/06. 03.05.2006.
To,
Shri. Dr. Jotiprakash,
Professor I.I.T.,
Powai,
Mumbai.
Sir,
Please find enclosed herewith a design calculation for the stretch of S.V. Road between
Mahim causeway Bandra to Akbar Ali Shop, Santacruz & Link Road from Turner Road to
Shastri Nagar, Santacruz.
As the section of Storm Water Drain is same on the both sides of the road, Design
calculation are done by including catchment area likely to discharge in to the same & other
discharge coming in the drain is also considered.
You are therefore requested to go through the design calculation & offer your remarks.
Thanking you,
Yours faithfully,
(A.P. Athawale)
Executive Engineer
R(L)
No.ED/MUIP/Road Maintenance/E&W Sub/06. May 15, 2006.
To,
__________________________________
__________________________________
__________________________________
__________________________________
Sir,
You may please note that Date of Submission for above mentioned work is postponed
Enclosed please find herewith Addendum containing Pg. – 1, you may please note that
Thanking you,
Yours faithfully,
(J.C. Gandhi)
Executive Engineer
R(L)
Engineering Division.
May 12, 2006.
Sub : (i) Removal of Debris & Unserviceable material from the roads in
Mumbai Suburbs.
(ii) Maintenance of Roads during monsoon in Mumbai Suburbs.
(iii) Desilting of Storm Water Drains of any size & shape during monsoon
anywhere in Mumbai Suburbs.
--- Extension for date of tender submission ---
The tenders for above three works were purchased by five agencies. The
date of submission for the above mentioned tenders was 05.05.2006 upto 13.00
Hrs., the same has extended upto 12.05.06 upto 13.00 hrs. but the tenders were
not received on 12.05.06.
Therefore it is proposed to extend the date of tender submission i.e. on
15.05.06 upto 13.00 hrs.
A draft letter for the same is also prepared to inform the agencies @ Pg.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
C.E.(ED)
R(L)
Engineering Division.
May 16, 2006.
The tenders for above three works were purchased by five agencies. The
date of submission for the above mentioned tenders was 05.05.2006 upto 13.00
Hrs., the same has extended upto 15.05.06 upto 13.00 hrs. but the tenders were
not received on 15.05.06 because bidder has expressed their views that the rate
for Item No.2 removal of debris is very low compare to market rate. Therefore
the request to revised the rate of this item so that they will quote the reasonable
considering the market rate.
In view of this the rate analysis for the Item No.2 considering the lead of
12 Km for removal of debris is prepared based on MCGM FMR Road and kept
@ Pg. c/s. The revised rate worked out to Rs.200/- Per Cum. instead of
Rs.80/- Per Cum. Accordingly quantity is reduced to 1200 Cum. so that total
amount tender will not be change.
It is proposed to extend the date of tender submission i.e. on 17.05.06 upto
13.00 hrs.
The Addendum for revised quantity and rate is prepared and draft letter for
the same to inform the agencies kept @ Pg.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
C.E.(ED)
R(L)
Engineering Division.
May 16, 2006.
As discussed the copy of Order passed by the High Court, Bombay in the
subjected matter is enclosed herewith for your reference and further necessary
action. The undersigned has already carried out the joint inspection of Site on
dt.08.05.06.
A copy of minutes also enclosed below. It is seen from the minutes, there
(A.P. Athawale)
Executive Engineer
R(L)
Engineering Division.
May 17, 2006.
Sub : (I) Removal of Debris & Unserviceable material from the roads in
Mumbai Suburbs. --- Est. Cost : 15,00,000/-
(III) Desilting of Storm Water Drains of any size & shape during monsoon
anywhere in Mumbai Suburbs. -- Est. Cost Rs. 15,00,000/-
1. The sealed tenders for the above mentioned work were invited by publishing tender
notice in daily news paper daily Sakal (Marathi) on dated 14.04.2006.
2. The notice period was 2 weeks i.e. upto 05.05.2006.
3. The time period for the work is Four months, from the date of issue of work order.
4. Total Six (6) nos. of tenders were issued to various agencies between the issue period
of 24.04.06 to 02.05.06. The last date of submission of tender was 05.05.06. The same
was extended upto 17.05.06. The total (2) Two nos. of sealed tenders were received
for each work on 15.05.06 & 17.05.06 upto 13.00 Hrs.
5. The sealed tenders were opened by Shri J.C. Gandhi, Executive Engineer, in presence
of the undersigned and J.A.O.(D) and contractor's representative on same day. The
comparative statement for the same is prepared and kept at page c/s.
The details of lowest bidder are as below.
%ge
Sr. Work Agency Quoted
No. &
Amt. (RS.)
I. Removal of Debris & Unserviceable
material from the roads in Mumbai M/s. N.A. Construction.
40.00% above
Suburbs.
21,00,000/-
II. Maintenance of Roads during monsoon
in Mumbai Suburbs. M/s. Sunrise Stone Ind.
30.00% above
19,50,000/-
III. Desilting of Storm Water Drains of any
size & shape during monsoon anywhere M/s. J. Kantilal & Co. 35.99% above
in Mumbai Suburbs
20,39,850/-
7. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
8. The registration requirement as per PWD is upto 20 Lakhs. The lowest bidders are
registered with the PWD and MCGM in appropriate Class as per requirement.
R(L)
9. The details specifications for each items is included in the tender in Chapter – X and
Special Conditions in Chapter VI of the tender document.
10. The work site is in possession of MMRDA and work can start immediately after
completion of the formalities like payment of Security Deposit and signing of
agreement etc.
11. The lowest bidders has full filling qualification criteria i.e. bidders has carried out the
similar type of work in last three years.
12. Considering the last year experience during monsoon (i.e. some work require to be
done on urgency in case the main contractor fails to carryout the scope of tender /
approved item of the work) and an precautionary measure tender for the above work is
called for, so that as and when require, in case of failure of main contractor the work
will not suffer and same shall be got done through these agencies at the risk & cost of
the main contractor.
13. (a) Since the work is to be done during monsoon / before monsoon in anywhere in
Eastern / Western Suburbs of Mumbai. (b) Considering the shortage of labours
problem. (c) Further the work is require to be done in small magnitude. The rate
quoted is seems to reasonable and hence recommended for approval please.
14. Considering the above mentioned reasons rates offered by the lowest bidder is for work
(I) is 40.00% above, for work (II) is 30.00% above, & for work (III) is 35.99% above
are competitive and reasonable.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
Engineering Division.
May 17, 2006.
R(L)
Sub : Maintenance of Roads during monsoon in Mumbai Suburbs.
1. The sealed tenders for the above mentioned work were invited by publishing tender
notice in daily news paper daily Sakal (Marathi) on dated 14.04.2006.
3. The time period for the work is Four months, from the date of issue of work order.
4. Total Six (6) nos. of tenders were issued to various agencies between the issue period
of 24.04.06 to 02.05.06. The last date of submission of tender was 05.05.06. The same
was extended upto 15.05.06. The total (2) Two nos. of sealed tenders were received on
15.05.06 upto 13.00 Hrs.
5. The sealed tenders were opened by Shri J.C. Gandhi, Executive Engineer, in presence
of the undersigned and J.A.O.(D) and contractor's representative on 17.05.06. The
comparative statement for the same is prepared and kept at page c/s. From the
comparative statement it is seen that M/s. Sunrise Stone Industries has quoted the rate
30.00% above the estimated rates which is lowest amongst all the bidders.
7. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
8. The registration requirement as per PWD is upto 20 Lakhs. The lowest bidder is
registered with the Executive Engineer, PWD, Mumbai, in Class – 1 (B) category and is
entitle to quote for works upto 2500 Lakhs.
9. The details specifications for each items is included in the tender in Chapter - X tender
document.
10. The work site is in possession of MMRDA and work can start immediately after
completion of the formalities like payment of Security Deposit and signing of
agreement etc.
R(L)
11. M/s. Sunrise Stone Industries who is the lowest is full filling qualification criteria i.e.
bidder has carried out the similar type of work in last three years.
12. Rates offered by the lowest bidder is @ 30.00% above and are competitive.
Considering above the lowest offer of M/s. Sunrise Stone Industries @ Rs.19,50,000/-
i.e. @ 30.00% above cost put to tender is submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
R(L)
Engineering Division.
May 17, 2006.
Sub : Desilting of Storm Water Drains of any size & shape during monsoon anywhere in
Mumbai Suburbs.
The sealed tenders for the above mentioned work were invited by publishing tender notice in
daily news paper daily Sakal (Marathi) on dated 14.04.2006.
3. The time period for the work is Four months, from the date of issue of work order.
4. Total Seven (7) nos. of tenders were issued to various agencies between the issue
period of 24.04.06 to 02.05.06. The last date of submission of tender was 05.05.06.
The same was extended upto 15.05.06. The total (2) Two nos. of sealed tenders were
received on 15.05.06 upto 13.00 Hrs.
5. The sealed tenders were opened by Shri J.C. Gandhi, Executive Engineer, in presence
of the undersigned and J.A.O.(D) and contractor's representative on 17.05.06. The
comparative statement for the same is prepared and kept at page c/s. From the
comparative statement it is seen that M/s. J. Kantilal & Co. has quoted the rate 35.99%
above the estimated rates which is lowest amongst all the bidders.
7. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
8. The registration requirement as per PWD is upto 20 Lakhs. The lowest bidder is
registered with the Executive Engineer, MCGM, in Class – B category and is entitle to
quote for works upto 100 Lakhs.
9. The details specifications for each items is included in the tender in Chapter - X tender
document.
10. The work site is in possession of MMRDA and work can start immediately after
completion of the formalities like payment of Security Deposit and signing of
agreement etc.
R(L)
11. M/s. J. Kantilal & Co. who is the lowest is full filling qualification criteria i.e. bidder
has carried out the similar type of work in last three years.
12. Rates offered by the lowest bidder is @ 35.99% above and are competitive.
Considering above the lowest offer of M/s. Sunrise Stone Industries @ Rs.20,39,850/-
i.e. @ 35.99% above cost put to tender is submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
R(L)
Engineering Division.
May 20, 2006.
(M.S. Raikar)
Deputy Engineer – I
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
No.ED/MUIP/Monsoon Rd. Repari/06. June 2, 2006.
To,
M/s. J. Kantilal & Co.,
A-28/112, Siddharth Nagar,
Goregaon (W),
Mumbai – 400 104.
LETTER OF INTENT
Sub : Desilting of Storm Water Drains of any size & shape during monsoon
anywhere in Mumbai Suburbs.
Sir,
Your tender dated 15.05.06 for the above mentioned work is proposed to be accepted by
this office. Your offer 35.99% above the estimated cost put to tender, Rs.15,00,000/- which
worked out to Rs.20,39,850=00 (Rupees Twenty Lakhs Thirty Nine Thousand Eight Hundred
You are, therefore, requested to pay the initial Security Deposit of Rs.22,500/- (Rupees
Twenty Two Thousand Five Hundred Only) immediately from the date of issue of this letter
and start the work immediately and also to attend this office to sign the agreement.
In case you intend to pay the Initial Security Deposit by way of Bank Guarantee, then
Yours faithfully,
(J.C. Gandhi)
Executive Engineer
R(L)
No.ED/MUIP/Monsoon Rd. Repari/06. June 2, 2006.
To,
M/s. N.A. Construction.
Ground floor,
Park Reach, 10th Road,
TPS IV, Bandar (W),
Mumbai – 400 050.
LETTER OF INTENT
Sub : Removal of Debris & Unserviceable material from the roads in Mumbai
Suburbs.
Sir,
Your tender dated 17.05.06 for the above mentioned work is proposed to be accepted by
this office. Your offer 40.00% above the estimated cost put to tender, Rs.15,00,000/- which
worked out to Rs.21,00,000=00 (Rupees Twenty One Lakhs Only) is acceptable to us.
You are, therefore, requested to pay the initial Security Deposit of Rs.22,500/- (Rupees
Twenty Two Thousand Five Hundred Only) immediately from the date of issue of this letter
and start the work immediately and also to attend this office to sign the agreement.
In case you intend to pay the Initial Security Deposit by way of Bank Guarantee, then
Yours faithfully,
(J.C. Gandhi)
Executive Engineer
R(L)
No.ED/MUIP/Monsoon Rd. Repari/06. June 2, 2006.
To,
M/s. Sunrise Stone Industries.
42-A, Damupada,
Akurli Road,
Kandivali (E),
Mumbai – 400 101.
LETTER OF INTENT
Sir,
Your tender dated 15.05.06 for the above mentioned work is proposed to be accepted by
this office. Your offer 30.00% above the estimated cost put to tender, Rs.15,00,000/- which
worked out to Rs.19,50,000=00 (Rupees Nineteen Lakhs Fifty Thousand Only) is acceptable to
us.
You are, therefore, requested to pay the initial Security Deposit of Rs.22,500/- (Rupees
Twenty Two Thousand Five Hundred Only) immediately from the date of issue of this letter
and start the work immediately and also to attend this office to sign the agreement.
In case you intend to pay the Initial Security Deposit by way of Bank Guarantee, then
Yours faithfully,
(J.C. Gandhi)
Executive Engineer
R(L)
Engineering Division.
Dt.
Sub : Draft tender papers for the work of Erecting temporary Sun proof
Mandap, Stage & Supplying Funiture, Lighting Sound System
arrangement function anywhere in Mumbai.
The draft tender papers for the above mentioned work are prepared and
kept below.
Also and estimate for printing & binding tender 10 copies is prepared and
kept at Page to c/s. for an amount of Rs.4,230/-.
After approval the work of printing & binding of tender copies will be
carried out on Rate list on approved rates.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
Engineering Division.
Dt.
Sub : Draft tender papers for the work of Providing / Supplying / fixing
various items related to offical function anywherein Mumbai.
The draft tender papers for the above mentioned work are prepared and
kept below.
Also and estimate for printing & binding tender 10 copies is prepared and
kept at Page to c/s. for an amount of Rs.4,230/-.
After approval the work of printing & binding of tender copies will be
carried out on Rate list on approved rates.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
Engineering Division.
June 5, 2006.
Sub : Structural repairs to A-1, B-2 & D-2 bldg and miscellaneous works in
Ph – I of T.T.W.
---- Estimate ----
There are four building which was constructed in the year of 1994 by MMRDA
for offices & godowns at Wadala T.T.
During the inspection it is observed that the beams & chajjas of these four
buildings at various floor level has developed a crack at many places from outside. The
photographs of the same has been kept at page 29 to 69 c/s.
It is necessary to repair the same urgently to avoid further damages of structure
and corrosion of reinforcement and to stop the leakages.
An estimate is prepared considering items of applying corrosion inhibitor EPCO-
KP-100, two coats of IPNET-RB for reinforcement, EPIBOND epoxy for bonding to
old concrete and new polymer modified mortar.
An estimate works out to Rs.4,92,600/- based on the approved rate for similar
work at WTT. since the work is specialize and urgent nature we may carryout by calling
quotation from experience agencies on A1 / A2 basis.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.(ED)
R(L)
ED/MUIP/Rds/Monsoon Works/06. Engineering Division.
June 6, 2006.
To,
All MUIP E.Es
R(L)
that due to their non action the said scope (give specific chainages / details) is
being carried out at their risk & cost, which will also mean that legal action will
be taken for act of negligence, you may please note.
This letter shall be treated as the Notice to carry out the scope at your risk
and cost.
(A.V. Deshingkar)
Chief Engineer
Copy to :
1) All MUIP Engineers for information and necessary action. All shall take
serious note of above instructions and ensure strict compliance. Any
failure shall be viewed seriously and actions will be taken.
2) All PMCs & Contractors.
3) Master file.
4) SWD file.
O/c submitted to the AMC & PD / M.C., MMRDA for favour of information.
R(L)
Engineering Division.
May 26, 2006.
Sub : Carrying out Video & Still Photography of the Drains along & under the
18 corridors of roads being developed by MMRDA.
--- Quotation ---- Estimated Cost Rs. 50,000/-
The Three quotations were collected from the experienced agency who has carried out
similar type of works and same is opened by Executive Engineer (JCG) on 25.05.06 at 15.30
hrs. in presence of J.A.O.(D) and the undersigned.
The Comparative Statement for the same is prepared and kept at page c/s.
From Comparative Statement is it observed that M/s. Tandon & Associates, has quoted
AT PAR the estimated rates which is lowest among all the three quotations.
The cost of lowest quotation works out to Rs.50,000/-.
Quotation from M/s. Tandon & Associates., seems to be reasonable and competitive.
The work will be carried out on Rate List basis.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
Engineering Division.
June 7, 2006.
1. The sealed tenders for the above mentioned work were invited by publishing
tender notice in daily news paper Vartahar (Marathi) on dated 27.05.2006.
3. The time period for the work is Twelve months, from the date of issue of work
order.
4. Total Three (3) nos. of tenders were issued to various agencies between the issue
period of 24.05.06 to 02.06.06. The last date of submission of tender was
02.06.06. The same was extended upto 07.06.06. The total (3) Three nos. of
sealed tenders were received on 07.06.06 upto 13.00 Hrs.
5. The sealed tenders were opened by Shri J.C. Gandhi, Executive Engineer, in
presence of the undersigned and J.A.O.(D) and contractor's representative on
07.06.06. The comparative statement for the same is prepared and kept at page
c/s. From the comparative statement it is seen that M/s. Vartika Advertising. has
quoted the rate AT PAR the estimated rates which is lowest amongst all the
bidders.
7. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid
meeting was held.
8. The work order to the selected tenderer will be issued for the work of individual
function when it is officially decided.
9. M/s. Vartika Advertising who is the lowest is full filling qualification criteria i.e.
bidder has carried out the similar type of work in last three years and having
solvency amounting to Rs.20.00 Lakhs with State Bank of India of Hydrabad,
Kalina Branch.
R(L)
10. Rates offered by the lowest bidder is AT PAR and are competitive. Considering
above the lowest offer of M/s. Vartika Advertising @ Rs.44,31,000/- i.e. AT PAR
cost put to tender is submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
CAO & FA
AMC & PD
R(L)
Engineering Division.
June 7, 2006.
Sub : Work of Erecting temporary Sun proof Mandap, Stage & Supplying
Funiture, Lighting Sound System arrangement function anywhere in
Mumbai.
1. The sealed tenders for the above mentioned work were invited by publishing
tender notice in daily news paper Vartahar (Marathi) on dated 27.05.2006.
3. The time period for the work is Twelve months, from the date of issue of work
order.
4. Total Three (3) nos. of tenders were issued to various agencies between the issue
period of 24.05.06 to 02.06.06. The last date of submission of tender was
02.06.06. The same was extended upto 07.06.06. The total (3) Three nos. of
sealed tenders were received on 07.06.06 upto 13.00 Hrs.
5. The sealed tenders were opened by Shri J.C. Gandhi, Executive Engineer, in
presence of the undersigned and J.A.O.(D) and contractor's representative on
07.06.06. The comparative statement for the same is prepared and kept at page
c/s. From the comparative statement it is seen that M/s. Pratap D. Thakkar &
Co., has quoted the rate AT PAR the estimated rates which is lowest amongst all
the bidders.
7. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid
meeting was held.
8. The work order to the selected tenderer will be issued for the work of individual
function when it is officially decided.
9. M/s. Pratap D. Thakkar & Co., who is the lowest is full filling qualification
criteria i.e. bidder has carried out the similar type of work in last three years and
having solvency amounting to Rs.10.00 Lakhs with Syndicate Bank, Matunga
Branch.
R(L)
10. Rates offered by the lowest bidder is AT PAR and are competitive. Considering
above the lowest offer of M/s. Pratap D. Thakkar & Co., @ Rs.11,12,400/- i.e.
