You are on page 1of 17

100000

110000
120000

60000
70000
80000
90000

200000
220000
240000
260000
280000
300000
320000
340000
360000
380000
2015-11-23 2015-11-23

2015-11-25 2015-11-25

2015-11-27 2015-11-27

2015-11-29 2015-11-29

2015-12-01 2015-12-01

2015-12-03 2015-12-03

•KPIs are following the normal trend.


2015-12-05 2015-12-05

2015-12-07 2015-12-07

2015-12-09 2015-12-09

2015-12-11 2015-12-11

2015-12-13 2015-12-13

2015-12-15 2015-12-15

2015-12-17 2015-12-17

2015-12-19 2015-12-19

12/21/2015 12/21/2015
12/23/2015
Total

12/23/2015

Total
12/25/2015
12/25/2015
CS Traffic (Erl)

12/27/2015
12/27/2015
CS & PS Traffic

PS Traffic (MByte)

12/29/2015
12/29/2015
12/31/2015
12/31/2015
1/2/2016
1/2/2016
1/4/2016
1/4/2016
1/6/2016
1/6/2016
1/8/2016
1/8/2016
1/10/2016
1/10/2016
1/12/2016
1/12/2016
1/14/2016
1/14/2016
1/16/2016
1/16/2016
1/18/2016
1/18/2016
1/20/2016
1/20/2016
1/22/2016
1/22/2016
Call Setup & Radio HO Success Rate
Call Setup Success Rate (%)
3500000 100
3000000 98
2500000
2000000 96
1500000 94
1000000
500000 92
0 90
2015-12-01

2015-12-11

2015-12-21

2015-12-31

2016-01-10

2016-01-20
2015-11-23
2015-11-25
2015-11-27
2015-11-29

2015-12-03
2015-12-05
2015-12-07
2015-12-09

2015-12-13
2015-12-15
2015-12-17
2015-12-19

2015-12-23
2015-12-25
2015-12-27
2015-12-29

2016-01-02
2016-01-04
2016-01-06
2016-01-08

2016-01-12
2016-01-14
2016-01-16
2016-01-18

2016-01-22
Total Attempts(Times) Call Setup Success Rate (%)

Handover Success Rate


3500000 100
3000000
99
2500000
2000000 98
1500000 97
1000000
96
500000
0 95

Handover Attempts(Times) HANDOVER SUCCESS RATE (%)

• HSR is following normal trend


• 08-Jan-2016: CSSR degraded in HBSC03 due to site SaihAlMakarem as traffic increased, trend is back to normal.
• 18-Jan-2016: CSSR was low at HRCC1B, no alarms were found on site. KPIs trend is back to normal. Issue has been escalated to concerned team.
TCH & SDCCH Drop Rate
TCH Drop Rate (%)
12000 0.3
10000 0.25
8000 0.2
6000 0.15
4000 0.1
2000 0.05
0 0

2015-12-19

1/2/2016
1/4/2016
1/6/2016
1/8/2016
1/10/2016
1/12/2016
1/14/2016
1/16/2016
1/18/2016
1/20/2016
1/22/2016
2015-11-23
2015-11-25
2015-11-27
2015-11-29
2015-12-01
2015-12-03
2015-12-05
2015-12-07
2015-12-09
2015-12-11
2015-12-13
2015-12-15
2015-12-17

12/21/2015
12/23/2015
12/25/2015
12/27/2015
12/29/2015
12/31/2015
Call Drops on Traffic Channel(times) TCH CALL DROP RATE(%)

SDCCH Drop Rate (%)


25000 0.2
20000 0.15
15000
0.1
10000
5000 0.05
0 0

1/2/2016
1/4/2016
1/6/2016
1/8/2016

1/18/2016
1/20/2016
1/22/2016
1/10/2016
1/12/2016
1/14/2016
1/16/2016
2015-11-23
2015-11-25
2015-11-27
2015-11-29
2015-12-01
2015-12-03
2015-12-05
2015-12-07
2015-12-09
2015-12-11
2015-12-13
2015-12-15
2015-12-17
2015-12-19
12/21/2015
12/23/2015
12/25/2015
12/27/2015
12/29/2015
12/31/2015

