Professional Documents
Culture Documents
GEMS Manual
Base Services Contractor
UNCLASSIFIED
Garrison and Estate Management System
BSC Manual October 2017
DOCUMENT ADMINISTRATION
Document Properties
Author Adan Weeks / Peter Howard
Document Version 1.3
Status Draft
Classification Unclassified
Date of Issue
Revision History
Revision Date Author Version No. Description
Approvals
Name Title Signature Date
Peter Howard P. Howard
UNCLASSIFIED
Garrison and Estate Management System
BSC Manual – Table of Contents
Contents
Contents .................................................................................................................................................................................. 1
Introduction ............................................................................................................................................................................. 1
Work Order Management Process Flows ............................................................................................................................... 2
#1: Create Notification & Work Order .................................................................................................................................. 2
#2: Survey & Quote ............................................................................................................................................................. 2
#3: Create Scheduled Work Order ...................................................................................................................................... 2
#4: Execute & Confirm Work Order ..................................................................................................................................... 2
#5: Create Service Entry Sheet & Generate Payment ........................................................................................................ 2
Work Order Management Business Rules ............................................................................................................................. 3
List of GEMS Responsive / Requested Services Business Rules ...................................................................................... 3
RR001: Notification Description [Naming Convention] ....................................................................................................... 4
RR002: Customer Pays ....................................................................................................................................................... 4
RR003: Insurable Events .................................................................................................................................................... 5
RR004: Events, Exercises and Trials .................................................................................................................................. 5
RR005: Escalations ............................................................................................................................................................. 6
RR006: Navy Ships ............................................................................................................................................................. 6
Product Director Business Rules ........................................................................................................................................ 7
Work Order Types ................................................................................................................................................................... 8
ZM01 – Responsive Maintenance (Estate Upkeep) Work Orders .................................................................................... 10
ZM02 – Scheduled Maintenance Work Orders ................................................................................................................. 10
ZM03 – Estate Appraisal Work Orders ............................................................................................................................. 10
ZM04 – Requested Service (Non EUMS) Work Orders .................................................................................................... 10
ZM05 – Scheduled Service Work Orders.......................................................................................................................... 11
Creating a Survey & Quote Work Order ............................................................................................................................... 13
Service Specific Guidance When Creating Work Orders ..................................................................................................... 23
Hospitality & Catering ........................................................................................................................................................ 23
Sports & Recreation .......................................................................................................................................................... 24
Housekeeping ................................................................................................................................................................... 24
Retail Stores and POL ....................................................................................................................................................... 24
Transport ........................................................................................................................................................................... 24
Waste Management .......................................................................................................................................................... 25
Cleaning ............................................................................................................................................................................ 25
Pest and Vermin ................................................................................................................................................................ 25
Laundry & Dry Cleaning .................................................................................................................................................... 25
Land Management ............................................................................................................................................................ 26
Training Areas and Range Management .......................................................................................................................... 26
Operational Procedures ........................................................................................................................................................ 27
Work Order Cancellations ................................................................................................................................................. 27
Survey & Quote Process (Requested Services, ZM04 Work Order Type) ........................ Error! Bookmark not defined.
Customer Pays Process .................................................................................................................................................... 28
Project Requested Services .............................................................................................................................................. 30
Extended Work Orders (spanning multiple months) ......................................................................................................... 30
Receipt of Work Order .......................................................................................................................................................... 33
Contractor Information Exchange (CIX) ............................................................................................................................ 33
Actioning Released Work Orders ...................................................................................................................................... 33
What to do if errors found .................................................................................................................................................. 33
Documentation / Attachments ............................................................................................................................................... 34
Requirements of the BSSC (Responsive/Requested Services) ....................................................................................... 34
Work Order Completion / Confirmation ................................................................................................................................. 35
Confirmation Process ........................................................................................................................................................ 35
ZM01 Responsive Maintenance Confirmations ................................................................................................................ 36
ZM02 Estate Upkeep Maintenance Schedule Confirmations ........................................................................................... 36
ZM04 Requested Services Confirmations ......................................................................................................................... 36
ZM05 Scheduled Services Confirmations ......................................................................................................................... 36
Fixed Fee (costed) ......................................................................................................................................................... 36
Rate of Effort (non-costed) ............................................................................................................................................ 36
Service specific schedules (non-costed) ....................................................................................................................... 36
UNCLASSIFIED
Garrison and Estate Management System
BSC Manual – Table of Contents
UNCLASSIFIED
Garrison and Estate Management System
BSC Manual – Table of Contents
Introduction
The Base Services Contractor (BSC) operations manual has been developed to assist and direct both Defence and
EMOS staff in best practice usage of Defence SAP (GEMS).
The procedures outlined in this manual describe how best to interact with various GEMS artefacts and data objects in
such a way as to meet Defence operational and reporting requirements.
Additional supporting materials are also included within this manual as a reference resource for the BSC to use as
necessary.
The materials presented herein were developed according to the following principles:
• Provision of work order management process flows and associated business rules can provide greater clarity and
insight into standard operating procedures within Defence.
• The complex nature of services required in the upkeep of the Defence estate precludes a “one size fits all”
approach to service delivery. To assist the BSC, service-specific content has been provided herein.
• Historically challenging scenarios should be outlined with a view to empowering all parties to readily adopt the
optimised GEMS solution. As an example, customer pays activities have been explained in detail with Defence
expectations clarified.
• The transmission of data between GEMS and contractor systems (via the CIX) requires clear descriptions of how
Defence requires data to be formatted. For example, time confirmations and rate of effort associated with work
order completion requirements are clearly described within this manual.
This manual is further supported by content contained on the GEMS Gateway. To access the GEMS Gateway please go
to http://drnet/dsrg/GEMS/InterfaceAssets/GEMSGateway.aspx.
UNCLASSIFIED
Garrison and Estate Management System 1
BSC Manual – Process Flows
UNCLASSIFIED
Garrison and Estate Management System 2
BSC Manual – Business Rules
RR005 Escalations
UNCLASSIFIED
Garrison and Estate Management System 3
BSC Manual – Business Rules
• Purpose
The purpose of this Business Rule (BR) is to provide naming convention guidance for the short description
field in GEMS SAP relating to Responsive and Requested services. This is to assist capturing information
for evidentiary trail reporting purposes.
• Background
GEMS SAP has an additional description field (known as the ‘short description’ field) that provides free text
with a total of 40 characters in length.
A standardised use of the short description field provides flexibility with searching and reporting and can
meet various business reporting requirements that might not otherwise be available.
• Contractor Obligations
The BSSC is to comply with this business rule when raising all Responsive and Requested Notifications
within GEMS SAP.
Other parties (other than the BSSC) can create Notifications and should also adhere to this business rule,
however the BSSC is responsible for monitoring and amending Base Services Notification details to ensure
they conform to all applicable business rules.
• Purpose
The purpose of this Business Rule (BR) is to provide guidance relating to the administration of requested
services Work Orders not funded by E&IG. These services are delivered under the Base Services
Contracts and can be funded by other Defence groups or external parties. This Business Rule does not
include guidance on funding arrangements.
• Background
E&IG has developed specific funding guidance in consultation with other Defence groups and services.
With the implementation of GEMS SAP, some variations to the current administrative practices are
necessary.
Further Information
http://drnet.defence.gov.au/dsrg/DSOContracts/Pages/Customer-Pays-Info.aspx
UNCLASSIFIED
Garrison and Estate Management System 4
BSC Manual – Business Rules
• Purpose
The purpose of this Business Rule (BR) is to provide guidance for recording insurable events related to
Responsive and Requested services.
