1.04 Building Lay-out 605.70 sq.m. 16,499.75 9% 8% 17% 2,804.96 965.24 3,770.20 20,269.95
2.00 EARTHWORKS
2.01 Excavation/Backfill 690.23 cu.m. 100,000.00 9% 8% 17% 17,000.00 5,850.00 22,850.00 122,850.00
2.02 Gravel Bed 119.61 cu.m. 103,070.00 9% 8% 17% 17,521.90 6,029.60 23,551.50 126,621.50
2.03 Embankment 205.24 cu.m. 120,100.00 9% 8% 17% 20,417.00 7,025.85 27,442.85 147,542.85
3.00 CONCRETE WORKS
Ready Mixed Concrete(fc' = 3,000psi;
3.01 653.39 cu.m. ### 9% 8% 17% ### ### 756,175.05 4,065,475.05
7days)
Bagger Mixer Mixed Concrete (Class A
3.02 124.12 cu.m. 652,373.00 9% 8% 17% ### 38,163.82 149,067.23 801,440.23
Mixture)
4.00 STEEL WORKS
4.01 Structural Steel Works ### kg. ### 9% 8% 17% ### ### 1,320,021.64 7,096,921.59
4.02 Reinforcing Bars ### kg. ### 9% 8% 17% ### ### 1,203,503.17 6,470,475.47
4.03 Roof Framing ### kg. ### 9% 8% 17% ### 60,121.23 234,832.48 1,262,545.73
4.04 Stair and Balcony Railings ### kg. ### 9% 8% 17% ### 66,159.46 258,417.71 1,389,348.61
5.00 STEEL DECKING 7,257.60 sq.m. ### 9% 8% 17% ### ### 1,012,416.78 5,443,124.78
6.00 FORMS & SCAFFOLDINGS 566.04 sq.m. ### 9% 8% 17% ### 74,339.78 290,369.91 1,561,135.37
7.00 MASONRY WORKS
7.01 4" CHB Filler and Setting 1,670.85 sq.m. ### 9% 8% 17% ### 67,378.95 263,181.04 1,414,958.04
7.02 Plastering/Finishing 3,709.78 sq.m. 712,614.00 9% 8% 17% ### 41,687.92 162,832.30 875,446.30
8.00 ROOFING & TINSMITHRY WORKS
Prepainted Rib Type Roofing - 0.40mm
8.01 783.92 sq.m. 725,474.55 9% 8% 17% ### 42,440.26 165,770.93 891,245.48
thk.
Prepainted Bended Panels - Spanish
8.02 183.88 ln.m. 121,261.00 9% 8% 17% 20,614.37 7,093.77 27,708.14 148,969.14
Type Gutter & Flashing
ESTIMATED MARK-UPS IN TOTAL
QUANTIT TOTAL MARK-UP
ITEM NO. DESCRIPTION UNIT DIRECT PERCENT VAT INDIRECT TOTAL COST
Y
COST OCM PROFIT % VALUE COST
9.00 DOORS & WINDOWS
9.01 Doors
9.01.1 Panel Door, D1 - 1.00m x 2.10m 58.00 unit 463,586.75 9% 8% 17% 78,809.75 27,119.83 105,929.58 569,516.33
Hollow Core Flush Door, D2 - 0.80m x
9.01.2 5.00 unit 28,404.50 9% 8% 17% 4,828.77 1,661.66 6,490.43 34,894.93
2.10m
Hollow Core Flush Door, D3 - 0.70m x
9.01.3 10.00 unit 56,588.75 9% 8% 17% 9,620.09 3,310.44 12,930.53 69,519.28
2.10m
Wood Louver Swing Door, D3a - 0.70m
9.01.4 25.00 unit 98,134.50 9% 8% 17% 16,682.87 5,740.87 22,423.74 120,558.24
x 1.50m
Hollow Core Flush PWD Door with
9.01.5 1.00 unit 6,673.00 9% 8% 17% 1,134.41 390.37 1,524.78 8,197.78
Louver, D4 - 1.00m x 2.10m
9.02 Window
9.02.1 Jalougrill Window, W1 - 3.550m x 1.50m 29.00 unit 235,513.83 9% 8% 17% 40,037.35 13,777.56 53,814.91 289,328.74
9.02.2 Jalougrill Window, W2 - 2.80m x 1.50m 35.00 unit 317,864.01 9% 8% 17% 54,036.88 18,595.04 72,631.92 390,495.93
9.02.3 Jalougrill Window, W3 - 3.550m x 0.80m 4.00 unit 16,804.61 9% 8% 17% 2,856.78 983.07 3,839.85 20,644.46
9.02.4 Jalougrill Window, W3a - 2.80m x 0.66m 16.00 unit 58,956.84 9% 8% 17% 10,022.66 3,448.98 13,471.64 72,428.48
9.02.5 Jalougrill Window, W3b - 1.40m x 0.60m 1.00 unit 2,457.89 9% 8% 17% 417.84 143.79 561.63 3,019.52
(13) (14)
(12)/(3) (13)*(3)
208.80 91,767.60
2,999.59 35,995.08
294.84 56,786.18
33.47 20,272.78
177.98 122,847.14
1,058.62 126,621.54
718.88 147,542.93
6,222.13 4,065,477.52
6,456.98 801,440.36
74.75 7,096,969.82
70.65 6,470,778.39
88.14 1,262,477.17
104.45 1,389,350.03
749.99 5,443,127.42
2,757.99 1,561,133.99
846.85 1,414,959.32
235.98 875,433.88
1,136.90 891,243.20
810.14 148,968.54
UNIT COST ADJUSTED COST
9,819.25 569,516.50
6,978.99 34,894.95
6,951.93 69,519.30
4,822.33 120,558.25
8,197.78 8,197.78
9,976.85 289,328.65
11,157.03 390,496.05
5,161.12 20,644.48
4,526.78 72,428.48
3,019.52 3,019.52
700.63 100,470.34
1,000.09 156,014.04
3,577.09 158,584.32
3,232.49 51,719.84
8,953.31 26,859.93
117,377.80 117,377.80
7,090.90 177,272.50
3,525.80 70,516.00
6,394.65 191,839.50
3,384.52 13,538.08
3,193.08 38,316.96
4,557.67 1,627,088.19
55,235.25
1,205.99 504,513.49
UNIT COST ADJUSTED COST
517.20 284,330.70
1,081.79 339,162.80
397.47 66,298.00
9,275.18 394,315.73
200.15 742,512.47
444.22 318,305.84
6,157.24 24,628.96
12,348.88 12,348.88
113,880.42 455,521.68
77,334.65 77,334.65
5,000.00 5,000.00
APPROVED BUDGET CONTRACT (ABC): ###
TOTAL ESTIMATED PROJECT COST 39,610,902.80
BUDGET RESERVED (8,777,691.69)
TOTAL 30,833,211.11
Name of Project : CONSTRUCTION OF 5-STOREY SCHOOL BUILDING WITH ROOF DECK
DETAILED ESTIMATES
A. Labor Cost
Output per
Manpower Requirement
Day Activity
Rate per day Total
Designation Manpower Rqd. (cu.m/manday Duration Designation
)
Laborer 10 8.0 300.00 24,000.00
Exisitng Building
Roofing
Total 24,000.00
Total Area
Total 7,500.00
B. Equipment Cost
Output per Rate per day
Equipment Requirement Activity
Day (840/hr @ Total
Particular Equpt. Rqd. Duration
(cu.m./day) 6hrs)
Backhoe, PC 60 1 2 8,800.00 17,600.00
Mini Dump Truck 1 1 2,200.00 2,200.00
Chainsaw 1 2 1,000.00 2,000.00
Total 21,800.00
9/117
Qty. = 192.60 ln.m.
