SECTION

3 TYPE Engine Adjustment Standards


SHEET 8DK-32C Assembly Adjustment Table
1
■ Assembly Adjustment Table
Engine specifications
Item NOX-control generator Remarks
Generator Main engine
engine engine
950 ppm 750 ppm
Open (before T.D.C.) 50° 72° 50° 50°
Intake valve Close (after B.D.C.) 35°
Valve end clearance (A) 0.6 mm
Open (before B.D.C.) 55°
Exhaust
valve Close (after T.D.C.) 50°
Valve clearance is
with engine cold.
Valve end clearance (A) 0.6 mm
Open (before T.D.C.) 4°
Starting
rotary valve
Close (after T.D.C.) 130°
Fuel nozzle injection starting pressure 34.5 MPa (350 kg/cm2)
*Note 2)
Maximum explosion pressure
14.3 MPa max. (145 kg/cm2 max)
Pressure of cylinder safety valve (relief 18.1 MPa max. (185 kg/cm2 max.)
pressure)
Top clearance 15 mm 10 mm
(clearance above piston)
Notes: 1) This table lists standard adjustment values.
2) These values vary according to specifications and/or outputs for individual engines. For actual values, refer to
engine nameplate and operation test result sheet.
DK-32 Z 04-08
SECTION
3 TYPE Engine Adjustment Standards
SHEET 8DK-32 Main Bolts Tightening Torque Table
3
◎ The main bolts and nuts should be tightened in accordance with "Main Bolt Tightening Torque Tablet" as described on
the right.
1) All bolts and nuts should be tightened according to the procedures in the respective items of Section 7
"Maintenance".
2) The bolts and nuts should always be tightened diagonally and alternately.
3) The cylinder head tightening nuts, crank pin bolts and connecting rod joining bolts should be checked for tightening
force after the engine is operated for a certain period.
As for the period, see Section 6 “Periodic Inspection.”
4) The symbol marks shown in the Remarks column have the following meanings
※: Priority should be given to the tightening hydraulic pressure and torque shown on the nameplate on the engine.
☆: Apply lubricant (MOLYKOTE 1000 Spray) to the threaded portions (including studs).
★: Apply lubricant (MOLYKOTE 1000 Spray) to the contact surfaces (bearing surfaces).
□: Apply lubricant (MOLYKOTE U Paste) to the contact surfaces and threaded portions.
◆: Apply lubricating oil to the threaded portions and contact surfaces. Do not use MOLYKOTE.
The △-marked parts are assembly parts. Lubricant has been applied to them by the manufacturer before
shipment.
5) Apply an anti-seizing agent or lubricant (MOLYKOTE 1000 Spray) to the threads and bearing surfaces in heated
areas around the exhaust pipe.
If any agent other than the specified product is used, the frictional force of the threaded portions changes.
This may cause the bolts to be tightened excessively, broken or loosened, thereby resulting in damage to the
piping.
6) The torque wrench should be checked periodically.
7) All mounting bolts should be re-tightened when the engine is stopping, and after re-tightening, the crank differential
should always be checked.
DK-32 Z 04-08
SECTION
3 TYPE Engine Adjustment Standards
SHEET 8DK-32C Clearance and Wear Limit
5
■ Clearance and Wear Limit
Unit (mm)
Maximum Wear and
Name Schematic drawing Size Remarks
allowable clearance repair limit
Inner diameter of +1.2 Partial Replace liner
D=320
cylinder liner wear +0.4
Cylinder liner and piston

Piston skirt A=320 −0.5 Replace piston


outer diameter
Protect ring thickness A=13 −0.33 Replace protect ring
c1=2.00-2.30 Replace ring
Ring end clearance in c2=1.60-1.90 3.0* Measure the clearance with a
Piston ring

cylinder c3=1.60-1.90 new liner or jig


A=7 a=0.12-0.16 0.30 Replace ring
Piston ring Use an oversized ring if wear on
B=7 b=0.08-0.12 0.30 the piston groove is excessive
(Re-machine the ring groove)
Oil ring (including coil)

Ring end clearance in c4=1.30-1.60 3.0*


cylinder c5=1.30-1.60
Replace ring
Measure the clearance with a
new liner or jig
Oil ring D=10 d=0.06-0.10 0.30
Piston pin

Piston pin and boss a=0.08-0.13 0.25 Replace the worn more one
A=φ140
Piston pin and b=0.08-0.22 0.35 Replace metal
bearing
Crank pin metal A=250 a=0.17-0.27 0.40 Replace metal
Use an undersized metal if wear
on the crankshaft is excessive.