• Background
Under the Base Services Contracts, the Base Services Support Centre (BSSC) is the primary mechanism
for Customers to initiate service requests.
Insurance claim processes may take up to four years, therefore it is imperative that the BSSC has the
ability to accurately record this detail to ensure the required information/details for a formal insurance claim
is able to be identified and retrieved by Defence personnel in preparing that insurance claim.
An insurable event is accidental loss or damage to Defence property – Buildings, Contents and
Infrastructure – that is not considered to be caused by wear & tear or requires general maintenance, and is
likely to exceed an accumulated loss of $500,000 across all Defence locations. For example, accidental
loss or damage to Defence property or several properties could be caused by natural disasters such as a
cyclone, flood, bush fire, earthquake etc or a single event such as a fire, lightning strike, building collapse
or a theft.
The EMOS Contractor is not responsible for submitting any insurance claims. The Defence
Insurance Office is responsible for handling Comcover insurance claims for Defence Estate property
damage caused by severe weather events Australia wide. Further detail on the process is outlined in
Annex A: Process for Property Claims (for information).
• Purpose
The purpose of this Business Rule (BR) is to provide guidance for recording Responsive and Requested
services relating to official Defence events, exercises and trials.
• Background
Historically, service requests (for base services) relating to various Official Events (e.g. ANZAC Day),
Exercises and Trials have not been identified and therefore budgeting, tracking and reporting for these
activities has not been effective.
Further Information
Events: http://drnet.defence.gov.au/dsrg/DSOContracts/Pages/Events-.aspx
UNCLASSIFIED
Garrison and Estate Management System 5
BSC Manual – Business Rules
RR005: Escalations
• Purpose
The purpose of this Business Rule (BR) is to provide guidance for the use of the GEMS SAP escalation
functionality relating to Responsive and Requested Notifications.
• Background
Under the Base Services Contracts, the Base Services contractors are required to advise if they are not
able to meet the contracted timeframes.
Customers can contact the BSSC to have the provider return to site under the following circumstances:
GEMS SAP provides functionality, called “Escalation” in the Notification that will trigger a workflow to notify
the Base Services contractor and PSM that follow-up action is required.
• Purpose
The purpose of this Business Rule (BR) is to provide guidance for recording Requested services delivered to
Navy Ships.
• Background
Historically, service requests (for base services) delivered to Navy ships have been recorded against the wharf
location to which the ship is docked with no ability to accurately capture costs and activities delivered directly to
the ship.
From time to time E&IG are required to provide data pertaining to its services delivered to Navy ships.
In Defence SAP, ships are recorded in the Estate Master data as equipment objects.
UNCLASSIFIED
Garrison and Estate Management System 6
BSC Manual – Business Rules
Where applicable, Product Directors have developed business rules that provide specific guidance on the handling of
Service Requests pertaining to their products. This guidance is directed for Base Services Contractor use and
adherence.
These Business Rules are coordinated through the Directorate of Base Services Management Integration & Coordination
http://drnet/dsrg/DSOContracts/BaseServicesContracts/Pages/BSSC.aspx
UNCLASSIFIED
Garrison and Estate Management System 7
BSC Manual – Work Order Types
Work orders represent the work to be undertaken by a Base Services contractor. Work orders reference a Floc and/or
EQUIP, nominate the services (service masters) required to perform the activity, and track the associated rates of effort.
Work orders can be generated manually via notification processing, or via system automation through scheduled
maintenance plans.
A work order is always created with reference to an estate element Floc. Or EQUIP. The following serve as examples:
• Base Support Area
• Property
• Building
• Building Level/Building Space
• Land Space
• Infrastructure System
• Equipment.
Work Orders will be either Costed or Non-costed. This is shown as a Control Key of the Work Order Operation line –
ZPM3 = costed, ZPM4 = non-costed. Generally, the BSSC will initially raise as a non-costed ‘placeholder’ operation
regardless if the Work Order is costed or non-costed.
Costed:
Approved work orders that are payment relevant will be linked to a Purchase Order (PO). Once the work is complete,
acceptance by the Product Director of a service entry sheet will generate a goods receipt and facilitate payment to the
Base Services contractor via Recipient Created Tax Invoice (RCTI), and settlement of costs to the customer cost centre if
required.
Non-costed:
Work orders for services covered under a fixed fee or volumetric service contract do not require additional financial
approval or reference to a purchase order.
The following table (refer table 2.0 on next page) provides a representation of the key differences between the different
types of service requests.
UNCLASSIFIED
Garrison and Estate Management System 8
BSC Manual – Work Order Types Matrix
Opportunity Minor
Responsive Responsive Requested Requested Requested Requested
Request Type based Workplace
Maintenance Maintenance Service Service Service Service
Maintenance Adjustment
UNCLASSIFIED
Garrison and Estate Management System 9
BSC Manual – Work Order Types
All of these work orders when initially raised from a customer request are
released for action by the EMOS contractor.
Subsequent work orders such as for alternate proposals (costed ZM01 Work Orders) or EU reimbursable follow approval
processes. For further information on the approval processes please refer to DEQMS and other documentation endorsed
by DEPU.
These work orders relate only to the Estate Upkeep Maintenance Schedule
(EUMS). These are system generated non-costed Work Orders.
These work orders are recommended works arising from the Estate Appraisal
inspections. Note: these do not have a corresponding Notification record and are used
for the purpose of review and scoping for project delivery. These will never be used to
capture actual ROE or actual costs.
Requested services are delivered on an ad-hoc basis under a requested or a survey-and-quote process. Once requested
and approved, the Base Services contractor will schedule the request for delivery within service level agreements and
advise of any changes to the scheduled delivery date and time.
There are a number of variances to the ways that requested services are managed in the system depending on how they
are catered for under the Base Services Contract. This affects the type of notification and work order created, and the
way that confirmations and service entry is performed. Table 2.0 Work Order Type Matrix provides a representation of the
key differences between the different types of requested services.
UNCLASSIFIED
Garrison and Estate Management System 10
BSC Manual
Scheduled services are predetermined service activities to be conducted on the Defence estate. Scheduled services are
planned for delivery on a regular basis.
The scheduled services process includes services priced in the form of a fixed period (mostly monthly or daily) fee for a
contractually pre-agreed measurable outcome and takes into consideration the following for each service package:
• identification of the location and frequency of delivery of services
• development, maintenance and delivery of a service delivery schedule
• requests for the delivery of service when requested by customers via a service request
• records of rate of effort specified for every service
• assignment of service delivery tasks to the relevant service delivery contractor.
The scheduled services process also identifies the contractor actions required to confirm delivery of services on a periodic
basis and the provision of supporting data required for analytical purposes. This data is typically captured via
measurement documents, completed by the contractor when the service is delivered, and recorded against the relevant
GEMS measurement points.
The scheduled services process outlines the financial integration of requests from procurement to final settlement of
funds. The steps to process scheduled services in Defence SAP are generally the same as scheduled and performance
maintenance, including the same key steps:
• task list
• maintenance plan
• work orders
• completion and payment.
There are a number of variances to the ways that scheduled services are managed in the system depending on how the
services are catered for under the Base Services contract. This affects the type of task list and maintenance plan created,
and the way that confirmations and service entry is performed. Table 2.0
Work Order Type Matrix provides a representation of the key differences
between the different types of scheduled services.
UNCLASSIFIED
Garrison and Estate Management System 11
BSC Manual
These notifications and work orders are then linked to the original notification and work order using the Reference
Notification and Reference Work order fields. This provides the Product Director and BSSC with a mechanism to
collectively schedule, reschedule work orders, and coordinate delivery of the services.