2days
A. Quantity Take-Off and Costing
Materials
Description of Materials Factor Unit Unit Price Total Cost
Quantity
Temporary Fence using Laminated Sack on 2" x
192.60 ln.m. 240.00 46,224.00
3" Coco Lumber Frame. Including Labor Cost.
Designation
Total 46,224.00
Coconut Tree
Direct Cost 46,224.00
Acacia Tree
Profit 3,651.70
O.C.M. 4,160.16
Acacia Tree
V.A.T. 2,701.79
Total
Total Indirect 10,513.65###
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
Carpenters 8 #DIV/0! 350.00 #DIV/0!
Laborers 8 #DIV/0! 0.00 #DIV/0!
Total #DIV/0!
V.A.T.
#DIV/0!
###
Total Indirect #DIV/0!
10/117
CW Nails 17.50 kg 62.50 1,093.75
###
Total 11,299.75###
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
Carpenters 8 1.0 350.00 2,800.00
###
Laborers 8 1.0 300.00 2400.00
###
Total 5,200.00###
2.00 EARTHWORKS
2.01 Excavation/Backfill
A. Labor Cost
Output per
Manpower Requirement Day Activity
Rate per day Total
Designation Manpower Rqd. (cu.m/manday Duration Designation
)
Laborer 6 8.0 300.00 14,400.00
###
F2
Total 14,400.00F3
F4
B. Equipment Cost F5
Equipment Requirement Output per Rate per day F6
Activity
Day (840/hr @ Total
Particular Equpt. Rqd. Duration F7
(cu.m./day) 6hrs)
Backhoe, Wheel Type PC30 1 8.0 6,300.00 50,400.00
###
Mini Dump Truck 2 8.0 2,200.00 35,200.00F9
Total 85,600.00CF-1
TB-1
Direct Cost 100,000.00TB-2
Profit 7,900.00
TB-3
O.C.M. 9,000.00
TB-4
V.A.T. 5,845.00TB-5
Total Indirect 22,745.00
Stairs Foundat
12/117
Total Cost of Item 126,513.27
Unit Cost 1,057.71
Adjusted Cost 126,512.69
2.03 Embankment
13/117
V.A.T. 193,428.59
F8C2
Total Indirect 752,700.29F3C3
F2C4
Total Cost of Item 4,062,000.29
F4C2
Unit Cost 6,216.81
F9C1
Adjusted Cost 4,062,001.49
F1C4
F1C6
14/117
R
4.00 STEEL WORKS o
W16X26
4.01 Structural Steel Works u
W14X22
n
d
Qty. = 94,942.74 kg. W8X18
F
-
A. Quantity Take-Off and Costing ###
a
o
Materials c
f
Description of Materials Unit Unit Price Total Cost
Quantity tf
Total Volume
W24X84 10 lngth 33,930.00 339,300.00 ###o
W24X76 54 lngth 30,800.00 1,663,200.00 ###r
W21X44 5 lngth 17,895.00 89,475.00
###
W16X77 13 lngth 31,560.00 411,858.00
###
W16X50 20 lngth 21,100.00 413,560.00
###
W16X36 14 lngth 14,900.00 208,600.00
###
W16X26 37 lngth 10,850.00 401,450.00
###
W12X26 17 lngth 10,950.00 186,150.00
###
W6X9 14 lngth 3,870.00 54,180.00
###
W8X18 18 lngth 7,810.00 136,805.17
###
W8X10 9 lngth 4,600.00 41,400.00
###
W14X22 2 lngth 8,988.00 17,976.00
###
W16X26 2 lngth 10,615.00 15,922.50
###
W16X36 9 lngth 14,520.00 130,680.00
###
Paint Primer 20 gal. 325.00 6,500.00
W24X84
Paint Brush 10 pc. 61.00 610.00
W21X44
Paint Thinner 15 gal. 302.00 Roof
4,530.00
Level ( I - Be
Connection & Stiffeners 1.00 lot 483,512.00 483,512.00
W8X10
W14X22
Total 4,605,708.67
W16X26
W16X36
B. Labor Cost
Manpower Requirement Output per Activity Total Weight
Rate per day Total
Designation Manpower Rqd. Day Duration
Steelman 10 48.0 350.00 168,000.00
###
Laborer 10 48.0 300.00 144,000.00
###
Total 312,000.00
C. Equipment Cost
Equipment Requirement Output per Activity
Rate per day Total
Particular Equpt. Rqd. Day Duration
Mobile Crawler Crane 1 48.0 7,000.00 336,000.00
Welding Machine 10 48.0 450.00 216,000.00
H-Frame w/ Cross Bracing
40 48.0 49.00 94,080.00
and Joint Pin
One-Tank Oxygen/ 2-Tank Acetylene 10 set 4,350.00 43,500.00
Electric Grinder 8 48.0 145.00 55,680.00
Provision for Electricity 113,931.29
Total 859,191.29
15/117
12mmØ Def. Bar, Grade 33 1055 lght. 248.25 261,903.75
###
10mmØ Def. Bar, Grade 33 18681 lght. 170.00 3,175,770.00
###
Ga. #16 Tie Wire 1832 kg. 79.00 144,728.00
###
Total 4,389,472.30F5
F6
16/117
B. Labor Cost F7
Manpower Requirement Output per Activity F8
Rate per day Total
Designation Manpower Rqd. Day Duration ###
Steelman 10 117.0 350.00 409,500.00
###
Laborer 10 117.0 300.00 351,000.00C1
Total 760,500.00C2
C3
C. Equipment Cost F6C4
Equipment Requirement Output per Activity ###
Rate per day Total
Particular Equpt. Rqd. Day Duration ###
Bar/Shear Cutter 4 117.0 250.00 117,000.00 ###
Total 117,000.00TB1
16mmφ
Direct Cost 5,266,972.30 TB2
Profit 416,090.81 TB3
O.C.M. 474,027.51 TB4
V.A.T. 307,854.53 ###
Total Indirect 1,197,972.85 Stirrups
###
Total Cost of Item 6,464,945.15
Stair Foundati
Unit Cost 70.59
Main Stairs
Adjusted Cost 6,465,283.0410mmφ
Stair Landin
4.03 Roof Framing 10mmφ
Qty. = 14,323.54 kg. Concrete Cano
10mmφ
17/117
Direct Cost 1,027,713.25
###
Profit 81,189.35
###
O.C.M. 92,494.19
###
V.A.T. 60,069.84
###
Total Indirect 233,753.38###
18/117
Total Cost of Item 1,261,466.63
Unit Cost 88.07 ###
Adjusted Cost 1,261,474.52
C. Equipment Cost
Equipment Requirement Output per Activity
Rate per day Total Cost
Day Duration
19/117
Output per Activity
Rate per day Total Cost
Designation Equipment Rqd. Day Duration
Welding Machine 2 29.5 450.00 26,550.00
Provision for Power Consumption 3,000.00
Total Equipment Cost 29,550.00
Err:5
6.00 FORMS & SCAFFOLDINGS ###
Total Area
20/117
Ga#16 Tie Wire 81 kg. 79.00 6,399.00
###
Gravel "YY" 73 cu.m. 780.00 56,940.00
###
Total 960,677.00###
Planters
B. Labor Cost Steps
Manpower Requirement Output per Activity ###
Rate per day Total
Designation Manpower Rqd. Day Duration ###
Mason 10 21.0 350.00 73,500.00
###
Laborer 10 21.0 300.00 63,000.00
###
Total 136,500.00 ###
###
21/117
C. Equipment Cost
Equipment Requirement Output per Activity ###
Rate per day Total
Particular Equpt. Rqd. Day Duration ###
Concrete Mixer 2 21.0 1,300.00 54,600.00
Total 54,600.00###
###
Direct Cost 1,151,777.00 ###
Profit 90,990.38
Total Ground Floor
O.C.M. 103,659.93
V.A.T. 67,321.37
I.T./ Computer R
Total Indirect 261,971.68Electronics
Staff Office
Total Cost of It 1,413,748.68
###
Unit Cost 846.13
Prayer Room
Adjusted Cost 1,413,756.31###
Stairs Low Wa
7.02 Plastering/Finishing ###
Male and Female
Qty. = 3,709.78 sq.m. ###
###
A. Quantity Take-Off and Costing ###
F
Materials ###
a
Description of Materials Unit Unit Price Total Cost
Quantity c
Portland Cement 1,069.00 bag 266.00 284,354.00 t
Tools Storag
Washed Sand 60 cu.m. 646.00 38,760.00###o
r
Total 323,114.00 ###
Stairs Area
B. Labor Cost Ramp
Manpower Requirement Output per Activity Planters
Rate per day Total
Designation Manpower Rqd. Day Duration Err:52
Mason 10 38.0 350.00 133,000.00
Subtotal
Laborer 10 38.0 300.00 114,000.00
###
Total 247,000.00###
C. Equipment Cost
Equipment Requirement Output per Activity
Rate per day Total
Particular Equpt. Rqd. Day Duration
Concrete Mixer 3 38.0 1,250.00 142,500.00
Total 142,500.00W2
22/117
p
u
t
p
e
Total 680,674.55 r###
###
B. Labor Cost D Sp
Cosmetics/
Manpower Requirement Activity a
Dressmaking/ Curtai
Rate per day Total y
Designation Manpower Rqd. Duration
Tinsmith 4 14.0 350.00 19,600.00
CHB Low Wall Ra
(
Helper/Laborer 4 14.0 300.00 16,800.00
###
s
Total 36,400.00###
q
.
