DRAFT REPORT

CITY DEVELOPMENT PLAN


ALANDI
2017-2037

Prepared by,
ACKNOWLEDGMENT

This project consumed huge amount of work, research and dedication. Still, implementation

would not have been possible if we did not have a support of many individuals and organizations.

Therefore we would like to extend our sincere gratitude to all of them.

First of all we are thankful to Alandi AMC for their active support and for providing necessary

information and data concerning City Development Plan.

We are also grateful to Mr. Samir Kailas Bhumkar (Chief Officer) and Mrs Vaijayanta Ashok

Umargekar (President) for their guidance in understanding town’s characteristics. Without their

superior knowledge and experience, the Project would lack in quality of outcomes, and thus their

support has been essential.

We would like to express our sincere thanks towards City-Engineer, Sanitation Inspector, various

departments and all staff of Municipal Council who devoted their time and knowledge in the

implementation of this project.

Nevertheless, we would also like to thank people of Alandi for their enthusiastic participation and

involvement while survey and consultation in preparation of City Development Plan.


ALANDI CITY DEVELOPMENT PLAN

Contents

Contents ................................................................................................................................ i

List of Figures ....................................................................................................................... ix

List of Tables ........................................................................................................................ xi

Acronyms and Abbreviations ............................................................................................... xiv

1 BACKGROUND ............................................................................................................... 1

1.1 City Development Plan ..................................................................................................... 1


1.2 Objectives of CDP ............................................................................................................. 4
1.3 The CDP Process Adopted By Alandi ................................................................................ 5
2 ABOUT ALANDI TOWN ................................................................................................... 8

2.1 History of the town .......................................................................................................... 8


2.2 Geography ........................................................................................................................ 8
2.2.1 Location..................................................................................................................... 8

2.2.2 Spatial pattern and terrain: ...................................................................................... 9

2.2.3 Connectivity ............................................................................................................ 10

2.2.4 Climate and rainfall ................................................................................................. 10

2.3 Civic administration ........................................................................................................ 10


2.4 Demographic profile....................................................................................................... 11
3 ECONOMIC BASE OF ALANDI ........................................................................................ 14

3.1 Introduction.................................................................................................................... 14
3.2 Work Participation Ratio ................................................................................................ 14
3.3 Occupational Structure .................................................................................................. 16

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

3.4 Trade and Commerce ..................................................................................................... 17


3.5 Informal Business and Local Economy ........................................................................... 18
3.6 Growth potential ............................................................................................................ 19
3.7 Issues, Strategies and Potential Projects ....................................................................... 19
4 CITY ASSESSMENT – SITUATION ANALYSIS .................................................................... 21

4.1 Demography ................................................................................................................... 23


4.1.1 Growth Pattern ....................................................................................................... 23

4.1.2 Floating Population ................................................................................................. 23

4.1.3 Population Projection ............................................................................................. 24

4.1.4 House Hold Size....................................................................................................... 26

4.1.5 Sex Ratio.................................................................................................................. 26

4.1.6 Child Sex Ratio......................................................................................................... 27

4.1.7 Literacy .................................................................................................................... 28

4.1.8 Scheduled Caste ...................................................................................................... 30

4.1.9 Scheduled Tribes ..................................................................................................... 31

4.2 Social and cultural Environment .................................................................................... 34


4.2.1 Educational Facilities............................................................................................... 34

4.2.2 Health Facilities ....................................................................................................... 35

4.2.3 Cremation and Burial Facilities- .............................................................................. 36

4.2.4 Playgrounds and Parks ............................................................................................ 36

4.3 Traffic and Transportation ............................................................................................. 38


4.3.1 Connectivity ............................................................................................................ 38

ii

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

4.3.2 Road condition ........................................................................................................ 40

4.3.3 Major Junctions....................................................................................................... 55

4.3.4 Public Transport system.......................................................................................... 56

4.3.5 Parking .................................................................................................................... 56

4.3.6 Street lighting .......................................................................................................... 57

4.3.7 SWOT....................................................................................................................... 58

4.3.8 Issues ....................................................................................................................... 58

4.4 Urban Growth Scenario .................................................................................................. 60


4.4.1 Development Plan................................................................................................... 60

4.4.2 Physical Constraints to Growth of Town ................................................................ 61

4.4.3 Future Growth Direction ......................................................................................... 61

4.4.4 SWOT....................................................................................................................... 62

4.4.5 Issues, Strategies and Potential Projects ................................................................ 62

4.5 Housing ........................................................................................................................... 65


4.5.1 Housing overview.................................................................................................... 67

4.5.2 Issues, Strategies and Potential Projects ................................................................ 68

4.6 Slum / Urban Poor .......................................................................................................... 68


4.6.1 Condition of slums .................................................................................................. 69

4.6.2 Issues, Strategies and Potential Projects ................................................................ 71

4.7 Water Supply .................................................................................................................. 74


4.7.1 Source ..................................................................................................................... 74

4.7.2 Elevated Service Reservoir ...................................................................................... 74

iii

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

4.7.3 Coverage of water supply ....................................................................................... 76

