You are on page 1of 164

Rev.

0 Remakes : All detail mention in table as per tender drawing documment


5/24/2018

Pier No. Bored Pile Footing


Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar

(ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t)

P628 4 40 45.2 4.5 180.9 18.1 1 B-16-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P627 4 40 45.2 4.5 180.9 18.1 1 B-16-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
M
o P626 Sta. 4 38 67.1 6.7 268.5 26.8 1 S16-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
tiJ P625 Sta. 4 38 67.1 6.7 268.5 26.8 1 S16-SP-06 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
h
ee P624 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
l P623 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
St
a P622 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
ti P621 Sta. 4 37 65.4 6.5 261.4 26.1 1 S16-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
o
n P620 Sta. 4 35 61.8 6.2 247.3 24.7 1 S16-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP

P619 4 40 45.2 4.5 180.9 18.1 1 B15-NP-29 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P618 4 40 45.2 4.5 180.9 18.1 1 B15-NP-28 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P617 4 36 40.7 4.1 162.8 16.3 1 B15-NP-27 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P616 4 37 41.8 4.2 167.3 16.7 1 B15-NP-26 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P615 4 38 43.0 4.3 171.8 17.2 1 B15-NP-25 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P614 4 40 45.2 4.5 180.9 18.1 1 B15-NP-24 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P613 4 40 45.2 4.5 180.9 18.1 1 B15-NP-23 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P612 4 40 45.2 4.5 180.9 18.1 1 B15-NP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P611 B/C 4 40 45.2 4.5 180.9 18.1 1 B15-NP-21 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
Bala
nce P610 B/C 4 39 148.2 14.8 592.7 59.3 1 B15-SB-20 9.90 9.90 2.50 9.9 x 9.9 x 2.5 306.0 15.3 10.2 245.0 36.8 SB
Canti
P609 B/C 4 37 140.6 14.1 562.3 56.2 1 B15-SB-19 9.90 9.90 2.50 9.9 x 9.9 x 2.5 306.0 15.3 10.2 245.0 36.8 SB
liver
P608 4 35 39.6 4.0 158.3 15.8 1 B15-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P607 4 35 39.6 4.0 158.3 15.8 1 B15-AP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P606 4 35 39.6 4.0 158.3 15.8 1 B15-AP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P605 4 36 40.7 4.1 162.8 16.3 1 B15-AP-15 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P604 4 37 41.8 4.2 167.3 16.7 1 B15-NP-14 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P603 4 37 41.8 4.2 167.3 16.7 1 B15-NP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P602 4 37 41.8 4.2 167.3 16.7 1 B15-NP-12 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P601 4 37 41.8 4.2 167.3 16.7 1 B15-NP-11 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P600 4 37 41.8 4.2 167.3 16.7 1 B15-NP-10 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P599 4 37 41.8 4.2 167.3 16.7 1 B15-NP-09 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P598 4 37 41.8 4.2 167.3 16.7 1 B15-NP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P597 4 37 41.8 4.2 167.3 16.7 1 B15-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P596 B/C 4 37 41.8 4.2 167.3 16.7 1 B15-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
Bala
nce P595 B/C 4 45 171.0 17.1 683.9 68.4 1 B15-SB-05 9.90 6.00 2.00 9.9 x 9.9 x 2.5 156.6 9.4 6.3 245.0 36.8 SB
Canti
P594 B/C 4 45 171.0 17.1 683.9 68.4 1 B15-SB-04 9.90 9.90 2.50 9.9 x 9.9 x 2.5 306.0 15.3 10.2 245.0 36.8 SB
liver
P593 4 46 52.0 5.2 208.0 20.8 1 B15-NP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P592 4 46 52.0 5.2 208.0 20.8 1 B15-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P591 4 46 52.0 5.2 208.0 20.8 1 B15-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
Pr
es
s
Rev.0 Remakes : All detail mention in table as per tender drawing documment
5/24/2018

Pier No. Bored Pile Footing


Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar

(ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t)
Pr
es P590 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
s P589 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-06 7.50 7.50 2.60 7.50 x 7.50 x 2.60 183.8 8.9 5.9 146.3 21.9 SP
Cl
u P588 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
b P587 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
St
a P586 Sta. 4 45 79.5 7.9 317.9 31.8 1 S15-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
ti P585 Sta. 4 29 51.2 5.1 204.9 20.5 1 S15-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
o
n P584 Sta. 4 28 49.5 4.9 197.8 19.8 1 S15-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP

P583 4 30 33.9 3.4 135.6 13.6 1 B14-NP-34 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P582 4 30 33.9 3.4 135.6 13.6 1 B14-NP-33 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P581 L 6 38 29.8 3.0 179.0 17.9 1 B14-PP-32 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP
Portal
P581 R 6 38 29.8 3.0 179.0 17.9 1 B14-PP-32 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP

P580 4 32 36.2 3.6 144.7 14.5 1 B14-AP-31 6.00 6.00 2.50 6 X 6 x 2.50 115.3 5.8 3.8 90 13.5 AP

P579 4 37 41.8 4.2 167.3 16.7 1 B14-CP-30 6.40 6.40 2.50 6.40 x 6.40 x 2.50 130.7 6.5 4.4 102.4 15.4 CP

P578 L 4 29 22.8 2.3 91.1 9.1 1 B14-PP-29 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP
Portal
P578 R 4 29 22.8 2.3 91.1 9.1 1 B14-PP-29 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP

P577 4 34 38.4 3.8 153.7 15.4 1 B14-NP-28 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P576 4 34 38.4 3.8 153.7 15.4 1 B14-NP-27 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P575 4 30 33.9 3.4 135.6 13.6 1 B14-AP-26 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P574 L 4 30 23.6 2.4 94.2 9.4 1 B14-PP-25 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP
Portal
P574 R 4 30 23.6 2.4 94.2 9.4 1 B14-PP-25 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP

P573 L 4 32 25.1 2.5 100.5 10.0 1 B14-PP-24 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP
Portal
P573 R 4 32 25.1 2.5 100.5 10.0 1 B14-PP-24 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP

P572 L 6 38 29.8 3.0 179.0 17.9 1 B14-PP-23 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP
Portal
P572 R 6 38 29.8 3.0 179.0 17.9 1 B14-PP-23 8.00 5.00 2.00 8x5x2 106.6 6.4 4.3 80 12 PP

P571 4 34 38.4 3.8 153.7 15.4 1 B14-AP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P570 4 34 38.4 3.8 153.7 15.4 1 B14-NP-21 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P569 4 35 39.6 4.0 158.3 15.8 1 B14-NP-20 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P568 4 35 39.6 4.0 158.3 15.8 1 B14-NP-19 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P567 4 35 39.6 4.0 158.3 15.8 1 B14-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P566 4 35 39.6 4.0 158.3 15.8 1 B14-NP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P565 4 35 39.6 4.0 158.3 15.8 1 B14-AP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P564 L 4 34 26.7 2.7 106.8 10.7 1 B14-PP-15 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP
Portal
P564 R 4 34 26.7 2.7 106.8 10.7 1 B14-PP-15 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP

P563 4 40 45.2 4.5 180.9 18.1 1 B14-AP-14 6.00 6.00 2.60 6 x 6 x 2.60 119.2 5.8 3.8 93.6 14.04 AP

P562 4 32 36.2 3.6 144.7 14.5 1 B14-NP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P561 L 4 31 24.3 2.4 97.3 9.7 1 B14-PP-12 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP
Portal
P561 R 4 31 24.3 2.4 97.3 9.7 1 B14-PP-12 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP

P560 4 30 33.9 3.4 135.6 13.6 1 B14-AP-11 6.00 6.00 2.20 6 x 6 x 2.20 103.8 5.8 3.8 79.2 11.88 AP

P559 4 29 32.8 3.3 131.1 13.1 1 B14-NP-10 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
Rev.0 Remakes : All detail mention in table as per tender drawing documment
5/24/2018

Pier No. Bored Pile Footing


Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar

(ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t)

P558 4 29 32.8 3.3 131.1 13.1 1 B14-NP-09 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P557 4 27 30.5 3.1 122.1 12.2 1 B14-NP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P556 4 26 29.4 2.9 117.6 11.8 1 B14-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P555 4 26 29.4 2.9 117.6 11.8 1 B14-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P554 4 25 28.3 2.8 113.0 11.3 1 B14-NP-05 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P553 4 25 28.3 2.8 113.0 11.3 1 B14-NP-04 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P552 4 25 28.3 2.8 113.0 11.3 1 B14-NP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P551 4 25 28.3 2.8 113.0 11.3 1 B14-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P550 4 25 28.3 2.8 113.0 11.3 1 B14-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P549 Sta. 4 28 49.5 4.9 197.8 19.8 1 S14-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
TS P548 Sta. 4 36 63.6 6.4 254.3 25.4 1 S14-SP-06 7.50 7.50 2.60 7.50 x 7.50 x 2.60 183.8 8.9 5.9 146.3 21.9 SP
C
St P547 Sta. 4 33 58.3 5.8 233.1 23.3 1 S14-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
a P546 Sta. 4 33 58.3 5.8 233.1 23.3 1 S14-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
ti
o P545 Sta. 4 33 58.3 5.8 233.1 23.3 1 S14-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
n P544 Sta. 4 29 51.2 5.1 204.9 20.5 1 S14-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP

P543 Sta. 4 29 51.2 5.1 204.9 20.5 1 S14-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP

P542 4 31 35.0 3.5 140.2 14.0 1 B13-NP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P541 L 4 33 25.9 2.6 103.6 10.4 1 B13-PP-21 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP
Portal
P541 R 4 33 25.9 2.6 103.6 10.4 1 B13-PP-21 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP

P540 L 4 33 25.9 2.6 103.6 10.4 1 B13-PP-20 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP
Portal
P540 R 4 33 25.9 2.6 103.6 10.4 1 B13-PP-20 5.00 5.00 2.00 5x5x2 67.6 4.1 2.7 50 7.5 PP

P539 4 34 38.4 3.8 153.7 15.4 1 B13-AP-19 6.00 6.00 2.20 6 x 6 x 2.20 103.8 5.8 3.8 79.2 11.88 AP

P538 4 34 38.4 3.8 153.7 15.4 1 B13-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P537 4 33 37.3 3.7 149.2 14.9 1 B13-NP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P536 4 34 38.4 3.8 153.7 15.4 1 B13-NP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P535 4 34 38.4 3.8 153.7 15.4 1 B13-NP-15 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P534 4 34 38.4 3.8 153.7 15.4 1 B13-NP-14 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P533 4 34 38.4 3.8 153.7 15.4 1 B13-NP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P532 4 32 36.2 3.6 144.7 14.5 1 B13-NP-12 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P531 4 32 36.2 3.6 144.7 14.5 1 B13-NP-11 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P530 4 32 36.2 3.6 144.7 14.5 1 B13-NP-10 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P529 4 32 36.2 3.6 144.7 14.5 1 B13-NP-09 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P528 4 32 36.2 3.6 144.7 14.5 1 B13-NP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P527 4 32 36.2 3.6 144.7 14.5 1 B13-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P526 4 32 36.2 3.6 144.7 14.5 1 B13-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P525 4 32 36.2 3.6 144.7 14.5 1 B13-AP-05 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P524 4 32 36.2 3.6 144.7 14.5 1 B13-AP-04 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P523 4 32 36.2 3.6 144.7 14.5 1 B13-AP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P522 4 32 36.2 3.6 144.7 14.5 1 B13-NP-02 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
Rev.0 Remakes : All detail mention in table as per tender drawing documment
5/24/2018

Pier No. Bored Pile Footing


Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar

(ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t)

P521 4 32 36.2 3.6 144.7 14.5 1 B13-NP-01 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

Sh P520 Sta. 4 32 56.5 5.7 226.1 22.6 1 S13-SP-07 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
ah P519 Sta. 4 31 54.8 5.5 219.0 21.9 1 S13-SP-06 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
ba
g P518 Sta. 4 34 60.1 6.0 240.2 24.0 1 S13-SP-05 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
St P517 Sta. 4 34 60.1 6.0 240.2 24.0 1 S13-SP-04 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
a
ti P516 Sta. 4 34 60.1 6.0 240.2 24.0 1 S13-SP-03 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
o P515 Sta. 4 29 51.2 5.1 204.9 20.5 1 S13-SP-02 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP
n
P514 Sta. 4 28 49.5 4.9 197.8 19.8 1 S13-SP-01 7.50 7.50 2.50 7.50 x 7.50 x 2.50 177.9 8.9 5.9 140.6 21.1 SP