m
/
m
a
n
/
d
a
y
)
23/117
O
u
t
p
###
u
C. Equipment Cost t###
Equipment Requirement Activity
Rate per day Total
Particular Equpt. Rqd. Duration p
Electric Handrill 4 14.0 150.00 8,400.00
###e
Total ### r
8,400.00
###
D
Direct CostTotal 725,474.55
Third Floor a
Profit 57,312.49 y
O.C.M. 65,292.71
V.A.T. 42,403.99
Total Area
Total Indirect 165,009.19###
B. Labor Cost
Manpower Requirement Output per
Activity
Day Rate per day Total
Designation Manpower Rqd. (ln.m/manday) Duration
Tinsmith 2 12.0 350.00 8,400.00
###
Helper/Laborer 2 12.0 300.00 7,200.00
###
Total 15,600.00
C. Equipment Cost
Equipment Requirement Output per Activity
Particular Equpt. Rqd. Rate per day Total
Day Duration
Electric Handrill 2 12.0 150.00 3,600.00
Total 3,600.00 Err:52
24/117
Door Knob 58.00 set 1,195.00 69,310.00
Loose Pin Hinges 3 1/2" 87.00 pair 130.25 11,331.75
C.W. Nails 29.00 kg. 125.00 3,625.00
Total 425,886.75
25/117
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
Carpenter 2 1 29.0 350.00 20,300.00
Helper 2 1 29.0 300.00 17,400.00
Total 37,700.00
B. Labor Cost
26/117
Manpower Requirement Output per Activity ###
Rate per day Total
Designation Manpower Rqd. Day Duration
Carpenter 2 1 5.0 350.00 3,500.00
Helper 2 1 5.0 300.00 3,000.00
Total 6,500.00
27/117
Direct Cost 56,588.75
Profit 4,470.51
O.C.M. 5,092.99
V.A.T. 3,307.61
Total Indirect 12,871.11
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
Carpenter 2 1 13.0 350.00 9,100.00
Helper 2 1 13.0 300.00 7,800.00
Total 16,900.00
Err:520
Direct Cost 98,134.50
Profit 7,850.76
O.C.M. 8,832.11
V.A.T. 5,740.87
Total Indirect 22,423.74
9.01.5 Hollow Core Flush PWD Door with Louver, D4 - 1.00m x 2.10m
Qty. = 1.00 unit
F
A. Quantity Take-Off and Costing a
Materials c
Description of Materials Unit Unit Price Total Cost
Quantity t
Shop Made Hollow Core Flush Door in Marine o
1.00 unit 2,155.00 2,155.00
###
r
Plywood - 1.00m x 2.10m
Readymade Lauan 2" x 6" - Door Jamb 1.00 set 2,350.00 2,350.00
###
Door Knob 1.00 set 1,195.00 1,195.00
###
Loose Pin Hinges 3 1/2" 2.00 pair 130.25 260.50
###
C.W. Nails 0.50 kg. 125.00 62.50
###
Total 6,023.00
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
Carpenter 1 1 1.0 350.00 350.00
Helper 1 1 1.0 300.00 300.00
Total 650.00
R
Direct Cost 6,673.00 o
Profit 527.17 u
O.C.M. 600.57 n
d
-
o
f
28/117
f
V.A.T. 390.04
Total Indirect 1,517.78
###
Total Cost of It 8,190.78
###
Unit Cost 8,190.78
###
Adjusted Cost 8,190.78
###
29/117
9.02 Window
9.02.1 Jalougrill Window, W1 - 3.550m x 1.50m
Qty. = 29.00 unit
B. Labor Cost
Manpower Requirement Output per Activity ###
Rate per day Total
Designation Manpower Rqd. Day Duration
Installer/ Welder 4 1 8.0 350.00 11,200.00
###
Helper 4 1 5.0 300.00 ###
6,000.00
Total 17,200.00
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
Installer/ Welder 2 1 18.0 350.00 12,600.00
Helper 2 1 18.0 300.00 10,800.00
Total 23,400.00
30/117
9.02.3 Jalougrill Window, W3 - 3.550m x 0.80m Err:520
Qty. = 4.00 unit
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
Installer/ Welder 2 1 2.0 350.00 1,400.00
Helper 2 1 2.0 300.00 1,200.00
Total 2,600.00
31/117
9.02.5 Jalougrill Window, W3b - 1.40m x 0.60m
Qty. = 1.00 unit
33/117
10.02 Sanitary Line ###
Qty. = 156.00 ln.m. ###
34/117
O.C.M. 11,617.90
V.A.T. 7,545.18
Total Indirect 29,361.01
35/117
10.04 Catch Basin
Qty. = 16.00 unit
36/117
Total Indirect 4,972.97
37/117
R
o
10.06 Septic Vault (2.80m x 6.45m x 2.15m) including Excavation u
Qty. = 1.00 unit n
d
-
A. Quantity Take-Off and Costing Laborer
o
Materials F
f
Description of Materials Unit Unit Price Total Cost a
Quantity f
c
Machine Made / Load-Bearing t
620.0 pc. 21.00 13,020.00
###
4" Concrete Hollow Blocks
o
10mmØ x 6.00 Def. Bars 88.0 lght. 170.00 23,408.00 -r
Portland Cement 81 bag 266.00 21,630.12 -
Washed Sand 4.5 cu.m. 646.00 2,907.00 -
Gravel YY 7.0 cu.m. 780.00 5,460.00 -
Gravel Class "A" 2.0 cu.m. 610.00 1,220.00 -
Coco Lumber 120.0 bd.ft. 18.00 2,160.00
Common Wire Nail - Asstd. 3.0 kg. 62.50 187.50
Ga # 16 Tie Wire 7.0 kg. 79.00 553.00
###
Total 70,545.62
###
###
B. Labor Cost (Including Excavation Works) ###
Manpower Requirement Activity
Output Rate per day Total
Designation Manpower Rqd. Duration ###
Plumber/Mason 2 - 10.0 350.00 7,000.00
###
Helper/Laborer 6 - 10.0 300.00 18,000.00
###
Total 25,000.00
10.07 Fixtures
38/117
0.07.2 Lavatory (Wall Hung)
Qty. 20.00 unit
39/117
###
B. Labor Cost
Manpower Requirement Activity ###
Output Rate per day Total
Designation Manpower Rqd. Duration
Plumber 2 - 2.0 350.00 1,400.00
###
Helper/Laborer 2 - 2.0 300.00 1,200.00
###
Total 2,600.00
40/117
###
Direct Cost 11,020.00
###
Profit 870.58
###
O.C.M. 991.80
V.A.T. 644.12
Total Indirect 2,506.50###
###
Total Cost of Item 13,526.50
Unit Cost 3,381.63 ###
Adjusted Cost 13,526.52
###
###
0.07.5 Prefabricated Stainless Steel Slop Sink (0.8 x 0.7m)
Qty. 12.00 unit
R
11.00 ELECTRICAL WORKS
o
Qty. = 357.00 outlets u
n
A. Quantity Take-Off and Costing d
Materials -
Description of Materials Unit Unit Cost Total Cost o
Quantity ###
f
2"x4" Utility Box 94.00 pcs 27.50 2,585.00
###
f
4"x4" Junction Box with cover 200.00 pcs 33.00 6,600.00
###
Single gang switch "Flush Type" 7.00 sets 100.00 700.00
Double gang switch "Flush Type" 21.00 sets 155.00 3,255.00