UNCLASSIFIED
Garrison and Estate Management System 12
BSC Manual – Work Order Types
The BSSC will raise work orders with a placeholder non-costed (ZPM4) operation line (example below).
Within the contractor system, this line is to be replaced with a costed operation (ZPM3) and the correct service activity,
Purchase Order, etc details. Confirmations are done against the costed lines and therefore the placeholder non-costed
line becomes redundant.
Multiple service activities (in accordance with the LRS/TRS) may be required in order to provide the correct costing and
breakdown of the quotation. For ‘true’ survey and quote (where LRS/TRS does not apply) then the ‘generic’ service
activity can be used.
Multiple operation lines may also be added in order to provide the required breakdown of the quotation.
Submission of the quotation must firstly be sent via the CIX with ‘QSUP’ (Quotation Supplied) status. Following
acknowledgement, the status is to be changed to ‘QAPR’ (Quotation Approval Requested) status.
UNCLASSIFIED
Garrison and Estate Management System 13
BSC Manual
UNCLASSIFIED
Garrison and Estate Management System 14
BSC Manual
For all services other than Estate Upkeep, ‘Specified requirement’ should be used.
2 Message Details (Icon). On site point of contact information for primary and secondary contacts.
UNCLASSIFIED
Garrison and Estate Management System 15
BSC Manual
UNCLASSIFIED
Garrison and Estate Management System 16
BSC Manual
UNCLASSIFIED
Garrison and Estate Management System 17
BSC Manual
The subsequent operational lines (lines 0020 onwards) will be populated by the contractor as part of the “scope and
quote” activity.
UNCLASSIFIED
Garrison and Estate Management System 18
BSC Manual
UNCLASSIFIED
Garrison and Estate Management System 19
BSC Manual
UNCLASSIFIED
Garrison and Estate Management System 20
BSC Manual
The final step (in the work order creation phase) performed by the BSSC is to save the work order by clicking the SAVE
button. The GEMS system will then generate workflows (system messages via email) according to the user status values
set by the BSSC.
Note: the BSSC does not have the ability to release a work order with SVNQ status.
The next page contains a summary of the status values (and associated workflows) relevant to the survey and quote work
order process.
UNCLASSIFIED
Garrison and Estate Management System 21
BSC Manual
Status Values
Workflow
Status Status Name Description Notes
Recipient
Used to indicate that the service request
is outside the monthly fixed fee and/or Set by the BSSC during work order
SVNQ Survey & Quote N/A
requires approval before it can be creation.
released (REL).
Work order is routed through to the
Acts as an indicator to the contractor
EMOS/MSP system via the CIX
QREQ Quote Required that more information is required before EMOS/MSP
containing one non-costed
work may proceed.
operational line item.
Additional costed line items are
Set by the EMOS/MSP system to added to the work order by the
QSUP Quote Supplied Requestor
indicate that a quote has been provided. contractor. The workflow generates
an email to inform the requestor.
Work order is routed back through
Set by the EMOS/MSP system when a Product the CIX into GEMS. Appears in the
Quote Approval
QAPR quote is submitted for approval. Used as Director relevant Product Director’s
Requested
a subsequent status to QSUP. (approver) dashboard as an item requiring
approval.
System status is set to Released
Set in response to the Product Director (REL). The workflow generates an
QAPP Quote Approved Requestor
approving the quote provided. email to inform the requestor that
the quote has been approved.
A rejection reason will be entered
by the Product Director. A workflow
Set in response to the approver will generate an email to the
selecting ‘Reject and Requote’ for the Requestor requestor including the reason for
QREJ Quote Rejected
quote supplied by the provider. Allows EMOS/MSP the rejection. An additional
the contractor to re-submit a quote. workflow will also update the status
values in the EMOS/MSP system
for this work order via the CIX.
Set in response to the approver
Rejecting the quote (or alternate
Requestor is informed of service
proposal). Also used to manually reject
REJC Rejected Requestor request closure via workflow
a work order. Contractor will not be able
generated message (email).
to re-submit a quote on these work
orders.
Work order is sent through to the
EMOS/MSP system via the CIX in
The work order is released for
REL Released EMOS/MSP a state that allows confirmations
completion/fulfilment by the contractor.
and payment claims to be
submitted against it.
Table 2.1: Survey & Quote Status to Workflow Relationships
UNCLASSIFIED
Garrison and Estate Management System 22
BSC Manual
Where functions are funded by the Mess Committees, the following process applies:
UNCLASSIFIED
Garrison and Estate Management System 23
BSC Manual
Housekeeping
Activity Costed (S&Q) Non-costed
Transport
Activity Costed (S&Q) Non-costed
UNCLASSIFIED
Garrison and Estate Management System 24
BSC Manual
Waste Management
New bin/service
Existing bin/service
Cleaning
Activity Costed (S&Q) Non-costed
UNCLASSIFIED
Garrison and Estate Management System 25
BSC Manual
Land Management
Activity Costed (S&Q) Non-costed
UNCLASSIFIED
Garrison and Estate Management System 26
BSC Manual
Operational Procedures
Work orders can be cancelled at various stages and for a variety of reasons.
Once a work order is released, GEMS will notify the contractor via the CIX. A released work order is essentially an
authorisation (from Defence) for a contractor to proceed with fulfilling the service request. When a released work order is
subsequently cancelled, it may be possible that the contractor has already commenced activities related to fulfilling the
service request and may therefore have incurred costs. The contractor is entitled to claim payment for any costs incurred
against a released work order.
For this reason, the BSSC is NOT to cancel a work order unless instructed by the relevant contractor. Instead, the BSSC
will do the following:
• add “CANC” at the beginning of the Notification Short Text description field,
• add a note in the long text description field detailing who has requested the cancellation and why. Also who is
being notified (contractor) of the cancellation,
• Save the Notification
• Send an email to the relevant contractor referencing the Notification and Work Order number advising of the
cancellation.
• The BSSC will NOT action anything further unless instructed by the contractor.
Where the BSSC is being instructed to cancel a Notification and Work Order, the contractor must provide them the
following details:
The BSSC will then proceed to cancel the Notification and Work Order by:
UNCLASSIFIED
Garrison and Estate Management System 27
BSC Manual
Defence Customer
• Customer raises request (and hopefully provides their Cost Centre/WBS Element upfront)
• BSSC raises the Notification (with the customer codes) and the associated Work Order with the activity type
denoting it is user pays (with Quote Required status).
• The contractor investigates, scopes and produces a quotation to the customer using the Quotation form (off
system).
• The customer considers the quote and either approves and rejects (off system).
• If approved, the customer needs to provide the Cost Centre/WBS Element on the form. Without either of these
codes the work cannot proceed.
• Contractor retains the Quotation form and inputs all quotation details into their system (including customer
approval confirmation detail in the long text description), sets the status to Quotation supplied. This is then
transferred via CIX to Defence SAP in which an email is automatically triggered to the customer (that the quote is
supplied).
• Under normal circumstances or unless directed by the applicable Product Director there is no requirement at the
time of submitted the quote via GEMS for the Quotation form to be submitted to the Product Director either in
GEMS (via an Objective link) or via email. Note the Product Director teams reserve the right to conduct
assurance checking either at the time of submission or afterwards.
• Contractor sets the status to Quotation Approval Requested in their system which again is sent to Defence SAP
via the CIX. This status triggers the workflow to the Product Director seeking approval.
• Product Director approves based on the fact that the Work Order activity type shows it is customer pays and they
validate the Cost Centre or WBS code has been entered in the relevant field in the Work Order Additional Details
tab. Where codes are missing the PD team will enter text into the Notification long description and select ‘reject
and re-quote’ from their inbox. Other issues could also lead to rejection or delays if requiring clarification or
validation.