4.7.4 Distribution system ................................................................................................. 77

4.7.5 Existing water supply .............................................................................................. 78

4.7.6 Water supply in Slums/Economical Weaker Section (EWS) Areas ......................... 78

4.7.7 Water charges ......................................................................................................... 78

4.7.8 Service adequacy .................................................................................................... 79

4.7.9 SWOT....................................................................................................................... 80

4.7.10 Issues ....................................................................................................................... 80

4.8 Access to Sanitation Facilities ........................................................................................ 82


4.8.1 Household Sanitation .............................................................................................. 82

4.8.2 Public Level Sanitation: ........................................................................................... 86

4.9 Waste Water, Septage and Storm Water Management ................................................ 93


4.9.1 Generation of wastewater ...................................................................................... 93

4.9.2 Existing Conveyance System ................................................................................... 93

4.9.3 Existing Treatment and disposal system .............................................................. 102

4.9.4 Storm water management .................................................................................... 102

4.9.5 Issues ..................................................................................................................... 103

4.10 Solid Waste Management ............................................................................................ 106


4.10.1 Waste Generation ................................................................................................. 106

4.10.2 Existing Waste Collection ...................................................................................... 107

4.10.3 Garbage Transport System ................................................................................... 109

4.10.4 Garbage Treatment and Disposal System............................................................. 111

iv

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

4.10.5 Medical Waste ...................................................................................................... 111

4.10.6 Service level Benchmarking .................................................................................. 112

4.10.7 SWOT..................................................................................................................... 112

4.10.8 Key Issues in Solid waste management ................................................................ 113

4.11 Tourism......................................................................................................................... 113


4.11.1 Important places in Alandi Town .......................................................................... 113

4.11.2 Festivals in Alandi.................................................................................................. 114

4.11.3 Tourist Accommodation ....................................................................................... 116

4.13 CITY GOVERNANCE FRAMEWORK AND REFORMS ...................................................... 118


4.14 Deliberate Wing ........................................................................................................... 119
4.15 Administrative Wing..................................................................................................... 119
4.16 Reforms Being Undertaken by AMC ............................................................................ 119
5 VISION FORMATION FOR ALANDI ............................................................................... 122

5.1 Approach ...................................................................................................................... 122


5.2 Consultation with Municipal Council ........................................................................... 122
5.3 Consultation with People ............................................................................................. 122
5.4 SWOT Analysis .............................................................................................................. 123
5.5 Vision Statement for Alandi ......................................................................................... 124
6 CITY INVESTMENT PLAN ............................................................................................. 126

6.1 Capital Facilities, Investment Phasing and Implementation ........................................ 127


6.1.1 Long Term Planning .............................................................................................. 127

6.1.2 Short Term Planning ............................................................................................. 129

6.2 Water supply ................................................................................................................ 131

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

6.2.1 Strategies .............................................................................................................. 131

6.2.2 Expected Outcomes .............................................................................................. 131

6.2.3 Investment ............................................................................................................ 131

6.2.4 Priority Needs ....................................................................................................... 133

6.3 Sewerage and Sanitation System ................................................................................. 134


6.3.1 Sewerage ............................................................................................................... 134

6.3.2 Sanitation .............................................................................................................. 135

6.3.3 Total Investment ................................................................................................... 137

6.4 Transportation.............................................................................................................. 139


6.4.1 Strategies .............................................................................................................. 139

6.4.2 Total Investment ................................................................................................... 140

6.4.3 Outcome ............................................................................................................... 140

6.4.4 Priority Needs ....................................................................................................... 140

6.5 Solid Waste Management ............................................................................................ 143


6.5.1 Strategy ................................................................................................................. 144

6.5.2 Investment ............................................................................................................ 145

6.5.3 Outcome ............................................................................................................... 146

6.6 Poverty Reduction and Basic Services for Urban Poor ................................................ 147
6.6.1 Strategy ................................................................................................................. 147

6.6.2 Housing for All ....................................................................................................... 148

6.6.3 Investment ............................................................................................................ 149

6.6.4 Outcome ............................................................................................................... 149

vi

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

6.7 Urban Governance ....................................................................................................... 151


6.8 Growth Management and Land Use ............................................................................ 152
6.8.1 Sector Strategies & Investment Need................................................................... 153

6.8.2 Strategy ................................................................................................................. 153

6.8.3 Investment ............................................................................................................ 153

6.8.4 Outcomes .............................................................................................................. 153

6.9 Tourism......................................................................................................................... 155


6.9.1 Strategies .............................................................................................................. 155

6.9.2 Investment ............................................................................................................ 157

6.9.3 Outcome ............................................................................................................... 157

Annexure I- Capital Investment Plan- Long Term Plan (2017-2037) .......................................... I

Annexure II- Capital Investment Plan- Short Term Plan (2017-2022) ...................................... III

Annexure III- POSSIBLE OPTIONS FOR PPP ............................................................................ VI

Building O&M as a part of the construction contract: .............................................................. VI