P513 4 28 31.7 3.2 126.6 12.7 1 B12-NP-36 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P512 4 28 31.7 3.2 126.6 12.7 1 B12-NP-35 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P511 4 28 31.7 3.2 126.6 12.7 1 B12-NP-34 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P510 4 29 32.8 3.3 131.1 13.1 1 B12-NP-33 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P509 4 29 32.8 3.3 131.1 13.1 1 B12-NP-32 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P508 4 29 32.8 3.3 131.1 13.1 1 B12-NP-31 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P507 4 28 31.7 3.2 126.6 12.7 1 B12-NP-30 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P506 4 28 31.7 3.2 126.6 12.7 1 B12-NP-29 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P505 4 28 31.7 3.2 126.6 12.7 1 B12-NP-28 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P504 4 28 31.7 3.2 126.6 12.7 1 B12-NP-27 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P503 4 28 31.7 3.2 126.6 12.7 1 B12-NP-26 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P502 4 29 32.8 3.3 131.1 13.1 1 B12-NP-25 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P501 4 29 32.8 3.3 131.1 13.1 1 B12-NP-24 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P500 4 29 32.8 3.3 131.1 13.1 1 B12-NP-23 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P499 4 29 32.8 3.3 131.1 13.1 1 B12-NP-22 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P498 4 29 32.8 3.3 131.1 13.1 1 B12-NP-21 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P497 4 27 30.5 3.1 122.1 12.2 1 B12-NP-20 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P496 4 26 29.4 2.9 117.6 11.8 1 B12-NP-19 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P495 4 25 28.3 2.8 113.0 11.3 1 B12-NP-18 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P494 4 24 27.1 2.7 108.5 10.9 1 B12-NP-17 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P493 4 27 30.5 3.1 122.1 12.2 1 B12-NP-16 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P492 4 26 29.4 2.9 117.6 11.8 1 B12-NP-15 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P491 4 27 30.5 3.1 122.1 12.2 1 B12-AP-14 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P490 4 29 32.8 3.3 131.1 13.1 1 B12-AP-13 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P489 4 39 44.1 4.4 176.3 17.6 1 B12-CP-12 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP

P488 4 42 47.5 4.7 189.9 19.0 1 B12-CP-11 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP

P487 4 42 47.5 4.7 189.9 19.0 1 B12-CP-10 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP

P486 4 40 45.2 4.5 180.9 18.1 1 B12-CP-09 6.00 6.00 2.50 6 x 6 x 2.50 115.3 5.8 3.8 90 13.5 CP

P485 4 36 40.7 4.1 162.8 16.3 1 B12-AP-08 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 AP

P484 4 36 40.7 4.1 162.8 16.3 1 B12-NP-07 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P483 4 38 43.0 4.3 171.8 17.2 1 B12-NP-06 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
Rev.0 Remakes : All detail mention in table as per tender drawing documment
5/24/2018

Pier No. Bored Pile Footing


Dia. 1.0 Dia. 1.2 Dia. 1.5 Dia. 2.2 length Concrete Rebar Total No Type of footing Size WxLxH Excavation Brick Chip Blinding Concrete Rebar

(ea) (ea) (ea) (ea) (m) (m3/ea) (t/ea) Conc. (m3) Rebar(t) and pier W L H (m) cu.m cu.m cu.m (m3) (t)

P482 4 36 40.7 4.1 162.8 16.3 1 B12-NP-05 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P481 4 27 30.5 3.1 122.1 12.2 1 B12-NP-04 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP

P480 4 28 31.7 3.2 126.6 12.7 1 B12-NP-03 6.00 6.00 2.00 6x6x2 96.1 5.8 3.8 72 10.8 NP
Bala
nce P479 6 30 114.0 11.4 683.9 68.4 1 B12-SB-02 9.90 15.40 3.00 9.9 x 15.4 x 3 551.5 23.6 15.8 457.4 68.6 SB
Canti
P478 6 30 114.0 11.4 683.9 68.4 1 B12-SB-01 9.90 15.40 3.00 9.9 x 15.4 x 3 551.5 23.6 15.8 457.4 68.6 SB
liver
P477

P477 scope under ?

Total 80 432 112 28 29,050 2,905 160 14,796 2,219

Summary Detail
1 Pile 652 nos. (excluding screw pile) Total Concrete 55,800 m3
2 Number of Footing and Pier 160 nos. Total Rebar 8,113 ton
3 Detail of Pier Type span number
Assymmetry Pier (AP) 16 ea.
Catilever Pier (CP) 5 ea.
Normal Pier (NP) 87 ea.
a=น น้อยกวว่า 30 c = น น้อยกวว่า 40 e = น น้อยกวว่า 45
b=น น้อยกว่วา 35 d = balance cantiliver
Pier Pier Head and Cross Beam Span Type of Viaduct Span Length Bored Pile
Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos. (m) Dia. 1.0

(m) (m3) (t) (m3) (t) 1-3

A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 682-627 1 a 30

A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 627-626 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 626-625 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 625-624 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 624-623 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 623-622 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 622-621 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 621-620 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 620-619 1 a 30

A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 619-618 1 a 30

A 2x2 7.5 30 7.5 36.2 9.05 4.6 x 3.0 618-617 1 a 30

B 2x2 6.3 25.3 6.3 41.4 10.4 4.6 x 3.0 617-616 1 c 40

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 616-615 1 c 40

B 2x2 6.2 24.9 6.2 41.4 10.4 4.6 x 3.0 615-614 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 614-613 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 613-612 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 612-611 1 b 35

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 611-610 1 d 45

BC 3x3 8.0 72.0 18.0 610-609 1 d 70

BC 3x3 8.0 72.0 18.0 609-608 1 d 45

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 608-607 1 a 28

L 2x2 8.1 32.2 8.1 36.0 9.0 4.6 x 3.0 607-606 1 a 30

K 2x2 8.1 32.3 8.1 35.6 8.9 4.6 x 3.0 606-605 1 a 25

J 2x2 7.7 30.8 7.7 34.3 8.6 4.6 x 3.0 605-604 1 a 25

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 604-603 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 603-602 1 a 30

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 602-601 1 a 30

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 601-600 1 a 30

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 600-599 1 a 30

C 2x2 7.0 28.1 7.0 41.4 10.4 4.6 x 3.0 599-598 1 c 40

C 2x2 6.7 26.9 6.7 41.4 10.4 4.6 x 3.0 598-597 1 a 30

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 597-596 1 a 30

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 596-595 1 d 45

BC 3x3 8.0 72.0 18.0 595-594 1 d 70

BC 3x3 8.0 72.0 18.0 594-593 1 d 45

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 593-592 1 b 32

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 592-591 1 b 32

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 591-590 1 b 32


a=น น้อยกวว่า 30 c = น น้อยกวว่า 40 e = น น้อยกวว่า 45
b=น น้อยกว่วา 35 d = balance cantiliver
Pier Pier Head and Cross Beam Span Type of Viaduct Span Length Bored Pile
Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos. (m) Dia. 1.0

(m) (m3) (t) (m3) (t) 1-3


Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 590-589 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 589-588 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 588-587 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 587-586 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 586-585 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 585-584 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 584-583 1 a 20

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 583-582 1 a 23

C 2x2 6.5 26.1 6.5 41.4 10.4 4.6 x 3.0 582-581 1 c 40

I 1.5 x 2.5 5.4 20.3 5.1


153.3 38.3 2.6 x 3 x (16.1) 581-580 1 c 40
I 1.5 x 2.5 5.4 20.3 5.1

I 2x3 7.1 42.7 10.7 38.8 9.7 4.6 x 3.0 580-579 1 a 30

E 2x3 6.0 36.1 9.0 47.4 11.8 4.6 x 3.0 579-578 1 c 40

G 1.5 x 2.5 6.4 23.9 6.0


128.2 32.0 2.2 x 3 x (13.01) 578-577 1 a 30
G 1.5 x 2.5 6.4 23.9 6.0

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 577-576 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 576-575 1 a 30

P 2x2 7.2 28.7 7.2 34.6 8.6 4.6 x 3.0 575-574 1 a 30

F 1.5 x 2.5 6.6 24.7 6.2


116.5 29.1 2 x 3 x (12.36) 574-573 1 c 40
F 1.5 x 2.5 6.6 24.7 6.2

E 1.5 x 2.5 5.7 21.3 5.3


107.3 26.8 2.1 x 3 x (11.2) 573-572 1 c 40
E 1.5 x 2.5 5.7 21.3 5.3

H 1.5 x 2.5 4.4 16.5 4.1


161.9 40.5 2.6 x 3 x (17.2) 572-571 1 c 40
H 1.5 x 2.5 4.4 16.5 4.1

H 2x2 6.0 24.1 6.0 41.4 10.4 4.6 x 3.0 571-570 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 570-569 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 569-568 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 568-567 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 567-566 1 a 30

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 566-565 1 a 30

G 2x2 6.6 26.4 6.6 40.6 10.1 4.6 x 3.0 565-564 1 c 40

D 1.5 x 2.5 5.1 19.1 4.8


105.7 26.4 2.4 x 3 x (11.21) 564-563 1 c 40
D 1.5 x 2.5 5.1 19.1 4.8

F 2x3 6.2 37.4 9.3 42.5 10.6 4.6 x 3.0 563-562 1 b 35

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 562-561 1 b 35

C 1.5 x 2.5 6.4 24.0 6.0


108.6 27.1 2.4 x 3 x (10.84) 561-560 1 c 40
C 1.5 x 2.5 6.4 24.0 6.0

E 2 x 2.5 6.5 32.4 8.1 40.9 10.2 4.6 x 3.0 560-559 1 a 30

A 2x2 7.5 30.1 7.5 36.2 9.1 4.6 x 3.0 559-558 1 b 32


a=น น้อยกวว่า 30 c = น น้อยกวว่า 40 e = น น้อยกวว่า 45
b=น น้อยกว่วา 35 d = balance cantiliver
Pier Pier Head and Cross Beam Span Type of Viaduct Span Length Bored Pile
Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos. (m) Dia. 1.0

(m) (m3) (t) (m3) (t) 1-3


A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 558-557 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 557-556 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 556-555 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 555-554 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 554-553 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 553-552 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 552-551 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 551-550 1 a 30

A 2x2 8.0 32.1 8.0 36.2 9.1 4.6 x 3.0 550-549 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 549-548 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 548-547 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 547-546 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 546-545 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 545-544 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 544-543 1 a 30

Sta. 2 x3 7.1 42.6 10.7 41.2 10.3 4.6 x 3.0 543-542 1 a 28.25

C 2x2 6.5 26.1 6.5 41.4 10.4 4.6 x 3.0 542-541 1 c 40

B 1.5 x 2.5 5.8 21.7 5.4


119.0 29.7 2 x 3 x (13.7) 541-540 1 c 40
B 1.5 x 2.5 5.8 21.7 5.4

A 1.5 x 2.5 5.8 21.7 5.4


119.0 29.7 2 x 3 x (13.7) 540-539 1 c 40
A 1.5 x 2.5 5.8 21.7 5.4

D 2x2 6.0 24.0 6.0 36.4 9.1 4.6 x 3.0 539-538 1 c 40

B 2x2 5.2 20.9 5.2 41.4 10.4 4.6 x 3.0 538-537 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 537-536 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 536-535 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 535-534 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 534-533 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 533-532 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 532-531 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 531-530 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 530-529 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 529-528 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 528-527 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 527-526 1 a 30

A 2x2 7.0 28.1 7.0 36.2 9.1 4.6 x 3.0 526-525 1 a 30

O 2x2 7.2 28.8 7.2 34.3 8.6 4.6 x 3.0 525-524 1 a 27

N 2x2 7.0 28.1 7.0 36.0 9.0 4.6 x 3.0 524-523 1 a 30

M 2x2 7.1 28.4 7.1 35.4 8.8 4.6 x 3.0 523-522 1 a 30

C 2x2 6.5 26.1 6.5 41.4 10.4 4.6 x 3.0 522-521 1 e 45


a=น น้อยกวว่า 30 c = น น้อยกวว่า 40 e = น น้อยกวว่า 45
b=น น้อยกว่วา 35 d = balance cantiliver
Pier Pier Head and Cross Beam Span Type of Viaduct Span Length Bored Pile
Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos. (m) Dia. 1.0

(m) (m3) (t) (m3) (t) 1-3


B 2x2 4.9 19.7 4.9 41.4 10.4 4.6 x 3.0 521-520 1 b 32

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 520-519 1 a 30

Sta. 2 x3 6.6 39.6 9.9 41.2 10.3 4.6 x 3.0 519-518 1 a 30

Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 518-517 1 a 30

Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 517-516 1 a 30

Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 516-515 1 a 30

Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 515-514 1 a 30

Sta. 2 x3 7.6 45.6 11.4 41.2 10.3 4.6 x 3.0 514-513 1 a 22.88

A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 513-512 1 a 23

A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 512-511 1 a 30

A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 511-510 1 a 30

B 2x2 7.2 28.9 7.2 41.4 10.4 4.6 x 3.0 510-509 1 c 40

C 2x2 7.2 28.9 7.2 41.4 10.4 4.6 x 3.0 509-508 1 a 25

A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 508-507 1 a 30

A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 507-506 1 a 30

A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 506-505 1 a 30

A 2x2 9.0 36.1 9.0 36.2 9.05 4.6 x 3.0 505-504 1 a 30

A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 504-503 1 a 30

A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 503-502 1 a 30

A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 502-501 1 a 30

A 2x2 9.5 38.1 9.5 36.2 9.05 4.6 x 3.0 501-500 1 a 25

C 2x2 9.0 36.1 9.0 41.4 10.4 4.6 x 3.0 500-499 1 c 40

B 2x2 7.4 29.7 7.4 41.4 10.4 4.6 x 3.0 499-498 1 a 30

A 2x2 10.0 40.1 10.0 36.2 9.05 4.6 x 3.0 498-497 1 a 30

A 2x2 10.0 40.1 10.0 36.2 9.05 4.6 x 3.0 497-496 1 a 30

A 2x2 10.0 40.1 10.0 36.2 9.05 4.6 x 3.0 496-495 1 a 30

A 2x2 10.5 42.1 10.5 36.2 9.05 4.6 x 3.0 495-494 1 a 30

A 2x2 10.5 42.1 10.5 36.2 9.05 4.6 x 3.0 494-493 1 a 30

C 2x2 9.5 38.1 9.5 41.4 10.4 4.6 x 3.0 493-492 1 c 40

B 2x2 8.7 34.9 8.7 41.4 10.4 4.6 x 3.0 492-491 1 a 25

C 2x2 10.7 42.7 10.7 34.6 8.6 4.6 x 3.0 491-490 1 a 30

B 2x2 11.1 44.2 11.1 35.8 9.0 4.6 x 3.0 490-489 1 a 30

D 2x3 10.3 61.9 15.5 42.8 10.7 4.7 x 3 489-488 1 a 30

C 2x3 10.7 64.3 16.1 48.3 12.1 5.3 x 3 488-487 1 a 30

B 2x3 11.2 67.3 16.8 48.3 12.1 5.3 x 3 487-486 1 a 30

A 2x3 11.3 67.6 16.9 45.6 11.4 5x3 486-485 1 a 30

A 2x2 12.6 50.5 12.6 35.1 8.8 4.6 x 3.0 485-484 1 a 26.16

A 2x2 12.5 50.1 12.5 36.2 9.05 4.6 x 3.0 484-483 1 b 35

C 2x2 11.5 46.1 11.5 41.4 10.4 4.6 x 3.0 483-482 1 c 40


a=น น้อยกวว่า 30 c = น น้อยกวว่า 40 e = น น้อยกวว่า 45
b=น น้อยกว่วา 35 d = balance cantiliver
Pier Pier Head and Cross Beam Span Type of Viaduct Span Length Bored Pile
Type WxL Height Concrete Rebar Concrete Rebar Wx L Pier-Pier Span Nos. (m) Dia. 1.0