Main bearing metal B=280 b=0.14-0.24 0.35 (Re-grind the bearing)
Thrust bearing
Crankshaft

D=139 d=0.30-0.50 0.80 Replace thrust bearing


clearance
Rear oil thrower B=520 e=0.25-0.40
and flange
Deflection    Refer to Section 10, Sheet 15
* When the chromium plating layer has worn and the ground is exposed, replace the part even if the clearance is lower than
the limit (when chrome-plated rings are used).
DK-32 Z 04-08
SECTION
3 TYPE Engine Adjustment Standards
SHEET 8DK-32C Capacities of Lubricating Oil and Cooling Water
7
■ Capacities of Lubricating Oil and Cooling Water
Item Capacity Remarks
Engine 50
Lubricating oil cooler 190 In case of 35 m²
3.2 … VTR304A
Turbocharger
6.0 … MET33SC
Lubricating oil
Governor 1.3 (RHD10) ⋅ 1.5 (UG8)
1.4-2.7 l/kW Depending on fuel oil grade and
Lubricating oil tank
(1.0-2.0 l/PS) is recommended engine specifications
Rocker arm oil tank 30
Leaked oil tank 10
Engine 390
Lubricating oil cooler 165 In case of 35 m²
Cooling water
Turbocharger 66 In case of VTR304A
Intercooler 62 In case of DK134
Note: Capacities in this table may differ according to specifications.
DK-32 Z 04-08
SECTION
5 TYPE Operating Procedure and Daily Maintenance
SHEET 8DK-32C Cautions When Operating Engine
1
1. Cautions When Operating Engine
(1) When Starting
1) Check the quantities of oil, water and air in the tanks, open and close relevant valves, and make preparations for
starting. Make sure that the engine starting conditions are met.
2) Make sure that the turning device is in the released state.
3) Confirm that there are no persons around the engine. If someone is near the engine, give him a sign to ensure his
safety before starting the engine.
(2) During Operation
1) After starting the engine, check the following points to ensure that the engine is in the normal running state. If
any abnormality is found, stop the engine, investigate the cause, and take measures.
• Check that the engine data on the lubricating oil pressure, exhaust temperature, etc. are normal.
• Check for abnormal noise and abnormal heat generation.
• Check for leakage from the piping system. Leakage from the oil pipe system can cause a fire.
Never restart the engine until the cause of any abnormality or trouble is revealed, measures are taken and the
engine is recovered.
2) If your body or any article touches a rotating part, e.g. the flywheel and coupling, your body may catch in the part,
or the article may break into pieces, and serious accidents may occur. Never touch any rotating part.
Before starting the engine, fit the protective covers to the rotating parts.
3) While the engine is running, particularly the following parts are hot. If your bare hand or bare skin touches them,
it can be burnt. When maintaining and inspecting them, wear protective means, such as safety gloves.
After the completion of the work, restore the lagging, heat covers, combustible oil splash preventive means and
protection covers that have been removed for maintenance and servicing. Then, start the engine.
• Exhaust pipe
• Turbocharger
• Air cooler inlet pipe
• Cylinder head
• Pressure indicator and safety valve
• Fuel injection pump and high-pressure pipe
• Fuel oil filter and fuel oil pipe (when heavy fuel oil is used)
(3) When Stopping
1) Before stopping the engine, remove loads from the engine except in case of emergency.