Providing incentives for billing efficiency etc. on a sharing basis: ............................................ VI
Outsourcing pumping, transmission and distribution activities:.............................................. VII
Towards achieving 24x7 water supply: ..................................................................................... VII
Annexure IV - E- GOVERNANCE ........................................................................................... VIII

Introduction ............................................................................................................................. VIII


Current system ......................................................................................................................... VIII
Objectives of E-Governance System ...................................................................................... IX

Scope of an E-Governance System ............................................................................................ IX


Administrative system ........................................................................................................... IX

vii

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

Management Information System .......................................................................................... X

Citizen Interface ...................................................................................................................... X

Implementing E-Governance System ......................................................................................... X


Municipal Administration ....................................................................................................... X

System consultants ................................................................................................................ XI

Employees .............................................................................................................................. XI

Citizens ................................................................................................................................... XI

viii

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

List of Figures

Figure 1-1 Framework of CDP ......................................................................................................... 3

Figure 1-2 Approach to formation of City Development Plan ........................................................ 5

Figure 2-1Location of Alandi ........................................................................................................... 9

Figure 2-2.2: Municipal Council Building of Alandi ....................................................................... 11

Figure 3-1Commercial Areas ......................................................................................................... 18

Figure 3-2 Market areas in town................................................................................................... 19

Figure 4-1 ZP Primary and secondary Schools .............................................................................. 34

Figure 4-2 Private primary, secondary high school and Colleges. ................................................ 35

Figure 4-3 Facilities & Utilities in Town ........................................................................................ 36

Figure 4-4Road Hierarchy of Town ............................................................................................... 40

Figure 4-5 Road Condition Map .................................................................................................... 41

Figure 4-6: Map showing Major Junctions.................................................................................... 55

Figure 4-7 Alandi Bus Stand and Depot ........................................................................................ 56

Figure 1.4-8: Road side parking .................................................................................................... 57

Figure 1.4-9: Street Lights ............................................................................................................. 58

Figure 4-10 Land Use as per Development Plan ........................................................................... 60

Figure 4-11 Map Showing Growth Trend and Growth Constraints .............................................. 61

Figure 4-12 Housing condition ...................................................................................................... 66

Figure 4-13: Housing Typology in Alandi ...................................................................................... 67

ix

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

Figure 4-14 Condition of Slums ..................................................................................................... 70

Figure 4-15Roads and Drains in slums .......................................................................................... 70

Figure 4-16 ESR’s in Alandi ............................................................................................................ 75

Figure 4-17 Map showing Location of ESR/ GSR........................................................................... 75

Figure 4-18 Map Showing % of HH having Treated Water Supply ............................................... 77

Figure 4-19 % HHs Having Individual Toilets ................................................................................ 84

Figure 4-20 Condition Of Public Toilets ........................................................................................ 88

Figure 4-21:% of HH Using Public Toilet ....................................................................................... 88

Figure 4-22 :% OF HH Performing Open Defecation .................................................................... 89

Figure 4-23Existing Sanitation Scenario........................................................................................ 90

Figure 4-24: Community Bins (Existing conditions) .................................................................... 108

Figure 4-25SWM Vehicles ........................................................................................................... 110

Figure 4-26 Open Dumping Locations in Alandi ......................................................................... 111

Figure 4-27Dnyaneshwar Maharaj Holy Wall ............................................................................ 114

Figure 4-28 Ghat of Indrayani River ............................................................................................ 115

Figure 4-29 Temples in Alandi .................................................................................................... 116

Figure 4-30 Tourist Parking near Old Bridge. .............................................................................. 116

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

List of Tables

Table 2-1 Population of Alandi ..................................................................................................... 11

Table 2-2 Comparative demography indicators with State and District ...................................... 12

Table 3-1: Workers Population Alandi as per Census 2011 .......................................................... 14

Table 3-2: Worker Participation Ratio for Maharashtra, Alandi District and Alandi (2011) ........ 15

Table 3-3 Issues, Strategies and Potential Projects in Town ........................................................ 19

Table 4-1Floating Population overview ........................................................................................ 23

Table 4-2: Population of Alandi –year 1971 to 2011 .................................................................... 24

Table 4-3 : Population projections ................................................................................................ 25

Table 4-4: Sex ratio comparisons (state, district and town) ......................................................... 27

Table 4-5: Population 0-6 Age Group for Last Three Decades ..................................................... 28

Table 4-6: Literacy rate comparison (state, district and town) .................................................... 29

Table 4-7: Population of scheduled caste (1971 to 2011) ............................................................ 30

Table 4-8: Population of scheduled tribes (1971-2011) ............................................................... 31

Table 4-9 Demography Analysis of Town ..................................................................................... 31

Table 4-10 Rod Details .................................................................................................................. 40

Table 4-11Existing Road condition................................................................................................ 41

Table 1.4-12: Street Light .............................................................................................................. 57

Table 4-13 SWOT Analysis of Transportation ............................................................................... 58

Table 4-14 Issues Related to Land Use ......................................................................................... 62