###
Triple gang switch "Flush Type" 1.00 sets 260.25 ###
260.25
2-way switch "Flush Type" 4.00 sets 255.25 1,021.00
Duplex Convenience Outlet "Floor Mounted
48.00 sets 1,415.00 67,920.00
Type"
Duplex Convenience Outlet "Wall Mounted
145.00 sets 162.75 23,598.75
Type"
Three Prong ACU outlet 18.00 sets 149.25 2,686.50
Rectangular Type (12" x 24") Aluminum Louver w/ 2-18watts
107.00 sets 1,500.20 160,521.40
T8 Tube
1-40watt FL Assembly (Open Type) 39.00 sets 401.35 15,652.65
Electrical Tape 100.00 rolls 28.25 2,825.00
Ga Tie Wire #16 10.00 kgs 80.25 802.50
Secondary Rack w/2 Spool Insulator 1.00 set 175.25 175.25
R
15 AT "Bolt - On Type " CB, 2P 220 VAC 11.00 pcs 435.70 4,792.70 ###
o
20 AT "Bolt - On Type " CB, 2P 220 VAC 15.00 pcs 435.70 6,535.50 u
30 AT "Bolt - On Type " CB, 2P 220 VAC 18.00 pcs 435.70 7,842.60 n
70 AT "Bolt - On Type " CB, 2P 220 VAC 4.00 pcs 666.25 2,665.00 d
100 AT "Bolt - On Type " CB, 2P 220 VAC 2.00 pc 1,195.00 2,390.00 -
125 AT "Bolt - On Type " CB, 2P 220 VAC 2.00 pc 2,905.00 5,810.00 o
###
f
200 AT "Bolt - On Type " CB, 2P 220 VAC 2.00 pc 3,800.00 7,600.00
###
f
500 AT "Bolt - On Type " CB, 2P 220 VAC 1.00 pcs 35,000.00 35,000.00
###
41/117
12 Branches Panel Board " Bolt - On ", C.M 1 -Phase 2.00 pc 3,120.00 6,240.00
###
10 Branches Panel Board " Bolt - On ", C.M 1 -Phase 3.00 pc 4,758.00 14,274.00
###
3.50 mm2 THHN Stranded Wire 50.00 rolls 4,355.05 217,752.50
###
15mm Ø PVC Pipe 1150.00 lghts 56.00 64,400.00
###
15mm2 Ø PVC Elbow 600.00 pcs 25.00 15,000.00
###
15mm2 Ø PVC Coupling 600.00 pcs 10.00 6,000.00
###
15mm2 Ø PVC Clamp 600.00 pcs 10.00 6,000.00
###
42/117
5.50 mm2 THHN Stranded Wire 10.00 rolls 6,000.00 60,000.00
###
20 mm Ø PVC Pipe 220.00 lghts 315.00 69,300.00
###
20mm2 Ø PVC Elbow 150.00 pcs 40.00 6,000.00
###
20mm2 Ø PVC Coupling 150.00 pcs 11.00 1,650.00
20mm2 Ø PVC Clamp 150.00 pcs 9.00 1,350.00
22.00 mm2 THW Stranded Wire 60.00 mts 151.00 9,060.00
30 mm2 THW Stranded Wire 60.00 mts 190.25 11,415.00
32 mm Ø RSC Pipe 20.00 lghts 502.00 10,040.00
40 mm Ø RSC Pipe 20.00 lghts 633.00 12,660.00
80 mm2 THW Stranded Wire 60.00 m 512.00 30,720.00
250 mm2 THW Stranded Wire 60.00 m 840.00 50,400.00
R
65 mm Ø RSC Pipe 15.00 lghts 1,111.00 16,665.00
o
Shutter Type (Wall Mounted) Emergency Light 12" (40watts) 27.00 sets 1,455.00 39,285.00 u
Ceiling Mounted Exhaust Fan (Open Type) 6.00 sets 1,250.00 7,500.00 n
Total 1,016,950.60 d
-
B. Labor Cost o
###
f
Manpower Requirement Output per Activity ###
Rate per day Total f
Designation Manpower Rqd. Day Duration ###
Electrician 2 75 350.00 52,500.00
Laborers 8 75 300.00 180,000.00
###
Total 232,500.00
###
C. Equipment Cost
Equipment Requirement Output per Activity
Rate per day Total
Designation Equipment Rqd. Day Duration
Electric Edger 2 75 500.00 75,000.00
Total 75,000.00
43/117
12.00 TILE WORKS
Designation
F
A. Quantity Take-Off and Costing a
Materials c
Description of Materials Unit Unit Price Total Cost
Quantity ###t
0.40 x 0.40 Floor Tiles 1,323 pcs. 159.00 210,302.89###o
r
020 x 0.20 Ceramic Floor Tiles 1,717 pcs. 90.00 154,561.84###
020 x 0.30 Ceramic Wall Tiles 1,150 pcs. 94.50 108,690.75
###
Cement Portland 143 bag 266.00 38,038.00
###
Sand 9 cu.m. 646.00 5,814.00###
ABC Grout 28 bag 155.25 4,347.00### I
T
Cutting Stone 10 pc. 402.35 4,023.50###
/
Total 315,475.09 ###
S
C
###
to
B. Labor Cost ###
a
m
Manpower Requirement Output per Activity fSeco
p
Rate per day Total M
fu
Designation Manpower Rqd. Day Duration
a
Mason 8 14.0 350.00 39,200.00 F t
lO
e
Laborer 8 14.0 300.00 33,600.00 ### e
fm
r
Total 72,800.00 ### f
a
T
ilR
C. Equipment Cost ### o
c
e
o
Equipment Requirement Output per Activity ie
o
Rate per day Total lT L
Particular Equipt. Rqd. Day Duration ### m
e e
o
Tile Cutter 8 14.0 200.00 22,400.00 ### ti s
Total 22,400.00 l s
###
e
Direct Cost 410,675.09 F t###
32,443.33 e :
Profit ###
m
O.C.M. 36,960.76
a
V.A.T. 24,003.96
### l
S
Total Indirect ### T
93,408.05 e
u
o
b L
Total Cost of Item 504,083.14### tT
-
S e
Unit Cost 1,204.96 a o
T s
lu
i
Adjusted Cost 504,082.60 o b s
l
D2 (0.7 tT -e x 2.1
a
13.00 CARPENTRY WORKS T
h
tl
:
io
13.01 Flat Ceiling (Third Floor Only) rtTotal
a
d
Qty. = 549.75 sq.m
l
###
F
A. Quantity Take-Off and Costing l
F
o
Materials a
Description of Materials Unit Unit Price Total Cost o
Quantity c
r
4.5 mm thk. x 4' x 8' Hardilite Board 204 sht. 401.25 81,855.00 t
0.40mm thk.x 5.0m. Double Furring 369 le. 183.75 67,803.75 ### o
r
0.40mm thk.x 5.0 m.Wall Angle 62 le. 50.05 3,103.10###
0.70mm thk.x 5.0m. Carrying Channel 55 le. 163.00 8,965.00
###
Hardware & Accessories 1 lot 7,987.19 7,987.19
###
1/8 x 1 1/2 Blind Rivets 30 box 301.00 9,030.00
###
CW Nails 12 kg. 125.00 1,500.00
###
Total 180,244.04###
R
###
o
B. Labor Cost u
Manpower Requirement Output per Activity n
Rate per day Total
Designation Manpower Rqd. Day Duration d
Carpenter 8 8.0 350.00 22,400.00 -
o
Laborer 8 8.0 300.00 19,200.00 f###
f
44/117
Total 41,600.00 ###
###
45/117
C. Equipment Cost
Output per Activity
Equipment Requirement Rate per day ###
Day Duration Total
Particular Equipt. Rqd. ###
Electric Drill 8 8.0 150.00 9,600.00
Total 9,600.00###
###
Direct Cost 231,444.04
Profit 18,284.08
O.C.M. 20,829.96
V.A.T.