2) When the emergency stop mechanism functions, never restart the engine until the cause of emergency stop is
revealed, measures are taken and the engine is completely recovered.
3) Do not open the inspection window cover on the engine frame for at least 10 minutes after the engine is stopped
until the engine cools down sufficiently. The combustible mist gas in the engine frame may catch fire and
explode.
4) The engine is kept at high temperatures after it is stopped as well as while it is running, and it can cause burns.
When inspecting and maintaining the engine, wear protective means.
DK-32 Z 04-08
SECTION
Operating Procedure and Daily Maintenance TYPE 5
Starting Prearrangements for Other Than Routine Operation 8DK-32C SHEET
4
(2) Starting Prearrangements for Other Than Routine 2) Fill the expansion tank with fresh water
Operation 3) Make sure that there are no loose parts.
After following steps 1) to 11) above, further check 4) Check to see that the fuel pump rack and each part in
the following. the link mechanism can move smoothly.
1) Open the inspection window cover on the engine Check also to see that the rack scale returns to zero
frame, and check that tools, waste cloth or other when the control lever is at the STOP position.
foreign matter, such as desiccant, are not left in the Further apply oil manually to the sections around the
engine, and that the cylinder liner and crank shaft has link and common rod bearings.
not rusted. 5) Check that the line heater for the fuel oil supply
When the engine has been stopped for a long time, the system is working normally.
engine parts have run out of oil. Particularly, the 6) If the valve driving system has been overhauled,
cylinder liner cannot be fully lubricated only by check for correct valve end clearance.
normal priming. Apply oil to the cylinder liner in 7) Clean the pre-filter at the air-inlet for the turbocharger
the following manner. blower.
i) Turn the engine, and move the piston upward. 8) Opening and cleaning filters
Apply lubricating oil to the lower part of the The filters for fuel oil, lubricating oil, rocker arm
cylinder liner with a sprayer. lubricating oil and nozzle cooling oil remove dust and
ii) Apply lubricating oil to other cylinders in the foreign matter that have entered during transportation
same manner. and machinery fitting. Therefore, disassemble and
clean them before operating the engine. As for the
procedures for disassembling and cleaning them, refer
to Section 10, Sheet 1.
9) Fuel oil priming and air bleeding
The heavy fuel oil is heated and hot (100℃ or
more). Touching the splashing oil can scald
your hands. If the splashing oil touches a
high-temperature part, a fire may occur. When
discharging air, take care not to splash the oil.
① Open fuel oil line valves. (In oil feed pump
Silica gel (There attached to engine, also open check valve at oil
must be no
foreign matter, feel pump cover.)
such as desiccant.)
② Loosen the fuel filter air vent plug to purge air.
③ Open injection pump air vent plug to purge air.
Spray
(Apply lubricating ④ Set governor operation lever to RUN.
oil.)
⑤ Plug a wrench into the priming shaft at the pump
mount side surface.
⑥ With fuel oil rack inserted manually, operate
priming handle until resistance is felt. If no
resistance is felt, purge air from injection pump
again.
⑦ Turn engine and prime all cylinders.
Lubricating Oil Application Procedure ⑧ With governor operation lever at STOP, prime and
check that no resistance is felt (fuel oil is shut off).
DK-32 Z 04-08
SECTION
Operating Procedure and Daily Maintenance TYPE 5
Maintenance and Inspection 8DK-32C SHEET
14
(3) Maintenance 2) Cleaning Turbocharger
When the turbocharger is contaminated, the intake air
1) Cleaning Filters
pressure decreases, the exhaust temperature rises, and
The various filters should be opened and cleaned the exhaust blackens. Then, the engine performance
periodically to keep them clean at all times. For and service life are significantly affected. Periodi-
detail of the cleaning procedures, refer to Section 19, cally clean the turbocharger in accordance with the
Sheets 1 - 5. instruction manual for the turbocharger.
① Fuel filter and lubricating oil filter As for the procedure for cleaning by feeding water to
Normally, one side of each gauze wire duplex the blower side, refer to Section 10, Sheet 6.
filter is used. During operation, the handle 3) Protective Devices
should be kept on the left or right side, and the For each of the protective devices provided, refer to
handle knock pin should be in position. individual manuals.