Table 4-15Housing Details ............................................................................................................ 66

xi

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

Table 4-16 Issues, Strategies and Potential Projects in Housing Sector ....................................... 68

Table 4-17 Slum Details ................................................................................................................ 69

Table 4-18 Issues, Strategies and Potential Projects of Slum Areas ............................................. 71

Table 4-19Details Of ESR/ GSR ...................................................................................................... 74

Table 4-20 Sources of Water Supply ............................................................................................. 76

Table 4-21 Distribution system Details ......................................................................................... 77

Table 4-22 Water Charges ............................................................................................................ 78

Table 4-23 Service level Benchmarks............................................................................................ 79

Table 4-24 SWOT- Water Supply .................................................................................................. 80

Table 4-25 HOUSEHOLD SANITATION-TOILET FACILITY ............................................................... 82

Table 4-26List of Public Toilets in Town ....................................................................................... 87

Table 4-27 Details of Drains .......................................................................................................... 94

Table 4-28Existing Conveyance System Condition ....................................................................... 94

Table 4-29SWOT Analysis ........................................................................................................... 103

Table 4-30Employee Details of SWM ......................................................................................... 107

Table 4-31Details of SWM Vehicles ............................................................................................ 109

Table 4-32 Service Level Benchmark for SWM ........................................................................... 112

Table 4-33: Roles and responsibilities of AMC ........................................................................... 118

Table 5-1: SWOT Analysis for Alandi town ................................................................................. 123

Table 6-1: Capital Facilities, Investment Phasing and Implementation- Long Term Plan .......... 127

Table 6-2: Capital Facilities, Investment Phasing and Implementation- Short Term Plan ......... 129

xii

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

Table 6-3: Water Supply- Action Plan ......................................................................................... 132

Table 6-4: Sewerage and Sanitation- Action Plan ....................................................................... 137

Table 6-5 Action Plan-Transportation and Traffic Management ................................................ 141

Table 6-6: SWM-Action Plan ....................................................................................................... 146

Table 6-7: Slums and Urban Poor-Action Plan ............................................................................ 149

Table 6-8 Action Plan for Urban Governance ............................................................................. 151

Table 6-9: Land Use- Action Plan ................................................................................................ 153

Table 6-10Action Plan for Tourism development ....................................................................... 158

xiii

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

Acronyms and Abbreviations

BPT Break Pressure Tank

AAMC Agricultural Produce Market Committee

CDP City Development Plan

CIP Capital Investment Plan

CPHEEO Central Public Health and Environmental Engineering Organization

CT Community Toilets

DCB Demand Collection Balance

DP Development Plan

AMC Alandi Municipal Council

DPR Detail Project Report

FOP Financial Operating Plan

GoI Government of India

GoM Government of Maharashtra

HHs Households

ISHDP Integrated Housing and Slum Development Programme

LL Lac Litres

lpcd Litres Per Capita Per Day

MBR Mass Balancing Reservoir

MIDC Maharashtra Industrial Development Corporation

xiv

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

MLD Million Litres Per Day

NRW Non-Revenue Water

O&M Operation and Maintenance

OD Open defecation

PHC Public Health Center

PPP Public Private Partnership

SC Scheduled Caste

STP Sewerage Treatment Plant

SWM Solid Waste Management

SWOT Strength Weaknesses Opportunity Threats

ULB Urban Local Bodies

WTP Water Treatment Plant

ZP Zillah Parishad

xv

PLANITECH CONSULTANTS
ALANDI CITY DEVELOPMENT PLAN

1 BACKGROUND

1.1 City Development Plan

City planning involves the intricate details of understanding the requirements of the city and its
various divisions and utilizing the land to the best of benefit. It is like promoting development by
implementing decisions and turning the town into a planned city, without interfering with the
environmental features. Cities play a critical role in the economic development process of the
nation. They are the engines of economic growth and places of high productivity. While cities
generate more than a proportionate share of the State’s income, they also pose certain
challenges. The challenges such as providing access to serviced land for housing the urban poor,
provision of basic amenities and facilities and a system to plan and manage these. Thus, urban
investments in economic, physical and social infrastructure at adequate levels are a prerequisite.

A City Development Plan (CDP) is a comprehensive document outlining the vision and
development strategy for future development of the city, prepared in consultation with a wide
range of stakeholders to identify the thrust areas to be addressed on a priority basis in order to
achieve the objectives and the vision. It thus provides the overall framework within which
projects are identified and put forward in a City Investment Plan.

CDP aims at helping the urban local bodies (ULBs) to-

a) Develop a vision for its city;

b) Ascertain the gap between existing infrastructure and investment;

c) Set out priorities, sequencing and timeline for undertaking various reforms and specific
investment and

d) Financial mechanism of investment.

CDP is a vision document of the city through which a medium term perspective of city planning
can be worked out. The exercise is a consultative process through which stakeholder opinion is
collected for deciding the direction and priorities of city development. CDP then provides lists of

PLANITECH CONSULTANTS 1
ALANDI CITY DEVELOPMENT PLAN

priorities and investment plans through which a detailed project can be developed for each
priority pertaining to primary infrastructure and basic services to urban poor.