• Work proceeds on the basis of the customer approval and customer kept informed of progress and completion.
• Contractor enters completion details (WO confirmation) in their system and is transferred to Defence SAP via the
CIX.
• A SES (payment) is created with the quoted amount in the contractor system and again is transferred to Defence
SAP via the CIX. This triggers a workflow to the Product Director for approval.
• Product Director approves.
• Automatic settlement journal occurs using the provided Cost Centre or WBS. The Account Code is taken from
the Purchase Order. Unfortunately this journal does not provide specific detail linking back to the Work Order.
Customers are provided the quotations of their funded Work Orders but if they want to reconcile between Roman and
GEMS they may encounter some issues as the settlement journal will not reference the Work Order.
Non-Defence Customer
• Same process as above with the exception of the need to capture a Cost Centre/WBS Element. Instead, it is
important to capture the customer billing details in the Customer Details tab of the Notification.
Exceptions
• Mess committee functions – refer ‘Service Specific guidance when creating work orders’, ‘Hospitality & Catering’.
• Where an organisation enters into a separate contractual arrangement to that of the Base Services
Contract. These would not be recorded in GEMS. For example, BGIS may deliver services directly to the
Australian Federal Police.
UNCLASSIFIED
Garrison and Estate Management System 28
BSC Manual
The BSSC is to have appropriate scripting arrangements to make all reasonable attempts in identifying and determining
funding arrangements. This should be based on PSM Business Rules and any other customer pays guidance
documentation where applicable. That being said, it is acknowledged that 100% accuracy is not always possible at this
early stage of receiving and registering the request.
The BSSC may be requested by base services providers to obtain the latest version of the quotation form.
The BSSC is responsible to despatch Work Orders to the relevant base services providers via the Contractor Information
Exchange (CIX). Customer pays Work Orders are to be assigned the ‘Quotation Required’ status.
Each base services contractor is responsible for liaising with the customer to determine the full scope of the service
required, confirming the funding source (i.e. E&IG or customer pays) and then completing the Quotation form. The
completion of the form includes obtaining the customer codes, or invoicing details in instances where it is a non-Defence
customer. The customer is to sign the form, giving their authorisation to proceed with the service.
The Quotation form is not to be used for E&IG pays services. These are to be submitted and approved in system via
GEMS SAP.
Regardless of the customer approval obtained on the Quotation form, base services providers must still enter the
applicable quotation information in GEMS SAP. The system approval processes will still apply however the Work Order
details
Base Services providers must retain the quotation form in accordance with Commonwealth record keeping requirements.
Further Information
http://drnet.defence.gov.au/dsrg/DSOContracts/Pages/Customer-Pays-Info.aspx
UNCLASSIFIED
Garrison and Estate Management System 29
BSC Manual
For the purpose of this document, “Projects” are defined as Defence works and services that are managed and delivered
as a package that is outside of the usual base services requested and responsive services.
Projects can be managed by Infrastructure Division (ID) and Service Delivery Division (SDD) of the Estate & Infrastructure
Group (E&IG). In most circumstances (apart from the EMOS Contractor), the project managers will not have access to
work orders within GEMS.
Project managers are responsible for the management and tracking of all services pertaining to their project.
All requests associated with projects (including project management fees) are NOT to be created as Notifications and
Work Orders within GEMS. All interaction and administrative processes must be directly with the Project Delivery
contractor and in accordance with the project management requirements and processes. These requirements are set by
the Directorate of Estate Works Program Office (DEWPO) or ID.
1) Work Order to have end date spanning entire duration of the requirement. Partially confirm if required to do in
stages. For example monthly. SES can be submitted aligning with the partial confirmation. Close out the Work
Order only after the end of the requirement. This is the preferred option.
2) Multiple Work Orders could be created, one for each month (as an example), however they must reference an
original Work Order (non-costed) that covers the whole period. These multiple work orders should not overlap in
timeframe, ie they are representing one portion of the whole period of the requirement. Each Work Order can be
fully confirmed with a SES submitted. At the completion of the entire requirement the original work Order will
need to be closed out.
Note: The Revision field in the Work Order is used to associate (and report) on Exercises.
UNCLASSIFIED
Garrison and Estate Management System 30
BSC Manual
All relevant details are copied across from the notification into the work order. (Note the basic finish date). This task is
completed by the BSSC.
UNCLASSIFIED
Garrison and Estate Management System 31
BSC Manual
The operational line items can be structured in such a way as to allow monthly confirmations. This will help facilitate
monthly SES submission. Operational line 10 is created by the BSSC as a non-costed placeholder only. This line is not
removed. Lines 20, 30 and 40 are configured by the contractor once the work order is sent through from the BSSC. These
lines are entered as costed line items (ZPM3).
Each of the costed (ZPM3) line items will contain the same set of service masters. These service masters are selected by
the contractor and effectively form the quotation. In the example below, the same two service masters (14009034 and
14006427) will be included against each of the ZPM3 operational lines (20, 30 and 40 in the image above).
UNCLASSIFIED
Garrison and Estate Management System 32
BSC Manual
All work orders created and any subsequent updates are sent via the CIX these transports logged in GEMS with the date
and time sent. It is important to note that acknowledgements of receipt of data are also logged. This confirms the
connectivity and that data has been sent successfully from one system to the other.
For the latest technical specifications relating to the CIX please refer to the most recent published CIX Application guide.
Releasing a Work Order is effectively the authority to proceed with the work. The status ‘REL’ will be displayed in the
System Status field on the Work Order.
• BSSC releases the Work Order where it is covered under the fixed fee or is volumetric in nature
• System auto-release where a Survey and Quote is submitted for Product Director approval that is under the
service threshold amount
• Product Director approves a Survey and Quote or Alternate Proposal.
ZM01 Work Orders – User status doesn’t change, i.e. stays as ‘INIT’, BSSC RELeases the Work Order
ZM01 Alternate Proposal Work Orders – User status will be APRO, requires Product Director approval
ZM04 Work Orders (volumetric or covered under the fixed fee) - User status doesn’t change, i.e. stays as ‘INIT’, BSSC
RELeases the Work Order
ZM04 Survey & Quote Work Orders – User status will be SVNQ, can be automatically released if under the applied
threshold, otherwise requires Product Director approval.
Validate with the BSSC first – ascertain if it is a data entry error or a technical issue
Technical issue
• Ascertain if the technical issue is GEMS or the contractor system
• If the issue is with the contractor system then take internal action to fix, advise the SDD GEMS team and the
GEMS Sustainment team if the issue has any impact to GEMS or business continuity.
• If the issue is with GEMS then log a request through to the GEMS Sustainment team. Advise the SDD GEMS
team if any impact to business continuity.
UNCLASSIFIED
Garrison and Estate Management System 33
BSC Manual
Documentation / Attachments
The BSSC is not currently required to store documents in Objective, nor are they required to include an Objective link in
the Notification within GEMS.
In all instances, any documents received by the BSSC must be emailed to the appropriate party, i.e. contractor and in a
timely manner to align with the despatch of the Work Order.
There is no provision in the CIX for attached documents.
All documents received are to be retained and managed by the relevant contractor and is subject to contractual
requirements, Commonwealth policy and legislation.
Note: the BSSC may hold these documents for the purpose of initiating the request or dealing with enquiries, however
there is no requirement of the BSSC for retention beyond that.
UNCLASSIFIED
Garrison and Estate Management System 34
BSC Manual
Confirmation Process
On completion of work, the Base Service contractor provides work completion documents via CIX. These documents
include:
• Work order confirmation along with actual effort in appropriate unit of time and/or materials.