When cleaning the filter, remove the element not
in use on the other side. ① Should any alarm be actuated during operation, stop
engine immediately and investigate the cause.
Close contact should be maintained with the
personnel working on the decks so that appropriate
When heavy fuel oil is used, the fuel oil is heated, actions may be taken in case of an alarm, to prevent
and the filter and piping are heated to high accidents in the incipient stage.
temperatures. When handling the filter, wear
safety gloves, and take care not to splash the ② Each of the protective devices shall be functional-
high-temperature oil on your skin or clothes. If ly tested at least once a month to ensure that each
fuel oil or lubricating oil spatters a functions satisfactorily, actuating the alarm
high-temperature part, a fire may occur. Take whenever an alarm condition is reached.
utmost care when handling the filter. Prior to conducting decreased pressure tests, be
sure to throttle the pressure switch takeoff valve
to reduce the pressure. The pressure reduction
② Rocker arm lubricating oil filter and nozzle in this case takes place only in the pressure
cooling oil filter switch circuit. Therefore, such testing may be
These filters consist of laminated metallic sheets. conducted while the engine is run under normal
Particularly, rocker arm lubricating oil is soiled operating condition.
heavily. Turn the filter handle frequently. The temperature switch can be functionally tested
Otherwise, the soil may stick to the filter. utilizing the separate hot water line.
③ Turbocharger lubricating oil filter (4) Maintenance and Inspection
The notch wire duplex filter is normally used with In order that leakage through joints, cracks or other
both elements set in parallel. defects can be detected at an early stage, the engine
As the filter is contaminated, the pressure should be maintained in a clean state at all times.
becomes lower. Periodically clean the filter by
1) Daily Inspection/Maintenance
blowing off. If blow-off cleaning cannot recover
the pressure, overhaul and clean the filter. ① Quantity of fuel oil in the fuel oil tank
② Quantity of oil in the oil pan
<Blow-off cleaning> ③ Quantity of oil in the rocker arm lubricating oil tank
The blow-off cleaning is performed to discharge ④ Quantity of cooling water in the fresh water tank
deposit by flowing a fluid back to the element on a ⑤ Starting air pressure
side. This cleaning method is not effective after the ⑥ Draining of condensate collected in air intake piping
elements are heavily clogged. Perform the cleaning ⑦ Draining of filters (Auto-clean type filters should be
early when the elements are not so contaminated. drained while the engine is in the stopped state.)
(Clean the filter at least once a week.) ⑧ Cleaning of auto-clean type filter by turning handle
⑨ Check of the rotating condition of valve rotator
and of the lubricating condition inside head cover
DK-32 Z 04-08
SECTION
7 TYPE Maintenance
SHEET 8DK-32C Cautions for Disassembly, Maintenance and Reassembly, and Checks
3
(3) Cautions for Disassembly, Maintenance and Reassembly
1) Prepare replacement parts, tools and measuring instruments in advance. Use specified tools. As replacement
parts, use our genuine or specified parts.
2) Washers, packing, O-rings, split pins and wire rings must be replaced with new ones every time the engine is
disassembled. Prepare such parts in advance according to the scope of disassembly.
3) After disassembling, cover openings with tape or clean cloth to prevent entry of foreign substances.
When restoring the engine, remove these covers without fail.
4) Keep the disassembled parts in order to prevent damage or loss of the parts and improve the efficiency of
reassembly.
5) Parts stamped with mounting positions, such as cylinder numbers and bearing numbers, or notch marks, should be
mounted in their original positions. When replacing any of these parts, stamp the part with the same mark as that
on the removed part.
6) For high-temperature parts, such as the exhaust pipe, bolts and nuts made of heat-resistant materials are used.
When reassembling, take care not to confuse them with general bolts and nuts.
7) Tighten major bolts and nuts uniformly to the specified torque (or specified hydraulic pressure).
