ROUTE SURVEYING

EARTHWORKS
Intended Learning Outcomes
1. Identify the methods in
calculating the area and volume
of cross sectional area for
earthworks
Intended Learning Outcomes

2. Determine the various types of


cross sectional areas used in
calculating areas and volumes
of earthworks
EARTHWORKS
Earthworks

Excavation
Earthworks

Embankment
Earthworks

Volume
Volume of Earthworks

𝐿
𝑉𝑒𝑛𝑑 = 𝐴1 + 𝐴2
2

End Area Method


Volume of Earthworks

𝐿
𝑉𝑝 = 𝐴1 + 4𝐴𝑚 + 𝐴2
6

Prismoidal Formula
Volume of Earthworks

𝑉𝑝 = 𝑉𝑒𝑛𝑑 − 𝐶𝑣

Prismoidal Formula
Volume of Earthworks

𝐿
𝐶𝑣 = 𝑐2 − 𝑐1 𝑑2 − 𝑑1
12

Prismoidal Correction
Earthworks

Area
AREA
COMPUTATIONS
Area Computations

Counting Squares
Method
Area Computations

Geometric
Method
Geometric Method

𝑏ℎ
𝐴=
2

Area of a Triangle
Geometric Method

2𝐴 = 𝑏ℎ

Double Area of a Triangle


Geometric Method

𝑏1 + 𝑏2
𝐴=ℎ
2

Area of a Trapezoid
Geometric Method

2𝐴 = ℎ 𝑏1 + 𝑏2

Double Area of a Trapezoid


EXAMPLE
#1
Geometric Method
Geometric Method

5.7 x 4.0
= 22.8m 2

2A of Triangle AJK
Geometric Method

5.2 x (5.7+6.0)
= 60.8m 2

2A of Triangle ABJ
Geometric Method

9.3 x (5.2+4.2)
= 87.4m 2

2A of Trapezoid BCIJ
Geometric Method

15.0 x (4.2+4.7)
= 133.5m 2

2A of Trapezoid CDHI
Geometric Method

4.8 x (4.7+1.5)
= 29.8m 2

2A of Trapezoid DEGH
Geometric Method

1.5 x 4.5
= 6.8m 2

2A of Triangle EFG
Geometric Method

22.8 + 60.8 + 87.4 + 133.5


+ 29.8 + 6.8
= 341.1m 2

Total Double Area (2A)


Geometric Method

341.1/2
= 170.5m 2

Area of the Cross Section


Area Computations

Double Meridian Distance


Method
(DMD)
Double Meridian Distance (DMD)

elevations
(latitudes)
Double Meridian Distance (DMD)

distance from centerline


(departures)
EXAMPLE
#2
Double Meridian Distance (DMD)
Double Meridian Distance (DMD)

if the path goes up, +lat.

if the path goes down, -lat.

Sign Convention for Latitudes


Double Meridian Distance (DMD)

if the path goes right, +dep.

if the path goes left, -dep.

Sign Convention for Departure


Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0
F–I -1.5 +30.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0
F–I -1.5 +30.0
I–H -1.8 +7.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0
F–I -1.5 +30.0
I–H -1.8 +7.0
H–G -0.9 -22.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0
F–I -1.5 +30.0
I–H -1.8 +7.0
H–G -0.9 -22.0
G–A +0.8 -15.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0
F–I -1.5 +30.0
I–H -1.8 +7.0
H–G -0.9 -22.0
G–A +0.8 -15.0
A–B +0.1 -5.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0
F–I -1.5 +30.0
I–H -1.8 +7.0
H–G -0.9 -22.0
G–A +0.8 -15.0
A–B +0.1 -5.0
B–C -1.1 -15.0

Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0
E–F +1.5 +30.0
F–I -1.5 +30.0
I–H -1.8 +7.0
H–G -0.9 -22.0
G–A +0.8 -15.0
A–B +0.1 -5.0
B–C -1.1 -15.0
C–D +1.9 -14.0
Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0 4.0
E–F +1.5 +30.0 38.0
F–I -1.5 +30.0 98.0
I–H -1.8 +7.0 135.0
H–G -0.9 -22.0 120.0
G–A +0.8 -15.0 83.0
A–B +0.1 -5.0 63.0
B–C -1.1 -15.0 43.0
C–D +1.9 -14.0 14.0
Total
Double Area:
Course Latitude Departure DMD Double Area (2A)
D–E +1.0 +4.0 4.0 4.0
E–F +1.5 +30.0 38.0 57.0
F–I -1.5 +30.0 98.0 -147.0
I–H -1.8 +7.0 135.0 -243.0
H–G -0.9 -22.0 120.0 -108.0
G–A +0.8 -15.0 83.0 66.4
A–B +0.1 -5.0 63.0 6.3
B–C -1.1 -15.0 43.0 -47.3
C–D +1.9 -14.0 14.0 26.6
Total 385.0
Double Area:
Double Meridian Distance

385m /2
2

= 192.50m 2

Area of the Cross Section


TYPES OF CROSS
SECTIONS
Different Cross Sections of Land
Area Computations

Three-Level
Section
Different Cross Sections of Land
Different Cross Sections of Land
Different Cross Sections of Land
EXAMPLE
#3
Three Level Section
Example #3

The following data are


cross-section notes of the
ground which will be
excavated for a roadway:
Three Level Section
Example #3

Station 4+120
8.00 0 9.20
+2.00 +3.20 +2.80

Three Level Section


Example #3

Station 4+160
9.50 0 10.70
+3.00 +2.60 +3.80

Three Level Section


Example #3

the base of the road is 10m


and the side slopes are
1.5:1

Three Level Section


Example #3
a.
find the volume of excavation
by end area method

Five Level Section


Example #3

𝑐1 𝑏
𝐴𝑟𝑒𝑎1 = 8 + 9.2 + 2 + 2.8
2 2

Three Level Section


Example #3

3.2 10
𝐴𝑟𝑒𝑎1 = 8 + 9.2 + 2 + 2.8
2 2

Three Level Section


Example #3

3.2 10
𝐴𝑟𝑒𝑎1 = 8 + 9.2 + 2 + 2.8
2 2
𝟐
𝐴𝑟𝑒𝑎1 = 𝟑𝟗. 𝟓𝟐𝒎

Three Level Section


Example #3

2.6 10
𝐴𝑟𝑒𝑎2 = 9.5 + 10.7 + 3 + 3.8
2 2

Three Level Section


Example #3

2.6 10
𝐴𝑟𝑒𝑎2 = 9.5 + 10.7 + 3 + 3.8
2 2
𝟐
𝐴𝑟𝑒𝑎2 = 𝟒𝟑. 𝟐𝟔𝒎

Three Level Section


Example #3

40
𝑉𝑒𝑛𝑑 = 39.52 + 43.26
2
𝟑
𝑉𝑒𝑛𝑑 = 𝟏𝟔𝟓𝟓. 𝟔𝒎

Three Level Section


Example #3
b.
compute the volume by
prismoidal formula

Five Level Section


Example #3
Station 4+120
8.00 0 9.20
+2.00 +3.20 +2.80

Station 4+160
9.50 0 10.70
+3.00 +2.60 +3.80
Three Level Section
Example #3
Station 4+140
Horizontal Distance
8.00+9.50 0+0 9.20+10.70
2 2 2
Vertical Distance
2.00+3.00 3.20+2.60 2.80+3.80
2 2 2
Three Level Section
Example #3