Taking the cue from the central government's Jawaharlal Nehru National Urban Renewal Mission
(JNNURM) scheme which aimed at executing infrastructure projects in major cities and metros,
the Maharashtra government has come up with a funding scheme, worked out on similar lines,
for infrastructure projects in smaller cities in the state.
The scheme — Maharashtra Suvarna Jayanti Nagarotthan Maha-abhiyan, aims to support
municipal bodies not falling under the JNNURM scheme. It is an attempt to raise the standard of
living of people in smaller cities by improving transportation, solid waste management, water
supply and eliminating slums. The scheme will be implemented in class 'D' municipal corporations
and main municipal councils.

The major objectives of the Maharashtra Suvarna Jayanti Nagarotthan Maha-abhiyan are to
provide various urban infrastructure in the urban areas of the State as per the standards
prescribed by the Government, develop infrastructure facilities related to education and health
as per the class of the city and enhance the social infrastructure along with the aesthetic features
of the cities.

The state government has suggested three optional modules to implement the scheme. The
mission cities will first have to explore the possibility of implementing the projects under public-
private partnership (PPP). If the PPP model does not work out, the state will provide assistance
either by 'viability gap funding' or by providing loans at concessional rates. Funds will be allocated
for the approved projects in the state budget. The scheme focuses on:

 Improving and augmenting the economic and social infrastructure of cities.


 Ensuring basic services to the urban poor, including security of tenure.
 Initiating wide-ranging urban sector reforms whose primary aim is to eliminate the
legal, institutional and financial constraints that have impeded investment in urban
infrastructure and services upon completion of the scheme, it is expected that the
respective ULB will have achieved the following outcomes:
 Modern and transparent budgeting, accounting, and financial management systems
will be designed and adopted for all urban services and governance functions.

PLANITECH CONSULTANTS 2
ALANDI CITY DEVELOPMENT PLAN

 A citywide framework for planning and governance will be established and become
operational. All urban residents will be able to access a basic level of urban services.
 Financially self-sustaining agencies for urban governance and service delivery will be
established through reforms.
 Local services and governance will be conducted in a transparent and accountable
manner.
 E-Governance applications will be introduced in Gaothan with transparent functions of
ULBs/ parastatals resulting in reduced cost and time of service delivery processes. In
order to be eligible for grant assistance under the scheme, GoI requires eligible cities
to prepare project proposals (detailed project reports) and submit them to state level
nodal agencies for appraisal.

Figure 1-1 Framework of CDP

Cities have to draw up a timeline for implementing the urban sector reforms. Preparation of a
City Development Plan (CDP) taking into consideration the potential for development of the city
over the next 20 years will be mandatory for every urban area participating in the Maharashtra
Suvarna Jayanti Nagarotthan Maha-Abhiyan. The CDP should incorporate, based on the future
needs, measures necessary for development of various basic urban services, education and
health infrastructure and social facilities for the city. The Alandi Municipal Council (AMC) plans
to avail of the funds under this scheme for the improvement of its urban infrastructure. These
funds would need to be directed towards priority actions and projects.

In this context, AMC appointed Planitech Consultants, Pune to prepare the City Development
Plan (CDP) of the Alandi town.

PLANITECH CONSULTANTS 3
ALANDI CITY DEVELOPMENT PLAN

1.2 Objectives of CDP

The City Development Plan (CDP) is aims at identifying an integrated solution to problems facing
the city. It identifies an economic growth strategy as well as actions that would be required by
various agencies to ensure sustainable development of the city. The CDP is the council’s
corporate strategy that presents both a vision of a desired future for the city and the
municipality’s organization, as well as mission statements on how the municipality, together with
other stakeholders, intends to work towards achieving this long-term vision in the next five years.

“It is essential for a city to systematically think of the future, and determine how it wishes to
shape that future.” A City Development Plan (CDP) is both a perspective and a vision for the
future development of a city. It presents the current stage of the city’s development – where are
we now? It sets out the directions of change – where do we want to go? It identifies the thrust
areas — what do we need to address on a priority basis? It also suggests alternative routes,
strategies, and interventions for bringing about the change – what interventions do we make in
order to attain the vision? It provides a framework and vision within which projects need to be
identified and implemented. It establishes a logical and consistent framework for evaluation of
investment decisions.

The CDP should lead to the translation of missions into actions and actions into outcomes. The
objective of involving stakeholders through a consultation process and securing endorsements
of the proposed actions of the local body and other implementing agencies is to hold these bodies
accountable for their mission statements, actions and expected outcomes. The CDP clearly
defines how a council will serve its customers (businesses and citizens). The CDP will also outline
how the council plans to run its business. The CDP will elaborate how the council intends to
manage public finance in a modern and transparent way; execute urban planning and governance
in line with an established framework; and become more responsive -cost and time efficient – by
availing of technology in its governance and service delivery processes. Finally, the CDP will reveal
the council’s strategy to manage its resources, i.e., how it intends to increase revenues and
expand its tax base to allow for self-sustaining urban service delivery; improve its credit-
worthiness; and recruit and retain a skilled workforce.

