Professional Documents
Culture Documents
(0.35 Hact.)
In Dalhousie Forest Division
FOR
CONSTRUCTION OF LINK ROAD FROM VILLAGE
GHATASANI PULL TO BHOLAG VIA PARWAT
KM. 0/0 TO 7/360 (Portion km 4/0 to 7/0)
By
HPPWD DIVISION DALHOUSIE
DEMAND LETTER OF THE PROJECT AUTHORITY/APPLICATION
INDEX
3 Form-A
4 Form-B
6 Recommendation
9 List of Trees
10 Project Report
11 Resolution of Gram/Sabha
13 Revenue Paper
Demand letter of the project Authority/Application
No. Pw-Forest case/2017-18- Dated:
To
Subject: Forest land diversion for the construction of LINK ROAD FROM GHATASANI
PULL TO BHOLAG VIA PARWAT KM 0/0 TO 7/360 Portion km 4/0 to 7/0)
The Govt. of HP has proposed to construct of Link road from Ghatasani pull to bholag
Via Parwat Km. 0/0 to 7/360 as purposed under SANSAD ADRASH GRAM YOJNA by our honorable
MP OF KANGRA CHAMBA SH SHANTA KUMAR to provide road transport facility/connectivity to
unconnected habitation/panchyats. The Above said road passes through total forest land 0 .35 hac in
Mohal Trimath Jattroon,Bhloag and Dadriadu which is required to be diverted for the propose of road
construction in Portion 4/0 to 7/0.
The case for the diversion of forest land under ST.OT.FD (Recognition of forest
Rights) Act-2006 has been prepared and the three copies of the case are enclosed here with for seeking
approval for the competent authority.
d. Map showing the required The Forest Map spelling out necessary detail
forest land, boundary of duly authenticated attached herewith.
adjoining forest on a 1:50000
scale map
iii Justification for location the project in As per provisions of FRA Act.2006 and rules
forest land (s) therefore (As Amended) the PWD department of HP
Govt. wants to provide a/link road Ghatasani pull to
Bholag road km 0/0 to 7/360. The proposed diversion
of land is unavoidable and barest minimum.
iv Number of tree to be felled (as per List attached.
Hact) and number will be kept standing
2. Detailed propose wise breakup of total The total length of the Ambulance/link road is 7.360
forest land required proposed Km. Out of this 4/0 to 7/0 Km. length passes
building/activity area. through Forest land upto 2m to 3m certain width. The
0.35 Ha. Govt./Forest Land is to be diverted to
HP;PWD.
3. Detailed propose wise breakup of total The total land 0.35 Ha. Is required for the
forest land required proposed construction of /link road from Ghatasani pull to
building/activity area map. bholag road km 0/0 to 7/360(Portion Bholag to
Trimath km 4/0 to 7/0 .
4. Confirmation that user agency will be Compensatory plan attached
plant at least twice the number of trees
to be felled, in the project or adjacent
area and the amount to be provided
annually for protection and maintance
of these plants for at least five years
(Detail to be enclosed)
5. Recommendation of the Gram Sabha The recommendation and regulation of the Gram
accepted/rejected (please tick (V) as Panchayat Jattroon is attached herewith.
the case may be) (Copy of the Gram
Sabha Resolution to be attached)
Signature
Name
Address
Office Seal
Place ……………….
Sr. No. of Proposal ………
FORM ‘B’
(See Para 2.2 (IV)
(TO BE FILLED THE CONCERNED RANGE FOREST OFFICER)
Sr.No. of PROPOSAL …………………
1. Project Details
1 Location of the Project/Scheme The Government of Himachal Pradesh
emphasizes to provide link road Ghatasani pull
to Bholag via Parwat km 0/0 to 7/300 (Portion
Bholag to Trimath km 4/0 to 7/0 . The above said
road is purposed under SANSAD ADRASH
GRAM YOJNA by our honorable MP OF
KANGRA CHAMBA SH. SHANTA
KUMAR.This road will connect parwai parwat
jattroon jangla bholag under gram panchatt
parchore and jattroon. More than 1000 people will
be benfitted after construction of this road. The
total length of road 7.360 kms out of which
approximately in 3km Forest land is involved
measure 0.35hac to achieve proper width of road
VIII) Weather Part of Biosphere, No, the land is the part of Govt./Forest land.