Call Drops on SDCCH(times) SDCCH DROP RATE (%)

•24-Nov-2015: TCH and SDCCH drop rate slightly increase in buraimi due to National day celebrations gathering. Now the KPIs are following the normal trend.
•05-Dec-2015:TCH Drop increased due to drops increased on Abayd2_S2 and Quraiha_S3, KPI is back to normal trend
•06-Dec-2015:SDCCH Drop increased due to drops increased on SMIA3A,SMST1A,SMIA2C, KPI is back to normal trend
RRC and CS RAB Success Rate
RRC Setup Successful Rate All Network
70000000 100.00%
65000000 99.50%
60000000 99.00%
55000000 98.50%
50000000 98.00%

12/7/2015

1/12/2016
11/23/2015

11/25/2015

11/27/2015

11/29/2015

12/1/2015

12/3/2015

12/5/2015

12/9/2015

12/11/2015

12/13/2015

12/15/2015

12/17/2015

12/19/2015

12/21/2015

12/23/2015

12/25/2015

12/27/2015

12/29/2015

12/31/2015

1/2/2016

1/4/2016

1/6/2016

1/8/2016

1/10/2016

1/14/2016

1/16/2016

1/18/2016

1/20/2016

1/22/2016
Sum of VS.RRC.AttConnEstab.RNC Average of QB.RRC.SuccConnEstab.Rate.RNC

CS RAB Establishment Successful Rate All Network


8000000 100.20%
7000000 100.00%
6000000
5000000 99.80%
4000000 99.60%
3000000 99.40%
2000000
1000000 99.20%
0 99.00%
12/13/2015

1/4/2016
11/23/2015

11/25/2015

11/27/2015

11/29/2015

12/1/2015

12/3/2015

12/5/2015

12/7/2015

12/9/2015

12/11/2015

12/15/2015

12/17/2015

12/19/2015

12/21/2015

12/23/2015

12/25/2015

12/27/2015

12/29/2015

12/31/2015

1/2/2016

1/6/2016

1/8/2016

1/10/2016

1/12/2016

1/14/2016

1/16/2016

1/18/2016

1/20/2016

1/22/2016
Sum of VS.RAB.AttEstabCS.Conv.RNC Average of QB.RAB.SuccEstabCS.Rate.RNC

• 29-Nov-2015:RRC SSR was degraded on RNC501 due to traffic increased on some sites. KPI is back to normal trend.
• 19-Jan-2016: RRC SSR slightly degraded in RNC 401 due to site AS_GHUSHAYBAH_3G as there were alarms on site. Now the trend is back to
normal.
• 22-Jan-2015: RRC SSR degraded in RNC 501 due to site AIRPORT_AZAIBA_3G, as traffic increased because of an event. DL power congestion
was also observed. KPIs trend is back to normal.
0
1000
2000
3000
4000
5000
6000
7000
8000
11/23/2015

20000000
21000000
22000000
23000000
24000000
25000000
26000000
27000000
28000000
11/24/2015
11/25/2015
11/23/2015
11/26/2015
11/27/2015 11/25/2015
11/28/2015
11/29/2015 11/27/2015
11/30/2015
12/1/2015 11/29/2015
12/2/2015
12/3/2015 12/1/2015
12/4/2015
12/5/2015 12/3/2015
12/6/2015
12/7/2015 12/5/2015
12/8/2015
12/9/2015 12/7/2015
12/10/2015
12/11/2015
12/9/2015
12/12/2015
12/11/2015
12/13/2015
12/14/2015
12/13/2015
12/15/2015
12/16/2015 12/15/2015
12/17/2015
12/18/2015 12/17/2015
12/19/2015
12/20/2015 12/19/2015
Sum of QB.RAB.AttEstabPS.RNC

12/21/2015
12/22/2015 12/21/2015

Sum of VS.RAB.AbnormRel.CS.RNC
12/23/2015
12/24/2015 12/23/2015
12/25/2015
12/26/2015 12/25/2015
12/27/2015
12/28/2015 12/27/2015
12/29/2015
12/30/2015 12/29/2015
CS.RAB.DropRate.RNC

12/31/2015
1/1/2016
12/31/2015
1/2/2016
1/2/2016
1/3/2016
1/4/2016
1/4/2016
1/5/2016
1/6/2016
Average of QB.CS.RAB.DropRate.RNC

1/6/2016
PS RAB Establishment Successful Rate All Network

1/7/2016
1/8/2016 1/8/2016
1/9/2016
Average of QB.RAB.SuccEstabPS.Rate.RNC

1/10/2016 1/10/2016
• 29-Nov-2015:PS RAB SR was increased on RNC501 due to traffic increased on some sites. KPI is back to normal trend.

