You are on page 1of 1

MJ TIONGSON CONSTruCTION

Prk. Kaunlaran, Brgy. San Isidro, General Santos City


BILL OF QUANTITIES
PROJECT: PROP. PRC REGIONAL WASH HUB
LOCATION: GENERAL SANTOS CITY

ITEM
NO DESCRPTION QTY. UOM RATE AMOUNT
I CLEARING & GRABBING 60.00 SQ.MTRS Php 20.00 Php 1,200.00
II EXCAVATION & BACKFILLING 4.00 CU.M. 285.00 1,140.00
III REINFORCED CONC. WORKS 6.32 CU.M. 5,375.00 33,970.00
IV MASONRY WORKS(CHB LAYING) 114.00 SQ.MTRS 830.00 94,620.00
V MASONRY WORKS(PLASTERING) 170.00 SQ.MTRS 112.00 19,040.00
VI STRUCTURAL STEELWORKS 1.00 LOT 75,000.00 75,000.00
VII TINSMITHRY WORKS 1.00 LOT 17,000.00 17,000.00
VIII CEILING WORKS 1.00 LOT 10,000.00 10,000.00
IX DOORS & WINDOWS 1.00 LOT 40,000.00 40,000.00
X ELECTRICAL WORKS 85.00 SQ.MTRS. 240.00 20,400.00
XI PAINTING WORKS 1.00 LOT 35,000.00 35,000.00
XII PLUMBING WORKS 1.00 LOT 2,500.00 2,500.00
TOTAL
MATERIAL
COST: 349,870.00
TOTAL LABOR
COST:
198,130.00
TOTAL BID
COST: 548,000.00
PREPARED BY:
RAUL M. DIAZ
CF.NO. 09253117492
PROJECT ENGINEER

You might also like