AT PAR cost put to tender is submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
CAO & FA
AMC & PD
R(L)
Engineering Division.
June 8, 2006.
The internal roads in Wadala Truck Terminal carrying the heavy traffic movement such
as Tailors, Tankers, Tourist Buses and RMC trucks and bouzers.
During the current monsoon the pot holes accurd on the road surface mainly on road
from information booth to Sion – Koliwada Junction, road for information to rawliy channel
and road along the rawliy channel.
To avoid further damage of road and also to have smooth traffic flow during monsoon it
is necessary to attend these pot holes by filling and compacting of size metal & stone dust
during monsoon and laying of bituminous macadam and seal coat in dry spell.
An estimate is prepared considering items of supply of metals / Stone dust, spreading
and compacting the same and laying 50mm thick BM and 10mm thick seal coat for an amount
of Rs. The rates adopted for estimate is approved rate from the tender of rectification
of D.P. Road at Wadala T.T.
As the work is of urgent nature same will be carried out on A-1 / A-2 basis by calling
quotations from experience contractors.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(M)
C.E.(ED)
R(L)
Engineering Division.
June 12, 2006.
M.M.R.D.A. has taken up the project of major Roads, Bridges and Flyovers in
Mumbai City under M.U.I.P. and also Building works under M.U.T.P.
For these projects new Deputy Engineers are appointed by Department. For
these Deputy Engineers should have knowledge of Standard Specifications for times of
Road Work, Bridge work. Etc.
Therefore it is proposed to purchase the 25 copies of Vol – I & 25 copies of
Vol – II of Standard Specification of P.W.D. which is published in year 1979 & 1981.
The P.W. Dept. has approved rate of this book Rs.200/- to M/s. Shenoy Technical
Services who is authorised Supplier of P.W.D.
Accordingly 25 No. Vol – I & 25 No. Vol – II books of Standard Specification is
purchased from the M/s. Shenoy Technical Services. The bill for the same is submitted
herewith for an amount of Rs.10,000/-
The bill in form of “Supply & Service” is prepared for the same in favour of
M/s. Shenoy Technical Services for an amount of Rs.10,000/-
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
No.ED/MUIP/Road. Imp/BKC/05. . June 16, 2006.
To,
The Chief Engineer.,
M.S.R.D.C. Ltd.,
Camp Office,
Aurangabad.
(A.V. Deshingkar)
Chief Engineer
R(L)
Engineering Division.
August 2, 2006.
Sub : Repairing of compound wall, fixing manhole cover, jali on water gullies in
Ph – I, at Truck Terminal Wadala.
--- Estimated Cost Rs. 4,88,300/-
The quotation notice for the above mentioned work was called on
24.07.06. The notice has been sent to other Government Department like P.W.D.,
M.H.A.D.A., Notice Board etc.
The Three quotations were received on 01.08.06 and same is opened by
Executive Engineer on 01.08.06 at 16.30 hrs. in presence of J.A.O.(D) and the
undersigned.
The Comparative Statement for the same is prepared and kept at
page c/s.
From Comparative Statement is it observed that M/s. M.G. Construction,
has quoted @ 1.10% below the estimated rates which is lowest among all the
three quotations. The cost of lowest quotation works out to Rs.4,82,928.70.
Quotation from M/s. M.G. Construction, seems to be reasonable and
competitive. The work will be carried out on A-1 / A-2 basis.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering Division.
June 30, 2006.
The compound wall on Eastern side as well as West side around the
Ph – I of T.T. Wadala is found damage at some places. The Anik Wadala Road is
going along the Eastern side compound wall of T.T.Wadala. The intensity of
traffic is high on this road; there are chances of trespassers entering through this
broken wall directly in the Truck Terminal area for illegal activities and theft. It
is necessary to repair this compound wall at these locations.
Considering items of pulling down the stone masonry, providing new
masonry, applying sand faced plaster the estimate is prepared for an amount of
Rs.4,88,300/-. The rates adopted for the estimate are taken from the Bldg, DSR
year 2006-2007.
Since the work is of urgent nature needs to carried out on A-1, A-2 basis.
Submitted for approval please.
(S.P.Padikar)
Deputy Engineer-
II
E.E.(APA)
J.A.O.(D)
S.E.(M)
C.E.(ED)
R(L)
Engineering Division.
July 6, 2006.
(M.S. Raikar)
Deputy Engineer
E.E. (APA)
J.A.O. (D)
R(L)
Engineering Divison.
August 24, 2006.
The MMRDA has constructed four buildings A1, B1, B2 & D2 in Wadala
Truck Terminal for the office premises and godowns in the year of 1994. The
structure of RCC frame type with sloping concrete slab provided at the terrace.
Originally, along with the construction, the brick bat coba type of water proofing
treatment was provided to the terrace. It is the general experience that such
cement based water proofing treatments usually render satisfactorily services for
7 to 8 years after which some sort of replacement becomes necessary.
2 In the last monsoon and also in this monsoon the terrace slab of building
B1 & B2 have shown sizeable cracks and there are major leakage on the top floor
of these two buildings in last 2 to 3 years. Also there are complaints regarding
leakages of terrace from RTO office and Mahasangh office which is occupants of
these buildings. Therefore earlier the surface of terrace was repaired in the
patches but the purpose has not served because cracks and lot of poping up has
taken place in the structure mainly due to rusting of reinforcement bar embedded
in the concrete. The photographs of the damaged portion of terrace slab for the
both buildings i.e. B1 & B2 are also taken and kept Pg. 23 to 29 c/s.
The main reason for rusting reinforcement bar are as follows :-
During course of rainy season water get seeps in the concrete through the
cracks and water get deposited in the concrete the chloride present in the air get
saturated with water expands & widen the cracks and thereby allowing more
water to penetrate in the concrete. Therefore reinforcement bars embedded in the
concrete get contact with air and water which needs to oxidation of steel and
rusting start to the reinforcement bars. If the rusting is not timely arrested the
corrosion will take further and the diameter of the reinforcement bar gets reduced
substantially reducing its strength and load carrying capacity and can result into
failure. Since the leakage are measure the local repair is not advisable.
3. Therefore it is very much necessary to make terrace as water tight as
possible for which a guaranteed water proofing has to be done along with some
R(L)
structural repairs to the terrace of these two buildings B1 & B2 at WTT. So as
avoid the further damages & to increase life of structure.
4. An estimate is prepared for the structural repair and waterproofing work
considering the item of corrosion treatment by providing two coat of IP-Net RB
for reinforcement, leak proof treatment by injection grouting method and then
Brick Bat coba and flooring of broken china mosaic. The estimate is based on
the rates adopted from current building DSR and approved tender rate for similar
work of office building in BKC.
5. The estimated cost for the work of waterproofing to terrace for B1 & B2
buildings amounting to Rs.42,62,000/- (net). The expenditure incurred will be
debited to budget provision made for WTT.
Considering the urgency the tender notice can be published in the news
paper by giving 15 days notice period.
A draft tender notice for the same is prepared and kept Pg. 53 c/s.
Submitted for approval please.
(S.P,Padikar)
Deputy Engineer - I
E.E. (APA)
J.A.O. (D)
S.E.
AMC (Engg)
R(L)
Engineering Division.
July 20, 2006.
under MUIP. The total length of such corridor is 1500 Km. The works for these
corridors already started in the year of 2004 and by the time approximate 1000
During the widening of these corridors the some trees are removed because
of hindrance. While granting the permission for tree cutting the MCGM tree
authority has informed that MMRDA has to plant the new trees along these
corridor at the 7 mtr. c/c distance. The provision for planting these trees is
already made all along these corridors. Also the tree authority has advice that
MMRDA should appoint the Horticultural consultant for the guidance, follow-up
and co-ordination. With main contractor so that the plantation work will be
M/s. H.A. Raje & Associates who is Horticultural consultant and also member of
tree authority. M/s. H.A. Raje & Associates has given the consent advisory
(ii) And for additional visit Rs.3,000/- will be charged per visit.
R(L)
Initially he may appoint M/s. H.A. Raje & Associates., for one year period
the cost is worked out for the one year period Rs.1,44,000/- for regular visit and
for additional visit Rs.72,000/- considering additional two visit per month. The
total amount works out to Rs.2,16,000/- considering the overall project cost this
amount is reasonable.
(M.S. Raikar)
Deputy Engineer – I
R(L)
CHECK LIST FOR ADMINISTRATIVE APPROVAL TO WORKS
D.E.(MSR)
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
A.M.C.(Engg)
CAO & FA
M.C.
R(L)
Engineering Division.
July 27, 2006.
Sub : Improvement to the internal road from Informationbooth to Petrol Pump at Wadala Truck
Terminal.
The above mentioned work tender is cancel and recalled. Therefore, now it
is proposed to refund the EMD of the below mentioned bidders.
(M.S. Raikar)
Deputy Engineer
E.E. (APA)
J.A.O. (D)
R(L)
Engineering Division.
July 23, 2007.
D.E.-I (MSR)
E.E. (APA)
J.A.O.(D)
R(L)
Engineering Division.
September 13, 2006.
Sub : Structural repairs & water proofing treatment to the terrace of B1 &
B2, building in Ph – I at Wadala Truck Terminal.
---- Publishing in The Asian Age & Sakal Mumbai dt.26.08.06.
Tender Notice for the above mentioned work was published in the news
papers The Asian Age & Sakal Mumbai on dt.26.08.06 by M/s. Dynamic
Advertising & Research Team Pvt. Ltd. on dt.26.08.06.
Accordingly the agency has submitted the bill for publishing tender notice
for an amount of Rs.13,260/- with 15% discount of Rs.1,989/- the Net amount is
Rs.11,271/-.
The bill in the form of Supply & Services for above mentioned work is
prepared for an amount of Rs.11,038/-/- in favour of M/s. Dynamic Advertising
& Research Team Pvt. Ltd. The necessary deductions are made as per rules in
force.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
August 25, 2006.
The Everard nagar flyover located on Eastern Express Highway carrying the heavy
loaded traffic such as Trailors, Trucks, Dumpers, etc. coming from Mumbai Port Trust & going
to Eastern Express Highway.
It is observed that during this monsoon there are no. of pot holes created on road
surface of bridge. The traffic flow is obstructed & creating traffic jam & unsafe condition for
the vehicular traffic due to pot holes, creating breakdown of vehicles & accidents on bridge.
To avoid the unsafe condition & to protect the bridge slab it is necessary to fill up pot
holes by putting B.M. & sealing with Asphalt concrete.
In this regard there is request from Senior Police Inspector, Traffic (Chembur Divn.) to
carryout the repairs immediately. Also there are orders from High Court to fill up the pot holes
on roads immediately. Therefore it is necessary to carryout repairs on bridge surface to have a
smooth & safe traffic.
An estimate is prepared for filling up pot holes by B.M. & sealing with A.C. for an
amounting to Rs.2,00,000/-. Since the work is of urgent nature which has to be carryout
immediately by closing the traffic. The work will be carried out on A-1 / A-2 basis through
experienced agency.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
AMC (Engg)
R(L)
Engineering Division.
July 31, 2007.
The above mentioned work awarded to M/s. Deepcon Engineers, vide Work Order
under reference. The agency has completed the above subject work satisfactorily
The 1st & Final Bill for the same work is prepared in favour of M/s. Deepcon
Engineers.
Details of the bill are as follows :
Rs. 4,65,699.00
Submitted for payment please.
(I.A. Ansari)
Deputy Engineer
E.E./S.E.(JCG)
JAO(D)
R(L)
Engineering Division.
September , 2006.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
AMC (Engg.)
R(L)
Engineering Division.
September 7, 2006.
Engineering
Division.
March 31, 2007.
Sub : Providing & laying marbonite flooring to the canteen of MMRDA office
Bldg.
The 1st & Final Bill for the abovementioned work was carried out on A-1 Agreement
from M/s. Allied Constructions.
The 1st & Final. Bill for the work are recorded in M.B. No.1191 Pg.33 to 35
Details of the bill are as follows :
Gross Amount = Rs. 3,89,722.00
Less : I.T. @ 2% (-) = Rs. 7,794.00
Less : S.C. 10% on I.T. (-) = Rs. 779.00
Less : WCT. 2% (-) = Rs. 7,794.00
Less : Edu cess @ 2% on I.T. & S.C. (-) = Rs. 171.00
Rs. 3,73,184.00
(I.A. Ansari)
Deputy Engineer
E.E(PKN)
JAO(D)
R(L)
Engineering Division.
September 8, 2006.
The road from information booth to Petrol Pump upto West side compound wall
of Truck Terminal Wadala is carrying heavy traffic movement due to plants located in
surrounding area. Also there is weigh bridge located in this area therefore loaded
Trucks, Tailors Dumpers are coming to this road due to such heavy traffic during
current monsoon period the major portion of this internal road is damaged by creating
large no. of pot holes on road surface. The major road stretch are –
15. Area around information booth.
16. Road from information booth to Petrol Pump.
17. Petrol Pump to West side compound wall of Ph – I.
This is also a another link to Sion through Truck Terminal area.
To avoid further damage & to have a smooth traffic flow on road. The potholes
needs to be filled up by stone metal and stone dust with properly compacted by roller.
In view of above the pot holes on road are surveyed and around
5000 Sqm is needs to be repaired by filling metal.
An estimate is prepared for an amounting to Rs.4,98,000/- the rates taken for the
estimate are approved tender rate for work of Repairing of internal road from Information
booth to West side Compound wall by filling metal, stone dust and compaction at Truck.
Since the work is of urgent nature it is proposed to carryout on A-1 / A-2 basis from
experienced agency.
Submitted for approval please.
(M.S. Raikar)
D.E. – I
E.E.(APA)
JAO(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering Division.
September 8, 2006.
The road from culvert E to Hemant Manjrekar Marg i.e. Sion – Koliwada
connector road is having loaded traffic flow due to plants located in Ph – IV area of T.T.
Wadala. Also there is weigh bridge located in this area therefore loaded Trucks, Tailors
Dumpers are coming to this road due to such heavy traffic during current monsoon
period the major portion of this road is damaged by creating large no. of pot holes on
road surface.
The major road stretch is from culvert E upto Hemant Manjrekar Marg, to have
smooth traffic flow on this road the potholes needs to be repair by filling stone metal
and stone dust with compaction over it.
In view of above the pot holes on road are surveyed and
around Sqm is needs to be repaired by filling metal.
An estimate is prepared for an amounting to Rs. /- the rates taken for
the estimate are approved tender rate for work of Repairing of road culvert E to Hemant
Manjrekar Marg, at T.T. Wadala.
Since the work is of urgent nature it is proposed to carryout on A-1 / A-2
basis from experienced agency.
Submitted for approval please.
(M.S. Raikar)
D.E. – I
E.E.(APA)
JAO(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering Division.
September 13, 2006.
Sub : Water proofing treatment at various units in A-1, B-1, B-2 and D-2
Building and miscellaneous work at Truck Terminal Wadala.
R(L)
Since the work is urgent nature it is proposed to carryout on A-1/A-2 basis
from experience agency after calling the quotations.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
JAO(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering Division.
September 15, 2006.
(A.P. Athawale)
Executive Engineer
S.E.(PBM)
AMC(Engg)
Lands Manger
R(L)
Engineering Division.
September 20, 2006.
The quotation notice for the above mentioned work was called on 11.09.06. The notice
has been sent to other Government Department like P.W.D., M.H.A.D.A., Notice Board etc.
The Three quotations were received on 18.09.06 and same is opened by Executive
Engineer on 18.09.06 at 15.30 hrs. in presence of J.A.O.(D) and the undersigned.
The Comparative Statement for the same is prepared and kept at page 87 c/s.
From Comparative Statement is it observed that M/s. N.A. Construction, has quoted
0.10% below the estimated rates which is lowest among all the three quotations.
The cost of lowest quotation works out to Rs.1,99,800/-.
Quotation from M/s. N.A. Construction., seems to be reasonable and competitive. The
work will be carried out on A1/A2 Agreement.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering Division.
September 28, 2006.
A note received from marketing cell requesting to fix informatory boards at T.T.
Wadala for Pay & Park Scheme at T.T. Wadala.
The Metropolitan Commissioner has approved the Pay & Park proposal to be
implemented in Ph-I of Wadala .Truck Terminal.
To implement the scheme, it is necessary to erect some board indicating Car
Parking and Parking for Heavy Vehicles etc.
In this regard T&C Divn. has submitted a note for the specifications & sizes of
boards. To prevent the thefts of boards, the material used is FRP / PVC mounted on
twin pole size & 1200mm x 900mm & 2 m high from road level.
In view of the above an estimate is prepared for 16 boards including fixing c.c.
block for an amounting of Rs.3,22,900/-. Rate consider for estimate is as per PWD /
DSR year 2005 – 06.
Since the work is of urgent nature it is proposed to carryout on A-1/A-2 basis
by calling quotation.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
R(L)
Engineering Division.
September 25, 2006.
R(L)
M/s. J. Kumar & Co. (India) Pvt. Ltd., who is the lowest quoted 12.42% above the
estimated cost and after negotiation, agreed to 12.30% above the estimated cost works
out to Rs.7,81,72,030/- is fulfilling the qualifying criteria as mentioned in the tender.
The other details of the work are as under :-
1. Administrative approval Rs.782.80 Lakhs.
2. Technical sanction. Rs.782.80 Lakhs.
3. Cost put to tender. Rs.696.10 Lakhs.
4. Date of tender notice published 24.07.06.
5. Tender notice published in news paper
Times of India (All Editions)
6. Period of issue of blank tender 28.07.06 to 07.08.06
7. Cost of blank tender form Rs.5000/-
8. Date of Pre-Bid meeting 04.08.06.
9. Date of receiving sealed tender 11.08.06
10. Date of opening of sealed tender 17.08.06
11. No. of blank forms issued 3 Nos.
12. No. of sealed tender received 2 Nos.
13. Budget Provision Provision for BKC – Rs.1500.00
Lakhs ( 2006 – 07)
The lowest of M/s. J. Kumar & Co. (India) Pvt. Ltd., at 12.30% above the
estimated rates i.e. Rs.7,81,72,030/- can be accepted for the reasons as under -
1. The work includes construction of bridge across Mithi River . The bridge is to
be constructed with Box girders, this requires major staging (scaffolding) to be
erected across the river. The tidal effect during construction will also make the
difference.
2. The rates of major item i.e. steel & cement which is growing day by day in the
market.
3. Agency is carrying out many projects particularly bridge works for MMRDA at
present.
Accordingly an item note is prepared for obtaining the approval of Executive
Committee for the lowest offer kept at Pg.483 c/s.
(M.S. Raikar)
Deputy Engineer – I
E.E.(NMG)
JAO(D)
S.E.(JCG)
AMC(Engg)
CAO & FA
M.C.
Engineering Division.
November 28, 2006.
Sub : Repair and maintenance of Building B-1 & B-2 in Ph-I of Wadala
Truck Terminal.
R(L)
--- Estimated Cost Rs. 4,90,840/-
The quotation notice for the above mentioned work was called on
20.11.06. The notice has been sent to other Government Department like P.W.D.,
M.H.A.D.A., Notice Board etc.
The Three quotations were received on 28.11.06 and same is opened by
Executive Engineer on 28.11.06 at 16.00 hrs. in presence of J.A.O.(D) and the
undersigned.
The Comparative Statement for the same is prepared and kept at
page c/s.
From Comparative Statement is it observed that M/s. M.G. Construction,
has quoted @ (-) 0.25% below the estimated rates which is lowest among all the
three quotations. The cost of lowest quotation works out to Rs.4,89,613/-.