Station 4+140
8.75 0 9.95
+2.50 +2.90 +3.30

Three Level Section


Example #3

2.9 10
𝐴𝑟𝑒𝑎𝑚 = 8.75 + 9.95 + 2.5 + 3.3
2 2

Three Level Section


Example #3

2.9 10
𝐴𝑟𝑒𝑎𝑚 = 8.75 + 9.95 + 2.5 + 3.3
2 2
𝟐
𝐴𝑟𝑒𝑎𝑚 = 𝟒𝟏. 𝟔𝟐𝒎

Three Level Section


Example #3

𝐿
𝑉𝑝 = 𝐴1 + 4𝐴𝑚 + 𝐴2
2

Three Level Section


Example #3

40
𝑉𝑝 = 39.52 + 4 41.62 + 43.26
2

Three Level Section


Example #3

40
𝑉𝑝 = 39.52 + 4 41.62 + 43.26
2
𝟑
𝑉𝑒𝑛𝑑 = 𝟏𝟔𝟔𝟏. 𝟕𝟑𝒎

Three Level Section


Example #3
c.
determine the prismoidal
correction

Five Level Section


Example #3

𝐿
𝐶𝑣 = 𝑐2 − 𝑐1 𝑑2 − 𝑑1
12

Three Level Section


Example #3
𝑑1 = 8 + 9.20 = 17.2𝑚

Three Level Section


Example #3
𝑑1 = 8 + 9.20 = 17.2𝑚
𝑑2 = 9.5 + 10.7 = 20.2𝑚

Three Level Section


Example #3
𝑑1 = 8 + 9.20 = 17.2𝑚
𝑑2 = 9.5 + 10.7 = 20.2𝑚

40
𝐶𝑣 = 2.6 − 3.2 20.2 − 17.2
12

Three Level Section


Example #3
𝑑1 = 8 + 9.20 = 17.2𝑚
𝑑2 = 9.5 + 10.7 = 20.2𝑚

40
𝐶𝑣 = 2.6 − 3.2 20.2 − 17.2
12
𝐶𝑣 = −𝟔𝒎𝟑
Three Level Section
Area Computations

Special Case
Three-Level Section
Different Cross Sections of Land
Different Cross Sections of Land
Different Cross Sections of Land
Area Computations

Five-Level
Section
Different Cross Sections of Land
Different Cross Sections of Land
Different Cross Sections of Land
EXAMPLE
#4
Five Level Section
Example #4

it is required to determine the


earthwork volume on a portion
of road construction grading
work based on the following
cross-section notes:
Five Level Section
Example #4

Station 7+460
+0.32 +0.60 +1.92 +1.52 +1.32
4.14 3.50 0 3.50 6.14

Five Level Section


Example #4

Station 7+500
2.70 3.20 1.60 2.0 2.40
8.90 3.50 0 3.50 8.30

Five Level Section


Example #4
Example #4
a.
determine the area of the first
section

Five Level Section


Example #4

Area1
1 −3.5 −4.14 −3.5 0 3.5 6.14 3.5
2 0 0.32 0.60 1.92 1.52 1.32 0

Five Level Section


Example #4
Area1
−3.5𝑥0.32 + (−4.14𝑥0.6)
+ −3.5𝑥1.92 + (3.5𝑥1.32)
1
2
− 0.32𝑥 − 3.5 − (1.92𝑥3.5)
− 1.52𝑥6.14 − (1.32𝑥3.5)
Five Level Section
Example #4

Area1 = 12.63m 2

Five Level Section


Example #4
b.
determine the area of the
second section

Five Level Section


Example #4

Area2
1 −3.5 −8.9 −3.5 0 3.5 8.3 3.5
2 0 2.7 3.2 1.6 2 2.4 0

Five Level Section


Example #4
Area2
−3.5𝑥2.7 + (−8.9𝑥3.2)
+ −3.5𝑥1.6 + (3.5𝑥2.4)
1
2
− 2.7𝑥 − 3.5 − (1.6𝑥3.5)
− 2𝑥8.3 − (2.4𝑥3.5)
Five Level Section
Example #4