• Technical completion of work order
• Measurement documents against applicable measurement points to provide information about the actual
condition against target or measurement information for a functional location or equipment
• Service entry sheet for services that generate payment:
o customer paid services, including non-Defence customer recoverable services
o survey and quote services
o requested services against labour and/or material rate schedules.
The Base Services contractor is required to lodge work order confirmations for every completed work order, and service
entry sheets only for those work orders that generate payment.
The PD is required to review and accept the service entry sheets. Once a service entry sheet has been accepted a
recipient created tax invoice (RCTI) is automatically generated.
Work order operation confirmation is used for capturing service activities and delivery times for contractor performance
reporting. That is, it captures the actual against the planned resources in the operation being confirmed.
An operation can be confirmed multiple times until its final confirmation; which is achieved when selecting the ‘Final
Confirmation’ checkbox.
Rate of Effort
Base Services contractors are required to provide information on rate of effort and other measurement information as
specified in the contract.
One way Base Services contractors may be required to provide this data is by providing the rate of effort in work order
confirmations. For example, under an Access Control contract, the Base Services contractor may provide the rate of effort
associated with the provision of Access Control under the monthly fixed fee.
These confirmations may be provided on a daily, weekly, or monthly basis, and multiple confirmations may be provided
against a single work order to provide the level of data required for analysis of the services delivered under the contract.
UNCLASSIFIED
Garrison and Estate Management System 35
BSC Manual
Under development
This is a scheduled work order generated for the monthly capture of rate of effort (ROE) data requirements as required in
the Base Services Contracts (Schedule 2 Statement of Works)
• Time confirm ‘0’ quantity
• On each ‘ROE’ service master activity applicable – enter ROE figures
• Set final confirmation status flag (this should automatically set system status to ‘CNF’)
For more detail on ROE requirements please refer to the Resources section of this document.
Under development
UNCLASSIFIED
Garrison and Estate Management System 36
BSC Manual
An electronic confirmation of the completion of work is received and the Base Services contractor marks the work order
as Technically Complete.
Where the work delivery results in a payment to the Contractor (ie the task is not covered under a fixed fee), the
Contractor will provide a service entry sheet via the CIX interface.
The PSM will review and accept the service entry. Approval of the Service Entry Sheet will trigger the creation of a
Recipient Created Tax Invoice (RCTI) and result in a payment to the contractor.
The work settlement occurs automatically through a Defence SAP generated periodic batch process. Finally, the work
order is marked as ‘Business Close’ automatically on a periodic basis.
Each work order contains a system generated settlement rule for the final posting of costs to a settlement receiver. This
credits the order removing all liability and debits the receiving cost centre.
Work order settlement will generally be an automated process. A work order settlement can be executed using
transaction KO88. Generally work order settlement will not occur until final completion of all planned works within the
order. At final settlement the work order is credited and the final cost receiver debited removing all liability from the work
order as cost object.
UNCLASSIFIED
Garrison and Estate Management System 37
BSC Manual
a) the customer to follow up on a service request that has not been completed, or
b) for the Base Services contractor to seek approval from the Product Director to agree to a change (or delay) in
service delivery or maintenance outside standard delivery requirements.
The escalation task will trigger a workflow to notify the Base Services contractor or Product Director that follow up action
is required. Please refer to the relevant business rules when processing escalation tasks.
UNCLASSIFIED
Garrison and Estate Management System 38
BSC Manual - Forms
Forms
Purpose
The AE547 Service Request form is a PDF webform and is for requesting a Base Service.
The form is to be used for requesting services within the scope of the Base Services Contracts only.
The form can only be completed and submitted via the Defence Restricted Network (DRN) or DSTG Protected
Research Network (PRN).
The form is NOT for requesting Emergency, Immediate and Urgent requests or any requests requiring delivery
within 7 calendar days. These must be telephoned through to the BSSC.
If the request is for multiple locations then a separate form should be submitted for each location.
Multiple services can be selected on the same form but may result in multiple Notifications and Work Orders
being raised.
The form may contain attachments, either embedded in the form or attached to the email. Where applicable,
these attachments should be provided to the relevant service provider.
For Reprographics, customers are to complete form CX 020-1 – Publishing Information Management System
(PIMS) Reprographic Request.
The form is NOT to be used for asset requests that are not covered under the Base Services contracts. The
Estate Services Supported Asset Request (ESSAR) is to be used for these requests. Business rules and
guidance is found in the ESSAR form.
The form is NOT for lodging complaints. All Base Services complaints should be telephoned to the BSSC.
Future plans
This form is to be superceded by the GEMS Customer portal.
Form owner
DBSMIC is the form owner and developer. Any issues or suggestions for improvement can be advised directly to
the DBSMIC Group Email box –
mailto:eigservicedelivery.dbsmic@defence.gov.au?subject=AE547 Service Request Form
The form and any information contained therein remains the property of the Commonwealth.
UNCLASSIFIED
Garrison and Estate Management System 39
BSC Manual – Forms Sept 2017
Quotation Form
Purpose
The Quotation form is an excel spread-sheet form and is for use by Base Services Contractors when providing
quotations for customer pays requests.
The form should only be used for customer pays quotations only (once transitioned to the Defence SAP
environment). All E&IG pays quotations will be submitted and approved within Defence SAP.
Base Services Contractors complete and submit the form directly to the customer requesting the service to obtain
their approval.
BSSC is not responsible for completing the form or actioning anything relating to the quotation other that creating
and releasing the Work Order (Quote Required status).
The BSSC may be requested to provide the form to Base Services providers upon request.
If the request is for multiple locations then a separate form should be used for each location.
Only one service is applicable per form although multiple activities can be itemised and costed.
Upon obtaining customer approval (Defence), a Cost Centre or WBS code must be given prior to proceeding with
the delivery of the service.
Upon obtaining customer approval (non-Defence), billing details must be given prior to proceeding with the
delivery of the service.
Form owner
DBSMIC is the form owner and developer. Any issues or suggestions for improvement can be advised directly to
the DBSMIC Group Email box –
eigservicedelivery.dbsmic@defence.gov.au
The form and any information contained therein remains the property of the Commonwealth.
UNCLASSIFIED
Garrison and Estate Management System 40
BSC Manual – Auto Release Thresholds
Auto release thresholds are dollar values applied (at the service line level) that provides a permit and automatic release
up to the threshold dollar value of a Work Order quotation that has been submitted via the CIX (with QAPR status).
This helps reduce the rate of effort required of the Product Directors in needing to approve S&Q work orders and provides
an immediate release of the Work Order to enable the contractor to proceed.
Column C Column F
PD Service Line Auto-release Threshold Auto-release Threshold
E&IG pays Customer pays
DBSO Access Control TBC Nil
DLOG Fire Fighting Not Required by PD Nil
DLOG Aircraft Refueling Not Required by PD Nil
DLOG Airfield Ops Support $3,000 $10,000
DLOG Retail Stores Under Review by PD $10,000
DLOG Petrol Oils and Lubricants Not Required by PD Nil
DLOG Transport $3,000 $10,000
DLOG Reprographics and Printing Not Required by PD $10,000
DHRS Housekeeping TBC $10,000
DHRS Hospitality and Catering $1,000 $10,000
DHRS Laundry and Dry Cleaning $1,000 $10,000
DHRS Sport and Recreation $1,000 $10,000
DBSMIC Base Services Support Centre Not Required by PD Nil
DBSMIC Commercial Operations Not Required by PD Nil
DEEESD Cleaning $3,000 $3,000
DEEESD Land Management $1,500 $1,500
DEEESD Pest and Vermin $500 $500
DEEESD Waste Management $10,000 $10,000
DEPU Estate Upkeep Not required by PD Nil
DOTAM Training Area Management TBC by PD $10,000
UNCLASSIFIED
Garrison and Estate Management System 41
BSC Manual - Frequently Asked Questions
• Once despatched, can the BSSC see my Notification and Work Order in SAP?