If it is necessary to apply an agent, such as a lubricant, for tightening, never use any agent other than the specified
one.
8) When maintaining, measure the parts to be measured, and keep the data on the measurements in order as reference
data for the future.
9) The protective covers and heat insulating covers that have been removed should be returned to their original
positions.
10) After using spare parts, fill up the shortage as soon as possible.
(4) Checks After Disassembly, Maintenance and Reassembly
1) Check that all bolts and nuts are not loose and are provided with specified stop rings. Check carefully the parts
in the engine that cannot be checked visually while the engine is running.
2) Turn the engine, and prime it with fluids. Check that moving parts do not interfere with one another, no leak
occurs and no parts are clogged.
3) After the completion of the work, make sure that the turning device is in the released state.
4) Record the performed operations and replaced parts in the engine log.
DK-32 Z 04-08
SECTION
Maintenance TYPE 7
Installation and Adjustment of Fuel Injection Pump,
Inspection and Correction of Fuel Injection Timing
8DK-32C SHEET
40
For correct torque for the bolts, refer to Section 3, Sheet The fuel injection timing can be inspected and
4. corrected by the following two methods.
· By using the tappet adjusting screw
… For fine correction after maintenance, and
⑨ Confirm that control rack moves smoothly after correction of dispersion of max. explosion
reassembling fuel injection pump. pressure among cylinders
⑩ Even when no abnormality is detected in the meantime, · By sliding the cam gear and gear wheel
both the plunger assembly and the delivery-valve … For correction of injection timing of all
assembly should be replaced after 15,000-20,000 cylinders
hours.
1) Correction by using tappet adjusting screw
(2) Installation and Adjustment of Fuel Injection
When reassembling the fuel injection pump, align the
Pump
base line with the plunger guide line as described
When the fuel injection pump is replaced, align the above, then operate the engine and adjust this only
basic line with the marked line on plunger guide by when the maximum explosion pressure fluctuates
means of the push rod adjusting shim inside the more than 0.59 MPa (6.0 kg/cm2) at each cylinder.
tappet.
<Adjustment procedure>
Fuel injection ① Remove the blind cover of fuel injection pump mount.
pump ② Check the field assembly position for tappet screws.
Tappet ad- (It is advisable to put a mark, for example.)
Initial pushing justing screw
position ③ Secure the fuel injection pump push rod, using a
Pump fixing tool.
mount
④ Loosen the tappet screws.
Base line
(base circle) U nut ⑤ Loosen the tappet screws, and move up and down the
notched line on the plunger guide to the base line.
· Set the plunger guide notched line above the base
Plunger guide Push rod line → Pmax up
marked line · Set the plunger guide notched line below the base
line → Pmax down
⑥ After positioning, loosen the tappet screws again,
assemble the adjusting shim, and tighten them securely
Fixing tool
Adjustment of Fuel Injection Pump Push Rod
(3) Inspection and Correction of Fuel Injection
Timing
The fuel injection timing is an item to be checked <Precautions>
against the engine setting specified in NOx ① The dispersion of maximum explosion pressure
Technical Code. Do not change the timing to between cylinders should be kept within 0.59 MPa
such a degree that the timing deviates from the (6.0 kg/cm2): It should not exceed the designed
setting. pressure 0.29 Mpa (3.0 kg/cm2).
(Section 1, Sheet 7 “Engines Conforming to NOx
Technical Code”)
DK-32 A 03-01
SECTION
Use of Various Equipment and Apparatus TYPE 10
Notch Wire Filters 8DK-32C SHEET
1
1. Cleaning of Filters <Blow-off cleaning procedure>
The fuel oil and lubricating oil filters have important ① Open the drain cock (B) under the filter. Take care
functions to remove foreign matter and sludge in oil to that waste oil does not splash or overflow from the
keep oil clean and ensure normal operations of engine cock.
parts. Therefore, periodically overhaul and clean the ② Turn the handle (A) of the switch cock (normally, the
filters to prevent degradation of the filtering capability. handle is set in the “both elements” position “P”) to
“blow-off position” “Q” (about 60°), and quickly (in
0.5 to 1 sec.) return it.