Area1 = 28.14m 2

Five Level Section


Example #4
c.
compute the volume of
excavation using end area
method

Five Level Section


Example #4

𝐿
𝑉𝑒𝑛𝑑 = 𝐴1 + 𝐴2
2

Five Level Section


Example #4

40𝑚
𝑉𝑒𝑛𝑑 = 12.63 + 28.14
2

Five Level Section


Example #4

𝑉𝑒𝑛𝑑 = 𝟖𝟏𝟓. 𝟒𝟎𝒎𝟑

Five Level Section


Area Computations

Irregular
Section
Different Cross Sections of Land
Different Cross Sections of Land
Different Cross Sections of Land
Area Computations

Levelled
Section
Different Cross Sections of Land
Different Cross Sections of Land
Different Cross Sections of Land
CUT AND FILL
SECTIONS
EXAMPLE
#5
Cut and Fill Section
Example #5

Given the following cross-sections:

Base for Cut = 9m Sideslope = 1:1


Base for Fill = 8m Sideslope = 1.5:1

Cut and Fill Section


Example #5

Station 3+000
5.48 0 5.00
+0.98 +3.05 +0.50

Cut and Fill Section


Example #5

Station 3+060
6.76 0 4.63
+0.98 −1.22 −0.42

Cut and Fill Section


Example #5

the base of the road is 10m


and the side slopes are
1.5:1

Cut and Fill Section


Example #5
a.
compute the volume of cut
using end area method

Cut and Fill Section


Example #5

5.05 9
𝐴𝑟𝑒𝑎1 = 5.48 + 5 + 0.98 + 0.5
2 2

Cut and Fill Section


Example #5

5.05 9
𝐴𝑟𝑒𝑎1 = 5.48 + 5 + 0.98 + 0.5
2 2
𝟐
𝐴𝑟𝑒𝑎1 = 𝟏𝟗. 𝟑𝟏𝒎

Cut and Fill Section


Example #5

1.22 8
𝐴𝑟𝑒𝑎2 = 6.76 + 4.63 + 1.84 + 0.42
2 2

Cut and Fill Section


Example #5

1.22 8
𝐴𝑟𝑒𝑎2 = 6.76 + 4.63 + 1.84 + 0.42
2 2
𝟐
𝐴𝑟𝑒𝑎2 = 𝟏𝟏. 𝟒𝟕𝒎

Cut and Fill Section


Example #5

42.86
𝑉𝑐𝑢𝑡 = 19.31
2
𝟑
𝑉𝑐𝑢𝑡 = 𝟒𝟏𝟑. 𝟖𝟏𝒎

Cut and Fill Section


Example #5
b.
find the volume of fill using
end area method

Cut and Fill Section


Example #5

60 − 42.86
𝑉𝑓𝑖𝑙𝑙 = 0 + 11.47
2
𝟑
𝑉𝑓𝑖𝑙𝑙 = 𝟗𝟖. 𝟑𝟎𝒎

Cut and Fill Section


EXAMPLE
#6
Cut and Fill Section
Example #6

From station 0+200 with center


height of 1.4m in fill, the ground line
makes a uniform slope of +5% to
station 0+260 whose center height
is 2.8m in cut.
Cut and Fill Section
Example #6

Assuming both sections to be


trapezoidal with a roadway of 10m
and side slope of 2:1

Cut and Fill Section


Example #6
a.
compute the grade of the
finished roadway

Cut and Fill Section


Example #6

1.20
𝐺𝑟𝑎𝑑𝑒𝑟𝑜𝑎𝑑 =
60

𝐺𝑟𝑎𝑑𝑒𝑟𝑜𝑎𝑑 = 𝟎. 𝟐𝟎

Cut and Fill Section


Example #6
b.
how far from station 0+200
will the filling extend?

Cut and Fill Section


Example #6

𝑥 60 − 𝑥
=
1.4 2.8

𝑥 = 𝟐𝟎𝒎

Cut and Fill Section


Example #6
c.
what is the elevation of the
section at station 0+250?

