You are on page 1of 4

UNIVERSITY OF MUMBAI

M.Sc. (Part – II) INFORMATION TECHNOLOGY Semester III (Practical) Examination


DECEMBER – 2014
COURSE - PSIT3P3A

Candidate No: ________ (Virtualization)

1. Implement VmwareEsxi for virtualizing the two servers the server hdd should not 20
occupy the hdd space at the time of creation
2. Identify and implement various components for providing the consolidate 20
processing capacity using UCS simulator.(HINT: Fabric creation is expected)
3. Journal 5
4. Viva 5

UNIVERSITY OF MUMBAI
M.Sc. (Part – II) INFORMATION TECHNOLOGY Semester III (Practical) Examination
DECEMBER – 2014
COURSE - PSIT3P3A

Candidate No: ________ (Virtualization)

1. Implement virtualization of server using Hyper-V and create /manage the virtual 20
machine
2. A 10K rpm drive is rated to perform 130 IOPS and a15 k rpm drive is rated to 20
perform 180 IOPS for an application the read/write ratio is 3:1 compute the RAID-
adjusted IOS for 10k and 15 K drives for RAID 1, RAID 5 also demonstrate the
solution on NAVISPHERE simulator i.e creation of LUN, assigning the LUN to a
server.
3. Journal 5
4. Viva 5
UNIVERSITY OF MUMBAI
M.Sc. (Part – II) INFORMATION TECHNOLOGY Semester III (Practical) Examination
DECEMBER – 2014
COURSE - PSIT3P3A

Candidate No: ________ (Virtualization)

1. Manage XEN server with XEN center perform creation of virtual machines and 20
manage it accordingly
2. 20

In given topology create VLAN between the switches to get basic connectivity.
The VLAN bet DLS1 , DLS 2,ALS1,ALS2 should persist to that port on switch and
its neighboring switch
(NOTE: it is advised to use GNS3 in case of SWITCH IOS is not available
students are permitted to use ROUTER IOS all functions of switching are
possible.To ensure the connectivity utilities like ping, cdp are permissible)
3. Journal 5
4. Viva 5
UNIVERSITY OF MUMBAI
M.Sc. (Sem III) INFORMATION TECHNOLOGY (Practical) EXAMINATION
December - 2014
COURSE - PSIT3P3A

Candidate No: ________ (Virtualization)

1. Identify and implement various components for providing the consolidate 20


processing capacity using UCS simulator.(HINT: Fabric creation is expected)
2. 20

Configure Layer 2 EtherChannels on all inter-switch links between DLS1 &


DLS2, DLS1& AlS1, and DLS1 & ALS2.Use Port-Channel numbers 12, 13,
and 14 respectively.These links should not use dynamic Ether Channel
egotiation
(NOTE: it is advised to use GNS3 in case of SWITCH IOS is not available
students are permitted to use ROUTER IOS all functions of switching are
possible to ensure the connectivity utilities like ping , cdp are permissible)
3. Journal 5
4. Viva 5
UNIVERSITY OF MUMBAI
M.Sc. (Part – II) INFORMATION TECHNOLOGY Semester III (Practical) Examination
DECEMBER – 2014
COURSE - PSIT3P3A

Candidate No: ________ (Virtualization)

1. Identify and implement various components for providing the consolidate 20


processing capacity using UCS simulator.(HINT: Fabric creation is expected)
2. An application has 1000 heavy users at a peak of 2IOPS and 2000 typical users at 20
apeak of 1 IOPS each with read write ratio of 2:1 .there is apossibility of overhead
of 20 percent for other workloads calculate IOPS for RAID 1 and RAID 5 also
demonstrate the solution on NAVISPHERE simulator i.e creation of LUN,
assigning the LUN to a server.
3. Journal 5
4. Viva 5

UNIVERSITY OF MUMBAI
M.Sc. (Part – II) INFORMATION TECHNOLOGY Semester III (Practical) Examination
DECEMBER – 2014
COURSE - PSIT3P3A

Candidate No: ________ (Virtualization)

1. Implement VmwareEsxi for virtualizing the two servers the server hdd should not 20
occupy the hdd space at the time of creation this task is to be performed using
VMware vSphere Web Client
2. Identify and implement various components for providing the consolidate 20
processing capacity using UCS simulator.(HINT: Fabric creation is expected)
3. Journal 5
4. Viva 5

You might also like