(m) (m3) (t) (m3) (t) 1-3


B 2x2 9.9 39.7 9.9 41.4 10.4 4.6 x 3.0 482-481 1 b 35

A 2x2 12.0 48.1 12.0 36.2 9.05 4.6 x 3.0 481-480 1 a 28.6

A 2x2 12.5 50.1 12.5 36.2 9.05 4.6 x 3.0 480-479 1 d 45

BC 3x3 8.0 72.0 18.0 479-478 1 d 70

BC 3x3 8.0 72.0 18.0 478-477 1 d 45

5,620 1,405 6,335 1,584 151 4,921.9 -

a = 111 span 180.5 m3 *111 span 20,147 m3


(excluding precast segment , station CC and PF , cast in-stu span) b = 10 span 200 m3 * 10 span 2,000 m3
c = 20 span (in-stu 40 m) 151 span 250 m3 * 20 span 5,000 m3
d = 9 span (3 balance ) 1000 m3 * 3 span 3,000 m3
e = 1 span ( in-stu 45 m) 300 m3 * 1 span 300 m3
30,447 m3
Cutting & Bending machine 15
Generator- 200 kva 5
Tower Crane 1
Generator- 250 kva 11
Ecxcavator PC200 7
Mobile Crane 25 ton 7
Truck Crane 5 ton , 10 wheel 5
Dump Truck 10 Wheel 16
Air Compressor - 175 CFM 9
Ecxcavator PC200 Wheel type 2
Mobile Crane 50 ton 5
Generator 350 KVA 6
Backhoe Virbo 1
JCB 3
Conrete Boom Pump ( 36 m ) 2
Hydrolic Breaker for PC 200 2
Motor Grader 1
Soil compactor 1
backup Generator 500 KVA (office and Camp ) 3

plant concrete M2.5 2

transit mixer 24

generator 400 Kva 2

generator 350 kva 2


Manpower Commencement Date expected start on 1 July 2018
2018
Unit
7 8 9 10
Item. Description Q'ty
Jul Aug Sep Oct
E-M
1 2 3 4
Working Group A

Motijheel Sta.
Working Group B

Working Group C

Press club Sta.

Working Group D

TSC Sta.

Shahbag Sta.

Working Group E
1 Working Group A
1.1 Chief front en. 41 month 1 1 1 1
1.2 Civil en 63 month 1 1 1 1
1.3 Technician Structure 70 month 1 1 1 1
1.4 Headman and Labours Structure 1130 month 10 10 10 10
1.5 Technician Formworks 59 month
1.6 Headman and Labours Formworks 429 month
1.7 General Housekeeping 210 month
1.8 Site Store , Site documment and other 239 month
1.9 Unit rate Sub-contractor (local)

2 Working Group B
2.1 Chief front en. 42 month 1 1 1 1
2.2 Civil en 71 month 1 1 1 1
2.3 Technician Structure 71 month 1 1 1 1
2.4 Headman and Labours Structure 1135 month 10 10 10 10
2.5 Technician Formworks 64 month
2.6 Headman and Labours Formworks 443 month
2.7 General Housekeeping 265 month
2.8 Site Store , Site documment and other 246 month
2.9 Unit rate Sub-contractor (local)

3 Working Group C
3.1 Chief front en. 34 month 1 1
3.2 Civil en 58 month 1 1 1 1
3.3 Technician Structure 58 month 1 1 1 1
3.4 Headman and Labours Structure 865 month
3.5 Technician Formworks 54 month
3.6 Headman and Labours Formworks 408 month
3.7 General Housekeeping 265 month
3.8 Site Store , Site documment and other 212 month
3.9 Unit rate Sub-contractor (local) month

4 Working Group D
4.1 Chief front en. 40 month 1 1
4.2 Civil en 71 month 1 1 1 1
4.3 Technician Structure 71 month 1 1 1 1
4.4 Headman and Labours Structure 1090 month
4.5 Technician Formworks 64 month
4.6 Headman and Labours Formworks 443 month
4.7 General Housekeeping 265 month
4.8 Site Store , Site documment and other 246 month
4.9 Unit rate Sub-contractor (local)

5 Working Group E
5.1 Chief front en. 40 month 1 1
5.2 Civil en 71 month 1 1 1 1
5.3 Technician Structure 71 month 1 1 1 1
5.4 Headman and Labours Structure 1090 month
5.5 Technician Formworks 64 month
5.6 Headman and Labours Formworks 443 month
5.7 General Housekeeping 265 month
5.8 Site Store , Site documment and other 246 month
5.9 Unit rate Sub-contractor (local)

Extra Balance Cantiliver 3 Location


Chief front en. 23 month 1 1 1
En 42 month 1 1
Technician 104 month 2
Labours 410 month
Sub-contractor ( local )

6 Motijheel Sta.
6.1 Chief front 34 month 1 1
6.2 Civil en 30 month 1 1
6.3 Architect 28 month
6.4 Technician 88 month 1 1
6.5 Headman and Labours 795 month 5 5
6.6 General Housekeeping 245 month
6.7 Site Store , Site documment and other 166 month
6.8 Unit rate Sub-contractor (local)
6.9 E&M

7 Press club Sta.


7.1 Chief front 31 month
7.2 Civil en 26 month
7.3 Architect 28 month
7.4 Technician 85 month
7.5 Headman and Labours 780 month
7.6 General Housekeeping 245 month
7.7 Site Store , Site documment and other 166 month
7.8 Unit rate Sub-contractor ( local)
7.9 E&M

8 TSC Sta.
8.1 Chief front 34 month 1 1
8.2 Civil en 30 month 1 1
8.3 Architect 28 month
8.4 Technician 88 month 1 1
8.5 Headman and Labours 795 month 5 5
8.6 General Housekeeping 245 month
8.7 Site Store , Site documment and other 166 month
8.8 Unit rate Sub-contractor (local)
8.9 E&M

9 Shahbag Sta.
9.1 Chief front 31 month
9.2 Civil en 26 month
9.3 Architect 28 month
9.4 Technician 85 month
9.5 Headman and Labours 780 month
9.6 General Housekeeping 245 month
9.7 Site Store , Site documment and other 166 month
9.8 Unit rate Sub-contractor ( local)
9.9 E&M

Summary 1 - 5 ( Sub-Structure )
Chief front en. 197 month 2 2 5 5
Civil en 334 month 5 5 5 5
Technician Structure 341 month 5 5 5 5
Headman and Labours Structure 5,310 month 20 20 20 20
Technician Formworks 305 month 0 0 0 0
Headman and Labours Formworks 2,166 month 0 0 0 0
General Housekeeping 1,270 month 0 0 0 0
Site Store , Site documment and other 1,189 month 0 0 0 0
Unit rate Sub-contractor (local) 0 0 0 0

Summary 6 - 9 ( Station )
Chief front 130 month 0 0 2 2
Civil en 112 month 0 0 2 2
Architect 112 month 0 0 0 0
Technician 346 month 0 0 2 2
Headman and Labours 3,150 month 0 0 10 10
General Housekeeping 980 month 0 0 0 0
Site Store , Site documment and other 664 month 0 0 0 0
Unit rate Sub-contractor ( local) month 0 0 0 0
E&M - month 0 0 0 0

10 Pool Department for site service


10.1 Survey Chief + en ( 1 + 2 ) 111 month 1 1 1 2
10.2 Technician + autocad 270 month 2 2 2 2
10.3 instrument + labours 905 month 5 5 5 5
10.4 Chief en. ( electrical + mechanical ) 39 month 1 1
10.5 EN ( electrical + mechanical ) 74 month 1
10.6 Technician + Helper (1+2) 935 month 5
10.7 chief en. Technical 42 month 1 1 1 1
10.8 tenhnical engineer 72 month 1 1 1 1
10.9 Autocad 96 month 1 1
10.10 Main store 303 month 3 3 5
10.11 Cook + helper (1+2) 426 month 3 3 6 6
10.12 House keeping 541 month 3 3 3 5
10.13 Chief safety 42 month 1 1 1 1
10.14 Safety officer 269 month 1 1 1 2
10.15 QA 113 month 1 1 1 2
10.16 Camp Boss 75 month 1 1 2

11 Main office
11.1 Account 246 month 2 4 6 6
11.2 Admin 192 month 1 3 3 5
11.3 Payroll 119 month 1 3 3 3
11.4 Cost 84 month 2 2 2 2
11.5 Procurement 156 month 2 2 2 4
11.6 Commercial / QS (4+1) 198 month 3 3 3 5
11.7 IT 79 month 1 1 2 2
11.8 office boy 192 month 2 2 2 5
ate expected start on 1 July 2018
2018 2019
11 12 1 2 3 4 5 6 7 8 9 10 11 12 1
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan
5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
sub - structure works
station works
sub-structure works
sub-structure works

sub-structure works
station works

sub-structure works

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 10 20 40 40 40 40 40 40 40 40 40 40 40
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 7 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10
5 5 8 8 8 8 8 8 8 8 8 8 8 8 8
20 30 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
10 10 10 20 40 40 40 40 40 40 40 40 40 40 40
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 7 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10
5 5 8 8 8 8 8 8 8 8 8 8 8 8 8
20 30 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
5 10 10 20 40 40 40 40 40 40 40 40 40 40 40
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 7 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10
5 5 8 8 8 8 8 8 8 8 8 8 8 8 8
20 30 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
5 10 10 20 40 40 40 40 40 40 40 40 40 40 40
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 7 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10
5 5 8 8 8 8 8 8 8 8 8 8 8 8 8
20 30 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
5 10 10 20 40 40 40 40 40 40 40 40 40 40 40
1 1 2 2 2 2 2 2 2 2 2 2 2 2 2
7 7 7 15 15 15 15 15 15 15 15 15 15 15 15
5 5 5 10 10 10 10 10 10 10 10 10 10 10
5 5 8 8 8 8 8 8 8 8 8 8 8 8 8
20 30 40 40 40 40 40 40 40 40 40 40 40 40 40

Balance cantiliver works


1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 4 6 6 6 6 6 6 6 6 6 6 6
15 15 25 25 25 25 25 25 25 25 25 25 25
50 50 50 50 50 50 50 50 50 50 50

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 3 3 3 3 3 3 3 3 3 3 3
5 10 20 20 30 30 30 30 30 30 30 30 30 30 30
5 5 10 10 10 10 10 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1
1 2 2 3 3 3 3 3 3
10 20 20 30 30 30 30 30 30
5 5 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1
1 1 2 2 3 3 3 3 3 3 3 3 3 3 3
5 10 20 20 30 30 30 30 30 30 30 30 30 30 30
5 5 10 10 10 10 10 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1
1 2 2 3 3 3 3 3 3
10 20 20 30 30 30 30 30 30
5 5 10 10 10 10 10 10
1 3 6 6 6 6 6 6 6
5 10 20 40 40 40 40 40

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
35 50 50 100 200 200 200 200 200 200 200 200 200 200 200
5 5 10 10 10 10 10 10 10 10 10 10 10 10 10
35 35 35 75 75 75 75 75 75 75 75 75 75 75 75
0 25 25 25 50 50 50 50 50 50 50 50 50 50 50
25 25 40 40 40 40 40 40 40 40 40 40 40 40 40
100 150 200 200 200 200 200 200 200 200 200 200 200 200 200

2 2 2 2 2 2 4 4 4 4 4 4 4 4 4
2 2 2 2 2 2 2 4 4 4 4 4 4 4 4
0 0 0 0 2 2 2 2 2 4 4 4 4 4 4
2 2 4 4 6 6 8 10 10 12 12 12 12 12 12
10 20 40 40 60 60 80 100 100 120 120 120 120 120 120
0 0 10 10 20 20 20 30 30 40 40 40 40 40 40
0 2 6 12 12 12 14 18 24 24 24 24 24 24 24
0 0 10 20 40 80 80 90 100 120 160 160 160 160 160
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