PLANITECH CONSULTANTS 4
ALANDI CITY DEVELOPMENT PLAN

1.3 The CDP Process Adopted By Alandi

The formulation of the CDP for Alandi was divided into four phases and involved the following
tasks and activities. The entire process is as shown below:

Figure 1-2 Approach to formation of City Development Plan

The steps involved in the preparation of city development plan of Alandi are shown in the
following image.

PLANITECH CONSULTANTS 5
ALANDI CITY DEVELOPMENT PLAN

The City Development Plan, thus prepared with the involvement of the stakeholders is a forward-
looking consensus program for the city.

It outlines the way to:

 Improve service levels,


 Improve financial sustainability, and
 Create a citizen-friendly, accountable and transparent administration by implementing
reforms as per the scheme guidelines.

PLANITECH CONSULTANTS 6
ALANDI CITY DEVELOPMENT PLAN

ABOUT TOWN

ALANDI

PLANITECH CONSULTANTS 7
ALANDI CITY DEVELOPMENT PLAN

2 ABOUT ALANDI TOWN

2.1 History of the town

Alandi have a special stature in the religious atmosphere of Maharashtra. Saint Dnyaneshwar
Maharaj took Samadhi in Thirteenth century year 1296 AD. Dnyaneshwari was written in Alandi
which is conversion of Bhagwat Geeta.

The name of Saint Dnyaneshwar is on the lips of everyone in Maharashtra. He was a born
Enlighten. He had control over the elements of his body. His work Dnyaneshwari is the crest-
jewel of Marathi literature. Dnyaneshwari is in simple style, the beautiful illustrations and the apt
similes have rendered the book attractive, charming and extremely useful. Dnyaneshwari is to
Maharashtrians what the Ramayan of Tulsidas is to the Hindi-speaking people. Dnyandev was a
great social and religious reformer. He boldly criticised his predecessors. Popularly known as
“Devachi Alandi”, Alandi has the samadhi and a temple of the Saint Poet Sant Dnyaneshwar. The
temple was built in 1570. The Saint spent most part of his short lifespan in Alandi. He inspired
the entire Maharashtra to worship Lord Panduranga. Like Pandharpur, Alandi is also a true a
pilgrim center for every Maharashtrian. Alandi has been an important religious destination for
the Varkari and has been a place of spirituality. Especially in context with Maharashtra’s cultural
and religious importance, Alandi has been a major destination with a large number of devotees
of Vitthal Rakhumai visiting the town especially in the month of Ashadha. In the ancient times,
Alandi was a small hamlet, known as Alankapuri or Alankawati. Though neglected in the middle
age for some time, Alandi has been famous from the time of Puranas and has mentions in the
history since 768 AD. During the British rule, a municipality was established here in the year 1869
AD.

2.2 Geography

2.2.1 Location

Alandi is connected to the District Head Quarter Pune and nearby main urban centres through
the Pune-Nashik NH-50 and a Major District Road (MDR). It is also connected to the Moshi village

PLANITECH CONSULTANTS 8
ALANDI CITY DEVELOPMENT PLAN

on the NH-50 by a road leading to Dehu, another religious town. Chakan, a village also situated
on the NH-50, is connected to Alani by a MDR passing through the town.

The town is situated at latitude 18040’37.2” North and at longitude 73053’49.2” East with an
average elevation of 577m above mean sea level. Alandi town is located approximately 20 km
away from Pune, 14.8 km from Pimpri-Chinchwad and 20 km from Chakan. Its location from
important places in the district is as under.

Table 1.1: Connectivity


Name of the town Distance
Pimpri-Chinchwad 14.8 km
Pune 20 km
Chakan 20 km
Lonikand 33km
Lonawala 50km

Figure 2-1Location of Alandi


The area of Alandi Municipal Council is 287.25 Ha. The boundary of the Municipal Council is as
per notification issued by government dated 30th September, 2015.

2.2.2 Spatial pattern and terrain:

Alandi Municipal Council is a C class Municipal Council of Khed Taluka. The town is located at an
average height of 577 m above sea level. Alandi town is based on the Deccan Trap Basalts. The
rock is dark grey to greenish grey in colour. Brownish to purplish tints is also met with. The specific
gravity is 2.9 on an average. Generally two types are seen. The nonvesicular types are hard,
tough, and compact and medium to fine grained, with conchoidal fracture. The vesicular or
amygdular types are comparatively soft and break more easily. The land is generally plain and
the general slope is towards the East. The Gaothan area is sloping towards the South. There is a

PLANITECH CONSULTANTS 9
ALANDI CITY DEVELOPMENT PLAN

hill towards the southwest of the town situated in a revenue village called Charholi. The hill is
without any vegetation

2.2.3 Connectivity

By road: Alandi is approachable by road from Pimpri- Chinchwad by Alandi- Pimpri- Chinchwad
Road and to Pune by Pune-Alandi road

By rail: Alandi is not accessible by railway, nearest railway station is Akurdi.