1/11/2016
1/12/2016 1/12/2016
1/13/2016
1/14/2016 1/14/2016
1/15/2016
1/16/2016
PS RAB Success Rate and CS Drop Rate

1/16/2016
1/17/2016
1/18/2016 1/18/2016
1/19/2016
1/20/2016 1/20/2016
1/21/2016
1/22/2016
1/22/2016
1/23/2016
95.00%
96.00%
97.00%
98.00%
99.00%

• 06-Dec-2015: PS RAB SSR degraded in RNC 501 due to SQU area sites where traffic increased caused the increase in congestion. Trend is back to normal.
0.00%
0.02%
0.04%
0.06%
0.08%
0.10%
0.12%
101.00%
100.00%
100000
200000
300000
400000
500000
600000
700000
800000
900000

200000
400000
600000
800000
1000000
1200000
1400000
1600000

0
11/23/2015
11/23/2015 11/24/2015
11/25/2015
11/25/2015 11/26/2015
11/27/2015
11/27/2015 11/28/2015
11/29/2015
11/29/2015 11/30/2015
12/1/2015
12/1/2015 12/2/2015

•KPIs are following the normal trend.


12/3/2015
12/3/2015 12/4/2015
12/5/2015
12/5/2015 12/6/2015
12/7/2015
12/7/2015 12/8/2015
12/9/2015
12/9/2015 12/10/2015
12/11/2015
12/11/2015 12/12/2015
12/13/2015
12/13/2015 12/14/2015
12/15/2015
12/15/2015 12/16/2015
12/17/2015
12/17/2015 12/18/2015
12/19/2015
12/19/2015 12/20/2015

Sum of VS.IRATHO.AttOutCS.RNC
12/21/2015
12/21/2015 12/22/2015
Sum of QB.RAB.AbnormRel.PS.CELL_PCH.RNC

12/23/2015
12/23/2015 12/24/2015
12/25/2015
12/25/2015 12/26/2015
12/27/2015
12/27/2015
12/28/2015
12/29/2015
12/29/2015
12/30/2015
12/31/2015
12/31/2015
IRATHO.SuccOutCS.Rate.RNC

1/1/2016
PS.RAB.DropRate.Cell_PCH.RNC

1/2/2016
1/2/2016
1/3/2016
1/4/2016 1/4/2016
1/5/2016
1/6/2016 1/6/2016
1/7/2016
1/8/2016 1/8/2016
1/9/2016
Average of QB.PS.RAB.DropRate.Cell_PCH.RNC

1/10/2016 1/10/2016
Average of QB.IRATHO.SuccOutCS.Rate.RNC

1/11/2016
1/12/2016 1/12/2016
1/13/2016
1/14/2016 1/14/2016
1/15/2016
1/16/2016 1/16/2016
PS Call Drop Rate & IRATHO Success Rate

1/17/2016
1/18/2016 1/18/2016
1/19/2016
1/20/2016 1/20/2016
1/21/2016
1/22/2016 1/22/2016
1/23/2016
94.00%
94.50%
95.00%
95.50%
96.00%
96.50%
97.50%
0.00%
0.10%
0.15%
0.20%

0.05%

97.00%
100000
120000
140000
160000
180000

0
20000
40000
60000
80000

30000000
31000000
32000000
33000000
34000000
35000000
36000000
37000000
38000000
39000000
11/23/2015
11/23/2015
11/25/2015
11/25/2015
11/27/2015
11/27/2015
11/29/2015
11/29/2015
12/1/2015
12/1/2015
12/3/2015
12/3/2015
12/5/2015
12/5/2015

• CS traffic was low during the Eid holidays.


12/7/2015
12/7/2015

• PS Traffic was increased during the Eid holidays.