2 3 3 3 3 3 3 3 3 3 3 3 3 3 3
4 6 8 8 8 8 8 8 8 8 8 8 8 8 8
10 15 30 30 30 30 30 30 30 30 30 30 30 30 30
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10 25 30 30 30 30 30 30 30 30 30 30 30 30 30
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
5 5 8 8 8 8 8 8 8 8 8 8 8 8 8
6 6 12 12 12 12 12 12 12 12 12 12 12 12 12
8 8 15 15 15 15 15 15 15 15 15 15 15 15 15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 4 6 8 8 8 8 8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
2020 2021
2 3 4 5 6 7 8 9 10 11 12 1 2 3 4
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
20 21 22 23 24 25 26 27 28 29 30 31 32 33 34
misc. works
station works
orks misc. works
misc. works
station works
misc. works
station works
station works
misc. works

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
40 40 40 40 40 40 40 40 40 40 40 20 20 20 20
2 2 2 2 2 2 2 2 2 2 2 1 1 1 1
15 15 15 15 15 15 15 15 15 15 15 7 7 7 7
10 10 10 10 10 10 5 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 5 5 5 5
40 40 40 40 40 40 40 20 20 20 20 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
40 40 40 40 40 40 40 40 40 40 40 20 20 20 20
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1
15 15 15 15 15 15 15 15 15 15 15 7 7 7 7
10 10 10 10 10 10 10 10 10 10 10 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 8 8 5 5
40 40 40 40 40 40 40 40 40 20 20 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 1 1 1 1 1 1
40 40 40 40 20 20 20 20 20 20 20 20 20 10 10
2 2 2 2 2 2 2 2 2 1 1 1 1 1 1
15 15 15 15 15 15 15 15 15 15 15 7 7 7 7
10 10 10 10 10 10 10 10 10 10 10 5 5 5 5
8 8 8 8 8 8 8 8 8 5 5 5 3 3 3
40 40 40 40 20 20 20 20 20 20 20 10 10 10 10

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
40 40 40 40 40 40 40 40 40 40 40 20 20 20 20
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1
15 15 15 15 15 15 15 15 15 15 15 7 7 7 7
10 10 10 10 10 10 10 10 10 10 10 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 8 8 5 5
40 40 40 40 40 40 40 40 40 20 20 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
40 40 40 40 40 40 40 40 40 40 40 20 20 20 20
2 2 2 2 2 2 2 2 2 2 2 2 2 2 1
15 15 15 15 15 15 15 15 15 15 15 7 7 7 7
10 10 10 10 10 10 10 10 10 10 10 5 5 5 5
8 8 8 8 8 8 8 8 8 8 8 8 8 5 5
40 40 40 40 40 40 40 40 40 20 20 20 20 20 20

1 1 1 1 1
2 2 2 2 2
6 6 6 4 4
25 25 25 15 15
50 50 50

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3 3 2 2
30 30 30 30 30 30 30 30 30 30 30 20 20 10 10
10 10 10 10 10 10 10 10 10 10 10 5 5 5
6 6 6 6 6 6 6 6 6 6 6 6 6 3 3
40 40 40 40 40 40 40 40 40 40 40 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3 3 2 2
30 30 30 30 30 30 30 30 30 30 30 20 20 10 10
10 10 10 10 10 10 10 10 10 10 10 5 5 5
6 6 6 6 6 6 6 6 6 6 6 6 6 3 3
40 40 40 40 40 40 40 40 40 40 40 20 20 20 20

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
30 30 30 30 30 30 30 30 30 30 30 30 30 30 30
10 10 10 10 10 10 10 10 10 10 10 10 10 10 10
6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
40 40 40 40 40 40 40 40 40 40 40 40 40 40 40

5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
10 10 10 10 10 10 10 10 10 9 9 8 8 8 8
10 10 10 10 10 10 10 10 10 9 9 9 9 9 9
200 200 200 200 180 180 180 180 180 180 180 100 100 90 90
10 10 10 10 10 10 10 10 10 9 9 8 8 8 5
75 75 75 75 75 75 75 75 75 75 75 35 35 35 35
50 50 50 50 50 50 45 45 45 45 45 20 20 20 20
40 40 40 40 40 40 40 40 40 37 37 34 32 23 23
200 200 200 200 180 180 180 160 160 100 100 90 90 90 90

4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
4 4 4 4 4 4 4 4 4 4 4 4 4 2 2
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
12 12 12 12 12 12 12 12 12 12 12 12 12 10 10
120 120 120 120 120 120 120 120 120 120 120 100 100 80 80
40 40 40 40 40 40 40 40 40 40 40 30 30 30 20
24 24 24 24 24 24 24 24 24 24 24 24 24 18 18
160 160 160 160 160 160 160 160 160 160 160 120 120 120 120
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
8 8 8 8 8 8 8 8 8 8 8 8 6 6 6
30 30 30 30 30 30 30 30 30 30 30 30 15 15 15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
30 30 30 30 30 30 30 30 30 30 30 25 25 25 15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
3 3 3 3 3 3 3 3 3 3 3 2 2 2 2
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
12 12 12 12 12 12 12 12 12 12 12 12 12 12 12
15 15 15 15 15 15 15 15 15 15 15 15 15 15 15
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 8 8 8 8 8 8 8 8 8 8 8 8 8 8
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2

6 6 6 6 6 6 6 6 6 6 6 6 6 6 6
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
4 4 4 4 4 4 4 4 4 4 4 4 4 4 4
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
Rev. 0
2021
5 6 7 8 9 10 11 12
Remarks.
May Jun Jul Aug Sep Oct Nov Dec
35 36 37 38 39 40 41 42

misc. works

misc. works

misc. works

1 1 1 1 1 1 1
1 1 1 1 1
2 1 1 1 1 1 1
20 20 10 10 10 5 5
1 1 1 1 1
7 7 7 7 7

3 3 3 3 3 1 1
20 20 20

1 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1
20 20 10 10 10 5 5 5
1 1 1 1 1 1 1
7 7 7 7 7 7 7
5 5
3 3 3 3 3 1 1 1
20 20 20 20 20

1 1
1 1
1 1
10 10
1 1
7 7
5 5
1 1
10 10

1 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1
20 20 10 10 10 5 5 5
1 1 1 1 1 1 1
7 7 7 7 7 7 7
5 5
3 3 3 3 3 1 1 1
20 20 20 20 20

1 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1
2 1 1 1 1 1 1 1
20 20 10 10 10 5 5 5
1 1 1 1 1 1 1
7 7 7 7 7 7 7
5 5
3 3 3 3 3 1 1 1
20 20 20 20 20

1 1

1 1
2 2
5 5

3 3
10 10

1 1 1 1 1 1 1
1 1 1
1 1 1 1 1 1 1
3 3 3 2 2 2 2
30 20 20 10 10 5 5
10 5 5 5
6 6 6 3 3 3 3
40 20 20 20 20 10 10

1 1

1 1
2 2
5 5

3 3
10 10

1 1 1 1 1 1 1
1 1 1
1 1 1 1 1 1 1
3 3 3 2 2 2 2
30 20 20 10 10 5 5
10 5 5 5
6 6 6 3 3 3 3
40 20 20 20 20 10 10

5 5 4 4 4 4 4 3
8 5 4 4 4 3 3 3
9 5 4 4 4 4 4 3
90 90 40 40 40 20 20 15
5 5 4 4 4 3 3 0
35 35 28 28 28 21 21 0
20 20 0 0 0 0 0 0
13 13 12 12 12 4 4 3
90 90 80 60 60 0 0 0

4 4 2 2 2 2 2 0
2 2 2 0 0 0 0 0
4 4 2 2 2 2 2 0
10 10 6 4 4 4 4 0
70 50 40 20 20 10 10 0
20 10 10 10 0 0 0 0
18 18 12 6 6 6 6 0
100 60 40 40 40 20 20 0
0 0 0 0 0 0 0 0

3 3 3 2 2 2 1 1
6 6 6 6 3 3 2 2
10 10 10 10 10 10 5
1 1 1 1 1 1 1
2 2 2 2 2 1 1 1
15 15 15 10 10 10 10
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
1 1 1 1 1 1 1 1
8 8 8 8 8 6 6 6
12 8 8 8 6 6 6 6
15 15 15 10 10 10 8 8
1 1 1 1 1 1 1 1
6 6 6 6 4 4 2 1
3 3 3 2 2 2 2 1
2 2 2 1 1 1 1 1

6 6 6 6 6 6 6 6
5 5 5 3 3 3 3 3
3 3 3 2 2 2 2 2
2 2 2 2 2 2 2 2
4 4 4 4 4 2 2 2
5 5 5 5 5 3 3 3
2 2 2 2 2 1 1 1
5 5 5 5 5 2 2 2
Consideration Nationality
Code Group name maximun requiement Thai
(Person) (Person)

Summary 1 - 5 ( Sub-Structure )
A Chief front en. 5 5
A Civil en 10 7
B Technician Structure 10 7
C Headman and Labours Structure 200 50
B Technician Formworks 10 7
C Headman and Labours Formworks 75 25
C General Housekeeping 50 5
B Site Store , Site documment and other 40 10
0 Unit rate Sub-contractor (local) 200 0

Summary 6 - 9 ( Station )
A Chief front 4 4
A Civil en 4 4
A Architect 4 4
B Technician 12 6
C Headman and Labours 120 40
C General Housekeeping 40 4
B Site Store , Site documment and other 24 8
0 Unit rate Sub-contractor ( local) 160 0
E&M

Balance Cantiliver 3 Location


A Chief front en. 1 1
A En 2 2
B Technician 6 3
C Labours 25 10
0 Sub-contractor ( local ) 50 0

Pool Department for site service


A Survey Chief + en ( 1 + 2 ) 3 3
B Technician + autocad 8 8
C instrument + labours 30 6
A Chief en. ( electrical + mechanical ) 1 1
A EN ( electrical + mechanical ) 2 2
B Technician + Helper (1+2) 30 10
A chief en. Technical 1 1
A tenhnical engineer 2 2
B Autocad 3 1
B Main store 8 4
B Cook + helper (1+2) 12 4
0 House keeping 15 0
A Chief safety 1 1
B Safety officer 8 4
A QA 3 2
0 Camp Boss 2 0

Main office
A Account 6 3
A Admin 5 2
B Payroll 3 1
B Cost 2 2
B Procurement 4 2
B Commercial / QS (4+1) 5 3
B IT 2 1
0 office boy 5 0

total 1213 265

summary as planning actual


Type of camp building
(person) (person)
A = Thai Engineer 44 50
B = Thai Staff 81 100
C = Thai Labours 140 200
Local manpower 948 1000
total 1213 1350
Nationality
Local
(Person)

0
3
3
150
3
50
45
30
200

0
0
0
6
80
36
16
160

0
0
3
15
50

0
0
24
0
0
20
0
0
2
4
8
15
0
4
1
2

3
3
2
0
2
2
1
5

948

building
(nos) Remarks
1 40 person/building
3 40 person/building
3 80 person/building
0 all local position JV not provide accommodation salary already inclusive
7
Footing
Pier No.
Type WxLxH