Yes, however the BSSC will not be able to see any costing details relating to any other contractor work orders. The
BSSC will be able to change the status and other details such as end date, add further description in the long text,
escalations, etc.
Work Orders are received via the CIX and will either be ‘Released’ to proceed or will require a ‘Survey and Quote’
(S&Q). In the case of S&Q the BSSC will update the status to SVNQ QREQ and save (not release) which triggers
the despatch via the CIX. In each instance, the BSSC will create the Work Order with a non-costed placeholder
Operation Line.
Where documents are provided to the BSSC, the BSSC is not currently required to store them in Objective.
In all instances, any documents received must be emailed to the appropriate party.
There is no provision in the CIX for attached documents.
• Work order changes: can the dates, etc be adjusted after it has been released?
The BSSC (and Contractor via the CIX) can update most fields in the Notification and Work Order after it has been
released (or sent for S&Q) but only before it has been completed in the system. Examples include - changes to the
description, start/end dates and status. One point to raise though - the BSSC could potentially send through an
updated Work Order that is currently being updated (with price information for example) in the contractor system. In
this case the information entered in the contractor system would be overwritten by the update from GEMS.
• What are Task Lists in the context of what the BSSC use to assist with the creation of Work Orders?
We have implemented the use of the task list functionality of the system to assist the BSSC in populating place holder
details in the Operation Line of the Work Order. Typically the BSSC will select the appropriate service line (Task) and
then choose the operation line, a choice of either Reactive or S&Q. This place holder line will always be a non-costed
line and automatically populate fields such as the material group, vendor and service.
The BSSC have a basic understanding and have been provided the Product Director business rules that assists with
providing guidance. The BSSC may not always get this right therefore it is up to the Contractor to be diligent when
receiving Work Orders.
Multiple Notifications/Work Orders that are ‘linked’ should be referenced to the original request. In the instance where
some coordination is required (under the MIC deliverable) then the original Notification and Work Order should be
raised against the MIC service line and all subsequent Notifications and Work Orders raised should reference the
original MIC Notification and Work Order.
Estate data in GEMS only has a representation of Defence assets, either owned or leased. There are no
miscellaneous or dummy functional locations. All Notifications must therefore be raised against an existing functional
location record. This is important as it ties to the service masters/contract rates. When raising it, the BSSC will
generally raise the Notification against the where they think the service will be delivered from or the nearest Defence
functional location. The actual delivery location details however must be clearly stated in the long text description of
the Notification. The BSC should review and amend the functional location if it should be assigned a more
appropriate location.
UNCLASSIFIED
Garrison and Estate Management System 42
BSC Manual - Frequently Asked Questions
Yes. The Contractor can cancel the Work Order in the Contractor system and update GEMS via the CIX.
Alternatively the BSSC can cancel it. Note that the reason for cancellation is to be provided in the Long text
description field and the customer is always to be kept informed.
• If a Work Order is released can it be changed back to S&Q? Likewise, if a Work Order is raised as S&Q can it
be changed back and released?
Once a Work Order is released it cannot be changed back therefore a subsequent Notification and Work Order will
need to be raised (referencing the original).
Where a Work Order is not yet released the status can be changed back to “INIT” (from SVNQ) and ‘Released’.
GEMS will default to Routine Priority with the Start Date as the date raised
Emergency = + 24 hours
Immediate = + 24 hours
Urgent = + 48 hours
Routine = + 28 days
For ‘Specified’, the End Date and Time is used for identifying the date and time required for the delivery of the
service.
If timeframes need to be adjusted at any point then that is possible (can be done from the Contractor system or
directly in GEMS), particularly in cases where the approval has occured after the planned end date. Also where a
timeframe cannot be met (for whatever reason) then an escalation can be raised.
If the privately funded event is endorsed by Defence as an official event then these are handled via the customer
pays process.
Other non-Defence activities should be by arrangement directly with the Contractor and not recorded and managed
through GEMS, however it is advised that the Contractor should seek Product Director advice on a case-by-case
basis.
The ‘Priority’ and ‘Basic End Date’ determines the date (and time) for practically completing the service. There is no
inbuilt ‘make safe’ dates and times therefore this is not recorded and tracked in GEMS.
These can be raised the next available working day however, the start and end dates cannot be backdated. The long
text description is to contain appropriate details of the after-hours call times, etc.
There is no impact on GEMS apart from the operation line with the quotation may be for a true S&Q rather than using
the labour rate or task schedule. GEMS does not keep any records of subcontractor activities as this is all managed
in the contractor systems.
UNCLASSIFIED
Garrison and Estate Management System 43
BSC Manual - Frequently Asked Questions
Where it has been agreed with the relevant Product Director, Contractors can seek approval for an extension of time
via the escalation process – refer Business Rule RR005. The BSSC will create the escalation record on behalf of the
contractor.
This is dependent on the error, however there should always be attempts made to correct the error by the Contractor
in the first instance and if not able to be fixed then the Contractor should seek assistance from GEMS Sustainment.
Throughout the deployment phases the contractors can seek advice from the SDD GEMS readiness team or from the
GEMS Project Business Analysts.
There is no provision for comparative quotes to be recorded in GEMS. The quotation provided in GEMS must be
assessed by the Contractor as the best value for money to Defence. If Defence wish to view comparative pricing to
assess the contractor compliance to Commonwealth procurement requirements then this will need to be viewed off
system.
Single quotations can be broken down in various ways and can contain a lot of detail. Although Work Orders are
created for a single functional location they can contain multiple operation lines (up to 99) and multiple activities. If
there is a requirement for multiple buildings on a property then the Work Order could be raised against the property
and each building specified in the functional location field on the operation lines. The preference however is to raise
the Work at the building level and this is generally how you will receive them from the BSSC.
Briefly, the customer pays process requires the quotation form to be completed and signed by the customer.
Although the BSSC may be able to obtain customer codes this is not always possible therefore it is up to the
contractor to ensure these are obtained and entered in. All quotations still require the submission through GEMS in
which the normal GEMS workflows apply.
This will need to be corrected by the contractor and then updated back via the CIX. PDs may reject.
Reactive = Responsive requests from customers that are covered under the fixed fee, most likely to be related to an
existing service.
Fixed Fee = scheduled monthly work order (managed by CAS) that needs to be confirmed and SES submitted. This
is the monthly fees for the service.
Survey and Quote = Responsive requests from customers that are not covered under the fixed fee, likely to be
related to a new requirement.
An additional Work Order needs to be created and referenced to the original Work Order – contact the BSSC to
create the placeholder. The original Work Order is confirmed for the original amount with a description explaining it
has exceeded the original quote which is included in the subsequent Work Order. The subsequent Work Order
needs to follow the workflow processes for the submission of the balance amount (quotation approval) and confirmed
accordingly. Assuming the full amount is to be charged then SES is submitted for both Work Orders.
In circumstance as explained above and whenever there is a follow on Work Order Required. Referenced Work
Orders can also be created where there is a requirement for multiple services. For example a large activity may
require EMOS coordination of catering, waste, transport, etc so there should be one original request (MIC service)
with multiple requests (for catering, waste, transport) referenced to that original request.
UNCLASSIFIED
Garrison and Estate Management System 44
BSC Manual - Frequently Asked Questions
Note: We are using the Revision field in the Work Order to associate (and report) on Exercises.
Yes. Automated system messages will be sent to Requestors at various Work Order status values. These are listed
in the Resources section of the manual.
