POWERGRID CORPORATION OF INDIA LIMITED Corporate Asset Management Ref: CC/AM/Circular/ Date: April 18, 2017 ‘TECHNICAL CIRCULAR NO.04/2017 Sub: Disabling End Zone Protection feature in Bus bar protection scheme Based on the Coordination meeting between CC-AM, CC-Engg and CC-QA&I, it has been decided to disable/block the End Zone Pratection feature in AIS/GIS Bus bar protection scheme. Hence it is advised to ensure blocking/disable the end zone protection feature in Bus bar protection scheme through necessary changes in settings and/or logic of the relay. Site shall ensure the implementation of blocking /disabling of end zone protection in future project. Compliances may be sent to CC-AM after necessary changes in Relay Settings. A. ae ele (Rar SR AeA (We AetorAc)- attr arte ‘Prawm: BRT (TAT AASTAT)~ FATT. S LT A VE VT qe stgens. 2a! wees (arftro-sraig, 30.4: fe Pao aeare: 1. faaere (werert) 2. aereberreras FRR ea, aTS.AT. VS. TITUS VT MLE EBISU ATA as.) HO-sTR, HowTo er ATA.