P628 NP 6x6x2

P627 NP 6x6x2

P626 SP 7.50 x 7.50 x 2.50

P625 SP 7.50 x 7.50 x 2.50

P624 SP 7.50 x 7.50 x 2.50

P623 SP 7.50 x 7.50 x 2.50

P622 SP 7.50 x 7.50 x 2.50

P621 SP 7.50 x 7.50 x 2.50

P620 SP 7.50 x 7.50 x 2.50

P619 NP 6x6x2

P618 NP 6x6x2

P617 NP 6x6x2

P616 NP 6x6x2

P615 NP 6x6x2

P614 NP 6x6x2

P613 NP 6x6x2

P612 NP 6x6x2

P611 NP 6x6x2

P610 SB 9.9 x 9.9 x 2.5

P609 SB 9.9 x 9.9 x 2.5

P608 NP 6x6x2

P607 AP 6x6x2

P606 AP 6x6x2

P605 AP 6x6x2

P604 NP 6x6x2

P603 NP 6x6x2

P602 NP 6x6x2

P601 NP 6x6x2

P600 NP 6x6x2

P599 NP 6x6x2

P598 NP 6x6x2

P597 NP 6x6x2

P596 NP 6x6x2

P595 SB 9.9 x 9.9 x 2.5

P594 SB 9.9 x 9.9 x 2.5

P593 NP 6x6x2
P592 NP 6x6x2

P591 NP 6x6x2

P590 SP 7.50 x 7.50 x 2.50

P589 SP 7.50 x 7.50 x 2.60

P588 SP 7.50 x 7.50 x 2.50

P587 SP 7.50 x 7.50 x 2.50

P586 SP 7.50 x 7.50 x 2.50

P585 SP 7.50 x 7.50 x 2.50

P584 SP 7.50 x 7.50 x 2.50

P583 NP 6x6x2

P582 NP 6x6x2

P581 L PP 8x5x2

P581 R PP 8x5x2

P580 AP 6 X 6 x 2.50

P579 CP 6.40 x 6.40 x 2.50

P578 L PP 5x5x2

P578 R PP 5x5x2

P577 NP 6x6x2

P576 NP 6x6x2

P575 AP 6x6x2

P574 L PP 5x5x2

P574 R PP 5x5x2

P573 L PP 5x5x2

P573 R PP 5x5x2

P572 L PP 8x5x2

P572 R PP 8x5x2

P571 AP 6x6x2

P570 NP 6x6x2

P569 NP 6x6x2

P568 NP 6x6x2

P567 NP 6x6x2

P566 NP 6x6x2

P565 AP 6x6x2

P564 L PP 5x5x2

P564 R PP 5x5x2

P563 AP 6 x 6 x 2.60

P562 NP 6x6x2

P561 L PP 5x5x2

P561 R PP 5x5x2

P560 AP 6 x 6 x 2.20

P559 NP 6x6x2
P558 NP 6x6x2

P557 NP 6x6x2

P556 NP 6x6x2

P555 NP 6x6x2

P554 NP 6x6x2

P553 NP 6x6x2

P552 NP 6x6x2

P551 NP 6x6x2

P550 NP 6x6x2

P549 SP 7.50 x 7.50 x 2.50

P548 SP 7.50 x 7.50 x 2.60

P547 SP 7.50 x 7.50 x 2.50

P546 SP 7.50 x 7.50 x 2.50

P545 SP 7.50 x 7.50 x 2.50

P544 SP 7.50 x 7.50 x 2.50

P543 SP 7.50 x 7.50 x 2.50

P542 NP 6x6x2

P541 L PP 5x5x2

P541 R PP 5x5x2

P540 L PP 5x5x2

P540 R PP 5x5x2

P539 AP 6 x 6 x 2.20

P538 NP 6x6x2

P537 NP 6x6x2

P536 NP 6x6x2

P535 NP 6x6x2

P534 NP 6x6x2

P533 NP 6x6x2

P532 NP 6x6x2

P531 NP 6x6x2

P530 NP 6x6x2

P529 NP 6x6x2

P528 NP 6x6x2

P527 NP 6x6x2

P526 NP 6x6x2

P525 AP 6x6x2

P524 AP 6x6x2

P523 AP 6x6x2

P522 NP 6x6x2

P521 NP 6x6x2

P520 SP 7.50 x 7.50 x 2.50


P519 SP 7.50 x 7.50 x 2.50

P518 SP 7.50 x 7.50 x 2.50

P517 SP 7.50 x 7.50 x 2.50

P516 SP 7.50 x 7.50 x 2.50

P515 SP 7.50 x 7.50 x 2.50

P514 SP 7.50 x 7.50 x 2.50

P513 NP 6x6x2

P512 NP 6x6x2

P511 NP 6x6x2

P510 NP 6x6x2

P509 NP 6x6x2

P508 NP 6x6x2

P507 NP 6x6x2

P506 NP 6x6x2

P505 NP 6x6x2

P504 NP 6x6x2

P503 NP 6x6x2

P502 NP 6x6x2

P501 NP 6x6x2

P500 NP 6x6x2

P499 NP 6x6x2

P498 NP 6x6x2

P497 NP 6x6x2

P496 NP 6x6x2

P495 NP 6x6x2

P494 NP 6x6x2

P493 NP 6x6x2

P492 NP 6x6x2

P491 AP 6x6x2

P490 AP 6x6x2

P489 CP 6 x 6 x 2.50

P488 CP 6 x 6 x 2.50

P487 CP 6 x 6 x 2.50

P486 CP 6 x 6 x 2.50

P485 AP 6x6x2

P484 NP 6x6x2

P483 NP 6x6x2

P482 NP 6x6x2

P481 NP 6x6x2

P480 NP 6x6x2

P479 SB 9.9 x 15.4 x 3


P478 SB 9.9 x 15.4 x 3

P477

Summary of Footing Size


W x L x H (m)
1 5x5x2 14
2 6x6x2 99
3 6 x 6 x 2.2 2
4 6 x 6 x 2.5 5
5 6 x 6 x 2.6 1
6 6.4 x 6.4 x 2.5 1
7 7.5 x 7.5 x 2.5 26
8 7.5 x 7.5 x 2.6 2
9 8x5x2 4
10 9.9 x 15.4 x 3 2
11 9.9 x 9.9 x 2.5 4
total 160

B = 4 ea / 1 set , high

แผว่นมมุมททงทั้ 4 ขนาด 1 m X 1 m

A = 4 ea / 1 set , high of formwork = 2.5 m

Remarks
As per working programme total requirement = 10 set ( 2 set /front)
Code

NP1

NP1

SP1

SP1

SP1

SP1

SP1

SP1

SP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

SB1

SB1

NP1

AP1

AP1

AP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

SB1

SB1

NP1
NP1

NP1

SP1

SP2

SP1

SP1

SP1

SP1

SP1

NP1

NP1

PP2

PP2

AP3

CP2

PP1

PP1

NP1

NP1

AP1

PP1

PP1

PP1

PP1

PP2

PP2

AP1

NP1

NP1

NP1

NP1

NP1

AP1

PP1

PP1

AP4

NP1

PP1

PP1

AP2

NP1
NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

SP1

SP2

SP1

SP1

SP1

SP1

SP1

NP1

PP1

PP1

PP1

PP1

AP2

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

AP1

AP1

AP1

NP1

NP1

SP1
SP1

SP1

SP1

SP1

SP1

SP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

NP1

AP1

AP1

CP1

CP1

CP1

CP1

AP1

NP1

NP1

NP1

NP1

NP1

SB2
SB2

ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea
ea

B = 4 ea / 1 set , high of formwork = 2.5 m

D = 4 ea / 1 set , high of formwork = 2.5 m

4.0 m 2.5 m 3.0 m

C
D
B
C = 4 ea / 1 set , high of formwork = 2.5 m

( 2 set /front)
rk = 2.5 m
Pier
Pier No.
Type
P628 NP
P627 NP
P626 SP
P625 SP
P624 SP
P623 SP
P622 SP
P621 SP
P620 SP
P619 NP
P618 NP
P617 NP
P616 NP
P615 NP
P614 NP
P613 NP
P612 NP
P611 NP
P610 SB
P609 SB
P608 NP
P607 AP
P606 AP
P605 AP
P604 NP
P603 NP
P602 NP
P601 NP
P600 NP
P599 NP
P598 NP
P597 NP
P596 NP
P595 SB
P594 SB
P593 NP
P592 NP
P591 NP
P590 SP
P589 SP
P588 SP
P587 SP
P586 SP
P585 SP
P584 SP
P583 NP
P582 NP
P581 L PP
P581 R PP
P580 AP
P579 CP
P578 L PP
P578 R PP
P577 NP
P576 NP
P575 AP
P574 L PP
P574 R PP
P573 L PP
P573 R PP
P572 L PP
P572 R PP
P571 AP
P570 NP
P569 NP
P568 NP
P567 NP
P566 NP
P565 AP
P564 L PP
P564 R PP
P563 AP
P562 NP
P561 L PP
P561 R PP
P560 AP
P559 NP
P558 NP
P557 NP
P556 NP
P555 NP
P554 NP
P553 NP
P552 NP
P551 NP
P550 NP
P549 SP
P548 SP
P547 SP
P546 SP
P545 SP
P544 SP
P543 SP
P542 NP
P541 L PP
P541 R PP
P540 L PP
P540 R PP
P539 AP
P538 NP
P537 NP
P536 NP
P535 NP
P534 NP
P533 NP
P532 NP
P531 NP
P530 NP
P529 NP
P528 NP
P527 NP
P526 NP
P525 AP
P524 AP
P523 AP
P522 NP
P521 NP
P520 SP
P519 SP
P518 SP
P517 SP
P516 SP
P515 SP
P514 SP
P513 NP
P512 NP
P511 NP
P510 NP
P509 NP
P508 NP
P507 NP
P506 NP
P505 NP
P504 NP
P503 NP
P502 NP
P501 NP
P500 NP
P499 NP
P498 NP
P497 NP
P496 NP
P495 NP
P494 NP
P493 NP
P492 NP
P491 AP
P490 AP
P489 CP
P488 CP
P487 CP
P486 CP
P485 AP
P484 NP
P483 NP
P482 NP
P481 NP
P480 NP
P479 SB
P478 SB
P477

Summary of Pier Size


W x L (m)
1 1.5 x 2.5
2 2x2
3 2 x 2.5
4 2x3
5 3x3
total
Pier
WxL Code
2x2 NPP1
2x2 NPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
3x3 SBP1
3x3 SBP1
2x2 NPP1
2x2 APP1
2x2 APP1
2x2 APP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
3x3 SBP1
3x3 SBP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x2 NPP1
2x2 NPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
2x3 APP3
2x3 CPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
2x2 NPP1
2x2 NPP1
2x2 APP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
2x2 APP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 APP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
2x3 APP3
2x2 NPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
2 x 2.5 APP2
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x2 NPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
1.5 x 2.5 PPP1
2x2 APP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 APP1
2x2 APP1
2x2 APP1
2x2 NPP1
2x2 NPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x3 SPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 APP1
2x2 APP1
2x3 CPP1
2x3 CPP1
2x3 CPP1
2x3 CPP1
2x2 APP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
2x2 NPP1
3x3 SBP1
3x3 SBP1

18 ea.
100 ea.
1 ea.
35 ea.
6 ea.
160 ea.
Summary piling Program
Project commencement date start from 6 June 2018
Y 2018
Item. Description Q'ty Unit Zone plan M October November December January February March April
materials W 840 841 842 843 844 845 846 847 848 849 850 851 852 901 902 903 904 905 906 907 908 909 910 911 912 913 914 915
1 Piling Rig 1
Dia. 1200 mm. Weekly 4 4 3 4 4 4 4 4
Sch.
P628 ---> P627 Cum.
1.1 40 nos.
P619 ---> P612 Conc. 184 184 138 184 184 184 184 184
mat.
Rebar 18 18 14 18 18 18 18 18
Zone 1
Dia. 1500 mm. Weekly 3 3 3 3 3 3 3 3 3 1
Sch.
P626 ---> P620 Cum.
1.2 28 nos.
Conc. 238.5 239 239 239 239 239 239 239 239 80
mat.
Rebar Test Pile = 1.5 m 24 24 24 24 24 24 24 24 24 8
Dia. 1200 mm. Weekly
Sch.
P527 ---> P521 Cum.
1.3 48 nos.
P513 ---> 509 Conc.
mat.
Rebar
Zone 2
Dia. 1500 mm. Weekly
Sch.
P520 ---> P514 Cum.
1.4 28 nos.
Conc.
mat.
Rebar
2 Piling Rig 2
Dia. 1200 mm. Weekly 3 3 3 3 3 3 3 3 3 3 3
Sch.
P611 Cum.
2.1 52 nos.
P608 ---> P597 Conc. 138 138 138 138 138 138 138 138 138 138 138
mat.
Rebar 14 14 14 14 14 14 14 14 14 14 14
Zone 1
Dia. 2200 mm. Weekly 2 2 2 2
Sch.
P610 ---> P609 Cum.
2.2 8 nos. Test Pile = 2.2 m
Conc. 342 342 342 342
mat.
Rebar 34 34 34 34
Dia. 1200 mm. Weekly
Sch.
P508 ---> P499 Cum.
2.3 40 nos. Zone 2
Conc.
mat.
Rebar
3 Piling Rig 3
Dia. 1200 mm. Weekly 4 4 4 4 3 4
Sch.
P596 Cum.
3.1 24 nos.
P593 ---> P591 Conc. 184 184 184 184 138 184
mat.
P583 ---> P582 Rebar 18 18 18 18 14 18
Dia. 2200 mm. Weekly 2 2 2 2
Sch.
P595 ---> P594 Cum.
3.2 8 nos.
Conc. 342 342 342 342
mat.
Rebar 34 34 34 34
Zone 1
Dia. 1500 mm. Weekly 3 3 3 3 3 3 3 3 3 1
Sch.
P590 ---> P584 Cum.
3.3 28 nos.
Conc. 239 239 239 239 239 239 239 239 239 80
mat.
Rebar 24 24 24 24 24 24 24 24 24 8
Dia. 1000 mm. Weekly
Sch.
PP581 Cum.
3.4 12 nos.
Conc.
mat.
Rebar
Dia. 1200 mm. Weekly
Sch.
P537 ---> P528 Cum.
3.5 40 nos. Zone 2
Conc.
mat.
Rebar
4 Piling Rig 4
Dia. 1200 mm. Weekly 2 2 4 3 3 3 3 3 1
Sch.
P580 ---> P579 Cum.
4.1 24 nos.
P577 ---> P575 Conc. 92 92 184 138 138 138 138 138 46
mat.
P571 Rebar 9 9 18 14 14 14 14 14 5
Zone 1
Dia. 1000 mm. Weekly 4 4 5 5 5 5 3 3 2
Sch.
PP578 Cum.
4.2 36 nos.
PP574 ---> PP572 Conc. 107 107 134 134 134 134 80 80 53
mat.
Rebar 10.8 11 14 14 14 14 8 8 5
Dia. 2200 mm. Weekly 3
Sch.
P478 ---> P479 Cum.
4.3 12 nos.
Conc. 513
mat.
Rebar 51
Zone 2
Dia. 1200 mm. Weekly
Sch.
P480 ---> P498 Cum.
4.4 76 nos.
Conc.
mat.
Rebar
5 Piling Rig 5
Dia. 1200 mm. Weekly 1 3 3 3 3 3 3 3 2 3 3 2 1 3 3 3
Sch.
P570 ---> P565 , P563 ---> P562 Cum.
5.1 88 nos.
P560 ---> P550 , P542 Conc. 46 138 138 138 138 138 138 138 92 138 138 92 46 138 138 138
mat.
PP539 ---> PP538 Rebar 5 14 14 14 14 14 14 14 9 14 14 9 5 14 14 14
Dia. 1000 mm. Weekly 1 4 3 2 4 2
Sch.
PP564 Cum.
5.2 32 nos. Zone 1 Test Pile = 1.2 m Test Pile = 1.0 m
PP561 Conc. 27 107 80 53 107 53
mat.
PP541 ---> PP540 Rebar 3 11 8 5 11 5
Dia. 1500 mm. Weekly
Sch.
P549 ---> P543 Cum.
5.3 28 nos.
Conc.
mat.
Rebar