Quotation from M/s. M.G. Constructions, seems to be reasonable and
competitive. The work will be carried out on A-1 / A-2 basis.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering Division.
November 28, 2006.
The quotation notice for the above mentioned work was called on
20.11.06. The notice has been sent to other Government Department like P.W.D.,
M.H.A.D.A., Notice Board etc.
The Three quotations were received on 28.11.06 and same is opened by
Executive Engineer on 28.11.06 at 16.00 hrs. in presence of J.A.O.(D) and the
undersigned.
The Comparative Statement for the same is prepared and kept at
page c/s.
From Comparative Statement is it observed that M/s. M.G. Construction,
has quoted @ (-) 1.50% below the estimated rates which is lowest among all the
three quotations. The cost of lowest quotation works out to Rs.1,35,841/-.
Quotation from M/s. M.G. Constructions, seems to be reasonable and
competitive. The work will be carried out on A-1 / A-2 basis.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering Division.
The quotation notice for the above mentioned work was called on 26.04.06. The notice
has been sent to other Government Department like P.W.D., M.H.A.D.A., Notice Board etc.
The Three quotations were received on 05.05.06 and same is opened by Executive
Engineer on 05.05.06 at 15.30 hrs. in presence of J.A.O.(D) and the undersigned.
The Comparative Statement for the same is prepared and kept at page c/s.
From Comparative Statement is it observed that M/s. Shree Engineering Construction
Co, has quoted 0.15% below the estimated rates which is lowest among all the three
quotations.
The cost of lowest quotation works out to Rs.43,934/-.
Quotation from M/s. Shree Engineering Construction Co., seems to be reasonable and
competitive. The work will be carried out on Rate List basis.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
AMC(Engg)
R(L)
Engineering
Division.
October 31, 2006.
Tender for above mentioned work has been accepted and awarded to
M/s. M.G. Constructions, who is the lowest.
As per the requirement M/s. M.G. Constructions has submitted full amount
of Security Deposit i.e. Rs. 1,70,500/- in form of Bank Guarantee from the Bank
of Parsik Janata Sahakari Bank Ltd., Belapur, vide B.G. No.30/18 dt.27.10.06
valid upto 18.10.2007.
Also contractor has signed the agreement the original documents for the
same is forwarded.
It is requested to kindly check the same & keep in safe custody.
Encl : As above
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
December 05,2007.
The above mentioned work was awarded to M/s. J. Kumar & Co. Pvt. Ltd.
Now it is proposed to refund the EMD of the below mentioned bidder.
(M.S. Raikar)
Deputy Engineer
E.E. (APA)
J.A.O. (D)
R(L)
Engineering Divison.
November 13, 2006.
The MMRDA has constructed four buildings A1, B1, B2 & D2 in Wadala
Truck Terminal for the office premises and godowns in the year of 1994. The
structure of RCC frame type with sloping concrete slab provided at the terrace.
At present the structural members of A1 & D2 building such as columns,
beams, chajjas have shown sizeable cracks and there are major leakage through
this cracks which are damaging the internal surface of the walls of various offices
& godowns and Punjab & Maharashtra Bank which is occupant of these
buildings. Because of cracks and lot of damaged of external plaster surface as
taken place in the structure mainly due to rusting of reinforcement bar embedded
in the concrete. The photographs of the damaged portion of structural members
for the both buildings i.e. A1 & D2 are also taken and kept Pg.21 to 39 c/s.
The main reason for rusting reinforcement bar are as follows :-
During course of rainy season water get seeps in the concrete through the
cracks and water get deposited in the concrete the chloride present in the air get
saturated with water expands & widen the cracks and thereby allowing more
water to penetrate in the concrete. Therefore reinforcement bars embedded in the
concrete get contact with air and water which needs to oxidation of steel and
rusting start to the reinforcement bars. If the rusting is not timely arrested the
corrosion will take further and the diameter of the reinforcement bar gets reduced
substantially reducing its strength and load carrying capacity and can result into
failure.
Therefore it is very much necessary to carryout the structural repair
considering an item of corrosion treatment by providing two coat IP-Net RB and
applying corrosion inhibitor EPCO KP – 100 to the entire portion to be repaired
and then applying polymer modified mortar to the damaged portion with average
50mm thickness. So as to avoid the further damages & to increase life of
structure.
R(L)
An estimate is prepared for the structural repair work considering the
above mentioned items for an amount of Rs.4,73,310/- (Net). The estimate is
based on the rates adopted from approved rate for similar works at Wadala Truck
Terminal.
The expenditure incurred will be debited to budget provision made for
WTT.
Considering the urgency the work will be carried out on A1/A2 basis by
calling quotations from the experience agencies who have carried out similar type
of work..
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E. (APA)
J.A.O. (D)
S.E.(PBM)
AMC (Engg)
R(L)
Engineering Division.
February 28, 2007.
Sub : Repairing of Road from information booth to West side wall in Ph-I of Truck
Terminal Wadala.
The road from information booth to West side wall i.e. entrance of W.T.T. is carrying
heavy traffic movement such as Trailors, Tankers, RMC Trucks and Tourist Buses etc. This
traffic is headed towards Sion through this road further from S.K.C.R. During current
monsoon the major stretch of internal road from Petrol pump to Information Booth gate
is highly damaged. The new weigh bridge of 100 MT capacity has been installed by the
lessee. With this the movement of heavily loaded vehicle on internal road surface at
major locations have received extensive damages in the form of deep pot holes.
The pot holes and damaged road are presently attended by filling metal & stone
dust for traffic movement. However now fair season is started, to avoid further
damages and to have smooth flow of traffic the surface needs to be asphalted. Plan for
the same is prepared & kept at Pg. 13 c/s for reference.
The local corporator and users of Truck Terminal are requesting for carrying out
asphalt work as early as possible. Also a request letters from MCGM is received to
carryout repair work to have smooth traffic flow.
In view of the above detailed survey has been carried out, total area to be
attended for asphalting work is @ 10,000 sqm. An estimate is prepared considering the
items of bituminous macadam, dense bituminous macadam, asphalt concrete and
100mm thick paver blocks at the entrance of Ph – I i.e. near information booth for the
work of Repairing of Road from information booth to West side wall and internal road in Ph-I
of Truck Terminal Wadala amounting to Rs.94,91,212/- (net). The rates are adopted from
MCGM current FMR. The expenditure incurred will be debited to budget provision
made for WTT.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
R(L)
C.E.(SMR)
R(L)
Engineering Division.
November 9, 2006.
Sub: Repairing of Post Office in the Amenity Building at Truck Terminal Wadala.
The Post officer of telegraph office in Amenity Building at Truck Terminal Wadala.
Is requested to carryout repair work such as painting, repairs toilet, grill work etc.
An estimate is prepared for the painting, window / door repairing grill work removed of
wild grass & other miscellaneous items for an amount of Rs.34100/- (Net) .
Since the work is urgent nature the same will be carried out on A1 / A2 agreement by
calling quotations.
Submitted for approval please.
(M.S. Raiker)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
AMC (Engg.)
R(L)
Engineering Division.
December 12, 2006.
Sub : Repairing of Road from information booth to West side compound wall
and internal road in Ph-I of Truck Terminal Wadala.
---Tenders----
Tender for the above mentioned work was called by publishing tender
notice in news paper Marathi & English on 24.11.06. The issue period of tender
was 04.12.06 to 06.12.06 during the issue period only one tender was sold. The
submission date of tender was on 11.12.06 on submission date no tender has
received.
Therefore it is proposed to recalled the tender giving second call in news
paper in Lokmat & Asian Age having 8 days period and relaxation in the
condition No.8 of tender notice.
The draft tender notice for the same is prepared & kept at Pg. c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
S.E.(PBM)
C.E.(ED)
R(L)
Engineering Division.
December 15, 2006.
Sub : Widening & construction of North – South East – West Corridors under MUIP.
--- Providing & fixing Vinyl Sign Boards on existing frame for MUIP ---
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
C.E.(ED)
R(L)
Engineering Division.
December 18, 2006.
The M/s. Reliance Industrial Infrastructure Ltd., 200mm dia pipe line affecting
Anik – Panjarpole Link Road needed to be shifted. In this context the Metropolitan
Commissioner has approved estimate amounting to Rs.80.95 Lakhs as shifting cost to
be deposited by MMRDA to M/s. Reliance Industrial Infrastructure Ltd.
Accordingly excavation permission for laying 200mm dia pipe along L.U.
Gadkari Marg Road was given on 15.09.2006. The completion date for same was
considered upto 23.09.2006.
As per permission granted M/s. Reliance Industrial Infrastructure Ltd., was
supposed to complete the work on 23.09.2006, but till date it is seen that physically
about 60 to 65% work is completed. It seems that balance work will take another 20
days time for completion.
During granting of permission for excavation reinstatement charges were
estimated amounting to Rs.37,33,950/- (refer pg. 1 N/s). However considering delay in
completion of work by M/s. Reliance Industrial Infrastructure Ltd., and huge hike in
material cost it is found necessary to revised reinstatement estimate with current FMR
Rate.
Accordingly estimate for the trench reinstatement is prepared amounting to
Rs.63,70,630/- on the basis of current FMR Rates.
Submitted for approval please.
(A.S. Titre)
D.E. – II
D.E.(MHP)
R(L)
Engineering Division.
January 25, 2007.
The road infront of R.T.O. building in Ph-I of Truck Terminal Wadala is mainly used by
vehicles related to R.T.O. work which is located on 3rd floor of B-2 building.
It is observed that there is no proper drainage & camber to this road resulting into big
potholes on this road. The road is completely damaged and needs to be re-sectioned by giving
proper camber. There are many complaints from the R.T.O. regarding this road. During the
meeting held by Chief Engineer, Chief T&C was pointed to have good road surface.
In view of the above an estimate is prepared for improvement of this road considering
item of GSB, W.M.M – 150 mm thick, B.M. – 50 mm thick and A.C. 30mm thick kept at Pg.
c/s to c/s. The drainage arrangement is considered by constructing 16 Nos. Water
entrances & laying 600mm dia pipes connecting to the existing storm water drainage.
The estimate is based on the reates of MCGM FMR for 2006. The net estimated cost is
Rs. 49,08,000/-
It is proposed to carryout the work on B-1 Agreement by calling tenders with vide
publicly in news paper as per the P.W.D. norms. A draft tender notice for the same is prepared
and kept at Pg. c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer –
I
E.E.(APA)
JAO(D)
S.E.(PBM)
R(L)
R(L)
No.ED/MUIP/Inaugration/flyover/06 Engineering Division.
January 22, 2007.
The above mentioned work was awarded to M/s. Vartika Advertising vide
work order under reference.
M.M.R.D.A. has arrange the Bhoomi Poojan function at Kherwadi & Santacruz
Airport Junction for construction of 16 flyovers in Mumbai.
The Hon’ble Chief Engineer, Govt. of Maharashtra has inaugurated and laid
foundation stone at Kherwadi & Santacruz Airport Junction on 10th December 2006.
The M/s. Vartika Advertising agency has carried out the work of various items
related to function such as Banners, VIP Boards, VIP Sign Board, photographs /video
shooting etc. The necessary items wise quantities are certified & verified by JPD (PR).
The R.A. Bill for the same is prepared for an amount of Rs. 21,85,832/- gross.
The necessary deductions are made from bill as per rules in force. The net amount
payable is Rs. 20,48,031/- submitted for payment please
(M.S. Raikar)
Deputy Engineer – I
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(SRN)
R(L)
No.ED/MUIP/Inaugration/flyover/06 Engineering Division.
December 05, 2006.
Sub : Foundation stone inauguration ceremony for 16th flyover under MUIP at
Kherwadi Jn. & Santacruz Airport Jn.
The inauguration ceremony for 16th flyover will be held at Kherwadi Jn. & at
Airport Jn, where the inauguration stone is to be laid by the Hon’ble Chief Minister on
10.12.2006.
For that open plot is to be leveled and compacted at Santacruz and same is
require to be clean, also some work of brick masonry for laying the inauguration stone
is to be get done immediately for which an Estimate No.1 for construction of brick
masonry and plot leveling is prepared, amounting to Rs 62,718/-( Ref. Page no. 1 c/s )
and Estimate No.2 for providing inauguration Granite slate and curtain is prepared for
an amount of Rs.29,353/- ( Ref. page no. 19 c/s) based on DSR Rates and sanctioned
estimated rates, which may be approved. Since the work is of urgent nature the same
will be carried out on Rate List basis at the estimated rates by the willing agency after
approval.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(SRN)
R(L)
CHECKLIST FOR ADMINISTRATIVE APPROVAL TO
WORKS
D.E.
E.E.
J.A.O.
S.E.
C.E.
R(L)
ESTIMATE
Budget Head :
T.T. Wadala II-1
Major Head :
Sub – Head :
GENERAL DESCRIPTION
Sub : Repairing of Road information booth to West side compound wall of Ph-I &
Internal Road in Truck Terminal Wadala.
Tender Notice for above mentioned work was published in the news paper Lokmat
(Marathi) & The Asian Age by M/s. Dynamic Advertising & Research Team Pvt. Ltd. on
24.11.06 & 02.02.07.
Accordingly the agency has submitted the bills for publishing tender notice on
dt.24.11.06 for an amount of Rs.16,320/- with 15% discount of Rs.2,448/- the Net Amount is
Rs.13,872/- & dt.02.02.07 for an amount of Rs.16,320/- with 15% discount of Rs.2,448/- the
Net Amount is Rs.13,872/-
The total amount of these two are Rs.27,744/-.
The bill in the form of Supply & Services for above mentioned work for an amount of
Rs.27,744/- is prepared in favour of M/s. Dynamic Advertising & Research Team Pvt. Ltd.
The necessary deductions are made as per rules in force.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
R(L)
SUMMARY
Pre-monsoon Works
(A) 69,96,690=00
Monsoon Works
(B) 4,64,580=00
(C) 4,97,160=00
R(L)
Engineering Division.
February 20, 2007.
MMRDA as a special Planning Authority for the Truck Terminal Wadala. The truck
terminal area are divided in Phase – I, II, III & IV. The area of Phase – I is about 1600 Sqm.
In Phase – I MMRDA has constructed 5 buildings namely A-1, B-1, & D2 Building having
office premises and godown on the ground floor. The B-2 Building is allotted to R.T.O.
Department for their office and godowns on ground floor. The Amenity Building is occupied
by Police Department & Postal Department. In the Phase – I MMRDA has also constructed the
internal roads having storm water drains, open gutters, sewer line etc. In Ph – IV there is a D.P.
Road from Anik Depot to Sion – Koliwada which needs to be maintain.
MMRDA needs to maintain these internal roads, storm water drains, water gullies,
manholes etc. by way of cleaning and sweeping entire area. Also there are common area of
Building such as staircase, passage & platforms which needs to maintain by way of sweeping
& cleaning. Also it is necessary to maintain road furniture such as kerb stone, water table, set
stones, water gullies, paver blocks etc. which are to be replaced / painting periodically.
Considering the all above requirements an estimate is prepared for maintenance of
infrastructural work such as removing / refixing / painting of kerb , water tables, water gullies
manhole etc. including sweeping & cleaning of road area, building area. Also it is necessary to
maintain smooth road surface & to avoid further damages during monsoon the provision is
made for metal, cold mix, B.M. for the filling pot holes for maintenance of 12 months period
for an amount of Rs.48,94,700/-. The rates adopted for an estimate is from DSR & approved
rate of BKC.
After approval the B-1 tenders will be called by publishing tender notice in news paper.
The draft tender notice for same is prepared and kept at Pg. c/s.
Submit for approval please.
(M.S. Raikar)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.(SMR)
R(L)
Engineering Division.
February 21, 2007.
Sub : Desilting of Nalla, SWD, cleaning of pipes in (Ph – I, II, IV) and Transit
Camp area at Truck Terminal Wadala.
--- Annual Maintenance ---
Every year before monsoon desilting of nalla is required to be done to avoid the
flooding in nearby located Slum area of T.T. Wadala. The nallas namely required to be desilted
are J.K. Chemical nalla, nalla along the D.P. Road along Ph. IV boundary, nalla from
Pratikshanagar to Mahul creek, nallas in MUTP transit camp area, open Storm Water Drain in
Ph – I of T.T. Wadala.
It is also required to maintain the free flow of nallas during the monsoon by removing
floating material with the labours engaged & JCB to remove the slush gathered in the nallas
from adjoining slum area of MUTP transit camp, Pratiksha nagar area.
After the monsoon in fair season antiflood measures are required to be taken by
cleaning the choke up pipes, cleaning the culverts and to clear the nalla flow.
Considering all the above an estimate is prepared for –
(a) Pre-monsoon desilting.
(b) Antiflooding measures during monsoon.
(c) Maintenance of nallas after monsoon.
The cost works out for -
(a) Pre-monsoon desilting Rs.69,96,690=00
(b) Monsoon works (anti flooding measures) Rs. 4,61,880=00
(c) Post-monsoon Rs. 4,94,460=00
Total cost works out to Rs.79,53,030=00
Say Rs.79,53,100/- (Net).
The rates adopted from the estimate approved to B.K.C. The amount will debited to
Task No.II – 1 (WTT).
After approval the B-1 tenders will be called by publishing tender notice in news paper.
The draft tender notice for same is prepared and kept at Pg. c/s.
Submit for approval please.
(M.S. Raikar)
Deputy Engineer -
I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
R(L)
C.E.(SMR)
R(L)
DRAFT :
To,
Shri. M.L. Gupta.,
M/s. STUP Consultant Pvt. Ltd.,
Plot No.22-A, Sector 19-C,
Palm Beach Marg,
Vashi,
Navi Mumbai – 400 705.
FAX No. 27896240
Sir,
The above mentioned work was awarded to M/s. J. Kumar & Co. (I) Pvt. Ltd. Vide this
office letter No.ED/BKC/Link/Kurla/07 dt.07.02.2007.
Contractor has started initial mobilization of site by putting up official staff.
There is meeting held with Metropolitan Commissioner, on 12.02.07 regarding change
in Superstructure Box Girder to I – Girder.
No person is deployed from your end only Mr. A.K. Majumdar, Team Leader has
attended this office.
General arrangement drawings are not available by which the contractor can start other
activities.
We are loosing fair working season because of no attention from your end. You are
required to depute your staff immediately. Regarding your fees for proof checking proposal in
under process and also for extending your contract period
Your immediate action is required.
Thanking you,
Yours faithfully,
(P.K. Naik)
Executive Engineer
R(L)
Engineering
Division.
June 4, 2007.
The above mentioned work was awarded to M/s. S.K. Construction at 59.41% below
vide work order dt.24.03.06 for the one year period further it is extended 23.03.07 on same
terms & conditions as mentioned in the existing tender.
As the extended time period for existing contract is expiring on 23.05.07. The tender
for next one year period work is in submission and it will take 3 months time to fix the new
agency.
As the day to day cleaning of roads & buildings is necessary to keep the cleanliness &
surrounding in hygienic condition and also the monsoon period has been started therefore it
very necessary to kept surrounding area hygienic. It is necessary to grant the extension to the
existing contractor for 3 months period i.e. upto 23rd August 2007 on same terms & conditions
as mentioned in existing tender.
The approximately expenditure for the extended period of 3 months will be Rs.