Reserve, Tiger (Reserve,
Elephants, Corridor etc.)
Name:
Date:
Place:
Accepted/Not Accepted
Date:
A proposal has been received by this office from the Executive Engineer,
Dalhousie Division Dalhousie for Diversion of 0.2670 hact.of forest land for the
construction of Ambulance road from Patka to Panjla Km. 0/0 to 0/800 in Village Panjla
Tehsil Sihunta, Distt. Chamba (H.P.).
Both the alignment of the proposed Ambulance road were inspected by me and it was
found that the proposed Ambulance road has to pass through the forest land and private land as
the villages to be connected through this Ambulance road are surrounded by the forest land the
proposed Ambulance road has to necessarily pass through the forest land.
AlternativeA-1: The A-1 Alternative alignment for the construction of Ambulance road
has been examined but rejected for the reason that the alternative involves more forest
land felling larger number of trees.
AlternativeA-2: This is the shortest route from Ambulance road from Patka to Panjla
Km. 0/0 to 0/800. In this alignment, forest land involved is less as well as felling of tree is also
lesser.
Name:
Date:
Place:
Executive Engineer, Divisional Forest Officer,
Dalhousie Division Dalhousie Forest Division,
HPPWD Dalhousie. Dalhousie, Distt. Chamba,
RECOMMENDATION OF THE PROPOSED PROJECT
The proposal has been received from the ASSISTANT ENGINEER, SIHUNTA
SUB DIVISION HP;PWD SIHUNTA TEHSIL BHATTIYAT DISTT. CHAMBA (H.P.) for
the diversion of 0.2670 Hact. Forest land for non-forestry purposes. The project envisages the
use of Govt./Forest Land for the construction of ambulance/link road form Patka to Panjla Km.
0/000 to 0/800. The site inspection has been done on ……………………..on inspection it has
been found that the requirement of proposed land by the user agency is un-avoidable and is
There is no any endangered species of the flora and fauna in the area. Moreover,
no any archeological heritage site or other important monument is located in the area.
The land does not vulnerable to soil erosion and do not form a part of seriously
eroded area. No non-forest land is available in the vicinity of the proposed site.
The proposed project is in the rural area of the Chowari Forest Range Dalhousie
Forest Division. The land is already used by the community as a path since long. Hence, the
proposed land is recommended that the approval under “The Schedule Tribe and other
Traditional Forest Dwellers (Recognition of Forest Right) Act, 2006 and Rules framed their
under”.
Name:
Date:
Place
JOINT INSPECTION REPORT
Sr. Name of Khasra No. Classification Forest area proposed for Legal status
No. Mohal diversion of forest
land
Bigha Hectare
1 Panlja 810/501 Charagah Billa Darkhtan 01-07-00 0.1092
2 Panlja 489 Charagah Billa Darkhtan 00-12-00 0.0486
3 Panlja 527 Gair Mumken Rasta 00-07-00 0.0283
4 Panlja 523 Gair Mumken Avadi 00-07-00 0.0283
5 Panlja 520 Varani Aval 00-01-00 0.0040
6 Panlja 558 Varani Aval 00-05-00 0.0202
7 Panlja 559 Gair Mumken School 00-03-00 0.0121
8 Panlja 560 Varani Doem 00-03-00 0.0121
Total 0.3478
Forest Land
Pvt. Land 0.0768
The revenue records duly attached showing the area proposed for non
forest land use are enclosed with the joint inspection report.
The following alternatives have been explored for the construction of
above Ambulance road by joint inspection team.
AlternativeA-1: The A-1 Alternative alignment for the construction of Ambulance road has
been examined but rejected for the reason that the alternative involves more forest land felling
larger number of trees.
AlternativeA-2: This is the shortest route Ambulance road from Patka to Panjla Km. 0/0 to 0/800.
In this alignment, forest land involved is less as well as felling of tree is also lesser.
Hence the alternative alignment A-II has been selected.
PROJECT REPORT
Executive Engineer,
Dalhousie Division,
HPPWD Dalhousie.