Weekly 7 7 13 13 15 15 15 15 14 18 17 17 17 17 17 15 16 15 17
Sch.
Cum. 7 14 27 40 55 70 85 100 114 132 149 166 183 200 217 232 248 263 280
Sub Total 652 nos.
Conc. M3 322 572 848 771 963.5 1,041 1,041 1,041 1,077 857 830 888 888 820 748 713 837 724 1,157
mat.
Rebar Ton 32 57 84 76.8 97 104 104 104 108 87 84 90 90 82 75 71 84 73 115

No. Pile nos 40 74 69 65


Monthly Production Concrete M3 2,513 5,163 3,463 3,118
Rebar Ton 250 517 351 312
Rev. 0
2019
April May June July August September October November December Remarks.
916 917 918 919 920 921 922 923 924 925 926 927 928 929 930 931 932 933 934 935 936 937 938 939 940 941 942 943 944 945 946 947 948 949 950 951 952 953

3 3 3 1.2 m L = 40 m
1.5 m L = 45 m
138 138 138 2.2 m L = 45 m
14 14 14 1.0 m L = 34 m

2 3 3 3 3 3 3 3 3 2 2 3 3 3 3 3 2 1

92 138 138 138 138 138 138 138 138 92 92 138 138 138 138 138 138 46
9 14 14 14 14 14 14 14 14 9 9 14 14 14 14 14 14 5
1 3 3 3 3 3 3 3 3 2 1

80 239 239 239 239 239 239 239 239 159 80


8 24 24 24 24 24 24 24 24 16 8

3 3 3 3 3 3 1

138 138 138 138 138 138 46


14 14 14 14 14 14 5

3 3 3 3 3 3 3 3 3 3 3 3 2 2

138 138 138 138 138 138 138 138 138 138 138 138 92 92
14 14 14 14 14 14 14 14 14 14 14 14 9 9

46
5

5 6 1

134 160 27
14 16 3
3 3 3 3 3 3 3 3 3 3 3 3 3 1

138 138 138 138 138 138 138 138 138 138 138 138 138 46
14 14 14 14 14 14 14 14 14 14 14 14 14 5

3 3 3

513 513 513


51 51 51
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 2 2 1

138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 138 92 92 92 46
14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 14 9 9 9 5

3 3 3 3 3 3 3 3 3 3 2 2 2 2 3 3 2

138 138 138 138 138 138 138 138 138 138 92 92 92 92 138 138 92
14 14 14 14 14 14 14 14 14 14 9 9 9 9 14 14 9
4 4 4 4

107 107 107 107


11 11 11 11
1 3 3 3 3 3 3 3 3 2 1

80 239 239 239 239 239 239 239 239 159 80


8 24 24 24 24 24 24 24 24 16 8

18 18 13 14 15 15 13 15 15 15 14 15 15 15 15 15 13 12 12 11 10 8 8 10 10 10 9 8 7 4

298 316 329 343 358 373 386 401 416 431 445 460 475 490 505 520 533 545 557 568 578 586 594 604 614 624 633 641 648 652
1,107 1,087 954 644 690 690 598 690 690 690 644 724 825 892 892 892 800 754 754 708 628 469 402 383 383 383 337 368 368 184

112 109 96 65 70 70 61 70 70 70 65 73 83 90 90 90 81 76 76 71 63 47 40 39 39 39 34 37 37 19

68 70 59 75 58 36 34 4 0 652
4,075 3,576 2,714 4,225 3,644 1,637 1,456 184 0 35,767
409 361 275 426 367 165 147 19 0 3,599
Summary Weekly Pilecap Program
Pilecap Type 1) Assymmetry Pier (AP) 2) Catilever Pier (CP)
Type works. Q'ty

Item. Description AP CP NP PP SP SB Unit

1 Front A

1.1 P628 - P627 , P619 - P612 , P527 - P526 , P522 - P521 14 nos.
1.2 P626 - P620 , P520 - P516 12 nos.
1.3 P525 - P523 3 nos.
total nos.
Concrete M3
materials
Rebar Ton
2 Front B

2.1 P611 , P608 , P604 - P597 , P508 - P499 20 nos.


2.2 P610 - P609 2 nos.
2.3 P607 - P605 3 nos.
total nos.
Concrete M3
materials
Rebar Ton
3 Front C

3.1 P596 , P593 - P591 , P583 - P582 , P537 - P528 16 nos.


3.2 P595 - P594 2 nos.
3.3 P590 - P584 7 nos.
3.4 P581 2 nos.
total nos.
Concrete M3
materials
Rebar Ton
4 Front D

4.1 P580 , P575 , P571 , P485 , P490 - P491 6 nos.


4.2 P579 , P486 - P489 5 nos.
4.3 P578 , P574 - P572 8 nos.
4.4 P577 - P576 , P480 - P484 , P492 - P498 14 nos.
4.5 P478 - P479 2 nos.
total nos.
Concrete M3
materials
Rebar Ton
5 Front E
5.1 P570 - P566 , P562 , P559 - P550 , P542 , P538 , P513 - P509 23 nos.
5.2 P565 , P563 , P560 , P539 4 nos.
5.3 P564 , P561 , P541 - P540 8 nos.
5.4 P549 - P543 7 nos.
5.5 P515 - P514 2 nos.
total nos.
Concrete M3
materials
Rebar Ton

Summary 16 5 87 18 28 6 nos.

Monthly
2) Catilever Pier (CP) 3) Normal Pier (NP) 4) Portal Pier (PP) 5) Station Pier (SP)

No. Y

Pier plan M Jan Feb Mar Apr

W 1 2 3 4 5 6 7 8 9 10 11 12 13 14

14 Sch. Weekly 1 1
12 Sch. Weekly 1 1 1 1 1
3 Sch. Weekly
29 1 1 1 1 1 1 1
72 72 140.6 140.6 140.6 140.6 140.6
10.8 10.8 21.6 21.6 21.6 21.6 21.6

20 Sch. Weekly 1 1
2 Sch. Weekly 1 1
3 Sch. Weekly 1
25 1 1 1 1 1
72 245 245 72 72
11 37 37 11 11

16 Sch. Weekly 1 1 1 1
2 Sch. Weekly 1 1
7 Sch. Weekly
2 Sch. Weekly
27 1 1 1 1 1 1
72 245 245 72 72 72
11 37 37 11 11 11

6 Sch. Weekly 1 1
5 Sch. Weekly 1
8 Sch. Weekly 1 1
14 Sch. Weekly 1 1
2 Sch. Weekly
35 1 1 1 1 1 1 1
90 102.4 50 50 72 72 72
14 15 8 8 11 11 11
23 Sch. Weekly 1 1 1 1 1
4 Sch. Weekly 1
8 Sch. Weekly 1
7 Sch. Weekly
2 Sch. Weekly
44 1 1 1 1 1 1 1
72 72 72 72 72 72 50
11 11 11 11 11 11 8

160 Sch. no. 0 3 0 4 1 4 1 4 1 4 1 4 1 4

Weekly Conc 0 234 0 318.4 72 507.6 245 507.6 245 356.6 72 356.6 72 334.6

Rebar 0 35 0 48 11 77 37 77 37 55 11 55 11 51
Pilecap No. 8 10 10 10
Monthly Concrete 624 1,505 857 860
Rebar 95 228 131 132
6) Special Bridge (SB) Balance Cantiliver

2019

Apr May Jun Jul Aug

15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

1 1 1 1 1 1 1
1 1

1 1 1 1 1 1 1 1 1
140.6 140.6 72 72 72 72 72 72 72
21.6 21.6 11 11 11 11 10.8 10.8 11

1 1 1 1 1 1 1 1

1 1
1 1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 72 72 72
11 11 11 11 11 11 11 11 11 11

1 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1
141 141 141 141 141 141 141 72 72
22 22 22 22 22 22 22 11 11

1 1 1 1 1 1

1 1
1 1 1 1 1 1 1 1 1
50 50 50 50 80 80 72 457.4 457.4
8 8 8 8 12 12 11 69 69
1 1 1 1
1 1
1 1 1

1 1 1 1 1 1 1 1 1
50 79 72 50 50 79 72 72 72
8 12 11 8 8 12 11 11 11

1 4 1 4 1 4 1 4 1 4 1 4 1 4 1 4 1 4 1

72 381.6 72 410.8 72 335 72 313 72 343 72 372 72 357 72 673.4 72 673.4 72

11 59 11 63 11 52 11 49 11 53 11 57 11 55 11 101 11 102 11
10 14 10 11 9
860 1,203 859 1,246 1,041
132 186 132 189 158
Aug Sep Oct Nov Dec

34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

1 1 1 1 1
1
1 1 1

1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 72 141
11 11 11 11 11 11 11 11 22

1 1 1 1 1 1 1 1

1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 72
11 11 11 11 11 11 11 11

1 1 1 1 1 1 1

1 1
1 1 1 1 1 1 1 1 1
80 80 72 72 72 72 72 72 72
12 12 11 11 11 11 11 11 11

1
1 1 1 1

1 1 1 1 1

1 1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 90 90 90 90
11 11 11 11 11 11 14 14 14 14
1 1 1 1 1 1 1

1 1 1

1 1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 141 141 141
11 11 11 11 11 11 11 22 22 22

4 0 3 1 3 2 3 2 3 2 3 2 3 2 3 2 3 2 3

296 0 224 72 216 144 216 144 216 144 216 144 234 144 303 144 303 144 372

45 0 34 11 33 22 33 22 33 22 33 22 36 22 47 22 47 22 58
9 9 13 10 10
1,041 656 936 825 963
158 100 143 127 149
Jan Feb Mar Apr May

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19

1 1 1 1

1 1 1 1
141 141 141 141
22 22 22 22

1 1

1 1
72 72
11 11

1 1 1

1 1 1
72 72 72
11 11 11

1 1

1 1 1 1 1 1 1

1 1 1 1 1 1 1 1 1
72 72 72 72 72 72 72 72 72
11 11 11 11 11 11 11 11 11
1

1 1 1 1
1 1 1 1

1 1 1 1 1 1 1 1 1
141 141 141 141 72 50 50 50 50
22 22 22 22 11 8 8 8 8

2 3 2 3 1 3 0 3 0 2 0 2 0 2 0 2 0 2 0

144 354 144 354 72 354 0 354 0 144 0 122 0 122 0 122 0 122 0

22 55 22 55 11 55 0 55 0 22 0 19 0 19 0 19 0 19 0
11 6 4 4 4
1,068 708 266 244 273
165 110 41 38 42
2020

May Jun Jul Aug Sep

20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
1 1 1 1 1 1
1

1 1
1 1 1 1 1 1 1 1 1
79 72 141 141 72 72 72 72 72
12 11 22 22 11 11 11 11 11

1 0 1 0 1 0 1 0 1 0 1 0 1 0 1 0 1

79 0 72 0 141 0 141 0 72 0 72 0 72 0 72 0 72

12 0 11 0 22 0 22 0 11 0 11 0 11 0 11 0 11
4 2 2 2 1
273 282 144 144 72
42 44 22 22 11
Rev. 0

Sep Oct Nov Dec Remarks.