60,000/-.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – II
D.E. – I(MSR)
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.(SMR)
R(L)
MMRDA has tried to handover the said bridge to MCGM, PWD & MSRDC for maintenance
work but the same proposal is denied by all the departments and said flyover is not maintained
since 1994. Therefore the carriageway way portion is damage due to heavy loaded traffic such
as trailors, dumpers, tankers, tempo, buses etc. In every monsoon this flyover gets heavy pot
holes and road users are suffering from safe drive. Since this bridge is very narrow and used
for one way traffic the accidental incidences are more, resulting in closing of traffic on bridge
therefore it is necessary to maintain the bridge surface.
An estimate is prepared considering the removal of existing asphalt layer to avoid dead
load on bridge and to provide Bituminous layer, D.B.M. and for sealing the surface by asphalt
concrete. The asphalt cake material removed by milling will be stacked in the Wadala Truck
Terminal area and same can be used for filling the pot holes during monsoon period on the
roads of Truck Terminal area.
R(L)
Engineering Division.
May 16, 2007.
The above mentioned work is awarded to M/s. J. Kantilal & Co. Now it is
proposed to refund the EMD of the below mentioned bidders.
1. M/s. Amar Construction Corporation. Rs.49,080/-
2. M/s. J. Kantilal & Co. Rs.49,080/-
3. M/s. N.A. Construction. Rs.49,080/-
4. M/s. Shah & Parikh. Rs.49,080/-
5. M/s. Sunrise Stone Industries. Rs.49,080/-
6. M/s. Valsons. Rs.49,080/-
(S.P. Padikar)
Deputy Engineer - II
D.E.-I (MSR)
E.E. (APA)
J.A.O. (D)
R(L)
Engineering Division.
June 21,2007
Pay Order / Demand Draft submitted by the agencies for the above
mentioned work is enclosed & forwarded to F&A Divn., for necessary action.
D.E.-I (MSR)
E.E. (APA)
J.A.O.(D)
R(L)
Engineering Division.
April 5, 2007.
1. The sealed tenders for the above mentioned work were invited by publishing tender
notice in daily news paper daily Dainik Lokmat & Free Press Journal on dated
22.03.2007.
3. The time period for the work is One month, from the date of issue of work order.
4. Total Nine (9) nos. of tenders were issued to various agencies between the issue period
of 26.03.07 to 03.04.07. The last date of submission of tender was 05.04.07. The total
Six (6) sealed tenders were received upto 13.00 hrs. on 05.04.07.
5. The post - qualification criteria for bidders was they should have carried out similar
type of work in last five years.
6. The sealed tenders were opened on 05.04.07 by Shri .A.P. Athawale, Executive
Engineer (TTW), in presence of the undersigned and J.A.O.(D) and contractor's
representative. The comparative statement for the same is prepared and kept at page
c/s. From the comparative statement it is seen that M/s. J. Kantilal & Co. has quoted
the rate 23.40% below the estimated rates which is lowest amongst all the bidders.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 50 Lakhs. The lowest bidder is
registered with the M.C.G.M., Mumbai City, in Class B category and is entitle to quote
for works upto One Crore.
10. Bank Guarantee for the Security Deposit is given in required format in the tender one
Page.12.
11. The details specifications for each items is included in the tender in Chapter - X tender
document.
R(L)
12. The work site is in possession of MMRDA and work can start immediately after
completion of the formalities like payment of Security Deposit and signing of
agreement etc.
13. M/s. J. Kantilal & Co. who is the lowest is full filling qualification criteria i.e. bidder
has carried out he similar type of work in Bandra – Kurla Complex & Oshiwara for
MMRDA.
14. The rates offered by contractor M/s. J. Kantilal & Co., i.e. 23.40% below seems to be
competitive & reasonable. Since the work is to be carried out before monsoon it is
necessary to start the work at the earliest.
(M.S. Raiker)
Deputy Engineer -
I
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.(SMR)
R(L)
Engineering
Division.
April 24, 2007.
Tender Notice for above mentioned work was published in the news paper Free Press
Journal & Lokmat (Marathi) by M/s. Dynamic Advertising & Research Team Pvt. Ltd. on
22.03.07.
Accordingly the agency has submitted the bills for publishing tender notice on
dt.30.03.07 for an amount of Rs.16,728/- with 15% discount of Rs.2,509/- the Net Amount is
Rs.14,219/-.
The bill in the form of Supply & Services for above mentioned work for an amount of
Rs.,744/- is prepared in favour of M/s. Dynamic Advertising & Research Team Pvt. Ltd. The
necessary deductions are made as per rules in force.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
R(L)
Engineering
Division.
April 25, 2007.
(S.P. Padikar)
D.E. – II
D.E.-I(MSR)
E.E.(APA)
S.E.(PBM)
C.E.(SMR)
Chief T&CP
R(L)
Engineering
Division.
April 24, 2007.
Sub : Widening and construction of North South East West Corridors under
MUIP.
--- Providing & fixing M.S. Sign Boards ---
(M.S. Raikar)
Deputy Engineer – I
E.E.(JCG)
JAO(D)
S.E.(JCG)
C.E.(SRN)
R(L)
RATE ANALYSIS
Item No.2 : Providing cautionary / warning sign boards in rectangular shape including MS
plate and angle iron frame (as per drawing enclosed) and duly painted with
approved colour scheme as directed by Engineer-in-charge.
Quantity :
Rate Analysis :
Prepared By :
R(L)
Engineering Division.
January 17, 2008.
Sub : Providing epoxy coating to the Swaminarayan flyover from Everard Nagar to
RCF Junction on Eastern Express Highway
--- Estimated Cost Rs. 45,52,400/-
1. The sealed tenders for the above mentioned work were invited by publishing tender
notice in daily news paper daily Dainik Lokmat and Free Press Journal on dated
22.12.2007.
2. The notice period was 2 weeks i.e. upto 14.01.08 as per Government G.R.
3. The time period for the work is One month, from the date of issue of work order.
4. Total Six (6) nos. of tenders were issued to various agencies between the issue period of
31.12.07 to 10.01.08. The last date of submission of tender was 14.01.08. The date of
submission was postponed and new date of submission was declared as on 16.01.08
upto 13.00 hrs. The total (3) Three nos. of sealed tenders were received.
5. The post - qualification criteria for bidders was the completion of similar type of work
successfully and epoxy painting work for minimum 1800 Sq.mtr as a single work in
presiding 3 years.
6. The sealed tenders were opened by Shri .A.P. Athawale, Executive Engineer (TTW),
Shri. M.S. Raikar, Deputy Engineer – I, in presence of the undersigned and J.A.O.(D)
and contractor's representative. The comparative statement for the same is prepared
and kept at page /s. From the comparative statement it is seen that M/s. M.G.
Construction has quoted the rate 0.61% below the estimated rates which is lowest
amongst all the bidders. (Est. Cost Rs.45,52,400/-)
7. Tender validity is 120 day from date of opening of tender i.e. upto 15.05.08.
8. As per the guide lines pre-bid meeting is not necessary. Hence no pre-bid meeting was
held.
9. The registration requirement as per PWD is upto 50 Lakhs. The lowest bidder is
registered with the Executive Engineer, PWD, Thane in Class - V category and is
entitle to quote for works upto Rs.50 Lakhs.
10. The details specifications for each items is included in the tender in Chapter - X tender
document.
11. The work site is in possession of MMRDA and work can start immediately after
completion of the formalities like payment of Security Deposit and signing of
agreement etc.
R(L)
12. M/s. M.G. Construction who is the lowest is full filling qualification criteria i.e. bidder
has carried out the epoxy painting work for the quantity of 3200 Sqm in the year 2005
and agency is authorized applicator of M/s. Krishna Conchem Product Pvt. Ltd. who is
manufacturer of epoxy paint to be used for the proposed work.
13. The rates offered by Contractor @ 0.61% below the estimated cost seems to be
reasonable @ Rs.45,24,630=36 (Rupees Forty Five Lakhs Twenty Four Six Hundred
Thirty & Paise Thirty Six Only).
14. The tender proposal is for epoxy coating to the flyover is necessary to improve the
structural condition of bridge and better aesthetic view.
15. Considering the above offered by the lowest bidder is @ 0.61% below the estimated
rate is reasonable & competitive. The lowest offer of M/s. M.G. Construction @
Rs.45,24,630=36 (Rupees Forty Five Lakhs Twenty Four Six Hundred Thirty & Paise
Thirty Six Only) is submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
S.E.(JCG)
R(L)
Engineering
Division.
May 8, 2007.
Sub : Providing & fixing barbed wire fencing on pre-cast R.C.C. posts &
G.I. pipes gate BEST plot in Ph-I at Truck Terminal Wadala.
--- Estimate ---
A note is received from Marketing Cell requesting to fence the BEST plot by barbed
wire fencing (Kept at Pg. 3 c/s) with R.C.C.post.
As per the request to fence the plot will be used for protecting the dumped material, it is
necessary to provide the gate in the fencing.
Considering above the estimate is prepared for constructing the fencing and pipe gate
amounting to Rs 81292/-. The rates considered for the estimate are approved rates for the
fencing works at Cuffe Parade, Colaba by M.MRDA recently.
Submitted for approval please.
After approval work will be carried out on A-1 agreement by calling quotations.
Submitted please.
(S.P. Padikar)
D.E. – II
D.E.-I(MSR)
E.E.(APA)
JAO(D)
S.E.(PBM)
C.E.(SMR)
R(L)
Engineering
Division.
May 10, 2007.
Above mentioned work is awarded to M/s. J. Kantilal & Co. and is in progress.
The laying of road side storm water drain line of 600 mm dia NP2 class pipe is in
progress.
As per tender there is no provision for encasing as these pipes are to be laid by the
adjacent of the building. While laying it is observed there are no. of electric cables. Therefore
the line is shifted towards road portion.
To avoid the trench settlement it is necessary to be filled up the trench by sand metal.
The quantity of sand metal is around 252 cum. The rate for sand metal filling is Rs.1,915/-
Cum as per MCGM FMR (Pg. attached). The cost works out to Rs.4,82,580/-.
The work will be carried out on Extra item rate list basis from the same agency as an
urgent.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I(MSR)
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.(SMR)
R(L)
Engineering Division.
June 6, 2007.
Sub : Repairs to Swaminarayan flyover bridge from Everard nagar to RCF circle
on Eastern Express Highway (Part – V) .
The above mentioned flyover opened for traffic in 1994 to divert the traffic load on
Sion circle. This traffic is diverted from Wadala / Shivadi to Eastern Express Highway from
Anik Wadala road at Barkat Ali Naka. Heavy vehicles coming from Bombay Post Trust using
this road to join the Eastern Express Highway without disturbing the traffic on Eastern Express
Highway. The BEST is also giving service on this road upto Kurla at one end & docks on the
another end.
The said flyover is damaged with its wearing course on deck slab. The vehicles using
this flyover are suffering from the pot holes on the surface. There are many chances of over
turning of vehicles on this bridge due to turns on the bridge. It is also observed that some
vehicles are overturned & damaged the electric poles on the bridge.
Considering the heavy traffic load it is decided to provide 80mm thick Paver block for
the bridge portion. Since there is a heavy traffic Permission from traffic department given for
the part wise portion i.e. it is necessary to carryout the work in parts.
An estimate is prepared for the part length of 70 meters approximately for amount
Rs.4,97,940/- considering the item of milling & 80mm thick Paver block the rates are adopted
from the PWD / DSR for road year 2006 – 07.
Since the monsoon is approaching fast the work needs to be carried out urgently to have
traffic safety. Therefore after approval the work will be carried out on A-1 / A-2 basis by
calling the short quotation notice.
Submit for approval please.
(M.S. Raikar)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(PBM)
C.E.(SMR)
R(L)
Engineering Division.
June 28, 2007.
Sub : Providing & fixing 80mm thick Paver blocks at internal road
from Information booth to Petrol Pump at Wadala Truck
Terminal.
The tender for the above mentioned work were invited by publishing
tender notice in the news paper on dated 14.04.07.
The sealed tenders were received on 09.05.07 the agency M/s. Relcon
Infraproject Pvt. Ltd., who is the lowest bidder has quoted 30.69% above the
estimated rate which seems to be higher side. The contractor has asked to reduce
their offer but they are enable to reduce their offer up to satisfaction of Engineer-
in-charge.
As such it is mentioned that road from information booth to Petrol Pump
i.e. entrance of Wadala Truck Terminal is carrying heavy loaded traffic such as
Trailors, Tankers, RMC Trucks, Tourist Buses, Trucks etc. There also new
weight Bridge of 100 MT capacity has been installed by lessee. There are no. of
heavy vehicles coming to this weigh bridge by this road.
During the last monsoon the major stretch of internal road have received
extensive damages in the form of deep pot holes. The Local Corporator and user
of Truck Terminal has complained regarding the damages of road also there is
complaint from road monitoring committee to repair this road surface.
As such the monsoon season is already started it is not possible to carryout
bituminous work on this road therefore it is proposed to cancelled above
mentioned tender and to revised the estimate by considering item of providing
80mm thick concrete paver blocks including the Wet Mix Macadam & D.L.C. for
sub base as to strengthen the existing road surface and to have good riding quality
surface for vehicular traffic in long term.
An estimate is prepared considering 150 mm thick wet mix macadam,
100 mm thick D.L.C. and 80mm thick paver block for an amount of
Rs.98,01,000/- the rate adopted for estimate is from approved rate for tender at
Wadala Truck Terminal.
R(L)
As there is a tremendous pressure from various local leaders and agencies,
it is necessary to complete the work as early as possible to avoid further damages
to avoid further damages of road surface.
As the Metropolitan Commissioner has already given the administrative
approval for an amount of Rs.99,95,000/-. It is proposed to invite tender by
publishing tender notice in the news paper as per norms.
The draft tender notice for the same is also prepared and kept at
Pg. c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
JAO(D)
S.E.(PBM)
C.E.(SMR
R(L)
Engineering Division.
July 26, 2007.
Sub : ---- Publishing Tender Notice in Lokmat new paper (Mumbai) &
The Free Press Journal -----
M/s. Dynamic Advertising & Research Team Pvt. Ltd., has published the tender notices for following
works in the news paper Lokmat (Mumbai) and Free Press Journal.
Sr.No. Name of Work No. of Bill Date of Amount
Publishing in (Rs.)
Advt.
1 Repairs to Swaminarayan flyover MB/SP/0407/010 14.04.07 16,728/-
bridge from Everard nagar to RCF
circle on Eastern Express Highway.
The bill for the same is prepared in the form of ‘Supply & Service’.
Submitted for payment please.
( S.P.Padikar )
Deputy Engineer-11
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
September 19, 2007
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
S.E.(JCG)
C.E.(SMR)
R(L)
Engineering Division.
October 05, 2007.
Annual contract for the above mentioned work was expired on 02.05.06 and
same is extended upto 02.11.2007. During site visit the Hon’ble Metropolitan
Commissioner has directed to keep the environment of Truck Terminal clean and green.
For cleaning the agency for sweeping & cleaning the area is appointed. Now for
keeping it green it is necessary to appoint the agency.
It is necessary to appoint agency to maintain the garden developed in Ph-I for
one – year period, estimate prepared for the maintenance of developed lawn, shrubs,
trees and providing water by water tanker, supplying red earth, manure,
pesticides/insecticides, trimming of trees removing wild vegetation, weeding of lawn
etc. and the new recreation ground (R.G) marked on the Ph-I plan near Amenity
Building is considered for development.
An estimate for the above works amount to Rs.17,97,000/- net is prepared and
kept at Pg. 3 c/s to 11 c/s.
The rates are taken for the items are approved rates for same work in the last
year i.e. 05-06 and the rate for preparation of lawn is taken from horticultural DSR year
The expenditure incurred will be debited to task No. II - 1 W.T.T.
The draft tender notice for the same is prepared and kept at Pg.15 c/s. After
approval the same B-1 tenders will be called by publishing tender notice in news
papers.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
S.E.(JCG)
R(L)
C.E.(SMR)
Engineering Division.
October 17, 2007.
The road from culvert E to Hemant Manjrekar Marg i.e. Sion – Koliwada
connector road is having loaded traffic flow due to plants located in Ph – IV area of T.T.
Wadala. Also there is Weigh Bridge located in this area therefore loaded Trucks, Tailors
Dumpers are coming to this road due to such heavy traffic during current monsoon
period the major portion of this road is damaged by creating large no. of pot holes on
road surface. The internal roads in Ph – I of T.T. Wadala are also damaged in some
places i.e. between Amenity Bldg., and A-1 Bldg., the junction of internal roads and
also the stretch of road from information booth to Rawoli channel.
The major road stretch is from (A)West side compound wall of Ph – I, T.T.
Wadala to culvert ‘C’ (B) from culvert E upto Hemant Manjrekar Marg (C) is internal
roads of Ph-I, T.T. Wadala. To have smooth traffic flow on these roads the potholes
needs to be repair by dressing to the existing surface after that laying Bituminous
Macadam & Asphalt Concrete layers on it.
In view of above the pot holes on roads are surveyed and the area
for stretch (A) is 193 Sqm, for stretch (B) it is 1298 Sqm and for stretch (C) it is 877
Sqm is needs to be repaired by laying BM & AC.the total area is 2370 Sqm.
An estimate is prepared for an amounting to Rs. 11,46,550/- the rates taken for
the estimate are DSR rates for Year 2007-2008
Since monsoon period is over and fair season is started it is proposed to carryout
the work of repairs by laying B.M. & A.C. by calling tenders from experienced agency.
The draft tender notice for the same is prepared and kept at Pg. c/s. After
approval the same B-1 tenders will be called by publishing tender notice in news papers
Submitted for approval please.
(S.P. Padikar)
D.E. – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
S.E.(JCG)
R(L)
C.E.(SMR)
The above mentioned work was awarded to M/s. Vartika Advertising vide
work order under reference.
M.M.R.D.A. has arrange the Metro Rail public Hearing at Inox Building at
Nariman Point from 3rd July to 5th July 2007.
The Metro Rail public hearing has been arrange under the Chairmanship of
Hon’ble Urban Development Minister, Shri. Rajesh Tope, Govt. of Maharashtra from
03rd July to 5th July 2007. (Three Days).
The M/s. Vartika Advertising agency has carried out the work of various items
related to function such as Banners, VIP Boards, VIP Sign Board, photographs /video
shooting etc. The necessary items wise quantities are certified & verified by JPD (PR).
The 2nd R.A. Bill for the same is prepared for an amount of Rs. 4,27,083/- gross.
The necessary deductions are made from bill as per rules in force. The net amount
payable is Rs. 4,17,045/-.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer – I
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(SRN)
R(L)
CAO & FA
R(L)
Engineering
Division.
October 24, 2007.
E.E.(NMG)
S.E.(JCG)
C.E.(SMR)
L.M./E.M.
R(L)
Engineering
Division.
October 29, 2007.
The above mentioned work is in progress by existing appointed Agency. The time
period is already extended which is expiring on 2 nd November 2007. An estimate for the
further 12 months period is prepared and under submission.
Till the time a new agency is appointed, if these gardens are not maintained it will spoil
the existing beauty of it and will require additional expenditure in future.
Therefore it is necessary to grant permission to maintain these gardens for next three
months i.e. upto 2nd February 2008 from the present contractor. The approx. cost for three
months period will be Rs.4.50 Lakhs.
The existing contractor M/s. Parimal Nursery has already submitted their request for
extension of the said work under the same terms & conditions.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
C.E.(SMR)
R(L)
Engineering Division.
November 01, 2007.
Above mentioned work is awarded on “AT PAR” to M/s. M. Devang Construction Co.,
and same is in progress.
As per tender there is no provision for removing and refixing kerb stones on the boths
sides of the roads. The vehicular heavy vehicular traffic is continuously plying on this road
towards Sion as well as Anik Wadala road, uneven surface of this road changed the alignment
of kerb stone along the both side of the road.