13,527.90
Total Indirect 52,641.94
R
Total Cost of Item 284,085.98 o
Unit Cost 516.75 u
Adjusted Cost 284,083.31 n
d
13.02 Ceiling Eaves -
o
Qty. = 313.52 sq.m f
###
f
###
###
Designation Length (m) Width (m) Height (m) No. of Face Area (sq.m.)
Eaves A = 313.5 sqm. 1 313.52
Total Area 313.52
C. Equipment Cost
Output per Activity
Equipment Requirement Rate per day
Day Duration Total
Particular Equipt. Rqd.
Electric Drill 8 5.0 200.00 8,000.00
Total 8,000.00
46/117
13.03 Hardi Sanipa - Fascia Board ###
R
Qty. = 166.80 ln.m.
o
u
A. Quantity Take-Off and Costing n
Materials d
Description of Materials Factor Unit Unit Price Total Cost
Quantity -
300mm x 2.44m x 10mm thk. Hardi Sanipa 113 pc. 330.00 37,287.20###o
f
1/8"Ø Metal Screw 4 box 345.00 1,380.00 -
f
Total 38,667.20 ###
C. Equipment Cost
Equipment Requirement Output per Activity
Rate per day Total
Particular Equipt. Rqd. Day Duration ###
Electric Drill 2 9.0 200.00 3,600.00
Total 3,600.00
47/117
R
o
14.00 PAINTING WORKS
u
14.01 Masonry Surface - 3 Coats n
Qty. = 3,709.78 sq.m. d
-
o
f
A. Quantity Take-Off and Costing ### f
Materials
Description of Materials Unit Unit Price Total Cost
Quantity
Neutralizer 38.00 gal. 446.00 16,948.00 F
Primer (Flat Latex) 186.00 gal. 530.00 98,580.00 a
###
Full Putty (Cast) 248.00 gal. 460.00 114,080.00 c
Topcoat (Latex) 248.00 gal. 623.00 ### t
154,504.00
Reducer for Cast 50.00 gal. 403.00 20,150.00 o
###
Sand Paper 78.00 doz 188.00 14,664.00 r
###
Total 418,926.00
###
###
B. Labor Cost ###
Manpower Requirement Output (sq.m Activity ###
Rate per day Total
Designation Manpower Rqd. per manday) Duration
Painter 10 28.5 350.00 99,878.69
Helper 10 28.5 300.00 85,610.31
###
Total 185,489.00###
48/117
F
A. Quantity Take-Off and Costing ### a
Materials c
Description of Materials Unit Unit Price Total Cost
Quantity ### t
Primer (Flatwall Enamel) 44 gal. 600.00 26,400.00 o
###
Putty 3 gal. 601.25 1,803.75 r
###
Topcoat (Quick Drying Enamel) 92 gal. 660.00 60,720.00
###
Paint Thinner 366 gal. 302.00 110,532.00
###
Sand Paper # 120 13 doz 188.00 2,444.00
###
Total 201,899.75
B. Labor Cost
Manpower Requirement Output (sq.m Activity Designation
Rate per day Total
per manday) Duration
Designation Manpower Rqd. Ceiling
Painter 8 11.0 350.00 30,800.00
###
Helper 8 11.0 300.00 26,400.00
###
Total 57,200.00###
###
Direct Cost 259,099.75
###
Profit 20,468.88
###
O.C.M. 23,318.98
Total Area
V.A.T. 15,144.38
###
Total Indirect 58,932.24
15.00 Project Marker - 2mm thk. x 300mm x 280mm Brass Type ###
Qty. = 4.00 unit ###
###
A. Quantity Take-Off and Costing ###
Materials
Description of Materials Unit Unit Price Total Cost
Quantity
49/117
16.00 Signage - Text & Logo
Qty. = 1.00 l.s
Materials
Description of Materials Factor Unit Unit Price Total Cost
Quantity
Total 303,370.00
B. Labor Cost
Manpower Requirement Output (sq.m Activity
Rate per day Total
Designation Manpower Rqd. per manday) Duration
Mason 2 6.5 350.00 4,550.00
Laborer 8 17.0 300.00 40,800.00
Steelman 8 3.0 350.00 8,400.00
Painter 2 1.5 350.00 1,050.00
Total 54,800.00
50/117
C. Equipment Cost
Output per Activity
Equipment Requirement Rate per day
Day Duration Total
Particular Equipt. Rqd.