39 40 41 42 43 44 45 46 47 48 49 50 51 52
1 160 nos
72 14,778 m3
11 2,265 ton
IDM0604 Viaduct completed

CP05 Start CP06 = 14Km163.592


Pier Type 1) Assymmetry Pier (AP) SB SB NP NP NP NP NP

2) Catilever Pier (CP) P477 P478 P479 P480 P481 P482 P483 P484

3) Normal Pier (NP) 45 70 45 28.6 35 40 35 26.16


4) Portal Pier (PP)
5) Special Bridge (SB) balance cantiliver

6) Station Pier (SP) 1 1 1 1 1 1 1 1

Y M w Pier number P477 P478 P479 P480 P481 P482 P483 P484

182 52
181 51
Dec 42
180 50
179 49
178 48
177 47
Nov 41
176 46
175 45
174 44
173 43
Oct 40 172 42
171 41
170 40
169 39
168 38
Sep 39
167 37
166 36
165 35
164 34
Aug 38
163 33
162 32
161 31
160 30
July 37 159 29
158 28
157 27
21
156 9
155 8
Jun 36
154 7
153 6
152 5
151 4
May 35 150 3
149 2
148 1
147 17

Apr 34
146 16
Apr 34
145 15
144 14
143 13
142 12
Mar 33
141 11
140 10
139 9
138 8
Fab 32
137 7
136 6
135 5
134 4
Jan 31 133 3
132 2 IMD 0603 = 924 Days
131 1
130 52
129 51 IMD 0604 = 896 Days
Dec 30
128 50
127 49
126 48
125 47
Nov 29
124 46
123 45
122 44
121 43
Oct 28 120 42
119 41
118 40
117 39
116 38
Sep 27
115 37
114 36
113 35
112 34
Aug 26
111 33
110 32
109 31
108 30
July 25 107 29
106 28
105 27
20
104 9
LG #2
103 8 IMD -0602 = 714 Days Assembly
Jun 24
102 7 closing segment
101 6
100 5
99 4
May 23
May 23 98 3
97 2
96 1
95 17
94 16
Apr 22 Segment casting
93 15
92 14
91 13
90 12
Mar 21
89 11
88 10
87 9
86 8
Fab 20
85 7
84 6
83 5
82 4
Jan 19 81 3
80 2
79 1
78 52
77 51
Dec 18
76 50
75 49
74 48
73 47
Nov 17
72 46
71 45
70 44
69 43
Oct 16 68 42
67 41
66 40
65 39
64 38
Sep 15
63 37
62 36
61 35
60 34
Aug 14
59 33
58 32
57 31
56 30
July 13 55 29
54 28
53 27
19
52 9
51 8
Jun 12
19

Jun 12
50 7
49 6 IMD 0601 = 336 Days
48 5
47 4
May 11 46 3
45 2
44 1
43 17
42 16
Apr 10
41 15
40 14
39 13
38 12
Mar 9
37 11
36 10
35 9
34 8
Fab 8
33 7
32 6
31 5
30 4
Jan 7 29 3
28 2
27 1
26 52
25 51
Dec 6
24 50
23 49
22 48
21 47
Nov 5
20 46
19 45 Test Pile should be start in the month of Nov18
18 44
17 43
Oct 4 16 42
15 41
14 40
18
13 39
12 38
Sep 3
11 37
10 36
9 35
8 34
Aug 2
7 33
6 32
5 31
4 30
July 1 3 29
July 1
2 28
1 27

CP06
SB SB NP NP NP NP NP
P477 P478 P479 P480 P481 P482 P483 P484
45 70 45 28.6 35 40 35 26.16

balance cantiliver
14Km953.353
AP CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP

P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506

30 30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30 30

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506
LG #1
Dismantling

LG #2
Dismantling

LG #2 = 20 span @ 5 day / sapn

Completion at least contimuous 2.5 KM length of vi


Segment casting = 20 span

borpil
e Rig #
4 total
scope
= 84
pile @
2 borpil
pile/d e Rig
ay #2
durati total
on = 7 scope
month = 44
pile
@2
pile/d
ay
durati
on =
3.5
mont
h
on =
3.5
mont
h
1 July 2018 commencement date

AP CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP NP
P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505 P506
30 30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30 30
15Km676.250
NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP NP

P507 P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528

30 25 40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30 30

shahbag station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P507 P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528
Viaduct Construction Completed. Will complete the remaining of Viaducts, Deck

muous 2.5 KM length of viaduct to allow the CP07 contractor for first installation of track works. will complete Viaducts, Deck Fu
borpil
e Rig #
1 total
scope
= 76
pile @
2
pile/d
ay
durati
on = 6
month
NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP NP
P507 P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527 P528
30 25 40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30 30

shahbag station
IDM 0602 Viaduct

16Km491.053
NP NP NP NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP NP

P529 P530 P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550

30 30 30 30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30 30

TSC station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P529 P530 P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550
maining of Viaducts, Deck Furnitue (incl. MEP Works) starting from 16km491.503 to 14km163.592 where distance continuously

mplete Viaducts, Deck Furniture (Incl. MEP Works) starting from 19KM085.503 to 16Km491.503 where distance continuously e
Cross Beam

LG #1 = 80 span @ 5 day /span


Cross Beam

Segment casting = 80 span

Sub-structure group C

borpil
e Rig # Sub-structure group E
3 total
scope Sub-structure group A
= 40
pile @
2
pile/d Sub-structure group B
ay
durati
on =
3.5
month
borpile Rig # 5total scope = 148 pile @ 2
pile/day duration = 11 month
1 July 2018 com

NP NP NP NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP NP
P529 P530 P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549 P550
30 30 30 30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30 30

TSC station
IDM 0602 Viaduct complete starting from 19km085.503 - 16Km491.503 continuously

16Km491.053
NP NP NP NP NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP PP

P551 P552 P553 P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572

30 30 30 30 30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P551 P552 P553 P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572
ere distance continuously equal 2,327.911 km.

e distance continuously equal 2,594 km.


an @ 5 day /span

Segment casting = 80 span

oup E

Cross Beam
tal scope = 148 pile @ 2
n = 11 month Cross Beam

borpil
e Rig #
4 total
scope
= 60
pile @
2
pile/d
ay
durati
on =
4.5
month
1 July 2018 commencement date

NP NP NP NP NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP PP
P551 P552 P553 P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571 P572
30 30 30 30 30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40 40
17Km776.503
PP PP AP NP NP PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP NP

P573 P574 P575 P576 P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593

40 30 30 30 30 40 30 40 40 23 20 30 30 30 30 30 30 32 32 32 45

press club station balance cantiliver

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P573 P574 P575 P576 P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593
LG #2
Dismantling

Cross Beam

Cross Beam

Cross Beam
sub- structure Group C
LG #1
Cross Beam Assembly
LG #1
Assembly

Cross Beam

Sub-structure Group D
borpil
e Rig #
4 total
scope
= 60
pile @ borpile Rig # 3 total scope = 72 pile @ 2
2 pile/day duration = 6 month
pile/d
ay
durati
on =
4.5
month
PP PP AP NP NP PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP NP
P573 P574 P575 P576 P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592 P593
40 30 30 30 30 40 30 40 40 23 20 30 30 30 30 30 30 32 32 32 45

press club station balance cantiliver


SB SB NP NP NP NP NP NP NP NP NP AP AP AP NP SB SB

P594 P595 P596 P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610

70 45 30 30 40 30 30 30 30 30 25 25 30 28 45 70 45

balance cantiliver balance cantiliver

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P594 P595 P596 P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610
LG #2 = 42 span @ 5 day / sapn
closing segment

Segment casting = 42 span closing segment

Sub- structure Group B

team 2
Balance catiliver te

team1

borpile Rig # 2 total scope = 60 pile @ 2


pile/day duration = 5 month
SB SB NP NP NP NP NP NP NP NP NP AP AP AP NP SB SB
P594 P595 P596 P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609 P610
70 45 30 30 40 30 30 30 30 30 25 25 30 28 45 70 45

balance cantiliver balance cantiliver


end of contract CP06 = 19Km085.503
NP NP NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP

P611 P612 P613 P614 P615 P616 P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628

35 30 30 30 40 40 30 30 30 30 30 30 30 30 30 30 30
total
motijheel station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 sum

P611 P612 P613 P614 P615 P616 P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628
LG #2
Assembly
Assembly

Balance catiliver team

Sub-structure Group A

borpile Rig # 1 total scope = 68 pile @ 2


pile/day duration = 5.5 month
1 July 2018 commencement date

end of contract CP06


NP NP NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP
P611 P612 P613 P614 P615 P616 P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628
35 30 30 30 40 40 30 30 30 30 30 30 30 30 30 30 30
total
motijheel station
end of contract CP06 = 19Km085.503
Pier type

Pier number

Span length (m)


4,922 m

151 span

Pier number w M Y

52 182
51 181
42 Dec
50 180
49 179
48 178
47 177
41 Nov
46 176
45 175
44 174
43 173
42 172 40 Oct
41 171
40 170
39 169
38 168
39 Sep
37 167
36 166
35 165
34 164
38 Aug
33 163
32 162
31 161
30 160
29 159 37 July
28 158
27 157
21
9 156
8 155
36 Jun
7 154
6 153
5 152
4 151
3 150 35 May
2 149
1 148
17 147

34 Apr
16 146
34 Apr
15 145
14 144
13 143
12 142
33 Mar
11 141
10 140
9 139
8 138
32 Feb
7 137
6 136
5 135
4 134
3 133 31 Jan
IMD 0603 = 924 Days 2 132
1 131
52 130
IMD 0604 = 896 Days 51 129
30 Dec
50 128
49 127
48 126
47 125
29 Nov
46 124
45 123
44 122
43 121
42 120 28 Oct
41 119
40 118
39 117
38 116
27 Sep
37 115
36 114
35 113
34 112
26 Aug
33 111
32 110
31 109
30 108
29 107 25 July
28 106
27 105
20
9 104
IMD -0602 = 714 Days 8 103
24 Jun
7 102
6 101
5 100
4 99
23 May
3 98 23 May
2 97
1 96
17 95
16 94
22 Apr
15 93
14 92
13 91
12 90
21 Mar
11 89
10 88
9 87
8 86
20 Feb
7 85
6 84
5 83
4 82
3 81 19 Jan
2 80
1 79
52 78
51 77
18 Dec
50 76
49 75
48 74
47 73
17 Nov
46 72
45 71
44 70
43 69
42 68 16 Oct
41 67
40 66
39 65
38 64
15 Sep
37 63
36 62
35 61
34 60
14 Aug
33 59
32 58
31 57
30 56
29 55 13 July
28 54
27 53
19
9 52
8 51
12 Jun
19

12 Jun
7 50
IMD 0601 = 336 Days 6 49
5 48
4 47
ture Group A 3 46 11 May
2 45
1 44
17 43
16 42
10 Apr
15 41
14 40
13 39
12 38
9 Mar
11 37
10 36
9 35
8 34
8 Feb
7 33
6 32
5 31
4 30
3 29 7 Jan
2 28
1 27
52 26
51 25
6 Dec
50 24
49 23
48 22
47 21
5 Nov
46 20
45 19
44 18
43 17
42 16 4 Oct
41 15
40 14
18
39 13
38 12
3 Sep
37 11
36 10
35 9
34 8
2 Aug
33 7
32 6
31 5
30 4
29 3 1 July
1 July
28 2
27 1

end of contract CP06


Pier type

Pier number
Span length (m)
4,922 m
CP05 Start CP06 = 14Km163.592
Pier Type 1) Assymmetry Pier (AP) SB SB NP NP NP NP

2) Catilever Pier (CP) P477 P478 P479 P480 P481 P482 P483

3) Normal Pier (NP) 45 70 45 28.6 35 40 35


4) Portal Pier (PP)
5) Special Bridge (SB) balance cantiliver

6) Station Pier (SP) 1 1 1 1 1 1 1

Y M w Pier number P477 P478 P479 P480 P481 P482 P483


total contract = 1274 Days
182 52
181 51
Dec 42
180 50
179 49 IMD 0607 = 1246 Days
178 48
177 47
Nov 41
176 46
175 45 IMD 0608 =1218 Days
174 44
173 43
Oct 40 172 42
171 41
170 40
169 39
168 38
Sep 39
167 37
166 36
165 35
164 34
Aug 38
163 33
162 32
161 31
160 30
July 37 159 29
158 28
157 27
21
156 9
155 8
Jun 36
154 7 IMD 0606 , 0609 = 1071 Days
153 6
152 5
151 4
May 35 150 3
149 2 IMD 0605 = 1043 Days
148 1
147 17

Apr 34
146 16
Apr 34
145 15
144 14
143 13
142 12
Mar 33
141 11
140 10
139 9
138 8
Fab 32
137 7
136 6
135 5
134 4
Jan 31 133 3
132 2 IMD 0603 = 924 Days
131 1
130 52
129 51 IMD 0604 = 896 Days
Dec 30
128 50
127 49
126 48
125 47
Nov 29
124 46
123 45
122 44
121 43
Oct 28 120 42
119 41
118 40
117 39
116 38
Sep 27
115 37
114 36
113 35
112 34
Aug 26
111 33
110 32
109 31
108 30
July 25 107 29
106 28
105 27
20
104 9
103 8 IMD -0602 = 714 Days
Jun 24
102 7 closing segment
101 6
100 5
99 4
May 23
May 23 98 3
97 2
96 1
95 17
94 16
Apr 22
93 15
92 14
91 13
90 12
Mar 21
89 11
88 10
87 9
86 8
Fab 20
85 7
84 6
83 5
82 4
Jan 19 81 3
80 2
79 1
78 52
77 51
Dec 18
76 50
75 49
74 48
73 47
Nov 17
72 46
71 45
70 44
69 43
Oct 16 68 42
67 41
66 40
65 39
64 38
Sep 15
63 37
62 36
61 35
60 34
Aug 14
59 33
58 32
57 31
56 30
July 13 55 29
54 28
53 27
19 LG #1
52 9 Assembly
51 8
Jun 12
19 LG #1
Assembly
Jun 12
50 7
49 6 IMD 0601 = 336 Days
48 5
47 4
May 11 46 3
45 2
44 1
43 17
42 16
Apr 10
41 15
40 14
39 13
38 12
Mar 9
37 11
36 10
35 9
34 8
Fab 8
33 7
32 6
31 5
30 4
Jan 7 29 3
28 2
27 1
26 52
25 51
Dec 6
24 50
23 49
22 48
21 47
Nov 5
20 46
19 45 Test Pile should be start in the month of Nov18
18 44
17 43
Oct 4 16 42
15 41
14 40
18
13 39
12 38
Sep 3
11 37
10 36
9 35
8 34
Aug 2
7 33
6 32
5 31
4 30
July 1 3 29
July 1
2 28
1 27