• Can any changes be made to an existing Notification via the customer self service portal?
No. The customer can only raise the initial Notification and look up the status of Notifications. Any amendments will
need to be called through to the BSSC. Alternatively, if the Work Order has been despatched then the BSC can
make amendments (conditional on circumstances) via their systems (which in turn will update GEMS via the CIX).
• When will we know the customer cost centre codes? Is there a generic customer cost centre code in
GEMS/SAP for non-defence customers or do we have to set-up each non-defence customers in GEMS/SAP, if
latter, what’s the process?
Where possible we expect the BSSC to try and get the codes from the customer otherwise it is the provider's
responsibility when liaising with the customer and obtaining their approval (via the Quotation form). These codes are
entered into the contractor system and should come across via the CIX into GEMS. GEMS has a validation check,
i.e. they will need to be a valid code. There is no generic customer cost centre codes, they must be legitimate codes.
For non-defence customers it is imperative the full customer details (address, etc) are entered as Defence will use
this information to generate an invoice to the customer.
• Is the Notification auto-populated if the request is received via an AE547 form? What if certain mandatory
fields are not filled in by the requestor?
The AE547 is not electronically uploaded therefore manual data entry is required. The AE547 has mandatory fields
and if not populated will not allow the user to proceed. That said, the quality of the information may not always be
enough in which case we expect the BSSC to call the requestor.
• What is the difference in how S&Q vs fixed fee requests are raised?
Requests covered under the fixed fee are deemed as non-costed and do require approval to proceed therefore they
can be released immediately by the BSSC. The BSSC will not need to change the User Status therefore it will remain
as “INIT”.
S&Q requests are also raised as non-costed by the BSSC, however they require quoting prior to approval and are
therefore NOT released. The BSSC will change the status to “SVNQ” and “QREQ” and save the Work Order. This
action triggers the despatch via the CIX where the costed lines can be entered in the Work Order via the Contractor
system.
Work orders are required to be confirmed before being technically closed. The confirmation captures the rate of
effort required to complete each operational line item within a work order. Please refer to the CIX user guide and
the BSC manual for further details.
UNCLASSIFIED
Garrison and Estate Management System 45
BSC Manual - Frequently Asked Questions
• Does the work order quote rejection reason get sent to the contractor?
Yes. When a Product Director rejects a quote (either ‘Reject’ or ‘Reject and Re-quote’) it is mandatory for a reason
to be entered. This reason is transported via the CIX to the contractor system and is also appended to the long text
description on the Work Order.
UNCLASSIFIED
Garrison and Estate Management System 46
BSC Manual – Resources
Resources
UNCLASSIFIED
Garrison and Estate Management System 47
BSC Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 48
BSC Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 49
BSC Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 50
BSC Manual – Resources
Email to
Status Name Abbreviation Description
Requestor?
System Status
On Hold OHLD
UNCLASSIFIED
Garrison and Estate Management System 51
BSC Manual – Resources
Email to
Status Name Abbreviation Description
Requestor?
Quote Approved Set in response to the approver approving the Yes
QAPP quote provided.
UNCLASSIFIED
Garrison and Estate Management System 52
BSC Manual – Resources
User Status
Requested Remains with this status unless On Hold, Rejected
RQST
or Cancelled
On Hold OHLD Request on hold
Rejected Request not proceeding, Rejected. This would
usually be as a result of the request not under the
REJC
scope of E&IG products & services or not a valid
request.
Cancel CANC Request not proceeding, Cancelled. Service no
longer required.
Table 4.1: Notification Status Values
UNCLASSIFIED
Garrison and Estate Management System 53
BSC Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 54
BSC Manual – Resources
Service Categories
Activity
Service Service Category
Intended Use Number
Categories Description
Series
ZACT Service: Activity Activity that requires monitoring with number and dollar 10******
values
ZLRS Service: LRS/TRS Agreed labour rate / task rate services 140*****
ZPAR Service: Parameters Agreed Service Parameters 141*****
ZSRD Service: Service Delivery Delivery table 15******
ZROE Service: Rate Of Effort Rate Of Effort - Non financial statistics 16******
ZSUR Service: Survey and Quote tbc 19******
ZZPR Service: Priced Item Agreed pricing schedule (fixed and volumetric) 30******
ZAUD Service: Audit Statement of Work audit information (Future Build) N/A
ZCOM Service: Compliance N/A N/A
ZCON Service: Conformance N/A N/A
ZCTR Service: Control framework N/A N/A
ZDOC Service: Documents N/A N/A
ZPER Service: Performance N/A N/A
ZPRO Service: Product Delivery N/A N/A
ZREM Service: Remediation N/A N/A
ZREP Service: Reporting N/A N/A
ZSSD Service: Service Sub Dlv N/A N/A
ZVAR Service: Variance N/A N/A
Table 4.4: Service Masters
UNCLASSIFIED
Garrison and Estate Management System 55
GEMS User Manual – Resources
Summary
ROE % of ROE
Reporting Reportng QLD SNSW Vic/Tas CW NNSW
PD Service Line Reporting items by
Frequency level Locations Locations Locations Locations Locations
items (IBIS) Total
DLOG Transport
4 Monthly Property 1.8% 9 7 10 13 9
UNCLASSIFIED
Garrison and Estate Management System 56
GEMS User Manual – Resources
Detail
Activity Base
Service Line Number Description Unit
Access Control Alarm Activations & Responses - Security EA
Access Control Alarm Activations & Responses - Fire EA
Access Control Issue Permanent Defence identity or access cards EA
Access Control Issue Temporary Defence Access cards EA
Access Control Issue Local Secure Area Passes EA
Access Control Response to Incidents EA
Provide Additional Access Control Guards to meet increased
Access Control Defence Security requirements EA
Access Control Issue Keys - Normal Hours EA
Access Control Issue Keys - Afer Hours EA
Access Control Conduct Safety Inductions EA
Access Control Issue Defence Drivers Licences EA
Access Control Mobile Patrols - Km Travelled KM
Aircraft Refuel & FF 16001000 Assistance Request-Normal Hours EA
Aircraft Refuel & FF 16001001 Assistance Request-After Hours EA
Aircraft Refuel & FF 16001002 Fuel Spills EA
Aircraft Refuel & FF 16001003 External Deployment-Duration EA
Aircraft Refuel & FF 16001004 External Deployment-Personnel Deployed EA
Aircraft Refuel & FF 16001005 External Deployment-Tankers used EA
Aircraft Refuel & FF 16001006 Alarm activations Attended EA
Aircraft Refuel & FF 16001007 Bush firefighting incidents Attended EA
Aircraft Refuel & FF 16001008 HAZMAT/HAZCHEM incidents Attended EA
Aircraft Refuel & FF 16001009 Heavy Vehicle Crew Rescue EA
Aircraft Refuel & FF 16001010 Emergency responses(exclAlarmActivation) EA
Aircraft Refuel & FF 16001011 Civil Fire-fighting Agency Approached EA
Aircraft Refuel & FF 16001012 Fire Encroaches-neighbouring properties EA
Aircraft Refuel & FF 16001013 Emergency responses Exercises EA
Aircraft Refuel & FF 16001014 Training Attendees EA
Aircraft Refuel & FF 16001015 Training Courses EA
Aircraft Refuel & FF 16001016 ARFF incidents Responded EA
Aircraft Refuel & FF 16001017 SRFF incidents Responded EA
Airfield Operations Support Departures During Normal Hours
Airfield Operations Support Departures Outside Normal Hours
Airfield Operations Support Arrivals During Normal Hours
Airfield Operations Support Arrivals Outside Normal Hours
Airfield Operations Support Passengers Arriving During Normal Hours