Plate Compactor 2 1.5 500.00 1,500.00
One-Bagger Concrete Mixer 1 6.5 1,250.00 8,125.00
Bar/Shear Cutter 4 3.0 250.00 3,000.00
Total 12,625.00
51/117
Profit 29,292.81
O.C.M. 33,371.55
V.A.T. 21,672.97
Total Indirect 84,337.33
B. Labor Cost
Manpower Requirement Output per Activity
Rate per day Total
Designation Manpower Rqd. Day Duration
First Aider/Part Time Practitioner 354 54,600.00 54,600.00
Total 54,600.00
SPL-III BILLBOARD
Qty. = 1.00 unit
1 DAY
A. Quantity Take-Off and Costing
Materials
Description of Materials Unit Unit Price Total Cost
Quantity
8' x 8' Tarpaulin on 5mm Thk Marine Plywood with Helevitica
Font (70 dpi) 3" Text Main Information on 2"x2" Lauan Lumber 1.00 unit 4,070.00
Wooden Frame with Stand 4,070.00
Total 4,070.00
52/117
Contract Name: CONSTRUCTION OF 5-STOREY SCHOOL BUILDING WITH ROOF DECK
(SUMMARY)
Unit Prices of Materials, Equipment and Labor
Rectangular Type (12" x 24") Aluminum Louver w/ 2-18watts T8 Tube sets 1,500.20
1-40watt FL Assembly (Open Type) sets 401.35
Electrical Tape rolls 28.25
Ga Tie Wire #16 kgs 80.25
Secondary Rack w/2 Spool Insulator set 175.25
15 AT "Bolt - On Type " CB, 2P 220 VAC pcs 435.70
20 AT "Bolt - On Type " CB, 2P 220 VAC pcs 435.70
30 AT "Bolt - On Type " CB, 2P 220 VAC pcs 435.70
70 AT "Bolt - On Type " CB, 2P 220 VAC pcs 666.25
100 AT "Bolt - On Type " CB, 2P 220 VAC pc 1,195.00
125 AT "Bolt - On Type " CB, 2P 220 VAC pc 2,905.00
200 AT "Bolt - On Type " CB, 2P 220 VAC pc 3,800.00
500 AT "Bolt - On Type " CB, 2P 220 VAC pcs 35,000.00
12 Branches Panel Board " Bolt - On ", C.M 1 -Phase pc 3,120.00
10 Branches Panel Board " Bolt - On ", C.M 1 -Phase pc 4,758.00
3.50 mm2 THHN Stranded Wire rolls 4,355.05
15mm Ø PVC Pipe lghts 56.00
15mm2 Ø PVC Elbow pcs 25.00
15mm2 Ø PVC Coupling pcs 10.00
15mm2 Ø PVC Clamp pcs 10.00
5.50 mm2 THHN Stranded Wire rolls 6,000.00
20 mm Ø PVC Pipe lghts 315.00
20mm2 Ø PVC Elbow pcs 40.00
20mm2 Ø PVC Coupling pcs 11.00
20mm2 Ø PVC Clamp pcs 9.00
22.00 mm2 THW Stranded Wire mts 151.00
30 mm2 THW Stranded Wire mts 190.25
32 mm Ø RSC Pipe lghts 502.00
40 mm Ø RSC Pipe lghts 633.00
80 mm2 THW Stranded Wire m 512.00
250 mm2 THW Stranded Wire m 840.00
65 mm Ø RSC Pipe lghts 1,111.00
Shutter Type (Wall Mounted) Emergency Light 12" (40watts) sets 1,455.00
Ceiling Mounted Exhaust Fan (Open Type) sets 1,250.00
Bill Deposit for installation of 1-50KVA, 7600V/480Vac,
60Hz, Distribution Type Transformer lot 45,000.00
(pending requested Work Order from DLPC)
0.40 x 0.40 Floor Tiles pcs. 159.00
020 x 0.20 Ceramic Floor Tiles pcs. 90.00
020 x 0.30 Ceramic Wall Tiles pcs. 94.50
ABC Grout bag 155.25
Cutting Stone pc. 402.35
0.40mm thk. X 177mm/229mm Pre painted spandrel ln.m. 136.00
0.40mm thk.x 5.0m. Double Furring le. 182.00
0.70mm thk.x 5.0m. Carrying Channel le. 160.00
1/8 x 1 1/2 Blind Rivets box 300.00
Hardware & Accessories lot 4,352.20
0.30m x 1.20m Shop Made CeilingVent 1"x1" S4S unit 650.00
Insect Screen mtr. 120.00
300mm x 2.44m x 10mm thk. Hardi Sanipa pc. 330.00
1/8"Ø Metal Screw box 345.00
Melamine Board with complete accessories, Including Installation sq.m. 7,550.00
Neutralizer gal. 446.00
Primer (Flat Latex) gal. 530.00
Full Putty (Cast) gal. 460.00
Topcoat (Latex) gal. 623.00
Reducer for Cast gal. 403.00
Sand Paper doz 188.00
Primer (Flatwall Enamel) gal. 600.00
Putty gal. 601.25
Topcoat (Quick Drying Enamel) gal. 660.00
EQUIPMENTS
Mini Dump Truck day 2,200.00
Jack Hammer with Compressor day 4,100.00
Backhoe, PC 60 day 8,800.00
Chainsaw day 1,000.00
Backhoe, Wheel Type PC30 day 6,300.00
Plate Compactor day 650.00
Pump Crete day 8,850.00
Concrete Vibrator day 1,050.00
One-Bagger Concrete Mixer day 1,250.00
Mobile Crawler Crane day 7,000.00
Welding Machine day 450.00
and Joint Pin day 49.00
One-Tank Oxygen/ 2-Tank Acetylene day 4,350.00
Electric Grinder day 145.00
Bar/Shear Cutter day 250.00
Boom w/ Chainblock day 2,500.00
Electric Handrill day 150.00
Electric Edger day 500.00
Electric Drill day 200.00
MANPOWER
Carpenter day 350.00
Mason day 350.00
Steelman day 350.00
Welder day 350.00
Installer day 350.00
Tinsmith day 350.00
Plumber day 350.00
Electrician day 350.00
Painter day 350.00
Helper day 300.00
Laborer day 300.00
First Aider/Part Time Practitioner lot 54,600.00
MANPOWER UTILIZATION
DESIGNATION
2019 April 2019 May
day 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical Engineer
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder
Carpenter 2 2 2 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Mason 2 2 2 2 2 2 2 2 2 2 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Steelman
Installer
Tinsmith
Plumber
Electrician
Painter
Laborer 2 2 2 2 5 5 5 5 5 5 5 5 5 5 5 5 5 5 ###
###10 10###10 10###
###
###
###
### ###
###
### 10 10 10 10
### 10
###
### 10 10
###
Time Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Driver 1 1 1 1 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
MANPOWER UTILIZATION
DESIGNATION
2019 May 2019 June 2019 July
day 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical Engineer
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder
Carpenter 5 5 5 5 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Mason 5 5 5 5 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Steelman 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Installer
Tinsmith
Plumber
Electrician
Painter
Laborer 5 5 5 5 15###
###
###
###
### ###
###
###
###
###
### ###
###
###
###15 15 15###15###
###
### ### 15
###
###
### 15 15
### 15
### 15
### 15 15 15
###
Time Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MANPOWER UTILIZATION
DESIGNATION
2019 July 2019 August
day 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical Engineer
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Carpenter 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Mason 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Steelman 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Installer
Tinsmith
Plumber
Electrician
Painter
Laborer ###
###
###
### 15###
###
###
###
### ###
###
###
###
###
### ###
###
###
###15 15 15###15###
###
### ### 15
###
###
### 15 15
### 15
### 15
### 15 15 15
###
Time Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MANPOWER UTILIZATION
DESIGNATION
2019 September 2019 October
day 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Carpenter 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Mason 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Steelman 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Installer
Tinsmith
Plumber 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Electrician 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Painter
Laborer ###
###
###
###15### ###
###
###
###
###
### ###
###
###
###
###
### ###15 15###15### ###
###
###
###
### 15 ###
### 15 15 15
### ### 15
###
### 15 15 ###
Time Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MANPOWER UTILIZATION
DESIGNATION
2019 October 2019 November 2019 December
day 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Carpenter 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Mason 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Steelman 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Installer
Tinsmith