12/9/2015
12/9/2015
12/11/2015
12/11/2015
12/13/2015
12/13/2015
12/15/2015
12/15/2015
12/17/2015
12/17/2015
12/19/2015
12/19/2015
12/21/2015
12/21/2015
12/23/2015
12/23/2015
Total

Total
12/25/2015 12/25/2015
CS.Erlang.RNC(Erl)

12/27/2015 12/27/2015

12/29/2015 12/29/2015

12/31/2015 12/31/2015
HSDPA RLC Traffic Volume (MBytes)

1/2/2016 1/2/2016

1/4/2016 1/4/2016

1/6/2016 1/6/2016
CS Traffic (Erlang) & HSDPA Volume

1/8/2016 1/8/2016

1/10/2016 1/10/2016

1/12/2016 1/12/2016

1/14/2016 1/14/2016

1/16/2016 1/16/2016

1/18/2016 1/18/2016

1/20/2016 1/20/2016

1/22/2016 1/22/2016
Congestion KPIs
Total Congestion for All Network
800000
700000
600000
500000
400000
300000
200000
100000
0

12/25/2015

12/27/2015
11/23/2015

11/25/2015

11/27/2015

11/29/2015

12/1/2015

12/3/2015

12/5/2015

12/7/2015

12/9/2015

12/11/2015

12/13/2015

12/15/2015

12/17/2015

12/19/2015

12/21/2015

12/23/2015

12/29/2015

12/31/2015

1/2/2016

1/4/2016

1/6/2016

1/8/2016

1/10/2016

1/12/2016

1/14/2016

1/16/2016

1/18/2016

1/20/2016

1/22/2016
Total. Radio Resource Congestion Total.All Congestion

Congestion Trend by 7 kinds of Radio Resource for All Network


700000
600000
500000
400000
300000
200000
100000
0

12/25/2015
11/23/2015

11/25/2015

11/27/2015

11/29/2015

12/1/2015

12/3/2015

12/5/2015

12/7/2015

12/9/2015

12/11/2015

12/13/2015

12/15/2015

12/17/2015

12/19/2015

12/21/2015

12/23/2015

12/27/2015

12/29/2015

12/31/2015

1/2/2016

1/4/2016

1/6/2016

1/8/2016

1/10/2016

1/12/2016

1/14/2016

1/16/2016

1/18/2016

1/20/2016

1/22/2016
Total Code congestion Total UL CE congestion Total DL CE congestion Total UL Power congestion
Total DL Power congestion Total UL Iub congestion Total DL Iub congestion
• 25-Nov-2015Congestion increased n RNC401 on Al_Felji_3G Site .KPIs are back to normal
• 29-Nov-2015:Radio resource congestion was increased on RNC501 due to traffic increased on some sites. KPI is back to normal trend
• 06-Dec-2015:Congestion increased on RNC501 due to increased in traffic on SQU sites. KPIs are back to normal.
• 12-Dec-2015:DL/UL power congestion was increased on Sini_3G_U9_B due to increase in traffic, KPIs are back to normal
• 19 & 20 Dec-2015:Congestion was high on Sini_3G_U9_B.Back to normal trend
• 25-26-Dec & 1-Jan—2015: DL Power congestion was slightly high during the weekend due to increase in traffic at Sini_3G. Now the KPIs are normal.
• 08/09-Jan & 15/16-Jan—2015: DL Power congestion was slightly high during the weekend due to increase in traffic at Sini_3G. Now the KPIs are normal.
• 22-Jan-2015: Congestion observed in RNC 501 due to site AIRPORT_AZAIBA_3G, As traffic increased because of an event. DL power congestion was also observed. KPIs
trend is back to normal.
0
10000000
12000000
14000000

2000000
4000000
6000000
8000000
100000000
120000000

0
20000000
40000000
60000000
80000000
2015-11-23 2015-11-23
2015-11-25 2015-11-25
2015-11-27 2015-11-27
2015-11-29 2015-11-29
2015-12-01 2015-12-01
2015-12-03 2015-12-03

• RRC service success rate is normal..