It is necessary to provide the kerb stone along the both side of the road. The length of
kerb stone required to be removed and refixed is calculated upto 912 meters. Also there are
SWD manholes which needs to be raised and water entrances both side of roads need to be
repaired & to fixed closable precast gratings on water gullies along this road. The rate for all
these items are taken from the approved tender rate in WTT in the year 2007. The cost works
out to Rs.1,98,100/-.
The work will be carried out on Extra item rate list basis from the same agency as an
urgent basis.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I(MSR)
E.E.(APA)
J.A.O.(D)
S.E.(JCG)
C.E.(SRN)
R(L)
No.ED/TTW/Imp. Rd/06-07. 02.11.2007.
To,
M/s. M. Devang Construction Co.,
17 – B, Everest, Near Famous Cine Lab,
Tardeo Road,
Mumbai – 400 034.
Ref : This office Work Order. No. even no. dt. 16.10.2007.
Sir,
The above mentioned work was awarded to you vide with reference to
above mentioned work order. The stipulated time period for this work is one
month from the issue of work order. It is observed that the progress of work is
very slow and is not as per the schedule.
Therefore it is inform that to expedite the work so as to complete within
the stipulated time period otherwise penalty will be levied accordingly. Also
submit Bar chart for completion of work within given time limit immediately.
Yours faithfully,
(A.P. Athawale)
Executive
Engineer
R(L)
Engineering Division.
November 15, 2007.
Sub : Repairs to Swaminarayan flyover bridge from Everard nagar to RCF circle
on Eastern Express Highway (Part I, II, III, IV & V).
The administrative approval for the above mentioned work was obtained from then
Metropolitan Commissioner. But because of monsoon season the nature of work was changed
i.e. Bituminous Macadam to Paver block. As during monsoon Bituminous Macadam work
cannot be carried out.
The road monitoring committee has been directed to improve the condition of bridge by
any way which is possible considering this the ultimate solution to have long life good surface
the fixing of paver block was decided.
Due to the heavy traffic and continues flow of traffic it was necessary to have a traffic
permission from traffic Police Chembur & Wadala R.T.O. The permission to carryout work by
traffic Police in phase manner is given & not continues therefore it was not possible to take up
the work at full stretch of the bridge. Therefore it was necessary to take up the work in the
patches i.e part by part as per traffic permission. Therefore it was necessary to split the work
as per the availability of stretches.
As regards the responsibility to maintain this flyover, the said bridge is constructed by
MMRDA through PWD. Several D.O. letters were sent to PWD at the level of then
Metropolitan Commissioner. But there were no response to take over this flyover. Therefore
it needs to take proper care as it dangerous to traffic and life of commuters as well as structure.
In view of the above and as approved by Metropolitan Commissioner we may release
the payment for the above mentioned works.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer
E.E.(APA)
S.E.(JCG)
CAO & FA
R(L)
Engineering Division.
November 21, 2007.
The compound wall on Eastern side as well as West side around the Ph – I
of T.T. Wadala is found damage at some places. The Anik Wadala Road is going along
the Eastern side compound wall of T.T.Wadala. The intensity of traffic is high on this
road; there are chances of trespassers entering through this broken wall directly in the
Truck Terminal area for illegal activities and theft. It is necessary to repair this
compound wall at these locations.
Considering items of pulling down the stone masonry, providing new masonry,
providing coping wherever necessary, applying sand faced plaster the estimate is
prepared for an amount of Rs.4,92,500/-. The rates adopted for the estimate are taken
from the Bldg, DSR year 2006-2007.
Since the work is of urgent nature needs to carried out on A-1, A-2 basis.
Submitted for approval please.
(S.P.Padikar)
Deputy Engineer-II
D.E.-I(MSR)
E.E.(APA)
J.A.O.(D)
S.E.(JCG)
C.E.(SRN)
R(L)
Engineering Division.
November 22, 2007.
Sub : Repairs to Swaminarayan flyover bridge from Everard nagar to RCF circle
on Eastern Express Highway.
The above mentioned flyover opened for traffic in 1994 to divert the traffic load on
Sion circle. This traffic is diverted from Wadala / Shivadi to Eastern Express Highway from
Anik Wadala road at Barkat Ali Naka. Heavy vehicles coming from Bombay Post Trust using
this road to join the Eastern Express Highway without disturbing the traffic on Eastern Express
Highway. The BEST is also giving service on this road upto Kurla at one end & docks on the
another end.
It is necessary to keep the bridge in good working condition for that epoxy coating is
needed to be given at the bottom surface of beams, columns, caps. The item includes one
primer coat and 2 epoxy coats over it. This will protect the concrete beams from erosion.
Considering above the estimate is prepared for maintaining bridge surface by providing
epoxy for bridge length of 287 mt. & 7.50m wide bottom.
The amount comes to Rs.35,29,300/- (Gross) & Rs.32,98,400/- (Net).
After approval the B-1 tenders will be called by publishing tender notice in news paper.
The draft tender notice for same is prepared and kept at Pg. c/s.
Submit for approval please.
(S.P. Padikar)
D.E. – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
S.E.
C.E.(SRN)
R(L)
Engineering Division.
December 05, 2007.
The above mentioned work was awarded to on ‘AT PAR’ to M/s. M. Devang
Construction Co., vide Work Order No. ED/TTW/Imp.Road/06-07 dt.16.10.07.
The original time period for this work was one month from the date of Work order i.e.
upto 15.11.07.
The above mentioned work is in progress and 75% work has been completed by the
contractor and 25% balance work needs to be carried out in extended period.
The agency has submitted their request letter to extend the time period for further one
month i.e. upto December 15, 2007. As there are extra work i.e. removing & re-fixing of kerb
stone, rasing & repairing of manholes, water gullies etc. and scope of work increases at
junction of entrance. Due to limited hours for traffic permission for heavy traffic, the work
cannot be carried out continuously for full day.
In view of the above we may consider the request of contractor to extend the time
period upto 15th December 2007.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
R(L)
Engineering Division.
November 22, 2007.
Sub : Providing epoxy coating to the Swaminarayan flyover from Everard Nagar to
RCF Junction on Eastern Express Highway.
The above mentioned flyover opened for traffic in 1994 to divert the traffic load on
Sion – Circle This traffic is diverted from Wadala / Shivadi to Eastern Express Highway from
Anik Wadala road at Barkat Ali Naka. Heavy vehicles coming from Bombay Post Trust are
using this road to join the Eastern Express Highway without disturbing the traffic on Eastern
Express Highway. The BEST is also giving service on this road upto Kurla at one end & docks
on the another end. Since 1994 no maintenance was done for this flyover. No epoxy paint was
provided in past to maintain this flyover properly. To have a smooth surface recently before
monsoon the paver blocks was provided on carriageway of this flyover.
It is necessary to keep the bridge structure in good condition the epoxy painting is very
much necessary to protect the concrete surface as well as structural members from the bad
environment. The work includes one primer coat and 2 epoxy coats it on flyover. This will
protect the structural members from erosion and also gives good aesthetic view.
In view of above an estimate is prepared for epoxy painting to flyover surface for
bridge length of 425mt. & 7.50m in width.
The estimate amount works out to Rs.45,52,400/- (Net). The rates adopted for estimate
is PWD / DSR Rd. flyover for the year 2007 – 08.
After approval the B-1 tenders will be called by publishing tender notice in news paper.
The draft tender notice for same is prepared and kept at Pg.17 c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
S.E.
R(L)
Engineering Division.
December 06, 2007.
The T&C Division on 8th floor of MMRDA office building have been taken up the
renovation work.
Therefore the present staff is to be shifted at Wadala Truck Terminal office building for
temporary basis to day to day activities. The officers of T&C Division, Chief Engineer, Dy.
Chief Engineer, Executive Engineer will be sitting at Wadala Truck Terminal office building.
Therefore the entire renovation Wadala Truck Terminal A-1 Bldg. 1st floor office.
The renovation work includes the item of PVC flooring internal painting, W.C. bath,
tiling, vertical blinds & misc. work.
An estimate is prepared considering above mentioned item for an amounting to
Rs.4,98,200/-. The rates are adopted for estimate is from PWD Presidency Division DSR for
the year 2006 – 07 & approved rate for other items.
Since the work is urgent nature the work will be carryout on A-1 / A-2 agreement basis.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – II
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
December 07, 2007.
B] PROPOSED WORKS :
R(L)
Engineering Division.
December 07, 2008.
Submitted please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
S.E.(JCG)
C.E.(SRN)
M.C.
R(L)
Engineering Division.
December 11, 2007.
Sub : Sweeping & cleaning of Roads & footpath in ‘G’ & ‘GN’ Block of BKC.
1. Sanctioned cost has worked out on the basis of payment made upto 3 rd R.A. Bill i.e. for
8th months (statement is kept at P-295) but at the time of preparing the bill, on the basis
of BOQ, the amount may increase or decrease also. In this case the amount has
increased on the basis of actual work done.
2. Period of work is given date wise i.e. from 18.01.07 to 31.05.07 on page no.36 to 40 in
M.B. No.1205.
4. Total outstanding Security Deposit is deducted from the bill & re-submitted.
(I.A. Ansari)
Deputy Engineer – I
E.E./S.E.(JCG)
C.E.
R(L)
Engineering Division.
December 19, 2007.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
S.E.
R(L)
Engineering Division.
December 19, 2007.
Sub : Water Supply bills for the Buildings namely A-1, B-1, B-2, D-2 and
Amenity Building in Ph-I of T.T. Wadala.
The Water supply bills for the period from 08.01.07 to 11.10.07 are not received
by MCGM.
The duplicate bills are collected personally, from MCGM’S F/N Ward Office for
the above mentioned period.
The amount of bills comes to Rs.7,68,231/-.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
R(L)
Engineering Division.
December 26, 2007.
The above cheque submitted by the representative agencies for the cost of
EMD for the work is forwarded to Accounts Division for further action please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
December 26, 2007.
The above cheque submitted by the representative agencies for the cost of
EMD for the work is forwarded to Accounts Division for further action please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
January 16 2008.
Sub : Providing epoxy coating to the Swaminarayan flyover from Everard Nagar
to RCF Junction on Eastern Express Highway.
The above cheque submitted by the representative agencies for the cost of
EMD for the work is forwarded to Accounts Division for further action please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
January 07, 2008.
(S.P. Padikar)
D.E. – II
D.E-I (MSR)
E.E.(APA)
R(L)
Engineering Division.
January 16, 2008.
Sub : Repairs to compound wall along Ph-I and Ph-II boundary at T.T. Wadala.
The compound wall on Eastern side as well as West side around the Ph-I of T.T. Wadala
is found damage at some places. The Anik Wadala Road is located along the Eastern side
compound wall of T.T. Wadala. The intensity of traffic is very high on this road; there are
chances of trespassers entering through this broken wall directly in the Truck Terminal area for
illegal activities and theft. It is necessary to repair this compound wall at these locations. The
photographs of damage portion of wall are also kept at page nos. 19 c/s to 23 c/s. It is
necessary to protect the U/G tank suction tank which is approvided with high capacity pumps,
as the road substitute along the U/G tank is road to Sion & is used by large number of vehicles.
This vehicles are continuously plying on this road.
Considering items of pulling down the stone masonry, providing new masonry,
providing coping applying sand faced plaster, protective coating, painting the estimate is
prepared for amounting to Rs.38,10,976/- (Gross) & Rs.35,28,681/- (Net). The rates adopted
for the estimate are from the Bldg. DSR year 2007 – 08.
After approval the B-1 tenders will be called by publishing tender notice in news paper.
The draft tender notice for same is prepared and kept at Pg. c/s.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – II
D.E. – I (MSR)
E.E.(APA)
JAO(D)
S.E.(JCG)
C.E.(SRN)
R(L)
Engineering Division.
January 21, 2008
Sub : Repair of Sion – Koliwada Connector road & internal roads in Ph-I
at Truck Terminal Wadala.
Please find enclosed herewith the original Bank Guarantee for the above
mentioned work of M/s. Yash Enterprises, amounting to Rs.22,940/-, B.G.No.03/08
dt.07.01.08 valid upto 31.12.08, drawn on the Vijaya Bank, Goregaon (W), Branch,
Mumbai – 400 062. And also the original agreement for the above mentioned work is
enclosed.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
January 22, 2008.
Above mentioned work was awarded to M/s. N.A. Construction on A-1 / A-2
agreement. The agency has completed the work within the time period and upto the
satisfaction of Engineer-in-charge. The final bill is also paid in the month of December
2007.
Now it is proposed to refund the Security Deposit deducted from bill an
amounting to Rs.19,908/- (Rupees Nineteen Thousand Nine Hundred Eight Only).
The bill in the form of Supply Service is prepared.
Submitted for passing and payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
Above mentioned work was awarded to M/s. H.M. Brothes on A-1 / A-2
agreement. The agency has completed the work within the time period and upto the
satisfaction of Engineer-in-charge. The final bill is also paid in the month of December
2007.
Now it is proposed to refund the Security Deposit deducted from bill an
amounting to Rs.19,918/- (Rupees Nineteen Thousand Nine Hundred Eighteen Only).
The bill in the form of Supply Service is prepared.
Submitted for passing and payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
Above mentioned work was awarded to M/s. N.A. Construction on A-1 / A-2
agreement. The agency has completed the work within the time period and upto the
satisfaction of Engineer-in-charge. The final bill is also paid in the month of December
2007.
Now it is proposed to refund the Security Deposit deducted from bill an
amounting to Rs.19,911/- (Rupees Nineteen Thousand Nine Hundred Eleven Only).
The bill in the form of Supply Service is prepared.
Submitted for passing and payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
Above mentioned work was awarded to M/s. T.A. Enterprises on A-1 / A-2
agreement. The agency has completed the work within the time period and upto the
satisfaction of Engineer-in-charge. The final bill is also paid in the month of December
2007.
Now it is proposed to refund the Security Deposit deducted from bill an
amounting to Rs.19,900/- (Rupees Nineteen Thousand Nine Hundred Only).
The bill in the form of Supply Service is prepared.
Submitted for passing and payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
Above mentioned work was awarded to M/s. N.A. Construction on A-1 / A-2
agreement. The agency has completed the work within the time period and upto the
satisfaction of Engineer-in-charge. The final bill is also paid in the month of December
2007.
Now it is proposed to refund the Security Deposit deducted from bill an
amounting to Rs.19,918/- (Rupees Nineteen Thousand Nine Hundred Eighteen Only).
The bill in the form of Supply Service is prepared.
Submitted for passing and payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
Sub : Structural repairs & water proofing treatment to the terrace of A1 & D2 building
in Ph – I at Wadala Truck Terminal.
---- Refund of EMD Rs.49,200/- ----
The following bidders are submitted the EMD for the above subject work,
now it is proposed to refund the EMD of the below mentioned bidders.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
The following bidders are submitted the EMD for the above subject work,
now it is proposed to refund the EMD of the below mentioned bidders.
1. M/s. New Park Sun Garden. Rs.17,970/-
2. M/s. Parimal Nursery. Rs.17,970/-
3. M/s. V.V. Gardens Rs.17,970/-
Bill in the form of Supply Service is prepared for amount of Rs.17,970/-
for the refund of EMD as above mentioned agencies.
Submitted for payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
The following bidders are submitted the EMD for the above subject work,
now it is proposed to refund the EMD of the below mentioned bidders.
1. M/s. Amar Construction Corporation. Rs.11,470/-
2. M/s. Yash Enterprises . Rs.11,470/-
Bill in the form of Supply Service is prepared for amount of Rs.11,470/-
for the refund of EMD as above mentioned agencies.
Submitted for payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
January 22, 2008.
Sub : Providing epoxy coating to the Swaminarayan flyover from Everard Nagar
to RCF Junction on Eastern Express Highway.
---- Refund of EMD Rs.45,550/- ----
The following bidders are submitted the EMD for the above subject work,
now it is proposed to refund the EMD of the below mentioned bidders.
1. M/s. Avin Constructions. Rs.45,550/-
2. M/s. M.G. Construction. Rs.45,550/-
3. M/s. Suhas P. Bhave. Rs.45,550/-
Bill in the form of Supply Service is prepared for amount of Rs.45,550/-
for the refund of EMD as above mentioned agencies.
Submitted for payment please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
JAO(D)
R(L)
Engineering Division.
February 07, 2008.
R(L)
It is also proposed to provide electrical equipments as stated below :-
Sr. Item to provided in each Flat Nos. Qty. Rate Amount
No flat. (in Rs.) (in Rs.)
1. Refrigerator (185 Litre) 103, 104, 203, 6 10,000/- 60,000.00
204, 303, 304.
2. Window model A.C. units (2 nos. A.C. units 8 25,000/- 2,00,000.00
for flat No.103,
104 & one A.C.
unit for flat
No.203, 204,
303, 304.
3. Microwave. 103, 104, 203, 6 5,000/- 30,000.00
204, 303, 304.
4. Geyser. 103, 104, 203, 6 3,000/- 18,000.00
204, 303, 304.
5. T.V. Set. 103, 104, 203, 6 25,000/- 1,50,000.00
204, 303, 304.
6. T.V. Trolley 103, 104, 203, 6 5,000/- 30,000.00
204, 303, 304.
7. Washing Machine. 103, 104, 203, 6 20,000/- 1,20,000.00
204, 303, 304.
Total Rs. 6,08,000/-
(A) The cost for furnishing including electrical item to these 6 nos. flats works out to
amounting to Rs.16,16,000/- (Approx).
(B) External painting of Amenity building is also required to be done and probable
expenditure will be Rs.30,00,000/- (Approx).
(C) The office accommodation for the Principal Advisor (Solid & Waste
Management Cell) is to be provided in Unit No.215 & 216 in A1 building at Wadala
Truck Terminal. It is therefore proposed to provide cabins for the officers and staffs
with necessary seating arrangement. For this following works are essential to be
carried out –
a. Providing 5 Cabins in Unit No.215 & 4 Cabins in Unit No.216 --- Rs.5,00,000/-.
b. Providing repairs to Toilets by replacing doors, windows,
sanitary fittings, floorings etc. --- Rs. 5,00,000/-.
c. Providing electrical installation and A.C. units --- Rs. 3,00,000/-.
Total Rs.13,00,000/-
Since these works mentioned at (A & C) above are of urgent nature, permission
to carryout the works from willing agencies is requested.
Submitted for approval please.
E.E.(APA)
R(L)
Engineering Division.
February 18, 2008.
R(L)
Pavement Design :
Since this road is constructed on marshy land and affected with the tidal
condition in the Mahul creek. The consultant has suggested the ground improvement
by installation of stone columns 600mm dia., and depth of 10m and providing non-
woven Geo textile below the embankment for the stability of embankment & to avoid
further settlement.
The traffic survey is carried out & on the base of that pavement design is done,
traffic growth rate 3.5, cumulative traffic for 30 years etc. (design report kept at Page
c/s).
Accordingly pavement composition Pavement Quality Concrete (PQC).. is
consider for three lanes on either side and one last lane of 2m wide is considered in
bituminous layer having layers of GSB 300mm, WMM 250mm, DBM 150mm &
Bituminous concrete 50mm thick and 2.2m wide raised footpath having 60mm thick
Paver block surface on both side. The provision for Storm Water Drain & utility duct is
also made.