Airfield Operations Support Passengers Departing During Normal Hours
Airfield Operations Support Passengers Departing Outside Normal Hours
Airfield Operations Support Passengers Arriving Outside Normal Hours
Base Services Support Centre 16001199 Average Call Duration MIN
Base Services Support Centre 16001200 Average Waiting Duration MIN
Base Services Support Centre 16001201 Total Calls EA
Base Services Support Centre 16001202 Calls answered at or after 10 Minutes EA
UNCLASSIFIED
Garrison and Estate Management System 57
GEMS User Manual – Resources
Base Services Support Centre 16001203 Calls Aborted by Caller after 10 Minutes EA
Base Services Support Centre 16001204 Customer Surveys Conducted EA
Base Services Support Centre 16001205 Complaints Registered from Survey EA
Base Services Support Centre 16001206 Customer Surveys to Total Svc Reqs %
Base Services Support Centre 16001207 Complaints Registered to Total Svc Reqs %
Housekeeping Linen Exchange - Single Bed
Housekeeping Linen Exchange - Larger Bed
Housekeeping Doona Cover Exchange
Housekeeping Towel and Soap Provision
Housekeeping Mattresses
Housekeeping Bed Nights Available
Housekeeping Bed Nights Used
Housekeeping Occupants
Housekeeping Check In
Housekeeping Check Outs
Housekeeping No Shows
Estate Upkeep 16001233 Cost of Materials used PU
Hospitality and Catering 16001018 Beer/Cider - Full Strength 285 ml Glass EA
Hospitality and Catering 16001019 Beer/Cider - Full Strength 330 ml Bottle EA
Hospitality and Catering 16001020 Beer/Cider - Full Strength 345 ml Bottle EA
Hospitality and Catering 16001021 Beer/Cider - Full Strength 345 ml can EA
Hospitality and Catering 16001022 Beer/Cider - Full Strength 355 ml Bottle EA
Hospitality and Catering 16001023 Beer/Cider - Full Strength 375 ml Bottle EA
Hospitality and Catering 16001024 Beer/Cider - Full Strength 375 ml can EA
Hospitality and Catering 16001025 Beer/Cider - Full Strength 425 ml Glass EA
Hospitality and Catering 16001026 Beer/Cider - Full Strength Litres LI
Hospitality and Catering 16001027 Premium Beer - Low Alcohol 330 ml Bottle EA
Hospitality and Catering 16001028 Premium Beer - Low Alcohol 375 ml Bottle EA
Hospitality and Catering 16001029 Premium Beer - Low Alcohol Jug EA
Hospitality and Catering 16001030 Premium Beer - Low Alcohol Litres LI
Hospitality and Catering 16001031 Low Strength Beer 330 ml Bottle EA
Hospitality and Catering 16001032 Low Strength Beer 355 ml Bottle EA
Hospitality and Catering 16001033 Low Strength Beer 375 ml Bottle EA
Hospitality and Catering 16001034 Low Strength Beer Litres LI
Hospitality and Catering 16001035 Wine 150 ml Wine Glass EA
Hospitality and Catering 16001036 Wine Litres LI
Hospitality and Catering 16001037 Prem Beer - Full Strength 330 ml Bottle EA
Hospitality and Catering 16001038 Prem Beer - Full Strength 345 ml Bottle EA
Hospitality and Catering 16001039 Prem Beer - Full Strength 355 ml Bottle EA
Hospitality and Catering 16001040 Premium Beer - Full Strength 440 ml can EA
Hospitality and Catering 16001041 Premium Beer - Full Strength Litres LI
Hospitality and Catering 16001042 Fortified Wine Port/Sherry 30 ml Nip EA
Hospitality and Catering 16001043 Fortified Wine Port/Sherry 60 ml Glass EA
Hospitality and Catering 16001044 Fortified Wine Port/Sherry 750 ml Bottle EA
Hospitality and Catering 16001045 Fortified Wine Port/Sherry Litres LI
UNCLASSIFIED
Garrison and Estate Management System 58
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 59
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 60
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 61
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 62
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 63
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 64
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 65
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 66
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 67
GEMS User Manual – Resources
UNCLASSIFIED
Garrison and Estate Management System 68
BSC Manual – Glossary
Glossary of Terms
This glossary provides definitions for many of the new terms and concepts introduced with GEMS SAP.
Term Definition
ABC Indicator Used to identify dollar thresholds for cost control
approval process.
UNCLASSIFIED
Garrison and Estate Management System 69
BSC Manual – Glossary
B.O.M. - Bill of Materials A bill of materials is a list of the raw materials, sub-
assemblies, intermediate assemblies, sub-components,
parts and the quantities of each needed to manufacture
an end product.
Building A functional location within the Estate Hierarchy
designated by the two letter prefix ‘BU’. For example;
BU 30/1111
Building Level A functional location within the Estate Hierarchy
designated by the two letter prefix ‘BL’. For example;
BL 30/1111/2.
Contract
Control Key A system value used to indicate if a work order will
attract a fee over and above the standard fixed fee
arrangement. Relevant values are;
ZPM3 – Cost Relevant Base Services
ZPM4 – Non-Cost Relevant Base Services
Customer
D.C.L .Defect Correction Limit An agreed upon dollar value threshold beyond which
the contractor will be reimbursed. For example, if the
DCL is $5000 and the cost to repair is $7000 then the
contractor may claim reimbursement for $2000.
UNCLASSIFIED
Garrison and Estate Management System 70
BSC Manual – Glossary
UNCLASSIFIED
Garrison and Estate Management System 71
BSC Manual – Glossary
Match Code Button Used to search for data within the selected field.
Material Group Used to group together services with the same attributes
into a common group.
For example, 72100000 = Estate Upkeep Services
Main Work Centre A value used to identify the Base Service Contractor by
service/region.
Measurement Document The mechanism by which measuring point data is
captured and entered into the GEMS SAP system.
Measuring Point A measuring point is created against a functional
location or equipment in the estate hierarchy to define
target functionality or provide a mechanism to collect
measurement information required under the contract.
The Base Services contractor subsequently provides
measurement documents to capture the actual
functionality or measurement against the measuring
point.
Message Address Details of the contact person whom the contractor
should contact in relation to completing the work order.
Message address details are populated by clicking the
message address button when the notification is created.
M.W.P.A. Minor Workplace Low value new work (not maintenance) up to the value
Adjustment of $5,000 (excluding GST) including but not limited to:
• moving items (e.g. partitions, workstations,
power points, whiteboards),
• installing additional items (e.g. power points,
mounting picture rails and whiteboards) and
• replacing locks with those with a specified
function.
Notification The first of two documents created in response to a
service request. The notification contains details on who
is raising the request, where the request is needed,
priority and specific details/description. A work order is
the follow-on document from a notification.
Notification Type A preconfigured value used to define different types of
notifications. Values are:
Z1: Responsive Maintenance
Z2: Scheduled Maintenance
Z4: Requested Service
Notification Status A system generated code, up to four letters long, used to
indicate the status of the notification. Common values
include (but are not limited to):
OSNO: Notification has not yet been started
ORAS: Notification attached to a work order
NOPR: Notification is in process.
Object Address The Object Address is derived from the address details
assigned to the functional location or equipment
referenced in the Notification.
UNCLASSIFIED
Garrison and Estate Management System 72
BSC Manual – Glossary
UNCLASSIFIED
Garrison and Estate Management System 73
BSC Manual – Glossary
UNCLASSIFIED
Garrison and Estate Management System 74
BSC Manual – Glossary
UNCLASSIFIED
Garrison and Estate Management System 75