• RRC signaling success rate is normal.
2015-12-05 2015-12-05
2015-12-07 2015-12-07
2015-12-09 2015-12-09
RRC Setup Attempt Times(Service)

RRC Setup Attempt Times(Signal)


2015-12-11 2015-12-11
2015-12-13 2015-12-13
2015-12-15 2015-12-15
2015-12-17 2015-12-17
2015-12-19 2015-12-19
12/21/2015 12/21/2015
RRC Service and Signaling

12/23/2015 12/23/2015
12/25/2015 12/25/2015
12/27/2015 12/27/2015
12/29/2015 12/29/2015

RRC Setup Success Times(Signal)


RRC Setup Success Times(Service)

12/31/2015 12/31/2015
RRC Setup Success Rate(Signal)[%]
RRC Setup Success Rate(Service)[%]

1/2/2016 1/2/2016
1/4/2016 1/4/2016
1/6/2016 1/6/2016
1/8/2016 1/8/2016
1/10/2016 1/10/2016
1/12/2016 1/12/2016
1/14/2016 1/14/2016
1/16/2016 1/16/2016
1/18/2016 1/18/2016
RRC Setup Success Rate(Signal)[%]
RRC Setup Success Rate(Service)[%]

1/20/2016 1/20/2016
1/22/2016 1/22/2016
98
99
99

98

100

98.5
99.5
100

98.5
99.5
100000000
120000000

0
20000000
60000000
80000000

40000000
2015-11-23
2015-11-25
2015-11-27
2015-11-29
2015-12-01
2015-12-03

•KPIs are following the normal trend.


2015-12-05
2015-12-07
2015-12-09

ERAB Setup Attempt Times


2015-12-11
2015-12-13
2015-12-15
2015-12-17
2015-12-19
12/21/2015
12/23/2015
RRC Service and Signaling

12/25/2015
12/27/2015
ERAB Setup Success Times

12/29/2015
ERAB Setup SR (Data)[%]

12/31/2015
1/2/2016
1/4/2016
1/6/2016
1/8/2016
1/10/2016
1/12/2016
1/14/2016
1/16/2016
ERAB Setup Success Rate(Data)[%]

1/18/2016
1/20/2016
1/22/2016
98
99
100

98.2
98.4
98.6
98.8
99.2
99.6
99.8
99.4
0
10000000
15000000
20000000
25000000
30000000

5000000
0
10000000
15000000
20000000
25000000
30000000

5000000
2015-11-23 2015-11-23
2015-11-25 2015-11-25
2015-11-27 2015-11-27
2015-11-29 2015-11-29

•HO In Success Rate is Normal


2015-12-01 2015-12-01

•HO Out Success Rate is Normal


2015-12-03 2015-12-03
2015-12-05 2015-12-05
2015-12-07 2015-12-07
2015-12-09 2015-12-09
2015-12-11 HO Out Attempt Times 2015-12-11

Sum of HO In Attempt Times


2015-12-13 2015-12-13
2015-12-15 2015-12-15
2015-12-17 2015-12-17
2015-12-19 2015-12-19
12/21/2015 12/21/2015
RRC Service and Signaling

12/23/2015 12/23/2015
12/25/2015 12/25/2015
HO Out Success Times

12/27/2015 12/27/2015

Sum of HO In Success Times


HO In Success Rate(%)

12/29/2015
HO Out Success Rate(%)

12/29/2015
12/31/2015 12/31/2015
1/2/2016 1/2/2016
1/4/2016 1/4/2016
1/6/2016 1/6/2016
1/8/2016 1/8/2016
1/10/2016 1/10/2016
1/12/2016 1/12/2016
Average of HO Out Success Rate[%]

1/14/2016 1/14/2016
Average of HO In Success Rate[%]

1/16/2016 1/16/2016
1/18/2016 1/18/2016
1/20/2016 1/20/2016
1/22/2016 1/22/2016
98
99
98
99

100
100

98.5
99.5
98.5
99.5
0.0005
0.0015
0.0025

0
0.001
0.002
0.003
500000
0
1000000
1500000
2000000
2500000
2015-11-23
2015-11-23
2015-11-25 2015-11-25
2015-11-27 2015-11-27
2015-11-29 2015-11-29
2015-12-01 2015-12-01