The Pavement Quality Concrete (PQC) M-40 grade for the thickness of 30 CM
is provided on top surface. Below this PQC the provision of Dry Lean Concrete (DLC)
M-10 of thickness 150mm is considered & below DLC the Granular Sub Base (GSB) of
300mm thickness is to be provided. Along this road there is open nalla having width of
6m adjacent to ISBT for length of 400m & nalla adjacent transit camp having width of
5m for length of 400m. These both nallas are planned to convert in to Box Drain. Also
there is low lying area adjacent to this road approx. 400m length needs to be supported
at the edges therefore construction of concrete retaining wall is proposed to support the
road embankment (Approx. 400m length). One box culvert near Pratiksha Nagar is
proposed for the drainage water coming through Pratiksha Nagar & joining ISBT nalla
through this box culvert.
The street lights is also considered in this estimate.
The detail estimate is prepared considering the above mentioned points –
(A) Road work including ground improvement Rs.15,85,06,933/-
(B) Culvert Rs. 50,46,827/-
(C) Box Drain Rs. 9,37,39,994/-
(D) Retaining Wall Rs. 84,42,692/-
(E) Electrical Work (Street Light) Rs. 36,55,521/-
Total Rs. 26,93,91,967/-
Add : Contingencies 5% Rs. 1,34,69,598/-
Grand Total Rs.28,28,61,566/-
Say Rs.28,29,00,000/-
R(L)
The estimate is based on current PWD DSR, Rate Analysis for non DSR items
and Rates adopted from the work of concrete of road at Bandra – Kurla Complex.
This estimate is scrutinized and submitted herewith, with view to get competitive
rates and to ensure wide publicity it is proposed to publish the tender notice in the
leading National & Regional Level News Papers as per Government Norms. It is also
to put the tender notice on Web Site of MMRDA for giving wide publicity. Also copies
of tender notices will be sent to the other Government bodies for given wide publicity.
Administrative Approval :
To carry out the work under MUIP a proposal was submitted to the authority in
its 119th meeting held on 28.09.2007. Authority accorded the Administrative approval
to carryout the works at Wadala Truck Terminal for an amounting to Rs.40.88 Crores.
A copy of the minutes of meeting for the same is kept on Pg. c/s.
Budget Provision :
The Budget provision in the current year 2007 – 2008 MMRDA has made
Rs.575 Crores for MUIP work (Phase – I, II, III).
Proposal :
It is proposed to approve as under.
An estimate amounting to Rs.28,28,00,000/- for the work of concretization of
Sion - Koliwada Connector Road from Anik Depot to Hemant Manjarekar Marg at
Wadala Truck Terminal.
A draft tender notice for the work kept at Page c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
S.E.(GRD)
C.E.(SRN)
M.C.
R(L)
Engineering Division.
March 07, 2008.
MMRDA has constructed the Amenity building in the year of 1996. Amenity
building consist of Police Station, M.T.N.L. office, Post & Telegraph office & fire station
at the ground floor and above three floors having office quarters, Six for Police Station,
Six for Post & Telegraph & Six for Fire Station. The structure of Building is R.C.C.
framed type which slopping concrete slab provided by the terrace slab.
During the Metropolitan Commissioner visit it has been directed to carryout the
external painting work for the external walls & anti fungus treatment to the stone
cladding. Since construction the building was not painted therefore at present
external painting has been spoiled and need to be re-painted to have better durability
of external surface and good esthetic view it is proposed to solvent base acrylic paint
and also there is Malad stone cladding provided at Ground level which has been
attack by fungus which gives a shabby look. Therefore it is now proposed to remove
the fungus by cleaning & to provide anti fungus chemical treatment to protect the
stone surface from attack fungus in future. Also the items has been consider for the
repairing building premises such as chainlink fencing, main gate entrance, paver block
& kota stone flooring in the compound and balcony railing, collapsible gate etc.
In view of the above detail the estimate prepared for an amount of
Rs.32,22,419/- (Net) and Rs.33,83,540/- (Gross) the estimated rates are based on
current DSR of Presidency Division 07 – 08 Government of Maharashtra. The
expenditure is debited to task II – 1 for Wadala Truck Terminal. The Tender notice can
be published in the news paper by giving 15 days notice period as per the norms. The
Hon’ble Metropolitan Commissioner has accorded the Administrative approval to the
same the copy of the same is kept at Pg c/s.
A draft tender notice for the same is prepared and kept on Page 103 c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
JAO (D)
Chief T&C
R(L)
No.T&C/TT/Const.Rd/2008 Date : 12.02.2008.
To.
The Divisional Engineer,
Planning (Network) BEST,
Veej Bhavan,
Near Fire Brigade,
Gen. Jagannath Bhosale Marg,
Backbay, Mumbai – 400 020.
Sir,
MMRDA has taken up the work of construction of internal road from petrol
pump to phase – I of Wadala Truck Terminal to Sion – Koliwada Connector road. The
alignment of road is marked on site. The above work will be start in shortly. You are
requested to convey your remark regarding your to cable laid at site of work.
Thanking you,
Yours faithfully,
(A.P. Athawale)
Executive Engineer
R(L)
SWM Cell.
March 17, 2008.
Encl : 1, 2, 3 as above.
Principal Advisor
(SWM Project Cell, MMRDA)
E.E.(APA)
R(L)
Pre-bid Meeting for the work of
Name of Work Concretization of Sion – Koliwada road from Anik Depot
to Hemant Manjrekar Marg at Wadala Truck Terminal
Date & Time : 18th March 2008 @ 15.00 Hrs.
R(L)
Engineering Division.
January 16, 2008.
Sub : Providing cabins for the office premises at unit No. 215 & 216,
2nd floor, A-1 Building at Wadala Truck Terminal.
With reference to note of Principal Advisor (SWM Cell) & the directive of
Metropolitan Commissioner on the above mentioned subject matter.
It is proposed to make one office at Wadala Truck Terminal for the Principal
Advisor (SWM Cell) & their technical as well as non technical staff on the 2 nd floor of A-
1 Building in unit No.215 & 216 at Wadala Truck Terminal.
Therefore renovation of these 2 unit i.e. 215 & 216 is very much necessary.
The renovation work includes the provision of PVC prefabricated cabin, 4 Cabin in unit
No.215 & 5 Cabin in unit No.216.
Hon’ble Metropolitan Commissioner has accorded the Administrative Approval for the
above mentioned work for an amount of Rs.5,00,000/- vide office note kept @ Pg. c/s.
An estimate is prepared considering above mention items for an amount of
Rs.4,99,300/-. The rates are adopted for estimate from market enquiry collecting
quotation from the specialized agencies who is carrying out similar type of work.
The quotations has been collected from the following agencies.
Agency Rate
i) M/s. Galaxy - Rs.4,041/- Per Sqm.
ii) M/s. Sai Plastic Industries - Rs.3,618/- Per Sqm.
iii) M/s. Synergy Marketing Corp. - Rs.3,977=75 Per Sqm.
The rates given by M/s. Sai Plastic Industries are lowest rate i.e. Rs.3,618/- Per
Sqm inclusive of VAT & Service Tax.
Since the work is urgent nature it is proposed to carryout the work from
M/s. Sai Plastic Industries on A-1 / A-2 agreement basis.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E. (APA)
JAO (D)
R(L)
Engineering Division.
December 24, 2007
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
March 27, 2008.
MMRDA T & C Division has appointed M/s. STUP Consultant Pvt. Ltd., as a
Detailed Engineering & PMC (DE & PMC) for the roads in an around the Truck
Terminal Wadala & ISBT vide work order reference No.1. The Consultancy fees for
the work is 2.75% of the estimated project cost. The scope of the services shall be
stipulated in the Terms of Reference (T.O.R.) of the main contract agreement.
M/s. STUP Consultant has carried out the plain table survey, geotechnical
investigation and submitted Draft Final Report, Detail Estimate Bid document and
drawings etc. except tender evaluation. Therefore it is proposed to fees due 95% of
Rs.21,92,326/- i.e. Rs.20,82,720/- and Service tax 12.36% i.e. Rs.2,57,423/-. The
total fees works out to Rs.23,40,133/- as mentioned in invoice submitted by M/s.
STUP consultant Pvt. Ltd. The bill prepared of Rs.23,40,133/- in favour of M/s. STUP
Consultant Pvt. Ltd, for construction of Sion – Koliwada Connector Road from Anik
Depot to H.M. Marg, at Truck Terminal Wadala, estimated cost for this work is
Rs.26,57,36,446/-. The consultancy fees for this is 2.75% of the Rs.26,57,36,446/- is
equal to Rs.73,07,552/- fees for Ph-I & Ph-II is 30% of 73,07,552/- is equal to
Rs.21,92,326/-.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
R(L)
Engineering Division.
March 28, 2008.
Sub : Desilting of Nalla, SWD, cleaning of pipes in (Ph – I, II, IV) and Transit
Camp area at Truck Terminal Wadala.
--- Annual Maintenance ---
Every year before monsoon desilting of nalla is required to be done to avoid the
flooding in nearby located Slum area of T.T. Wadala. The nallas namely required to be desilted
are J.K. Chemical nalla, nalla along the D.P. Road along Ph. IV boundary, nalla from
Pratikshanagar to Mahul creek, nallas in MUTP transit camp area, open Storm Water Drain in
Ph – I of T.T. Wadala.
It is also required to maintain the free flow of nallas during the monsoon by removing
floating material with the labours engaged & JCB to remove the slush gathered in the nallas
from adjoining slum area of MUTP transit camp, Pratiksha nagar area.
After the monsoon in fair season antiflood measures are required to be taken by
cleaning the choke up pipes, cleaning the culverts and to clear the nalla flow.
Considering all the above an estimate is prepared for –
(a) Pre-monsoon desilting.
(b) Antiflooding measures during monsoon.
(c) Maintenance of nallas after monsoon.
The cost works out for -
(a) Pre-monsoon desilting Rs.69,96,690=00
(b) Monsoon works (anti flooding measures) Rs. 4,64,580=00
(c) Post-monsoon Rs. 4,97,160=00
Total cost works out to Rs.79,58,430=00
The rates adopted from the estimate approved to B.K.C and SWD FMR. The amount
will be debited to Task No.II – 1 (WTT).
After approval the B-1 tenders will be called by publishing tender notice in news paper.
The draft tender notice for same is prepared and kept at Pg. c/s.
Submit for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
March 17, 2008.
The proposal for establishing full-fledged office for S.W.M. Project Cell at 1 st
floor, Balkum Fire Brigade office, old Thane Bhivandi Road, Thane (W), from Principal
Advisor, SWM Project Cell, MMRDA has been received. Their noting @ Pg.No.1 N/s,
where in they have stated that the Hon’ble Metropolitan Commissioner, has
appreciated and generally agreed layout submitted by Architect
M/s. Dilip Kulkarni & Associates for above mentioned office premises renovation.
Accordingly M/s. Dilip Kulkarni & Associates, Architect has prepared an
estimate for Interior work with Air-conditioned etc. as given below.
I) Civil & furniture work - Rs. 70,72,060/-
II) Electrical work - Rs. 41,03,600/-
III) Air Conditioning - Rs. 16,03,425/-
Total Rs. 1,27,79,085/-
Total cost works out to Rs.1,27,79,100/- including 5% contingencies on the
basis of rates approved by MMRDA for work of Interior at MMRDA office building on
8th floor, briefly description of the work as under –
I) Civil & Furniture work :
Internal wall plaster.
Internal painting.
Flooring.
Toilet Block renovation.
False ceiling.
Cabin Partitions.
Doors & windows.
II) Electrical Work :
Electrical wiring with required tube fittings, switchgears, LAN wiring, Telephone
wiring with EPABX of 8 x 96 extensions, water cooler with water purifier, etc. complete.
A provision of Rs.1,50,000/- towards service connection charges to obtain a 3 phase
electric meter from MSEDCL. As this office is in MSEDCL area, regular load shedding
for about 2.5 Hrs. daily is carried out. Considering the load shedding, a diesel
generator of 160 KVA to take care the full load is proposed. Provision of automatic
operation of D.G. Set is made in this estimate. A separate proposal for required diesel
(fuel & oil) & operator cum electrician for this office will be submitted on completion of
this work.
R(L)
III) Air-conditioning work :
The entire office area is proposed to be made air-conditioned by providing
ductable split units of total 33 TR capacity & 4 Nos. split room units of 2 TR / 1.5 TR
capacity. Necessary ducting etc. is considered in this estimate.
An estimate is scrutinized by Engineering Division and found in order.
1. It is proposed to extend the services of M/s. Dilip Kulkarni & Associates,
Architect on he same term & condition who is working for MMRDA office Building to
this work also. Total consultancy charges on the approved by MMRDA i.e. 1.45% +
Service Tax 12.36% comes to Rs.2,02,800/-.
2. An estimate is supported to accord the Administrative Approval please by the
Hon’ble Metropolitan Commissioner. After Administrative Approval, work will be
carried out by inviting tender notice publicly in the news paper as per Government
Resolution, keeping time limit for completion of work is 4 (Four) months from the date
of work order.
Submitted for
1. To accord the Administrative Approval Rs.127,79,100/-.
2. Appointment of Consultant M/s. Dilip Kulkarni & Associaties, as Architect on the
same terms & condition.
3. As proposed above in para 2 of noting.
Submitted please.
E.E.(APA)
J.A.O(D)
C.E.(SRN)
R(L)
Engineering Division.
April 2, 2008.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
Sub : Requisition of Mass Storage Device (Pen Drive) for Staff / Officer.
The staff of Engineering Division., has to work regularly with computer related
data for the day to day activities. The involves frequent editing of data, including
working on different PCs, adding of data from various sources like consultants office,
Internet data download, e-mail attachment download, data from Laptop and
confidential files etc. The staff is finding it difficult to carry on the day to day work with
the present storage device (i.e. Floppy Drive) as most of the works have to be
completed in urgency. It is therefore requested from Administration Division to kindly
arrange for the Pen Drive to the following staff/ officer as per the table follow :-
Quantity
1. Shri. A.P. Athawale Executive Engineer 2 No. (2 GB)
2. Shri. M.S. Raikar Deputy Engineer – I 2 No. (2 GB)
3. Shri. S.P. Padikar Deputy Engineer - II 2 No. (2 GB)
S.P. Padikar
(Deputy Engineer – II)
R(L)
Engineering Division.
April 11, 2008.
Sub : Supplying steel furniture for the office premises at unit No. 215 &
216, 2nd floor, A-1 Building at Wadala Truck Terminal.
(M.S. Raikar)
Deputy Engineer – I
E.E. (APA)
JAO (D)
R(L)
T&C Division.
May 02, 2008.
During the site visit of Hon’ble Metropolitan Commissioner it has been directed
to establish the full fledged office by providing centralized A.C. cabins, work stations
etc. in the unit No.201for the sitting arrangement of officers & staff of T&C Division &
Metro Rail Division. This office area is about 2600 Sq.ft. Presently, this unit is vacant.
M/s. Dilip Kulkarni & Associates, Architect who is working for MMRDA office
building renovation work was asked to prepare the layout drawing and cost estimate
for this units on 1st floor of A-1 building for proposed office. The tentative layout is
finalized in Consultation with the Chief T&C Divn., & is kept at 1 c/s.
Accordingly, an estimate amounting to Rs.62,15,289/- is prepared & submitted
herewith for approval. This estimate includes required Civil, Furniture work including
internal plastering & painting, false ceiling, doors & windows etc. along with necessary
electrical installation & air – conditioning. The provisions are similar to those of office
interior work in MMRDA office building & this estimate is prepared as per the approved
rates for these works.
It is proposed to extend the service of M/s. Dilip Kulkarni & Associates,
Architect who is working for MMRDA office building on the same terms & conditions.
Total Consultancy charges on approved by MMRDA i.e. 1.45% & Service Tax 12.36%
comes to Rs.1,01,261/-.
The Block estimate cost is Rs.63,16,550/- is submitted for the Administrative
approval by the Hon’ble Metropolitan Commissioner.
After Administrative approval, detailed estimate will be prepared & necessary
Technical sanction will be obtained from competent authority. Work will be carried out
by inviting tenders by publishing tender notice in the news paper. The time limit for
completion of work will be 4 months form date of work order.
Submitted for approval.
A. To accord administrative approval for Rs.63,16,550/-
B. Appointment of Consultant M/s. Dilip Kulkarni & Associates, as Architect on
same terms & conditions as approved for office building.
(M.S. Raikar)
Deputy Engineer – I
E.E. (SVA)
Chief T&C
Engineering Division.
R(L)
May 7, 2008.
Sub : Providing wooden flooring in the Guest House & 1st floor of
Amenity Building in Ph – I of Truck Terminal Wadala.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
R(L)
Engineering Division.
May 7, 2008.
R(L)
Engineering Division.
May 13, 2008.
Sub : Repairs to the toilet blocks in idle parking in Ph-I of Truck Terminal
Wadala.
The above mentioned toilet blocks are constructed either in idle parking – I and II at Ph
– I, Truck Terminal Wadala. Therefore toilet blocks are given on ‘Pay & Use’ basis by calling
tenders by T&C division.
The note is received from Chief T&C, regarding carryout repairs of toilet block.
An estimate for the same is prepared considering the current building DSR (2007-08)
items and other approved rates for the similar types of works. The net estimated cost comes to
Rs.
Since it is an urgent nature work it is proposed to carryout the work by calling
A-1 / A-2 quotations from willing agencies.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
J.A.O.(D)
R(L)
T&C Division.
May 21, 2008.
During the site visit of Hon’ble Metropolitan Commissioner it has been directed
to establish the full fledged office by providing centralized A.C. cabins, work stations
etc. in the unit No.115 for the sitting arrangement of officers & staff of T&C Division &
Metro Rail Division. This office area is about 2600 Sq.ft. Presently, this unit is vacant.
Accordingly, an estimate amounting to Rs.61,51,272/- is prepared & submitted
herewith for approval. This estimate includes required Civil, Furniture work including
internal plastering & painting, false ceiling, doors & windows etc. along with necessary
electrical installation & air – conditioning. The provisions are similar to those of office
interior work in MMRDA office building & this estimate is prepared as per the approved
rates for these works.
The Block estimate cost is Rs.62,51,489/- is Administrative approved by the
Hon’ble Metropolitan Commissioner.
Now it is proposed to accord the technical sanction by Chief T&C, for an
amounting to Rs.61,51,272/-.
Also the draft tender notice is prepared for publishing the same in News papers
kept at Pg. c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E. (SVA)
J.A.O.(D)
Addl. C.E.
Chief T&C
R(L)
T&C Division.
May 21, 2008.
Sub : Establishing the full fledged office premises at unit 201 & 202 on
2nd floor, in A-1 Building at Truck Terminal Wadala.
-- Technical Sanction to estimate amounting to Rs.61,15,289/- --
During the site visit of Hon’ble Metropolitan Commissioner it has been directed
to establish the full fledged office by providing centralized A.C. cabins, work stations
etc. in the unit No.201 & 202 for the sitting arrangement of officers & staff of T&C
Division & Metro Rail Division. This office area is about 2600 Sq.ft. Presently, this unit
is vacant.
Accordingly, an estimate amounting to Rs.62,15,289/- is prepared & submitted
herewith for approval. This estimate includes required Civil, Furniture work including
internal plastering & painting, false ceiling, doors & windows etc. along with necessary
electrical installation & air – conditioning. The provisions are similar to those of office
interior work in MMRDA office building & this estimate is prepared as per the approved
rates for these works.
The Block estimate cost is Rs.63,16,550/- is Administrative approved by the
Hon’ble Metropolitan Commissioner.
Now it is proposed to accord the technical sanction by Chief T&C, for an
amounting to Rs.62,15,289/-.
Also the draft tender notice is prepared for publishing the same in News papers
kept at Pg. c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E. (SVA)
J.A.O.(D)
Addl. C.E.
