AC load Calculation for 25KV/ 240V/120V XFMR sizing at TPS-1 & 2

120V
240V Equipment 240V Equipment 120V Equipment Equipment
Equipment load load Load Load
in VA in Amps in VA in Amps
HVAC -1 14400 60
HVAC-2 14400 60
Fututre T1-Fans 18000 75
Fututre T2-Fans 18000 75
AC distribbution panel (Gantry 4000 16.7
Battery charger 6000 25.0
Encl. Interior Lighting 480 4
Cable Vault Lighting 360 3
Exterior Perimeter Ltg 1536 12.8
Exterior Lighting Equip 4800 40
Receptacle in Enclosure 480 4
Exterior Receptacle 480 4
T1- Bus/feeder heaters 800 6.7
T2- Bus/feeder heaters 800 6.7
Mimic Panel 500 4.2
ABB control Panel 600 5.0
Tagging relay Panel 500 4.2
25KV Realy Panel 500 4.2
T-1 Cont.Cabinet heater 150 1.3
T-2 Cont.Cabinet heater 150 1.3
115KV-1 C.B. Heater 150 1.3
115KV-2 C.B. Heater 150 1.3
T1-LTC (primary) 1500 12.5
T1-LTC (primary) 1500 12.5
FA panel 250 2.1
115KV Manual Disconnect-1 300 2.5
115KV Manual Disconnect-2 300 2.5
Exhuast Fan 700 5.8
74800 311.7 16986 141.6

XFMR Size=IN KVA 94.7 Say 112.5KVA or 100KVA


Where 0.75 is divercity factor
& 1.25 is assuming transformer loading up to 80%