CASTING RCC WORK AT BEAMS AND SLAB AT 4TH FLOOR,LIFT WALL-3 WITH PARTITION WALL
ROD BINDING 4TH FLOOR PVR BEAM
STAGGING SCREEN-5 SLAB 4TH FLOOR
SHUTTERING 4TH FLOOR SLAB NON PVR AREA
DE-SHUTTERING 4TH FLOOR SLAB
CURING 4TH FLOOR BEAM WITH SLAB & STAIRCASE-1
WATER PROOFING GROUND FLOOR SUNKEN & 1ST FLOOR SUNKEN
BBS NIL
BRICKWORK 2ND FLOOR
CHECKING RCC WORK AT BEAMS AND SLAB AT 4TH FLOOR,LIFT WALL-3 WITH PARTITION WALL
CUBE CASTING 4TH FLOOR ENTRANCE AREA C96-99,C86-89

CASTING DETAILS
AS PER AS PER
AREA CUM POUR SQ. FT. REPOR AS PER WASTA
CARD
ACTUAL GE
T

4TH FLOOR BEAMS & SLAB 37.269 291 291 291

LIFT WALL-3 WITH PARTITION 12.948 100 100 100


WALL

MATERIAL CONSUMPTION
MATERIALS RECVD O.P STK USED IN STK TOL RECREMARKS
TMT ROD 0 51.485 3.497 47.988 2091.58
PENETRON 0 749.1 0 749.1 4017.9
SIKA 2004NS 0 3664.64 213.92 3450.72
PENETRON ADMIX 0 504 0 504 11170
PENIBAR 0 120 0 120 1470
SIKA GRAUT 0 2 0 2 3
CEBEX 100 0 25 0 25 150
CRYSO DELTA 0 719.23 0 719.23 2700
CEMENT OPC 0 1968 17 1951 16973
CEMENT PSC 0 0 0 0 94839
CEMENT PPC 0 363 363 0 25708

DRAWINGS ISSUE TO BDPL DRAWINGS RECEIVED FROM CONSULTANT


CUBE TEST REPORT
CASTING DATE TESTING DATE DAYS GRADE Mpa REQUIRED

31.01.2019 01.03.2019 28 M30 31.7 30

SL.NO ISSUE AT SITE DATE OF RESOLVE


1
2
3
4

SL.NO PROGRESS AT SITE DATE OF CASTING


1
2
3
4

ATTENDANCE

NOTES:-
ORT

-3 WITH PARTITION WALL

RCASE-1
SUNKEN

-3 WITH PARTITION WALL


C86-89

REMARKS

REMARKS

VED FROM CONSULTANT


RESULT
PASS

OF RESOLVE

ATE OF CASTING
02.03.2019 DAILY PROGRESS REPORT
TIME 06.20 PM (SATURDAY)

WORKS AT SITE
ITEMS DESCRIPTION
CASTING RCC WORK AT BEAMS AND SLAB AT 4TH FLOOR,ENTRANCE PART,C96,99-C86,88
ROD BINDING 4TH FLOOR PVR BEAM
STAGGING SCREEN-5 SLAB 4TH FLOOR
SHUTTERING 4TH FLOOR SLAB NON PVR AREA
DE-SHUTTERING 4TH FLOOR SLAB
CURING 4TH FLOOR BEAM WITH SLAB & STAIRCASE-1
WATER PROOFING GROUND FLOOR SUNKEN & 1ST FLOOR SUNKEN
BBS NIL
BRICKWORK 2ND FLOOR
CHECKING RCC WORK AT BEAMS AND SLAB AT 4TH FLOOR,ENTRANCE PART,C96,99-C86,88
CUBE CASTING 4TH FLOOR ENTRANCE AREA C96-99,C86-89

CASTING DETAILS
AS PER AS PER
AREA CUM POUR SQ. FT. REPOR AS PER WASTA
CARD
ACTUAL GE
T
4TH FLOOR BEAM & SLAB 638 638 638
82.04
C96,99-C86,88(M30)

pvr step m40 17.7 155 155 155

MATERIAL CONSUMPTION
MATERIALS RECVD O.P STK USED IN STK TOL RECREMARKS
TMT ROD 0 47.988 2.966 45.022 2091.58
PENETRON 0 749.1 0 749.1 4017.9
SIKA 2004NS 0 3450.72 349.49 3101.23
PENETRON ADMIX 0 504 0 504 11170
PENIBAR 0 120 0 120 1470
SIKA GRAUT 0 2 0 2 3
CEBEX 100 0 25 0 25 150
CRYSO DELTA 0 719.23 0 719.23 2700
CEMENT OPC 0 1951 155 1796 16973
CEMENT PSC 0 0 0 0 94839
CEMENT PPC 638 0 638 0 26346

DRAWINGS ISSUE TO BDPL DRAWINGS RECEIVED FROM CONSULTANT


CUBE TEST REPORT
CASTING DATE TESTING DATE DAYS GRADE Mpa REQUIRED

02.02.19 02.03.19 28 M40 42.22 40

SL.NO ISSUE AT SITE DATE OF RESOLVE


1
2
3
4

SL.NO PROGRESS AT SITE DATE OF CASTING


1
2
3
4

ATTENDANCE

NOTES:-
ORT

CE PART,C96,99-C86,88

RCASE-1
SUNKEN

CE PART,C96,99-C86,88
C86-89

REMARKS

REMARKS

VED FROM CONSULTANT


RESULT
PASS

OF RESOLVE

ATE OF CASTING

You might also like