Chief T&C.
R(L)
Engineering Division.
May 28, 2008.
Sub : Maintenance & repairs for fire buildings namely A-1, B-1, B-2,
D-2 & Amenity Building in Ph- I, Wadala Truck Terminal.
R(L)
After approval the B-1 tenders will be called by publishing tender notice in
news paper.
The draft tender notice for same is prepared and kept at Pg. 43 c/s.
Submit for approval please.
(M.S. Raikar)
Deputy Engineer
E.E.(APA)
J.A.O.(D)
S.E.(N)
C.E.(SRN)
R(L)
Name of Work : Concretization of Sion – Koliwada Road from Anik –
Depot to Hemant Mangrekar Marg at Wadala Truck
Terminal.
MAJOR ITEMS :
R(L)
Engineering Division.
June 5, 2008.
Sub : Supplying & fixing wooden furniture in the guest house at 1 st floor,
Of Amenity Building at Wadala Truck Terminal.
The comparative statement for the same is prepared and kept at Pg c/s.
From the comparative statement it is observed that the rates given by the M/s. Fine
Living are lowest rates of all items and the total amount for the furniture items works
out to Rs.3,67,875/- (inclusive 12.5% VAT).
Since the work is of urgent nature it is proposed to carryout the work from M/s.
Fine Living on A1/A2 Agreement basis, who is the lowest bidder.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(D)
S.E.(N)
Chief T&C
R(L)
Engineering Division.
August 6, 2008.
R(L)
After approval the B-1 tenders will be called by publishing tender
notice in news paper.
The draft tender notice for same is prepared and kept at
Pg. c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(D)
S.E.(N)
Chief T&C
M.C.
R(L)
T & C Division.
June 12, 2008.
As directed the list of work at Wadala Truck Terminal which has Administrative
Approval accorded by the Honorable Metropolitan Commissioner, is kept at
Pg. c/s.
As per the power delegated by the Honorable Metropolitan Commissioner, vide
office order dt.02.11.2007 at Sr.No. 3 the Superintending Engineer, has vested with
the power of Rs.1.25 Crores for according Administrative Approval. The cost of the
present work is Rs.17,97,000/- only. Hence, Administrative Approval has been
granted by the Chief Engineer on 22.11.2007 Kept at Pg. 1 N/s.
However, it is clarified by Account Division that No Administrative Approval
power with Technical officers. Full power to accord the Administrative Approval up to
Rs.10 Crores is with Honorable Metropolitan Commissioner.
As such it is necessary to obtain the Administrative Approval from Honorable
Metropolitan Commissioner. Hence, it is put up to accord the Administrative Approval.
We may request to Honorable Metropolitan Commissioner, the accord Administrative
Approval to the said work for an amounting to Rs.17,97,000/- only please.
Submitted please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
Chief T&C
R(L)
Engineering Division.
June 23, 2008.
Since this work is very prestigious & urgent nature the work will be carried out
from the experience agency who has carried out similar type of work in the past for
MMRDA function.
The work at Sr.No.1 above will be carried out from M/s. Pratap D. Thakkar &
Co., work at Sr.No.2 above will be carried out from M/s. Shree Decorators and work at
Sr.No.3. above will be carried out by M/s. N.A. Construction.
The Honorable Metropolitan Commissioner is competent to approve the same
as per circular enclosed at Pg. c/s.
(M.S. Raikar)
Deputy Engineer – I
E.E.(ANB)
S.E.(JCG)
C.E.(SRN)
M.C.
R(L)
No.EDWTT/Admn Approval/08-09. 27.06.2008.
To,
M/s. Fine Living.,
339/2714, Link Road,
Motilal Nagar, No.2,
Opp. Bangur Nagar Police Stn.,
Ganjotri Tower, Goregaon (W),
Mumbai – 400 062.
PURCHASE ORDER
Sub : Supplying & fixing wooden furniture in the guest house at 1st floor,
of Amenity Building at Wadala Truck Terminal.
Sir,
With reference to your Invoice above dated 26.05.08. You are requested to supply the office furniture at
your approved rates.
Sr.No. Furniture Item Size Qty. Rate in Rs. Amount in
Rs.
1. Wardrobe with door in 6’ x 6 ½ ‘ 4 Nos. 27,000/- 1,08,000=00
commercial veneer in
melamine finish.
2. Bed with storage box type 5’ x 6 ¼ ‘ 4 Nos. 15,000/- 60,000=00
in commercial veneer in
melamine finish
3. Bed side tables. 18” x 18” 4 Nos. 3,500/- 14,000=00
4. Dressing Table 4 Nos. 4,500/- 18,000=00
5. Sofa Set full cushion in 2 Sets. 28,000/- 56,000=00
Fabric with 32 Density
Foam.
6. Wooden Centre Table with 2 Nos. 4,500/- 9,000=00
Melamine Polish.
7. Dining Table with 6 Chairs 5’ x 3’ 12mm 2 Sets. 22,000/- 44,000=00
in Glass Top.
8. Mattresses Coir 74” x 58” x 4 Nos. 4,500/- 18,000=00
“Relaxwell” Brand. 4”
Total Rs. 3,27,000=00
Yours faithfully,
(A.P. Athawale)
Executive Engineer
R(L)
Compliance to remarks as on pre-page.
1. M.M.R.D.A. has appointed a M/s. STUP Consultant Pvt. Ltd., for Detailed Engineer &
PMC for the work of Road in and around Truck Terminal at Wadala, which includes
mainly 90’ D.P. Road and internal Roads at Phase – I of T.T. Wadala. The cost of D.P.
Road is works out to be Rs.26.57 Crore and the cost of internal road approximately
come to be Rs.94 Crore. Thus the project cost would be Rs.120.57 Crore. The
Consultancy charges will be Rs.2.71 Crore, same is submitted for approval please.
2. The Consultant has submitted Detailed Project Report for the work of D.P. Road while
submitting proposal the original cost for D.P. Road was work out on the basis of
Per Km cost of concrete Road of MUIP work. However, while calculating the revised
cost the following items are need to be consider as per site condition and soil condition
such as Ground Improvement, Training of nallas, Cross Drainage Works, Retaining
wall and provision of Road side duct.
Therefore the cost subsequently increased to Rs.26.57 Crore. This has already been
approved by the Hon’ble Metropolitan Commissioner.
3. Consultant submitted Detailed Plans & Estimate accordingly tender was invited and
Bid Evaluation was carried out by Consultant.
The necessary check list is also prepared & kept at Pg. c/s.
Submitted please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
R(L)
T & C Division.
July 3, 2008.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(D)
S.E.(HNN)
Chief T&C
R(L)
Engineering Division.
June 25, 2008.
The tender for above mentioned work was approved by Hon’ble Metropolitan
Commissioner, and the work order for the same was issued to M/s. M.G. Construction
on dt.06.06.08.
The details of the work are as under –
1. Estimated cost put to tender - Rs.32,22,420/-
2. Tender cost - Rs.33,51,316=80
3. Date of Work order - 06.06.2008.
4. Time period - One month.
5. Stipulated date of completion - 05.07.2008.
6. Scope of work
A) Water proofing work Qty. - 2500 Sqm.
B) Painting work Qty. - 1060 Sqm.
7. Work done upto date -
8. Work in progress - Internal works.
9. Balance work remaining - External painting work.
The contractor has started the work and same is in progress but due to
monsoon season work has stopped. Since the work order is issued in the month of
June 2008 immediately after issuing work order the rainy season is started therefore
work cannot be progressed.
The contractor has requested for extension of 4 months time period i.e. upto
14.11.08 (letter kept at Pg. 159 c/s). The work consist of major item of external
painting which cannot be carried out during the rainy season. Which can damage the
newly, painted surface and there will not be proper binding with the surface the work
must be done in fair season to get good results / appearance.
R(L)
In view of the above it is necessary to grant the permission of extension of Time
period for 4 months i.e. upto 14.11.2008 on the same terms and conditions of contract.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(D)
S.E.(HNN)
R(L)
No.ED/TT/Everard Nagar Flyover/Repairs/08 January 03, 2008.
To,
The Secretary (Works),
Public Work Department,
Government of Maharashtra,
Mantralaya,
Mumbai – 400 032.
Sir,
In order to provide link between Truck Terminal, Wadala and external road network, the
construction of flyover on Eastern Express Highway (EEH) was essential. This flyover near
Everard Nagar falls on the connector to the Eastern Express Highway. Therefore, PWD
constructed this flyover for which MMRDA arranged funds.
Since Eastern Express Highway carries major traffic and Anik-Wadala Road is an
important artery, construction of this flyover was necessary considering the magnitude of
traffic.
The MMRDA has already taken up the implementation of MUTP & MUIP to improve
the traffic conditions in the City of Mumbai. Improvement to Western Express Highway &
Eastern Express Highway are also included in the MUIP. The Everard Nagar flyover therefore
plays an important role as it takes the traffic from the Wadala Truck Anik Road, Eastern
Freeway & APLR (being constructed by the PWD) to the Eastern Express Highway without
disturbing the traffic on the Eastern Express Highway.
The PWD has a number of flyovers on Eastern Express Highway, Western Express
Highway and Sion – Panvel Highway, which are maintained by the PWD. The Everard Nagar
flyover is therefore part of these flyovers, hence need to be maintained by the PWD.
You are also aware of the fact that the MMRDA has constructed this flyover through
the PWD providing funds. However, it is not taken over by the PWD for maintenance since
1994, hence the condition is deteriorating day by day. If the bridge is not maintained by the
PWD then an asset to the City will keep on deteriorating.
I would, therefore, request you to take over this flyover as early as possible and
maintain the same at your cost.
(J.C. Gandhi)
Superintending Engineer
R(L)
No.ED/TT/Everard Nagar Flyover/Repairs/08 April 10, 2008.
To,
The Chief Engineer,
Special Project,
PWD, 25,
Murzban Road, Fort,
Mumbai – 400 001.
With reference to above this office has convey regarding the handing over of Everard
Nagar flyover, to your department for further maintenance.
The PWD has a number of flyovers on Eastern Express Highway, Western Express
Highway and Sion – Panvel Highway, which are maintained by the PWD. The Everard Nagar
flyover is therefore part of these flyovers, hence need to be maintained by the PWD.
I would, therefore, request you to take over this flyover as early as possible and
maintain the same at your cost.
(A.P. Athawale)
Executive Engineer
R(L)
During site visit to Amenity Building by Honorable Metropolitan
Commissioner, it has been decided to provide a well furnished Guest house in
this Building. To give the better aesthetic view and to have neat & clkljean area
around this Building it is proposed to provide a 80mm thick paver blocks through
the existing agency M/s. Essbee Enterprises, who has awarded the work of paver
blocks Road in Ph-I of Truck Terminal Wadala.
Also there is a complaint from weight bridge owner regarding damaged
portion in front of weigh bridge. Due to this damaged portion there is a
possibility of accident by tilting the vehicles such as Tailors, Tankers, Trucks etc.
which is coming to weigh bridge. This work has accordingly being carried out at
these two locations. Also increase in some quantity of DLC because of additional
area of Paver Block.
Also during the site visit by Engineer-in-charge for ongoing work of Road
from Petrol Pump to Sion – Koliwada, it has been decided to encase the pipes
(300mm & 900mm dia) laid for Storm Water Drain by providing M-15 grade
concrete as such these provision is not made in the estimate.
The total net Excess amount is Rs.7,53,521/- as shown in Excess Saving
Statement. This tender has been approved by the Honorable Metropolitan
Commissioner. In view of the urgency to complete the work before monsoon.
The work was carried out from existing agency M/s. Essbee Enterprises. Since
the above excess expenditure had to incurred for ensuring soundness & durability
of Storm Water Drain system for this road. The contract was approved in T & C
Division. The Chief T&C is competent to approve the additional expenditure.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(D)
R(L)
S.E.(HNN)
Chief T&C
R(L)
T & C Division.
MMRDA.
July 22, 2008.
The above mentioned work was allotted to M/s. STUP Consultants Pvt. Ltd.
During the discussion with Chief T&C for the work of concretization of internal Road it
is learnt that there will be increase in F.S.I. for future development in the Wadala Truck
Terminal.
Therefore, it is very much necessary to have proper utility services
i.e. up-gradation of existing Storm Water Drain System, Sewerage System and Water
Supply System. All these network has to be properly design before taking the
concretization work of internal roads at Wadala Truck Terminal.
It is requested to accordingly informed the Consultant M/s. STUP Consultants
Pvt. Ltd.
Submitted please.
(A.P. Athawale)
Executive Engineer
R(L)
Engineering Division.
July 25, 2007.
Sub : ----- Publishing Tender Notice in Hindustan Times, Lokmat new papers
(6 Works) :-
i) Providing Civil & interior work for establishing office in Unit No.115 on 1 st floor, in Building A-1,
at WTT.
ii) Providing Civil & interior work for establishing office in Unit No.201&205 on 2 nd flr, in Building
A-1, at WTT.
iii) Providing electrical installation for establishing office in Unit No.115 on 1 st floor, in Building A-1,
at WTT.
iv) Providing electrical installation for establishing office in Unit No.201&202 on 2 nd flr, in Building
A-1, at WTT.
v) Providing ductable Air conditioner for establishing office in Unit No.115 on 1 st floor, in Building
A-1, at WTT.
vi) Providing ductable Air conditioner for establishing office in Unit No.201&202 on 2 nd flr, in
Building A-1, WTT.
Ref : Bill No.MB/SP/0608/069 from M/s. DART Advt. Pvt. Ltd. dt.04.06.08.
M/s. Dynamic Advertising & Research Team Pvt. Ltd., has published the tender notice
for above mentioned 6 works in the news papers Hindustan Times, Lokmat (Mumbai, Pune,
Nagpur, Ahmednagar) on dt.04.06.08.
The bill for the same is received from M/s. Dynamic Advertising & Research Team Pvt.
Ltd., amounting to Rs.1,38,022/- with credit of Rs.20,703/-. Therefore the net amount payable
is Rs.1,17,319/-
The bill for the same is prepared in the form of ‘Supply & Service’ amounting to
Rs.1,17,319/-.
The necessary deduction of I.T., S.C. & Edu.cess is made as per rule in force the net
amount of bill is Rs.1,14,661/-
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(SVA)
A.C.A.O.(D)
R(L)
T & C Division.
July 29, 2008.
Sub : Security Guard for the Guest House & Staff Quarter in Amenity Building
at Phase – I, Wadala Truck Terminal.
(A.P. Athawale)
Executive Engineer
S.E.(N)
Chief T & C
Chief T & CP
Land Manager
R(L)
Engineering Division.
August 7, 2008.
R(L)
After approval the B-1 tenders will be called by publishing tender notice in
news paper.
The draft tender notice for same is prepared and kept at Pg.89 c/s.
Submit for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
A.C.A.O.(D)
S.E.(N)
Chief T&C
M.C.
R(L)
T & C Division.
August 20, 2008.
(M.S. Raikar)
Deputy Engineer - I
E.E.(APA)
S.E.(HNN)
Chief T&C
M.C.
R(L)
T & C Division.
August 25, 2008.
(S.P. Padikar)
Deputy Engineer - II
D.E.-I (MSR)
E.E.(APA)
S.E.(HNN)
Chief T&C
R(L)
T & C Division.
August 25, 2008.
(S.P. Padikar)
Deputy Engineer - II
D.E.-I (MSR)
E.E.(APA)
S.E.(HNN)
Chief T&C
Lands Manager
R(L)
Engineering Division.
June ,2008.
The first skywalk is constructed by MMRDA and it has been decided to inaugurate this
skywalk by the Hon’ble Chief Minister, Govt. of Maharashtra on 24.06.2008 near Bandra –
Kurla Complex.
For this function the block estimate is prepared for amounting to Rs.15,00,000/-.
Hon’ble Metropolitan Commissioner, has been accorded Administrative Approval for an
amounting to Rs.15,00,000/- on dt.23.06.08 as on pre-page.
Now the detailed estimate for the above mentioned three works is prepared as under -
1) Estimate for providing waterproof mandap, stage, stage seating
arrangement, Chairs & Carpet etc. amounting to ----------------------------- Rs.5,85,550/-
2) Estimate for Lighting Decoration & Flower Decoration of Stage,
Mandap & inaugural location amounting to ----------------------------------- Rs.3,98,600/-
3) Estimate for Misc. work such as painting kerb stone, supply
machinery, Labour etc amounting to -------------------------------------------- Rs.1,03,000/-
The rates consider for this estimate is upgraded rate by considering escalation for two
years period on approved tender rate for similar type of work in year 2006 – 2007.
As proposed and approved the work at Sr.No.1 has been carried out by
M/s. Pratap D. Thakkar & Co. Work at Sr.No.2 has been carried out by M/s. Shree Decorators
and work at Sr.No.3 has been carried out by M/s. N.A. Construction.
For above mentioned work at Sr.No.1 M/s. Pratap D. Thakkar & Co., has given 1%
rebate on estimated rate i.e. Rs.5,79,695/- and for work at Sr.No.2, M/s. Shree Decorators has
given 1.50% rebate on estimated rates i.e. Rs.3,92,621/-.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer - I
E.E.(ANB)
A.C.A.O.(D)
S.E.(JCG)
C.E.(SRN)
R(L)
T & C Division.
September 9, 2008.
The nalla is flowing from Almeda compound area through transit camp and joining at
J.K. Chemical nalla at Sion – Koliwada Road which is carrying the all slum discharge having a
total length of 400m. Adjacent to this nalla there is a primary school having a small children
because of this kaccha nalla there is a lot of bad smell and created a unhygienic condition to
due slum discharge. Also slum dwellers adjacent to this nalla is throwing a garbage directly in
the nalla flow due to this there is obstruction in nalla flow which create flooding situation and
creating a bad smell therefore it is necessary to have a proper section to maintain the nalla and
to keep this clean regularly.
There is also request from school Principal that there should be proper wall having a
fencing over the wall which protect the school children to any mishap and also to protect the
school property from the local theft.
To have a neat and clean area and nalla it is proposed to train the part of this nalla by
constructing uncoursed rubble masonry on both side and provide a barbed wire fencing over
this wall adjoining the school plot side.
An estimate is prepared for Part length of 120 Rmt drain UCR wall & Barbed wire
fencing for an amount of Rs.24,67,605/- gross.
The rates are adopted for estimate is from PWD – DSR for the year 2007 – 08.
The expenditure incurred will be debited Task II – I of Wadala Truck Terminal.
As this work has to be carried out on urgent basis, it is proposed to publish short tender
notice giving 15 days time period in the news paper. The draft tender notice is also prepared for
the same.
Submitted for Administrative approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(J)
S.E.(HNN)
Chief T&C
F.A.
M.C.
R(L)
T & C Division.
September 10, 2008.
Sub : Request for Vehicle for transition from Bandra to Wadala &
Wadala to Bandra.
The work of renovation of 5th Floor, Engineering Division, has been started
therefore the undersigned and Shri. S.P. Padikar, has shifted alongwith official
documents and files at Wadala Truck Terminal. The other officers are sitting at
B.K.C. office.
The important documents such as correspondence files, Measurement
Books, Agreements, Tender Documents & Drawings etc. has to taken from
Bandra office to Wadala office and Wadala office to Bandra office regularly.
These documents are very important so it has to be carry safely, therefore it is
requested to spare a vehicle to the undersigned also some times vehicle is needed
for attending meetings to MCGM and other Departments.
It is requested kindly to spare a vehicle for the same.
Submitted please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
Chief T & C
R(L)
T & C Division.
September 22, 2008.
Sub : Providing P.V.C. Sintex board partition for the cabin in unit No.115 on
1st floor, of A-1 Building at Wadala Truck Terminal.