Cut and Fill Section


Example #6

𝑦 2.8
=
30 40

𝑦 = 𝟐. 𝟏𝒎

Cut and Fill Section


BORROW PIT
COMPUTATION
Borrow Pit

an area where material


(usually soil, gravel or sand)
has been dug for use at
another location
Borrow Pit

𝐴
𝑉𝑝𝑖𝑡 = ෍ ℎ1 + 2 ෍ ℎ2 + 3 ෍ ℎ3 + 4 ෍ ℎ4
4

Volume of Borrow Pit


Borrow Pit

Elevation (h1)
Borrow Pit

Elevation (h2)
Borrow Pit

Elevation (h3)
Borrow Pit

Elevation (h4)
Borrow Pit

𝐴
𝑉𝑝𝑖𝑡 = ෍ ℎ1 + 2 ෍ ℎ2 + 3 ෍ ℎ3 + 4 ෍ ℎ4
4

Volume of Borrow Pit


EXAMPLE
#7
Borrow Pit
Example #7

A 90m x 90m square lot is to be


divided into 9 square sections. The
following data are the elevations at
the corners of the square sections
on the ground surface of the lot.
Volume of Borrow Pit
Example #7

If the ground is to be leveled at


elevation 5m, find the total volume
of earthworks to be excavated.

Volume of Borrow Pit


Example #7
A = 3.3m B = 7.9m C = 10.8m D = 6.8m

E = 7.6m F = 9.2m G = 10.6m H = 8.6m

I = 7.2m J = 10.2m K = 9.4m L = 6.9m

M = 7.2m N = 6.2m O = 9.6m P = 8.9m

Volume of Borrow Pit


A B C D

E F G H

I J K L

M N O P
A = 3.3m B = 7.9m C = 10.8m D = 6.8m

E = 7.6m F = 9.2m G = 10.6m H = 8.6m

I = 7.2m J = 10.2m K = 9.4m L = 6.9m

M = 7.2m N = 6.2m O = 9.6m P = 8.9m


Example #7

෍ ℎ1 = 𝑒𝑙𝑒𝑣𝑎𝑡𝑖𝑜𝑛𝑠 𝑎𝑡 𝐴 𝐷 𝑀 𝑃

Volume of Borrow Pit


Example #7

෍ ℎ1 = 3.3 + 1.8 + 3.9 + 2.2

Volume of Borrow Pit


Example #7

෍ ℎ1 = 11.2m

Volume of Borrow Pit


Example #7

෍ ℎ2 = 𝑒𝑙𝑒𝑣. 𝑎𝑡 𝐵 𝐶 𝐻 𝐿 𝑂 𝑁 𝐼 𝐸

Volume of Borrow Pit


Example #7

෍ ℎ2 = 2.9 + 5.8 + 3.6 + 1.9

+ 4.6 + 1.2 + 2.2 + 2.6

Volume of Borrow Pit


Example #7

෍ ℎ2 = 24.8m

Volume of Borrow Pit


Example #7

෍ ℎ3 = 𝑁𝑂𝑁𝐸

Volume of Borrow Pit


Example #7

෍ ℎ4 = 𝑒𝑙𝑒𝑣𝑎𝑡𝑖𝑜𝑛𝑠 𝑎𝑡 𝐹 𝐺 𝐾 𝐽

Volume of Borrow Pit


Example #7

෍ ℎ4 = 4.2 + 5.6 + 5.2 + 4.4

Volume of Borrow Pit


Example #7

෍ ℎ4 = 19.4m

Volume of Borrow Pit


Example #7

𝐴
𝑉𝑝𝑖𝑡 = ෍ ℎ1 + 2 ෍ ℎ2 + 3 ෍ ℎ3 + 4 ෍ ℎ4
4

Volume of Borrow Pit


Example #7

2
30
𝑉𝑝𝑖𝑡 = 11.2 + 2 24.8 + 4 19.4
4

Volume of Borrow Pit


Example #7

2
30
𝑉𝑝𝑖𝑡 = 11.2 + 2 24.8 + 4 19.4
4

𝑉𝑝𝑖𝑡 = 𝟑𝟏𝟏𝟒𝟎𝒎𝟑

Volume of Borrow Pit