CP06
SB SB NP NP NP NP
P477 P478 P479 P480 P481 P482 P483
45 70 45 28.6 35 40 35

balance cantiliver

Note
1 LG segment erection = 2 number
2 Balance cantiliver = 2 set substrure + 4 set form traveller
3 sub- structre works front will be mobilize = 5 group (formwork fo
4 borpile Rig = 5 Rig
5 Segment casting production require casting yards 03/04 provide
14Km953.353
NP AP CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP

P484 P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505

26.16 30 30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P484 P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505
Completion at least contimuous 2.5 KM length
LG #1 erection = 43 span @ 5 days/span
duration = 8.5 month

Segment casting time duration = 13 month


borpile Rig # 1 total scope = 92 pile @ 2
pile/day duration = 7 month

Front A
1 July 2018 commencement date

NP AP CP CP CP CP AP AP NP NP NP NP NP NP NP NP NP NP NP NP NP NP
P484 P485 P486 P487 P488 P489 P490 P491 P492 P493 P494 P495 P496 P497 P498 P499 P500 P501 P502 P503 P504 P505
26.16 30 30 30 30 30 30 25 40 30 30 30 30 30 30 40 25 30 30 30 30 30

+ 4 set form traveller


ilize = 5 group (formwork footing 10 set , Pier NP 8 set , Pier SP = 4 , Pier CP = 2 set , Pier AP = 2 set , Portal pier PP = 4 set

casting yards 03/04 provide planning and estimation number of bed and formworks as CP06 time frame
15Km676.250
NP NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP

P506 P507 P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527

30 30 25 40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30

shahbag station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P506 P507 P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527
Viaduct Construction Completed. Will complete the remaining of Viaducts,

ontimuous 2.5 KM length of viaduct to allow the CP07 contractor for first installation of track works. will complete Viaducts, De
LG #1
Dismantling

duration = 13 month

LG#2Assembly
LG#2Assembly
borpil
e Rig #
2 total
scope
= 92
pile @
2
pile/d
ay
durati
on = 7

mont
h

Front B
NP NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP AP AP AP NP NP
P506 P507 P508 P509 P510 P511 P512 P513 P514 P515 P516 P517 P518 P519 P520 P521 P522 P523 P524 P525 P526 P527
30 30 25 40 30 30 23 22.9 30 30 30 30 30 30 32 45 30 30 27 30 30 30

shahbag station

pier PP = 4 set
NP NP NP NP NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP

P528 P529 P530 P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549

30 30 30 30 30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30

TSC station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P528 P529 P530 P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549
e remaining of Viaducts, Deck Furnitue (incl. MEP Works) starting from 16km491.503 to 14km163.592 where distance continuo

ill complete Viaducts, Deck Furniture (Incl. MEP Works) starting from 19KM085.503 to 16Km491.503 where distance continuou
LG #2 erection = 70 span @ 5
Duration = 14 month

Cross Beam

Cross Beam
borpil
e Rig #
3 total
scope
= 88
pile @
2
pile/d
ay
durati
on =
6.8 Front C
month
NP NP NP NP NP NP NP NP NP NP NP AP PP PP NP SP SP SP SP SP SP SP
P528 P529 P530 P531 P532 P533 P534 P535 P536 P537 P538 P539 P540 P541 P542 P543 P544 P545 P546 P547 P548 P549
30 30 30 30 30 30 30 30 30 30 40 40 40 40 28.25 30 30 30 30 30 30 30

TSC station
16Km491.053
NP NP NP NP NP NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP

P550 P551 P552 P553 P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571

30 30 30 30 30 30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P550 P551 P552 P553 P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571
where distance continuously equal 2,327.911 km.

where distance continuously equal 2,594 km.


#2 erection = 70 span @ 5 day /span
ation = 14 month

Segment time duration = 19 month


borpile Rig # 4 total scope = 152 pile @ 2
pile/day duration = 10.5 month

Front D
1 July 2018 commencement date

NP NP NP NP NP NP NP NP NP NP AP PP NP AP PP AP NP NP NP NP NP AP
P550 P551 P552 P553 P554 P555 P556 P557 P558 P559 P560 P561 P562 P563 P564 P565 P566 P567 P568 P569 P570 P571
30 30 30 30 30 30 30 30 32 30 40 35 35 40 40 30 30 30 30 30 30 40
17Km776.503
PP PP PP AP NP NP PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP

P572 P573 P574 P575 P576 P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592

40 40 30 30 30 30 40 30 40 40 23 20 30 30 30 30 30 30 32 32 32

press club station


1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P572 P573 P574 P575 P576 P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592
LG#2 Dismantling
Balance catiliver tea
borpile Rig # 5 total scope = 100 pile @ 2
pile/day duration = 7.8 month

Front E
PP PP PP AP NP NP PP CP AP PP NP NP SP SP SP SP SP SP SP NP NP
P572 P573 P574 P575 P576 P577 P578 P579 P580 P581 P582 P583 P584 P585 P586 P587 P588 P589 P590 P591 P592
40 40 30 30 30 30 40 30 40 40 23 20 30 30 30 30 30 30 32 32 32

press club station


Km776.503
NP SB SB NP NP NP NP NP NP NP NP NP AP AP AP NP SB

P593 P594 P595 P596 P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609

45 70 45 30 30 40 30 30 30 30 30 25 25 30 28 45 70

balance cantiliver balance cantiliver

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

P593 P594 P595 P596 P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609
LG #1
Dismantling

Dismantling
tiliver tea

borpile Rig # 1 total scope = 60 pile @ 2


pile/day duration = 4.5 month
NP SB SB NP NP NP NP NP NP NP NP NP AP AP AP NP SB
P593 P594 P595 P596 P597 P598 P599 P600 P601 P602 P603 P604 P605 P606 P607 P608 P609
45 70 45 30 30 40 30 30 30 30 30 25 25 30 28 45 70

balance cantiliver balance cantiliver


end of contract CP06 = 19Km
SB NP NP NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP

P610 P611 P612 P613 P614 P615 P616 P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628

45 35 30 30 30 40 40 30 30 30 30 30 30 30 30 30 30 30
total
alance cantiliver motijheel station
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 sum

P610 P611 P612 P613 P614 P615 P616 P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628
LG #1 erection = 29 span @ 5 days/span
duration = 5.5 month

Segment casting time duration = 9 month


LG #1
Assembly
LG #1
Assembly

borpile Rig # 2 total scope = 68 pile @ 2


pile/day duration = 5 month
1 July 2018 commencement date

end of contract CP06


SB NP NP NP NP NP NP NP NP NP SP SP SP SP SP SP SP NP NP
P610 P611 P612 P613 P614 P615 P616 P617 P618 P619 P620 P621 P622 P623 P624 P625 P626 P627 P628
45 35 30 30 30 40 40 30 30 30 30 30 30 30 30 30 30 30
total
alance cantiliver motijheel station
end of contract CP06 = 19Km085.503
Pier type

Pier number

Span length (m)


4,922 m

151 span

Pier number w M Y
total contract = 1274 Days
52 182
51 181
42 Dec
50 180
IMD 0607 = 1246 Days 49 179
48 178
47 177
41 Nov
46 176
IMD 0608 = 1218 Days 45 175
44 174
43 173
42 172 40 Oct
41 171
40 170
39 169
38 168
39 Sep
37 167
36 166
35 165
34 164
38 Aug
33 163
32 162
31 161
30 160
29 159 37 July
28 158
27 157
21
9 156
8 155
36 Jun
IMD 0606 , 0609 = 1071 D 7 154
6 153
5 152
4 151
3 150 35 May
IMD 0605 = 1043 Days 2 149
1 148
17 147

34 Apr
16 146
34 Apr
15 145
14 144
13 143
12 142
33 Mar
11 141
10 140
9 139
8 138
32 Feb
7 137
6 136
5 135
4 134
3 133 31 Jan
IMD 0603 = 924 Days 2 132
1 131
52 130
IMD 0604 = 896 Days 51 129
30 Dec
50 128
49 127
48 126
47 125
29 Nov
46 124
45 123
44 122
43 121
42 120 28 Oct
41 119
40 118
39 117
38 116
27 Sep
37 115
36 114
35 113
34 112
26 Aug
33 111
32 110
31 109
30 108
29 107 25 July
28 106
27 105
20
9 104
IMD- 0602 = 714 Days 8 103
24 Jun
7 102
6 101
5 100
4 99
23 May
3 98 23 May
2 97
1 96
17 95
16 94
22 Apr
15 93
14 92
13 91
12 90
21 Mar
11 89
10 88
9 87
8 86
20 Feb
7 85
6 84
5 83
4 82
3 81 19 Jan
2 80
1 79
52 78
51 77
18 Dec
50 76
49 75
48 74
47 73
17 Nov
46 72
45 71
44 70
43 69
42 68 16 Oct
41 67
40 66
39 65
38 64
15 Sep
37 63
36 62
35 61
34 60
14 Aug
33 59
32 58
31 57
30 56
29 55 13 July
28 54
27 53
19
9 52
8 51
12 Jun
19

12 Jun
7 50
IMD 0601 = 336 Days 6 49
5 48
4 47
3 46 11 May
2 45
1 44
17 43
16 42
10 Apr
15 41
14 40
13 39
12 38
9 Mar
11 37
10 36
9 35
8 34
8 Feb
7 33
6 32
5 31
4 30
3 29 7 Jan
2 28
1 27
52 26
51 25
6 Dec
50 24
49 23
48 22
47 21
5 Nov
46 20
45 19
44 18
43 17
42 16 4 Oct
41 15
40 14
18
39 13
38 12
3 Sep
37 11
36 10
35 9
34 8
2 Aug
33 7
32 6
31 5
30 4
29 3 1 July
1 July
28 2
27 1

end of contract CP06


Pier type

Pier number
Span length (m)
4,922 m
IMD IMD IMD
month 601 336 day 602 714 day 603 924 day
1 Jul 31 31 31 31 31 31
2 Aug 31 62 31 62 31 62
3 Sep 30 92 30 92 30 92
18
4 Oct 31 123 31 123 31 123
5 Nov 30 153 30 153 30 153
6 Dec 31 184 31 184 31 184
7 Jan 31 215 31 215 31 215
8 Feb 28 243 28 243 28 243
9 Mar 31 274 31 274 31 274
10 Apr 30 304 30 304 30 304
11 May 31 335 31 335 31 335
12 Jun 1 336 30 365 30 365
19
13 Jul 31 396 31 396
14 Aug 31 427 31 427
15 Sep 30 457 30 457
16 Oct 31 488 31 488
17 Nov 30 518 30 518
18 Dec 31 549 31 549
19 Jan 31 580 31 580
20 Feb 29 609 29 609
21 Mar 31 640 31 640
22 Apr 30 670 30 670
23 May 31 701 31 701
24 Jun 13 714 30 731
20
25 Jul 31 762
26 Aug 31 793
27 Sep 30 823
28 Oct 31 854
29 Nov 30 884
30 Dec 31 915
31 Jan 9 924
32 Feb
33 Mar
34 Apr
35 May
36 Jun
21
37 Jul
38 Aug
39 Sep
40 Oct
41 Nov
42 Dec
IMD IMD IMD IMD IMD
604 896 day 605 1043 day 606 1071 day 607 1246 day 608
31 31 31 31 31 31 31 31 31
31 62 31 62 31 62 31 62 31
30 92 30 92 30 92 30 92 30
31 123 31 123 31 123 31 123 31
30 153 30 153 30 153 30 153 30
31 184 31 184 31 184 31 184 31
31 215 31 215 31 215 31 215 31
28 243 28 243 28 243 28 243 28
31 274 31 274 31 274 31 274 31
30 304 30 304 30 304 30 304 30
31 335 31 335 31 335 31 335 31
30 365 30 365 30 365 30 365 30
31 396 31 396 31 396 31 396 31
31 427 31 427 31 427 31 427 31
30 457 30 457 30 457 30 457 30
31 488 31 488 31 488 31 488 31
30 518 30 518 30 518 30 518 30
31 549 31 549 31 549 31 549 31
31 580 31 580 31 580 31 580 31
29 609 29 609 29 609 29 609 29
31 640 31 640 31 640 31 640 31
30 670 30 670 30 670 30 670 30
31 701 31 701 31 701 31 701 31
30 731 30 731 30 731 30 731 30
31 762 31 762 31 762 31 762 31
31 793 31 793 31 793 31 793 31
30 823 30 823 30 823 30 823 30
31 854 31 854 31 854 31 854 31
30 884 30 884 30 884 30 884 30
12 896 31 915 31 915 31 915 31
31 946 31 946 31 946 31
28 974 28 974 28 974 28
31 1005 31 1005 31 1005 31
30 1035 30 1035 30 1035 30
8 1043 31 1066 31 1066 31
5 1071 30 1096 30
31 1127 31
31 1158 31
30 1188 30
31 1219 30
27 1246
IMD
1218 day 609 1071 day
31 31 31
62 31 62
92 30 92
123 31 123
153 30 153
184 31 184
215 31 215
243 28 243
274 31 274
304 30 304
335 31 335
365 30 365
396 31 396
427 31 427
457 30 457
488 31 488
518 30 518
549 31 549
580 31 580
609 29 609
640 31 640
670 30 670
701 31 701
731 30 731
762 31 762
793 31 793
823 30 823
854 31 854
884 30 884
915 31 915
946 31 946
974 28 974
1005 31 1005
1035 30 1035
1066 31 1066
1096 5 1071