You are on page 1of 11

CONTENTS Introduction

At The Longley Group, we are perfectionists. For us “Good enough” is never any where


near good enough. Our attention to detail and our customer service is unrivalled. We
are extremely proud of our reputation and do not look to meet our clients requirements,
we aim to simply exceed them.

We have an extensive knowledge and vast experience in working on major projects,


ranging from the construction and refurbishment of schools and hospitals, through to
luxury accommodation.

We operate in occupied and un-occupied buildings, offering time critical contract services
that enables our clients and the public sector to maximise the use of their space.

We understand the importance of good communication, especially in occupied, working


INTRODUCTION 03 environments. We provide the upmost attention to detail, to ensure we can provide a safe,
cost effective and a programme driven solution to every project.

COMMERCIAL 04 A family owned and managed business, at The Longley Group we take a refreshing long-
term view, building lasting, mutually beneficial relationships with suppliers, customers,
RESIDENTIAL  08 employees and neighbours.

As we don’t have to deliver short-term gains to share holders, we can focus on what’s
MECHANICAL 12 important. The deliverance of major works and the satisfaction of our client base.

ELECTRICAL 14
OUR TEAM 16
C. Longley
OUR CLIENTS & PARTNERS 18 Managing Director
3
Commercial Case Studies
Borough Studios 
Instructed by TLS investments, we successfully carried out the
full refurbishment of a brand new co-working space in the heart
of London Bridge. Our works included; The full design and
renovation, mechanical & electrical installations, fire & security
upgrades, fully complete with a modern graffiti feature wall.

PROJECT VALUE - £370K


PROJECT DURATION - 12 WEEKS

At The Longley Group, we act as the


main contractor for construction,
refurbishment and commercial
fit-out works; Including all mechanical
and electrical services, data, IT, heating and
ventilation, air conditioning, fire upgrade works, DDA
compliance improvements, clinical upgrades, as well as cyclical
decorations and routine building maintenance.

Our management team is committed to building an organisation


that utilises all of our staffs experience and skills; Enabling us to
deliver projects that will simply exceed your expectations.
5
Redbridge Capital Works   Kings Oak SMEH
Instructed by Redbridge Council, we successfully completed a Working in a secure unit schooling facility environment (Social, Mental, Environmental
contract for the works to four public buildings and eleven schools issues) we successfully delivered the full electrical and mechanical installation of the
in the summer term break. Time critical and some in occupation school in it’s entirety. Working in a specialist environment and with unique procedures in
works, we carried out replacement plant rooms, lighting systems, place, we managed to complete all works ahead of schedule and in budget.
mechanical heating system installations and upgrades. The
PROJECT VALUE - £350K
buildings included the Redbridge Town Hall, Whitbread Sports
centre and a mixture of day care centres and schools. PROJECT DURATION - 10 WEEKS 

Project value - £1.65m


Project duration - 12 weeks 

Cardwell Primary School 


Instructed by Ingleton Wood, on the behalf of the London Borough of Greenwich, we were
instructed as the main contractor to deliver the major works of new air conditioning, fire
alarms, door access systems and full electrical installation upgrades to Cardwell Primary City & Guilds Art School 
School. This also involved switch gear panels, new incoming services, decorations and Working closely with City & Guilds we installed a new specialist ceiling suspended heating
associated building works - All delivered on schedule and achieved within the six week system, electrical upgrade works and associated building works to the stone and wood
summer holiday.  carving studios. All works achieved on schedule and under budget.

PROJECT VALUE - £400K PROJECT VALUE - £280K


PROJECT DURATION - 12 WEEKS PROJECT DURATION - 40 WEEKS 
7
Residential 

Case Studies
Heathview Place
A beautiful listed building that was operating as business
At The Longley Group we offer a fully comprehensive turn key centre was acquired by The Longley Group; Successfully gaining
solution for residential conversions, refurbishments and new permitted development to convert the building into 12 x luxury apartments.

build projects. We achieve the highest possible level of finish with We carried out the full remodelling, refurbishment and construction,
a desire to create homes of exceptional quality and design. We through to the sales process - Concept to completion.

are experts at gaining space, remodelling layouts and creating PROJECT VALUE - £4M
bespoke interiors beyond expectations. PROJECT DURATION - 45 WEEKS 
9
Madeira Avenue Redlap
We carried out the demolition of a derelict bungalow and replaced with two semi- A private residence that was acquired by The Longley Group, fully refurbished, remodelled
detached, new build, family homes offering 2500SQFT of luxury living space. Successfully and extended to create a beautiful family home offering 5000 SQFT of luxury living space. 
completed and sold within 7 months of demolition of the bungalow.
All aspects of work from the initial concept of design, planning process and construction
All aspects of work from the initial concept of design, planning process and construction completion through to the sales process managed by The Longley Group.
completion through to the sales process - Concept to completion.
PROJECT VALUE - £1.2M
PROJECT VALUE - £1.1M PROJECT DURATION - 40 WEEKS 
PROJECT DURATION - 32 WEEKS 

Market Mews, Mayfair 


Instructed by Pastor Real Estate and working with Box associates, we constructed a brand
new 5 storey, luxury private residence in the heart of Mayfair. The property has a lift, gym,
bespoke furniture and beautiful detailing throughout.

Project value - £1.5m 


Project duration - 40 weeks
11
Mechanical 

At The Longley Group, we offer innovative, cost-effective


solutions for mechanical engineering. We have an
extensive portfolio of works in Schools, Hospitals,
Universities and offices.

Our services include;


• Mechanical installations

• Plant and Boiler rooms

• Drainage systems

• Ventilation systems

• LPG and natural gas systems

• Energy management systems

• Sprinkler systems

• Medical gas systems


13
Electrical 

Working within both the commercial and industrial sectors


throughout the country, Longley Group provides a wide variety
of electrical services to buildings of varied occupation, details of
which are as follows;

Building Types Works Undertaken


• Schools • Brand new installations

• Hospitals • Adaptions

• Universities • Lighting upgrades


• Colleges • Sub main distribution
• Theatres • Main intake panels
• Care homes • Low voltage distribution
• Offices • DATA and IT installations
• Hotels • Testing and certification
• Public Buildings • Access control systems
• Art Galleries
• Fire Alarm Systems
• Leisure centres
• PA and Voice Alarm
• Museums systems
15
Our Managment Team 

Charlie Longley Peter Sinnock Sam Duggan Dean Harvey Billy Drummond George Fitzsimons
Managing Director Commercial & Operations Director Contracts Manager Senior Project Manager Senior Project Manager Project Manager

Kim Seymour Stewart Aspery Claire Foskett David Saunders Daniel Lines Alfie Longley
Office Manager Business Development Manager Accounts Manager Senior Project Manager Senior Project Manager Trainee Operations Manager
17
Proud to have delivered work for... Proud to be members of...

19
T: +44 (0) 203 846 8793
E: info@longleygroup.co.uk

www.longleygroup.co.uk
2A North Street, Bromley, Kent, BR1 1SB

You might also like