The filter for heavy fuel oil is at a high ③ Repeat this operation two or three times.
temperature (100℃ or more) during operation.
If you touch the filter with bare hands during ④ Perform the same operation on the other side.
operation or just after the engine is stopped, you ⑤ Close the drain cock.
may burn your hands. Use safety gloves without
fail. Both elements “P”
(1) Notch Wire Duplex Filter
The notch wire duplex filter is normally used with Blow-off on Blow-off on
left side right side
both elements set in parallel.
Contamination of the filters decreases the pressure. Left element Right element
Periodically clean the filters by blowing off. If the closed closed
pressure cannot be recovered by blow-off cleaning,
Handle (A)
overhaul and clean the filters.
Air vent valve (D) Blow-off
Case (C)
When both Blow-off on One element
elements are used right side closed
Drain cock (B)
E1/E2 ······ Left/right element
C1 ······ Switch cock inlet hole
Interlocked
C2 ······ Switch cock outlet hole
C3 ······ Switch cock blow-off, drain hole
Perform the blow-off cleaning in a short time.
Notch Wire Filter
Move the lever quickly to the specified position
(knocking position) without stopping the lever at
a) Blow-off cleaning
the center position.
The blow-off cleaning is performed to discharge If a too long time is taken to blow off deposits
deposit by feeding a fluid backward to the and switch the lever, the pressure may decrease,
element on a side. This cleaning method is not and the alarm and the emergency stop mechanism
effective after the elements are heavily clogged. may function.
Perform the cleaning early when the elements are
not so contaminated. (Clean the filter at least
once a week.)
DK-32 Z 04-08
SECTION
Use of Various Equipment and Apparatus TYPE 10
Gauze Wire Filter 8DK-32C SHEET
3
(2) Gauze Wire Filter <Overhauling and cleaning procedure>
The elements of the gauze wire duplex filter are used
a) Overhauling and cleaning
alternately. The element not in use can be
overhauled and cleaned while the engine is running. ① Switch over the cock to the opposite side.
Drain the filter everyday, and overhaul and clean the Depress the switch cock handle (A) to lighten the
filter once a week. friction, and turn the handle to the element to be used
until the handle touches the stopper.
② Loosen the air vent plug (B) to discharge air and
In the gauze wire filter, the element on the side on release residual pressure.
which the cock handle is positioned is in use. ③ Loosen the drain plug (C) to extract oil in the filter
The handle setting is different from that of the notch body (H).
wire duplex filter. Be careful in overhauling the ④ Loosen the cover retaining bolt (D), and remove the
filter. cover retainer (E).
If the oil running side is opened accidentally, oil may
⑤ Remove the cover (F).
spout and spatter. Adhesion of the oil to a
high-temperature part may cause accidents, such as a ⑥ Remove the element (G).
fire. ⑦ Clean the element (G) and the filter body (H) with
washing oil or gas oil.
Handle (A)
1) Check for sludge on the element.
If metallic particles are found on the lubricating
oil filter, reveal the causes, and take measures.
2) If an element is damaged or clogged so heavily
that the clog cannot be removed by cleaning,
Air vent plug replace the element with a new one.
(B) 3) The packing and O-rings are fragile. Handle
them carefully. These parts for heavy fuel oil
filters are easily deteriorated at high temperatures.
If possible, replace them every time the filter is
overhauled.
Drain plug
(C)
Oil feeding
side
DK-32 Z 04-08
SECTION
Use of Various Equipment and Apparatus TYPE 10
Water Cleaning of Turbocharger 8DK-32C SHEET
7
<Cleaning procedure> <Precautions>
① Close drain cock (2). When turbine side is water-cleaned, the following must
② Connect steel pipe on exhaust pipe to hose equipped be observed to prevent turbocharger damage.
with pressure gauge and stop valve using hose ① Reduce engine output and set turbocharger water
connector. supply quantity and speed in the following range.
③ Connect external hose with hose connector.