2.2.4 Climate and rainfall

Alandi has a tropical climate and come under Moderate rainfall zone. The average temperature
in Alandi is 25°C. It has a hot summer and dry weather throughout the year except monsoon
season.

The driest month is from December to April, with 0 to 1 mm of rainfall. Most of the precipitation
here falls in June, July and August averaging 721.7 mm. The warmest month of the year is April
with average temperature of 30.5°C. December is the coldest month, with temperatures
averaging 20 °C. The difference in precipitation between the driest month and the wettest month
is 162.56 mm. throughout the year.

Table 2-2: Climate Data of Alandi


Altitude 577 m(MSL)

Maximum temperature 410C

Minimum temperature 7.70C

Average rainfall 721.7mm

2.3 Civic administration

Alandi municipal council falls under ‘C’ class council category with a population of 28645as per
2011 Census data. There are seven subject committees namely

1. Standing Committee
2. Planning and Development Committee
4. Education Committee

PLANITECH CONSULTANTS 10
ALANDI CITY DEVELOPMENT PLAN

5. Water Supply and Sewerage Committee


6. Public Health and Sanitation Committee
7. Public Works Committee

Figure 2-2.2: Municipal Council Building of Alandi


2.4 Demographic profile

The knowledge of basic demographic trends is essential to sort out the problems and the exact
needs of the area. It gives idea regarding the habitation of people and their basic requirements,
which the authorities should consider while planning the city. The population figures of Alandi
town during the last 5 decades are as under. The figures are as per census.

Table 2-1 Population of Alandi


Year Population

1971 4788

1981 7523

1991 10249

2001 17565

2011 28645
Source: Census of India 2011

PLANITECH CONSULTANTS 11
ALANDI CITY DEVELOPMENT PLAN

The Alandi Municipal council has population of 28645 of which 16142 are males while 12503 are
females as per report released by Census India 2011.

Table 2-2 Comparative demography indicators with State and District


Alandi Municipal
Demographic indicators State (Maharashtra) District (Pune)
Council (AMC)

Population 2011 11,23,74,333 94,29,408 28645

Area (Sq. Km) 3,07,713 15,643 6.84

Density (Persons/Sq. Km) 365 602.78 4187.86

Sex Ratio: Females per


930 915 775
1000 males

Literacy Rate (%) 82.34 86.15 79.77


Source: Census of India 2011

PLANITECH CONSULTANTS 12
ALANDI CITY DEVELOPMENT PLAN

ECONOMIC BASE OF TOWN

PLANITECH CONSULTANTS 13
ALANDI CITY DEVELOPMENT PLAN

3 ECONOMIC BASE OF ALANDI

3.1 Introduction

Alandi is one of the oldest town in Khed Taluka Pune District. It is class C municipal council.
Forming the economic base of Alandi. The trade and commerce are the most dominant economic
activity observed in Alandi.

3.2 Work Participation Ratio

The term “Work” is used in a special sense in the census. “Works may be defined as participation
in any economically productive activity”. Such participation may be physical or mental in nature.
“Work” involves not only actual work, but also effective supervision and direction of work. It also
includes unpaid work on farm or in family enterprise.

As per the Census, All those who had worked for the major part of the preceding year were
recorded as main workers (at least 6 months or 183 days) while those who worked for some time
during the preceding year but not for the major part, have been treated as marginal workers. All
those who had not worked at all during the last year, were recorded as non-workers. Persons
engaged in household duties, students, dependents, retired persons, renters, beggars are some
of the categories grouped as non-workers.

Table 3-1: Workers Population Alandi as per Census 2011


Total Population

% Main workers
% Total workers

workers to total

% Non-workers
Non-Workers
Worker
Total Worker

% Marginal
Population

Population

Population

Population
Marginal
Workers
to total

to total

to total
Year

Main

1971 4788 1200 25.06 NA NA NA NA 3588 74.94


1981 7523 2197 29.20 2287 30.40 141 1.87 5185 68.92
1991 10249 2930 28.59 2930 28.59 337 3.29 6645 64.84
2001 17565 6154 35.04 5552 31.61 358 2.04 11411 64.96
2011 28645 10316 36.01 9772 34.11 544 1.90 18329 63.99
Source: Census of India, 2011

PLANITECH CONSULTANTS 14
ALANDI CITY DEVELOPMENT PLAN

The work Participation ratio in Alandi is 36.01 percent, according to 2011 census data. The
average Work Participation ratio for the last five decades is 30.78. Looking at past decades
marginal workers are declining. The Workers Participation ratio for Alandi is similar to urban area
in Pune district and State, as seen in the table below.

The Marginal Work Participation ratio for Alandi is 1.90%, which is close to that of urban areas in
Pune district 2.54 % and less than that of rural 4.13%. On comparison to state it is close to the
urban areas. This reflects that there is a high level of livelihood security and less workers face
uncertainty with respect to their sources of income in comparison to that of the state. Also Alandi
is of close proximity of Pimpri-Chinchwad, hence can be said to have urban character.