Plumber 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Electrician 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Painter
Laborer ###
###
###
###
### ###
###
###
###
###
### ###
###
###
###
###
### ###
###
###15 15### ###15###
###
###
### 15
###
###
### 15 15 ### 15
### 15
###
### 15 15
###
Time Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MANPOWER UTILIZATION
DESIGNATION
2020 January 2020 February
day 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 1 2
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Carpenter 7 7 7 7 7 7 7 7 7 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Mason 8 8 8 8 8 8 8 8 8 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Steelman 5 5 5 5 5 5 5 5 5 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Installer 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Tinsmith 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Plumber 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Electrician 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Painter
Laborer ###
###
### ###15###
###
###
### ###
###
###
###
###
### ###
###
###
###
###10 ###10###10###
### ###
### 10
###
###
### 10 10
### 10
### 10 10
###
Time Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
MANPOWER UTILIZATION
DESIGNATION
2020 March 2020 April
day 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Project Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Electrical Engineer 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Foreman 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welder 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Carpenter 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7 7
Mason 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
Steelman 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Installer
Tinsmith
Plumber 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Electrician 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Painter
Laborer ###
###
###
###15### ###
###
###
###
###
### ###
###
###
###
###
### ###15 15###15### ###
###
###
###
### 15 ###
### 15 15 15
### ### 15
###
### 15 15 ###
Time Keeper 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Driver 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EQUIPMENT UTILIZATION
EQUIPMENT
DURATION
wee
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
k
Backhoe 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Dumptruck 10W 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Concrete mixer 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Forward Loader 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Mini Excavator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Welding Machine 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Electric Grinder 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
Concrete Vibrator 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Mini Dumptruck 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
EQUIPMENT UTILIZATION
P RO J E C T D U R A T I O N - ( C A L E N D A R D A Y S )
DESIGNATION 6 12 18 24
IST QUARTER 2ND QUARTER 3RD QUARTER 4TH QUARTER
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Backhoe, PC 60 1 1
Chainsaw 1 1
Plate Compactor 1
Pump Crete 1 1 1
Concrete Vibrator 1 1 1 1 1
Welding Machine 1 1 1 1 1 1 1 1 1 1 1 1
Electric Grinder 1 1 1 1 1 1
Bar/Shear Cutter 1 1 1 1 1 1 1
Boom w/ Chainblock 1 1 1
Electric Handrill 1 1 1 1
Electric Edger 1 1 1 1 1 1 1 1 1 1
Electric Drill 1 1 1 1 1
Contract Name: CONSTRUCTION OF 5-STOREY SCHOOL BUILDING WITH ROOF DECK legend:
Project Location: MINTAL , DAVAO CITY normal schedule
Formworks
installation of railings &
Structural Steel Works Roof Framing Roofing & Tinsmithry Works Painting Works
Pouring & Curing of Tile Works & Installation of
Structure Excavation Reinforcing Bars Conc. Ftg./Col. Doors & Windows Marker & Logo Demobilization
20 days 10 days 50 days 45 days 30 days 2 days
1 3 4 5 6 7 8 9 10 11 12 13 14 15 16
73/117
Rain Harvesting Tank Platform
Footing 1.00 1.00 1.40 16 22.40
Wall Footing 3.00 0.30 0.75 4 2.70
Total Volume 25.10
A. Labor Cost
Manpower Requirement Output per Day Activity
Rate per day Total
Designation Manpower Rqd. (cu.m/manday) Duration
Laborer 8 1.25 3.5 301.00 8,428.00
Total 8,428.00
Designation Length (m) Width (m) Depth (m) No. of units Volume (cu.m.)
Rain Harvesting Tank Platform
Footing 1.00 1.00 0.10 16 1.60
Wall Footing 6.00 0.30 0.10 4 0.72
Flooring 2.00 2.00 0.10 4 1.60
Total Volume 3.92
Total 3,025.00
74/117
B. Labor Cost
Manpower Requirement Output per Day Activity
Rate per day Total
Designation Manpower Rqd. (cu.m/manday) Duration
Laborer 8 2 0.50 301.00 1,204.00
Total 1,204.00
2.03 Embankment
Designation Length (m) Width (m) Depth (m) No. of units Volume (cu.m.)
Rain Harvesting Tank Platform 2.00 2.00 1.30 4 20.80
Total Volume 20.80
B. Labor Cost
Manpower Requirement Output per Day Activity
Rate per day Total
Designation Manpower Rqd. (cu.m/manday) Duration
Laborer 8 2.0 2.0 301.00 4,816.00
Total 4,816.00
C. Equipment Cost
Equipment Requirement Activity
Output per Day Rate per day Total
Particular Equpt. Rqd. Duration
Plate Compactor 1 18 2.0 500.00 1,000.00
Total 1,000.00
75/117
3.00 CONCRETE WORKS
Designation Length (m) Width (m) Depth (m) No. of units Volume (cu.m.)
Rain Harvesting Tank Platform
F1 1.00 1.00 0.30 16 4.80
C1 0.25 0.25 2.50 16 2.50
76/117
Wall Footing 0.00 0.00 0.25 4 0.00
Flooring 2.00 2.00 0.10 4 1.60
B1 6.00 0.25 0.30 4 1.80
Total Volume 10.70
B. Labor Cost
Manpower Requirement Activity
Output per Day Rate per day Total
Designation Manpower Rqd. Duration
Mason 2 2.5 5.0 350.00 3,500.00
Laborer 8 2.5 5.0 301.00 12,040.00
Total 15,540.00
C. Equipment Cost
Equipment Requirement Activity
Output per Day Rate per day Total
Particular Equpt. Rqd. Duration
One-Bagger Concrete Mixer 1 2.5 5.0 1,300.00 6,500.00
Total 6,500.00
77/117
4.02 Reinforcing Bars
Summary
Structure
Bar size(mm dia) Weight/pc No. of pcs. Weight
Rain Harvesting Tank Platform
F1 16mmφ 9.50 34 323.00
C1 16mmφ 9.50 48 456.00
10mmφ 3.70 75 277.50
Wall Footing 10mmφ 3.70 21 77.70
Flooring 10mmφ 3.70 16 59.20
B1 16mmφ 9.50 45 427.50
10mmφ 3.70 33 122.10
Total Weight 1,743.00
B. Labor Cost
Manpower Requirement Activity
Output per Day Rate per day Total
Designation Manpower Rqd. Duration
Steelman 8 78.5 3.0 350.00 8,400.00
Laborer 8 78.5 3.0 301.00 7,224.00
Total 15,624.00
C. Equipment Cost
Equipment Requirement Activity
Output per Day Rate per day Total
Particular Equpt. Rqd. Duration
Bar/Shear Cutter 4 120 3.0 250.00 3,000.00
Total 3,000.00
Total Cost of
128,503.56
Item
Unit Cost 73.73
Adjusted Cost 128,511.39
Designation Length (m) Width (m) Height (m) No. of Face Area (sq.m.)
78/117
Rain Harvesting Tank Platform 6.00 1.60 4 38.40
Total Area 38.40
B. Labor Cost
Manpower Requirement Activity
Output per Day Rate per day Total
Designation Manpower Rqd. Duration
Mason 8 8 1.00 350.00 2,800.00
Laborer 8 8 1.0 301.00 2,408.00
Total 5,208.00
C. Equipment Cost
Equipment Requirement Activity
Output per Day Rate per day Total
Particular Equpt. Rqd. Duration
Concrete Mixer 1 1.0 1,300.00 1,300.00
Total 1,300.00
7.02 Plastering/Finishing
Designation Length (m) Width (m) Height (m) No. of Face Area (sq.m.)