MMRDA has taken of the project of monorail for that the required staff has been
appointed by T&C Division.
It has been decided to provide a sitting arrangement for these staff at Wadala Truck
Terminal, A-1 Building. Therefore it is necessary to provide an additional Cabin by alteration
in the existing office premises by providing PVC Sintex board partition in the existing office
premises at Wadala Truck Terminal. Considering the availability of open space five new
cabins can be provided. Also there is a leakage from West side window chajja therefore it has
been decided to provide waterproof work along this chajja to protect from leakage.( Drg.
Enclosed).
An estimate has been prepared for the PVC Sintex board (20mm) thick partition and
waterproofing treatment for window chajja for an amount of Rs.4,96,700/- (Net).
The rate analysis considering the market rates for the partition item has been prepared
and other items rate consider is approved rate & DSR rate.
Since the work is an urgent nature it is proposed to carryout the work on A1 / A2
agreement basis by collecting quotations.
Submitted for Administrative approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(J)
S.E.(HNN)
Chief (T&C)
M.C.
R(L)
T & C Division.
September 29, 2008.
Sub : Miscellaneous repairs works for the Fire Station and at in A-1 Building,
Wadala Truck Terminal.
Ref : (i)
(ii)
(iii)
The Fire Station officers are occupied the Fire Station premises in the Amenity
Building at Wadala Truck Terminal. The complaint letter received from Fire Station Officers
regarding the request to carryout the miscellaneous repair work such as aluminum window
frame & glass, door shutter, W.C. & bath repairs including salt glazed earthenware pipe, gulley
trap. Also they are requested for the window safety grill for the ground floor rooms to have
protection against theft. Also it is observed that there is a leakage from Toilet block of floor
Unit No.104 & 107 on 1st floor, because of this there is a creation of unhygienic condition at
ground floor passage. Therefore it is difficult to use the passage, also there is a leakage from
2nd floor toilet block due to that 1st floor, MMRDA office getting damage and creating
unhygienic condition. Therefore it is very much necessary to carryout repair work by carrying
waterproofing for these toilet blocks.
An estimate has been prepared considering the above items for an amount of Rs.
4,86,200/-. The rates are adopted from the current PWD DSR Presidency Division (2007 – 08)
& approved rates for other items. Since the work is urgent nature will be carried out on A-1 /
A-2 agreement basis by calling quotations.
Submitted for Administrative approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(J)
S.E.(HNN)
Chief (T&C)
M.C.
R(L)
T & C Division.
Date : 25.09.2008.
Sub : Construction of internal roads in Truck Terminal and D.P. Road &
Wadala Truck Terminal.
--- Sewerage system work ---
The sewer lines are laid along internal roads of Wadala Truck Terminal, Ph – I, by
MCGM as a deposit work in the year 1992 are not in operation at this stage because there is no
connection with Municipal Sewer network due to construction of Pumping Station issue is yet
to be resolved.
From the correspondence, it is seen that the work of pumping station & rising main was
to be carried out by the MCGM on deposit basis & the entire cost of this was to be borne by
MHADA & MMRDA who are the beneficiary of this pumping station.
However the issue of construction of pumping station and rising main was not yet
resolved. In the mean time MHADA has finally constructed a S.T.P. exclusively for their entire
development at Kokari Agar at their own cost.
Now as the MMRDA is proposing to carryout concretization of internal roads it is very
much necessary to carryout work of sewer line, therefore we have approach to MCGM Sewer
Project Planning Department. In the reply MCGM has suggested that MMRDA should design
and construct the sewerage network with Sewage Treatment Plant arrangement for entire
development of Wadala Truck Terminal.
Under the circumstances mentioned above it is proposed to appoint a Consultant or ask
the STUP for design & construct sewerage network with S.T.P.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
S.E.(HNN)
Chief (T&C)
R(L)
Engineering Division.
October 17, 2008.
Sub : Erecting temporary Sun proof Mandap, Stage and supplying Furniture,
Lighting, Sound system arrangement on hire basis for official function
anywhere in Mumbai.
The above mentioned work was awarded to M/s. Pratap D. Thakkar & Co. vide W.O.
under reference.
MMRDA has arrange the Metro Rail Public hearing at Inox Building at Nariman Point
from 3rd July to 5th July 2007.
The Metro Rail Public hearing has been arrange under the Chairmanship of Hon’ble
Urban Development Minister, Shri. Rajesh Tope, Government of Maharashtra, from 3 rd July to
5th July 2007 (Three Days).
The M/s. Pratap D. Thakkar, agency has been carried out the work of various items
related to function such as Octonorm partitions & doors for Cabin to have privacy for
discussions with public, temporary Cabins, revolving Chairs, Executive Chairs, Chemical
toilets, Sofa, Woolen carpet etc.
There are extra item of Octonorm partitions which is not included in the tender. The
rates are ascertained from market by collecting quotations for these items (Comparative
Statement for the same kept at Pg. c/s) M/s. Pratap D. Thakkar & Co. rates are lowest.
It is requested to kindly approve the same
Also, there is a Departmental meeting held by Hon’ble Metropolitan Commissioner,
with MMRDA and other organization officers at Inox Building held on various dates i.e. on
18th Jan 2008, 21st Jan 2008, 25th Jan 2008, 31st Jan 2008, 1st Feb 2008, 8th Feb 2008, 12th Feb
2008, 25th Feb 2008, for this meeting agency has supplied plastic chair, toilet (chemical)
Dunlop chairs etc.
The 2nd R.A. & Final Bill is prepared for the same amounting to Rs. /- the
necessary deductions are made as per rules in force. The net amount payable is Rs.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer – I
E.E./S.E.(JCG)
J.A.O.(D)
C.E.(ED)
R(L)
T & C Division.
November 14, 2008.
Sub : Providing foldable shade (owning) on the open terrace of Amenity Building
in Ph – I of Wadala Truck Terminal.
During the site visit of Hon’ble Metropolitan Commissioner to Wadala Truck Terminal.
It has been decided to furnish and make the flat No.103 & 104 as Guest House of MMRDA, on
first of the Amenity Building at Wadala Truck Terminal.
Accordingly, necessary work of renovation, furniture, painting (internal & external),
plumbing, electric work & miscellaneous work has been carried out in the Amenity Building.
Also it has been directed to provide foldable shade (owning) on the open terrace
admeasuring 20m length & 4.10m wide at the first floor level of the Amenity Building, which
can be used as sitting arrangement for Lunch, Dinner for the Guest / Visitors / Officers on
various function. And also fixed type owning at the main entrance at ground level.
The foldable shade is consist of Aluminum frame and PVC fabric on top which will
resist the direct sun light & rains in rainy season. And to provide fixed type shade consist of
M.S. frame & 3mm thick Acrylic sheet admeasuring 3.20m length & 2.50m wide at the main
entrance at ground floor.
We have obtained the Administrative approval for carrying out work at Guest House for
an amounting Rs.71.00 Lakhs. Probable expenditure so far is 61.10 Lakhs as such the work
will be carried out from saving amount of Administrative approval.
Considering the above mentioned items and estimate has been prepared for the same
for an amount of Rs.1,91,100/-on the basis of Market Rate.
The expenditure will be incurred from the budget of Wadala Truck Terminal. Since the
work is of urgent nature same will be carried out on A-1 / A-2 Agreement by calling quotations
from the agencies who has carried out similar type of work.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
A.C.A.O.(J)
S.E.(HNN)
Chief T & C
R(L)
T & C Division.
May 29, 2008.
Sub : Desilting of Nallas, Storm Water Drains, Culverts, Pipes in Ph-I, II, IV and
Transit camp area at Wadala Truck Terminal.
The letter for above mentioned subject under reference is received from
M/s. S.K. Construction. In which the agency has requested to extend the period of
submission of Bank Guarantee as Security Deposit & Additional Security Deposit
because their Bank will take little time due their internal procedures pertaining to
enhancement of their Financial limits.
As this contractor is working with organization for last 10 years and found best
in work. Also recently they have awarded ‘H’ Block desilting work which is nearly
completed.
Therefore we may consider their request as the work of desilting is to be carried
out before the current monsoon i.e. June 2008. However it is to mentioned that no
payment for the work will be made till receiving the required Bank Guarantee &
Additional Bank Guarantee from the agency. The draft work order is prepared and put
up for approval please.
Submitted please.
(S.P. Padikar)
Deputy Engineer – II
D.E.-I (MSR)
E.E.(APA)
R(L)
T & C Division.
November 26, 2008.
R(L)
Engineering Division.
Dt.28.11.2008.
The work order for above mentioned work has been issued to M/s. Shree Decorators.
The agency has carried out the work of lighting decoration & flower decoration on stage
Mandap, during the inaugural function of skywalk at BKC as per satisfaction of Engineer-in-
charge.
The 1st & Final Bill is prepared for the same for an amount of Rs.3,92,612/- in favour of
M/s. Shree Decorators The necessary deduction are made as per rules in force and net amount
payable of bill Rs.3,83,716/-
The Administrative approval for this work was accorded by Hon’ble Metropolitan
Commissioner on Pg – 1 N/s.
Submitted for payment please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(ANB)
A.C.A.O.(D)
S.E.(JCG)
R(L)
T & C Division.
December 4, 2008.
Sub : Providing & fixing I – Section barricading at the Car roads in Ph-I at
Wadala Truck Terminal.
------- ESTIMATE ------
During the site visit Chief T & C, directed to provide I-Section barricading to arrest the
entry of trucks on car roads. It was observed the heavy trucks are entering on car road & same
was parked on car road which are causing the huge traffic jam & obstruct the traffic movement
on car road.
Also there is a possibility of accidents due to this type of situation. Therefore it is
necessary to arrest the heavy vehicles on car road. For arresting this trucks the I – Section
barricading is consider for the height of 2.5m as shown in the drawing enclosed.
Considering the provision an estimate is prepared for an amount Rs.4,10,510/- (Net) &
Rs.4,31,100/- (Gross). The rates are adopted for the estimate from Bldg. DSR Presidency
Divn. (Yr. 2007-08).
As the work is of urgent nature the same will be carried out on A-1 / A-2 basis by
calling quotations from experienced agencies.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – I
D.E.-I (MSR)
E.E.(APA)
ACAO (R)
S.E.(HNN)
Chief T& C
R(L)
Engineering Division.
December 5, 2008.
Sub : External / internal painting and structural repair to A1, B1, B2 & D2
building at Truck Terminal Wadala.
MMRDA has constructed 4 buildings A1, B1, B2 & D2 in Wadala Truck Terminal
for the office premises and godowns in the year 1994. The structure of RCC frame
type with sloping concrete slab provided at the terrace.
The last external painting of above 4 buildings were done in the year of 2000.
At present the external painting has been spoiled and needs to be re-painted. The
existing surface of external painting is of cement paint. However, for the better
durability of surface structure now it is proposed to paint with acrylic paint.
Also it has been observed in many places plaster is damaged therefore sand
face plaster is taken in the estimate, oil paint for wood work & grill is also taken. There
are damaged of duct sheet providing G.I. Sheet on duct portion is taken. Dholpur
stone cladding work is also need to be repaired.
In view of above the detailed estimate is prepared for an amounting to
Rs.65,71,920/- (Net) & Rs.69,00,600/- (Gross). The estimated rates are based on
current DSR 06 – 07 PWD Government of Maharashtra.
The expenditure will be debited to task II – 1 for Wadala Truck Terminal.
The tender notice can be published in the news paper by giving 15 days notice
period as per norms.
A draft tender notice for the same is prepared and kept at Pg 181c/s.
Submitted for approval please.
(M.S. Raikar)
Deputy Engineer – I
E.E.(APA)
ACAO (R)
S.E.(HNN)
Chief T & C
F.A.
M.C.
R(L)
T&C Division.
December 11, 2008.
Annual contract for the above mentioned work was expired on 02.05.06 and
same is extended upto 02.11.2007. During site visit the Hon’ble Metropolitan
Commissioner has directed to keep the environment of Truck Terminal clean and green.
For cleaning the agency for sweeping & cleaning the area is appointed. Now for
keeping it green it is necessary to appoint the agency.
It is necessary to appoint agency to maintain the garden developed in Ph-I for
one – year period, estimate prepared for the maintenance of developed lawn, shrubs,
trees and providing water by water tanker, supplying red earth, manure,
pesticides/insecticides, trimming of trees removing wild vegetation, weeding of lawn
etc. and the new recreation ground (R.G) marked on the Ph-I plan near Amenity
Building is considered for development.
An estimate for the above works amount to Rs.17,97,000/- net is prepared and
kept at Pg. 3 c/s to 11 c/s.
The rates are taken for the items are approved rates for same work in the last
year i.e. 05-06 and the rate for preparation of lawn is taken from horticultural DSR year
The expenditure incurred will be debited to task No. II - 1 W.T.T.
The draft tender notice for the same is prepared and kept at Pg.15 c/s. After
approval the same B-1 tenders will be called by publishing tender notice in news
papers.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – I
D.E.-I (MSR)
E.E.(APA)
A.C.A.O.(R)
S.E.(HNN)
Chief T&C
R(L)
No.T&C/WTT/Security/09. T&C Division
March 16, 2009.
It is observed that on site during site visit that the water gulley covers (40 Nos.)
fixed on water gullies on newly constructed road to Sion – Koliwada Connector Road
& other Roads and the manhole covers on the another road are found missing from the
place. The new G.I. pipe line laid in the ground for public toilet area is also found
missing (nearly length of it 100 feet). The debris is also found dumped on K-1, K-2, K-
3 plots area near idle parking.
The Security agency is appointed by Land Cell to guard the entire Wadala Truck
Terminal area, of Ph-I, II, IV.
The Lands Manager is requested to instruct the security agency to protect the
property of MMRDA.
Submitted for necessary action please.
(S.P. Padikar)
Deputy Engineer – I
D.E. – I (MSR)
E.E. (APA)
R(L)
T & C Division.
Dt.13.04.09.
(S.P. Padikar)
Deputy Engineer – I
D.E.-I (MSR)
E.E. (APA)
ACAO(R)
S.E.(HNN)
Chief T&C
R(L)
No.T&C/WTT/Compound Wall/09. T & C Division.
March 20, 2009.
Sub : Providing and constructing UCR masonry & chain link fencing
around A-1 Building premises in Ph-I for Parking the vehicles at
Wadala Truck Terminal.
During the visit of Chief T&C Division, it has been observed that parking open
space behind A-1 Building is being used for repairing the vehicles.
Therefore, the officers vehicles for Mono Rail & Metro Rail there is no sufficient
for parking space. It is suggested to restrict the entries for other vehicles on this open
plot by providing the compound wall and one entry gate. So that our officers vehicles
may be parked on this plot. The office note in this regard is received from Marketing
Manager kept at Pg. c/s.
An estimate is prepared for the compound wall by providing UCR masonry &
Chain Link Fencing on wall and one M.S. gate at the entrance. The estimated cost
works out to Rs.7,68,000/-(net) and Rs.8,60,160/- (gross)
The work will be carried out by calling B-1 quotation publicly in news papers as
per rules in force. The tender notice is kept Pg. c/s.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – I
D.E.-I (MSR)
E.E. (APA)
ACAO(R)
S.E.(HNN)
Chief T&C
`
R(L)
No.T&C/WTT/Encroachment/09. T&C Division
March 18, 2009.
It is observed on Truck Terminal site that slum dwellers staying nearby recently
constructed nalla portion are occupying the open space nearby nalla to stop this the
fencing work around the open space is in progress the same is interrupted & stopped by
the slum dwellers.
And also the encroachment in front of temple on Sion – Koliwada Connector
Road is found which is shown to Security supervisors on Wadala Truck Terminal Site.
Dy. M.C. (Lands) is requested to take the necessary action regarding
encroachments & remove the same.
Submitted for necessary action please.
(S.P. Padikar)
Deputy Engineer – I
D.E. – I (MSR)
E.E. (APA)
R(L)
T&C Division
March 18, 2009.
Sub : Requirement of Steno typist and Peon for office work on 1st floor,
MMRDA office Building, in B.K.C.
(A.P. Athawale)
Executive Engineer
S.E. (HNN)
Chief T&C
R(L)
T&C Division
Date: 15.4.2009.
Annual contract for providing housekeeping services for office buildings namely
A1, B1, B2, D2 and Amenity Building at Truck Terminal Wadala is expiring on
11.6.2009. Recently Mono Rail Office is shifted to Unit. 115 in A1 Building. It is very
much necessary to keep cleanliness for hygienic condition by providing housekeeping
services such as sweeping & cleaning. The offices in the Wadala Truck Terminal
premises are as below :-
A-1 Building Gr + 3 floors.
1. Wadala Truck Terminal office & mono rail office in unit No.115.
2. APLR office in unit No.202 & 203.
3. Hydrology unit in unit No.215 & 216.
B-1 Building, Gr + 3 floors.
1. Mathadi Kamgar office in unit no.201 & 202.
2. MTNL office at 2nd floor.
B-2 Building, Gr +3 floors.
1. R.T.O. Office on 3rd floor.
D-2 Building, Gr + 1 floor.
1. Individual owners.
Amenity Building, Gr + 3 floors.
1. Police Station, Fire Station, Post Office at Ground floor.
2. Guest House at 1st floor.
3. Staff quarters on 2nd & 3rd floor.
The sweeping & cleaning of common areas such as passage, staircase,
loading/unloading platforms also cleaning of offices floors toilets, W.C’S removing
choke up drainage pipes & cleaning of inspection chambers, gulley traps chambers.
Etc.
R(L)
The works will be carried out by calling B1- tender by publishing tender notice
in news papers. Tender notice is kept at page..…./Cs.
Submitted for approval please.
(S.P. Padikar)
Dy, Engineer-I
D.E.-I (MSR)
E.E. (APA)
ACAO(R)
R(L)
T&C Division
Date :
(S.P. Padikar)
Deputy Engineer-I
D.E.-I (MSR)
E.E. (APA)
S.E. (HNN)
ACAO(R)
R(L)
T & C Division.
April 27, 2009.
R(L)
Since the work is of very urgent nature, it is proposed to carryout
the work on A-1, A-2 Agreement basis by approved agency M/s. Pest Rid
Corporation, who is carrying out the work in MMRDA’S office building in
Bandra – Kurla Complex.
Submitted for Administrative approval please.
(S.P. Padikar)
Deputy Engineer – I
E.E. (APA)
A.C.A.O.(R)
S.E.(HNN)
Adv. Finance :
Chief T & C
M.C.
R(L)
T & C Division.
May 14, 2009.
As per the directions of Chief T&C on pre-page the barbed wire fencing has
been proposed for the encroached land and compound wall for the open land as
demarked by Land Cell division plans attached.
The total length for boundary is 5000 m as per the plans attached by Land Cell
division. The 4600 m length is considered for barbed wire fencing and 400 metre
length considered for UCR masonry compound wall.
An estimate is prepared for barbed wire fencing rate analysis and for UCR
masonry wall from current PWD DSR i.e. Year 2008 – 2009. The net estimated cost
works out to Rs.45,18,944/- (Net) and Rs.50,61,218/- (Gross).
The draft tender notice is kept at Pg. 107 c/s.
Submitted for approval please.
(S.P. Padikar)
Deputy Engineer – I
E.E.(APA)
ACAO (R)
S.E.(HNN)
Chief T & C
F.A.
R(L)
T&C DIVISION.
Dt.
THEFT MATERIAL :
Total Rs.10,919.85
Say Rs.2,10,000/-
R(L)
Statement showing the tenements handed over to MCGM
R(L)