2015-12-03 2015-12-03

2015-12-05 2015-12-05

2015-12-07 2015-12-07

2015-12-09 2015-12-09
2015-12-11
2015-12-11 CSFB Prepare Attempt Times
2015-12-13
2015-12-13
2015-12-15
2015-12-15
2015-12-17
2015-12-17
2015-12-19
2015-12-19

RRC Setup Congestion Rate[%]


12/21/2015
12/21/2015
12/23/2015
RRC Service and Signaling

12/23/2015
12/25/2015
12/25/2015
12/27/2015
Setup Congestion %
CSFB Success Rate(%)

12/27/2015
CSFB Prepare Success Times

12/29/2015
12/29/2015 12/31/2015
12/31/2015 1/2/2016
1/2/2016 1/4/2016
1/4/2016 1/6/2016

1/6/2016 1/8/2016
ERAB Setup Congestion Rate[%]

1/8/2016 1/10/2016
• 15-Dec-2015:CSFB Success Rate was slightly low due to UGW activity(Redundancy test).KPIs are back to normal

1/10/2016 1/12/2016

1/12/2016 1/14/2016
CSFB Prepare Success Rate [%]

1/16/2016
1/14/2016
1/18/2016
1/16/2016
1/20/2016
1/18/2016
1/22/2016
1/20/2016
98
99

1/22/2016
100

98.5
99.5
10
15
20
25

0
5
10000
12000
14000
16000

0
2000
6000
8000

4000
2015-11-23 2015-11-23
2015-11-25 2015-11-25
2015-11-27 2015-11-27
2015-11-29 2015-11-29
2015-12-01 2015-12-01
2015-12-03 2015-12-03

•KPIs are following the normal trend.


2015-12-05 2015-12-05
2015-12-07 2015-12-07
2015-12-09 2015-12-09
2015-12-11 2015-12-11
2015-12-13 2015-12-13
2015-12-15 2015-12-15
2015-12-17 2015-12-17
2015-12-19 2015-12-19

User DL Throughput(Mbps)
DL Traffic Volume(GB)

12/21/2015 12/21/2015
RRC Service and Signaling

12/23/2015 12/23/2015
12/25/2015 12/25/2015
12/27/2015 12/27/2015
Traffic Volume (GB)

Throughptut (Mbps)

12/29/2015 12/29/2015
12/31/2015 12/31/2015
1/2/2016 1/2/2016
UL Traffic Volume(GB)

1/4/2016 1/4/2016
User UL Throughput(Mbps)

1/6/2016 1/6/2016
1/8/2016 1/8/2016
1/10/2016 1/10/2016
1/12/2016 1/12/2016
1/14/2016 1/14/2016

1/16/2016 1/16/2016

1/18/2016 1/18/2016

1/20/2016 1/20/2016

1/22/2016 1/22/2016
0
1
2
3
4
5
6
8
7
0
10000
20000
30000
40000
50000
60000
70000
2015-11-23
2015-11-23
2015-11-25
2015-11-25
2015-11-27
2015-11-27

•User Trend is normal.


2015-11-29
2015-11-29

•PRB utilization is normal.


2015-12-01
2015-12-01
2015-12-03
2015-12-03
2015-12-05
2015-12-05
2015-12-07
2015-12-07
2015-12-09
2015-12-09
2015-12-11
2015-12-11
2015-12-13
2015-12-13
2015-12-15
2015-12-15
2015-12-17
2015-12-17
2015-12-19
2015-12-19
12/21/2015
Average Active User

DL PRB Usage Rate[%]


12/21/2015
12/23/2015
RRC Service and Signaling

12/23/2015
12/25/2015
12/25/2015
PRB Usage (%)
Attatched Users

12/27/2015
12/27/2015
12/29/2015
12/29/2015
12/31/2015
12/31/2015
1/2/2016
1/2/2016
Maximum Active User

UL PRB Usage Rate[%]


1/4/2016
1/4/2016
1/6/2016 1/6/2016
1/8/2016 1/8/2016
1/10/2016 1/10/2016
1/12/2016 1/12/2016
1/14/2016 1/14/2016
1/16/2016 1/16/2016
1/18/2016 1/18/2016
1/20/2016 1/20/2016
1/22/2016 1/22/2016

You might also like