Water supply Speed
④ Open stop value to fill steel pipe to nozzle and hose Turbocharger type quantity
with water. Then close stop valve. (l/min) [min−1 (rpm)]
⑤ Fully open valve in nozzle mounted on exhaust pipe. VTR 160, 161 2-3 9,000 - 13,500
⑥ Open drain cock (1). Check drain pipe for clogging. VTR 200, 201, 214 3 - 4.5 6,500 - 9,800
⑦ Gradually open stop valve while monitoring pressure VTR 250, 251, 254 4.5-7 5,000 - 7,500
gauge and set water pressure to 0.05-0.10 MPa
(0.5-1.0 kg/cm2). VTR 320, 321, 304 8-12 4,000 - 5,000
⑧ Check if drain water flows through drain pipe. VTR 400, 401, 354 12-18 3,200 - 4,800
Continue monitoring drainage during cleaning to
check for excessive water supply and for clogging in The cleaning should be operated at the turbine speeds
drain pipe due to accumulation of removal particles. that the drain is confirmed from drain hole gas outlet
⑨ Supply water continuously for about 10 minutes. casing within above table.
⑩ After water cleaning close valve in nozzle. After However, note that since turbocharger speed drops
confirming that no more condensate flows out, close somewhat after water-jet operation, speed must by
the drain cock (1). readjusted property.
⑪ Open drain cock (2). (By introducing intake air into ② Set exhaust gas temperature at turbocharger inlet
drain pipe, clogging of drain pipe can be prevented.) below 300°C.
⑫ Hose with pressure gauge and stop valve should be ③ Use fresh water without additives. Never use sea
disconnected without fail. water.
⑬ After water cleaning, operate engine for 10 minutes at ④ After water-cleaning, let intake air flow into drain pipe
constant speed until turbocharger is dry. at all times to keep drain pipe from clogging.
⑤ The sooner cleaning is performed the better, since the
cleaning effect is lessened if accumulation has become
The supercharger is at a high temperature during thick. Standard cleaning interval is 200-250 hours.
operation or just after the engine is stopped. The interval should be adjusted according to the
If you touch it with bare hands during cleaning degree of contamination.
operation, you may burn your hands. Use safety ⑥ It is advisable to compare engine performance before
gloves without fail. and after water cleaning to check water-cleaning effect.
If no improvement is obtained, repeat the above steps.
If no changes are observed after the steps are repeated
several times, it is necessary to overhaul and clean the
turbocharger. (Refer to separate “Instruction Manual
for Turbocharger.”)
DK-32 Z 04-08
SECTION
Use of Various Equipment and Apparatus TYPE 10
Water Cleaning of Turbocharger 8DK-32C SHEET
9
④ Connect the hoses with connectors. <Cautions>
⑤ Open the stop valve to fill the hose to the cleaning When cleaning the turbine side with water jet, observe
nozzle with water, and close the stop valve. the following instructions to prevent damage of the
⑥ Fully open the valve in the cleaning nozzle con- turbocharger.
necting port fitted in the exhaust inlet pipe. ① The exhaust temperature at the turbocharger inlet
⑦ While observing the pressure gauge, slowly open the should be 430°C or less.
stop valve until the hydraulic pressure at the cleaning ② Use fresh water not containing additives. Never use
nozzle inlet is 0.04 to 0.05 MPa, and feed water for seawater.
60 seconds. (Adjust the pressure so that the pressure
at the cleaning nozzle inlet is 0.04 to 0.05 MPa in ③ Water jet cleaning is not effective when the deposit
consideration of the head pressure.) layer is thick. Perform water jet cleaning every 100
hours of operation.
⑧ Keep the stop valve closed for 60 seconds.
④ To verify the effect of water jet cleaning, it is
⑨ Repeat Steps ⑦ and ⑧ five times. desirable to compare the engine performance before
⑩ Close the valve in the cleaning nozzle connecting port, and after cleaning.
and disconnect the hose.
⑪ Run the engine for more than 10 minutes until the
turbocharger completely dries.