B. Labor Cost
Manpower Requirement Activity
Output per Day Rate per day Total
Designation Manpower Rqd. Duration
Mason 8 10 0.5 350.00 1,400.00
Laborer 8 10 0.5 301.00 1,204.00
Total 2,604.00
79/117
C. Equipment Cost
Equipment Requirement Activity
Output per Day Rate per day Total
Particular Equpt. Rqd. Duration
Concrete Mixer 1 0.5 1300.00 650.00
Total 650.00
Total Cost of
7,749.38
Item
Unit Cost 269.08
Adjusted Cost 7,749.50
80/117
14.00 PAINTING WORKS
14.01 Masonry Surface - 3 Coats
Qty. = 28.80 sq.m.
Designation Length (m) Width (m) Height (m) No. of Face Area (sq.m.)
CHB Wall 28.80
B. Labor Cost
Manpower Requirement Output (sq.m Activity
Rate per day Total
Designation Manpower Rqd. per manday) Duration
Painter 2 13.00 1.5 350.00 1,050.00
Helper 2 13.00 1.5 301.00 903.00
Total 1,953.00
Total Cost of
7,633.90
Item
Unit Cost 265.07
Adjusted Cost 7,634.02
81/117
2.00 EARTHWORKS
2.01 Excavation/Backfill
Qty. = 6.27 cu.m.
Total Volume
A. Labor Cost
Manpower Requirement Output per Day
Activity Duration
Designation Manpower Rqd. (cu.m/manday)
Laborer 6 1.25 1.0
Total
Total Volume
Total
B. Labor Cost
Manpower Requirement Output per Day
Activity Duration
Designation Manpower Rqd. (cu.m/manday)
Laborer 1 2 1.0
Total
Total Volume
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 2 2.5 1.00
Laborer 6 2.5 1.00
Total
Summary
Structure
Bar size(mm dia) Weight/pc No. of pcs.
Catch Basin 10mmφ 3.67 28
Total Weight
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Steelman 2 78.5 1
Laborer 2 78.5 1
Total
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Bar/Shear Cutter 2 120 1
Total
Total Area
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Concrete Mixer 1 120 2.00
Total
6.02 Plastering
Designation
100mm thk CHB
Catch Basin
Total Area
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 2 7.5 3.0
Laborer 2 7.5 3.0
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Concrete Mixer 1 1 3.0
Total
6.27
1,806.00
0.78
605.00
301.00
1.57
Weight
102.76
102.76
176.00 4,928.00
80.00 240.00
5,168.00
64 22.40
22.40
Area (sq.m.)
44.80
44.80
2.01 Excavation/Backfill
Qty. = 1.40 cu.m.
Total Volume
A. Labor Cost
Manpower Requirement Output per Day
Activity Duration
Designation Manpower Rqd. (cu.m/manday)
Laborer 6 1.25 1.0
Total
Total Volume
Total
B. Labor Cost
Manpower Requirement Output per Day
Activity Duration
Designation Manpower Rqd. (cu.m/manday)
Laborer 1 2 1.0
Total
Total Volume
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 2 2.5 1.00
Laborer 6 2.5 1.00
Total
Summary
Structure
Bar size(mm dia) Weight/pc No. of pcs.
Grease Trap 10mmφ 3.67 5
Total Weight
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Steelman 2 78.5 1
Laborer 2 78.5 1
Total
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Bar/Shear Cutter 2 120 1
Total
Total Area
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Concrete Mixer 1 120 1.00
Total
6.02 Plastering
Designation
100mm thk CHB
Grease Trap
Total Area
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 2 7.5 1.0
Laborer 2 7.5 1.0
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Concrete Mixer 1 1 1.0
Total
1.40
1,806.00
0.20
302.50
301.00
0.40
Weight
18.35
18.35
176.00 880.00
80.00 80.00
960.00
12 3.36
3.36
Area (sq.m.)
6.72
6.72
2.01 Excavation/Backfill
Qty. = 38.83 cu.m.
Designation Length (m) Width (m) Depth (m) No. of units Volume (cu.m.)
A. Labor Cost
Manpower Requirement Output per Day
Activity Duration Rate per day Total
Designation Manpower Rqd. (cu.m/manday)
Laborer 6 1.25 6.0 301.00 10,836.00
Total 10,836.00
Designation Length (m) Width (m) Depth (m) No. of units Volume (cu.m.)
Description of Materials Factor Materials Quantity Unit Unit Price Total Cost
Total 1,210.00
B. Labor Cost
Manpower Requirement Output per Day
Activity Duration Rate per day Total
Designation Manpower Rqd. (cu.m/manday)
Laborer 1 2 1.0 301.00 301.00
Total 301.00
Designation Length (m) Width (m) Depth (m) No. of units Volume (cu.m.)
Description of Materials Factor Materials Quantity Unit Unit Price Total Cost
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration Rate per day Total
Designation Manpower Rqd.
Mason 2 2.5 2.00 350.00 1,400.00
Laborer 6 2.5 2.00 301.00 3,612.00
Total 5,012.00
Summary
Structure
Bar size(mm dia) Weight/pc No. of pcs. Weight
Description of Materials Factor Materials Quantity Unit Unit Price Total Cost
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration Rate per day Total
Designation Manpower Rqd.
Steelman 2 78.5 2 350.00 1,400.00
Laborer 2 78.5 2 301.00 1,204.00
Total 2,604.00
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration Rate per day Total
Particular Equpt. Rqd.
Bar/Shear Cutter 2 120 2 150.00 600.00
Total 600.00
Description of Materials Factor Materials Quantity Unit Unit Price Total Cost
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration Rate per day Total
Designation Manpower Rqd.
Mason 2 10.5 3.00 350.00 2,100.00
Laborer 2 10.5 3.00 301.00 1,806.00
Total 3,906.00
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration Rate per day Total
Particular Equpt. Rqd.
Concrete Mixer 1 120 3.00 750.00 2,250.00
Total 2,250.00
6.02 Plastering
Description of Materials Factor Materials Quantity Unit Unit Price Total Cost
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration Rate per day Total
Designation Manpower Rqd.
Mason 4 7.5 3.0 350.00 4,200.00
Laborer 4 7.5 3.0 301.00 3,612.00
7,812.00
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration Rate per day Total
Particular Equpt. Rqd.
Concrete Mixer 1 1 3.0 750.00 2,250.00
Total 2,250.00
Total Volume
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 2 2.5 1.00
Laborer 6 2.5 1.00
Total
Total Area
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 1 10.5 1.00
Laborer 1 10.5 1.00
Total
6.02 Plastering
Designation
100mm thk CHB
Total Area
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 4 7.5 1.0
Laborer 4 7.5 1.0
B. Equipment
Equipment Requirement
Factor Activity Duration
Designation Equipment Rqd.
Cutter/Edger 2 4 1
Total Equipment Cost
C. Labor Cost
Manpower Requirement Output per Day (1
Activity Duration
Designation Manpower Rqd. Gang)
Mason 2 4 1
Laborer 2 4 1
Total Labor Cost
3 0.43
3 0.18
0.00
0.61
9 4.59
4.59
Area (sq.m.)
9.18
9.18
6.12
642.00 321.00
268.00 804.00
75.00 75.00
450.00 450.00
7,950.00
Total Area
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 2 10.5 2.00
Laborer 2 10.5 2.00
Total
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Concrete Mixer 1 120 2.00
Total
6.02 Plastering
Designation
100mm thk CHB
0
Total Area
B. Labor Cost
Manpower Requirement
Output per Day Activity Duration
Designation Manpower Rqd.
Mason 2 7.5 3.0
Laborer 2 7.5 3.0
C. Equipment Cost
Equipment Requirement
Output per Day Activity Duration
Particular Equpt. Rqd.
Concrete Mixer 1 1 3.0
Total
1 22.40
22.40
Area (sq.m.)
44.80
44.80