Table 3-2: Worker Participation Ratio for Maharashtra, Alandi District and Alandi (2011)

% Total % Main % Marginal % Non-


workers to workers to workers to workers to
State/District/Town Year
Total Total Total Total
Population Population Population Population

Total 43.99 38.94 5.04 56.01

Maharashtra Rural 49.79 43.07 6.73 50.21

Urban 36.95 33.95 3.00 63.05

Total 42.94 39.78 3.16 57.06

Pune District Rural 49.71 45.59 4.13 50.29

Urban 38.61 36.07 2.54 61.39

Alandi 36.01 34.11 1.90 63.99

According to the 2011 census, the total number of Non-workers in Alandi are 18329. Therefore
the dependency ratio for Alandi is 1.77 i.e. every worker supports 2.21 persons including him
/she on his/her own income. It can be seen in the table below that Alandi have less work force
participation as compared to that of district and state which depict the urban characteristics
where people are involved in secondary and tertiary activities.

PLANITECH CONSULTANTS 15
ALANDI CITY DEVELOPMENT PLAN

Ward Wise Worker Participation %


45
40
35
30
25
%

20
15
10
5
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Ward No.

3.3 Occupational Structure

5% of the total main workers in Alandi are engaged in Agriculture activities, 2% in Household
Industrial activities and 89 % in other activities as per the census data. Since Alandi is a major
place of pilgrimage, the economy of the town revolves around this activity. Although the major
festivals are held only twice a year, pilgrims from all over Maharashtra come to Alandi throughout
the year. The different needs of the pilgrims are catered by different groups of clerics who
officiate at the Samadhi, or weddings or the religious services to the bereaved respectively.

Most Marathi communities have built Dharmashalas that offer affordable accommodation to
pilgrims coming from different groups of society.

A considerable number of the locals also find employment with Indian Army bases not far away
from Alandi. In recent decades, villages around Alandi have attracted light manufacturing
Industry also. In addition, the industrial units in the nearby industrial areas of Chakan, also
provide employment to some of the local people.

PLANITECH CONSULTANTS 16
ALANDI CITY DEVELOPMENT PLAN

Occupation Structure of Main Workers in Alandi Municipal Council

4%
5%
2%
Cultivators

Agricultural Labour

Household Industry
89%
Other

3.4 Trade and Commerce

Alandi is an oldest town being adjacent to Pune and Pimpri-Chinchwad region therefore got
importance of trade and market centre. The people of Alandi are mostly engaged in trade and
commerce, large number of vendors do business in the area adjacent to the main temple
complex. It mainly deals with materials used for religious observance such as flowers, garlands,
coconuts, kunkum, turmeric powder etc. These vendors also do good business by selling religious
souvenirs, photographs and books.

Traditionally groundnut cultivation has been an important activity around Alandi. Most of the
production is sent to oil mills in the nearby town of Chakan for processing. Planned commercial
shopping centres are developed along the Dehu- Alandi road and Markal road , while unplanned
development is observed at Chakan road, Pradakshina marg and Bhairavnath chowk towards
Wadgaon road.

PLANITECH CONSULTANTS 17
ALANDI CITY DEVELOPMENT PLAN

Figure 3-1Commercial Areas


3.5 Informal Business and Local Economy

Informal and on street shopping activities are observed along the Dnyaneshwar Maharaj Temple,
Municipality Office ,ST Bus Stand premises and along Pune road. A major part of the local
economy is based on the religious activities in Alandi and Dehu. During the Kartiki Fair large scale
commercial activities take place in the Zaddi Bazar area. About 600 shopkeepers establish their
temporary shops in this area. Designated Vegetable market Place is located behind the existing
Municipal Council Building near Government Rural Hospital , This market is functional all days of
week.

PLANITECH CONSULTANTS 18
ALANDI CITY DEVELOPMENT PLAN

Figure 3-2 Market areas in town


3.6 Growth potential

Commercial activities within the area are seen mostly in the form of shops and on street
shopping. Being a pilgrim place, it is not developed up to the mark but has good potential.

3.7 Issues, Strategies and Potential Projects

Table 3-3 Issues, Strategies and Potential Projects in Town

PLANITECH CONSULTANTS 19
ALANDI CITY DEVELOPMENT PLAN

Sr. Strategies and Potential


Aspects Issues
No. projects

36.01% of the population are engaged Training to the people


in some form of economic activity with specially females to develop
Employment 34.11 % as main workers and mostly the skills for production of
1
Scenario dependent on pilgrims. Uncertainty in various goods as per the
business is observed due to the requirement of the floating
floating population of devotees. population.

House Hold Industrial


Establishment can help to
2 Industries Sparse industrial development.
generate employment
opportunities

Development of Organised
Trade and Most of the trade activities are in form commercial space in town
3
Commerce of shops and street activities. by development of
Shopping Complexes

PLANITECH CONSULTANTS 20
ALANDI CITY DEVELOPMENT PLAN

4 CITY ASSESSMENT – SITUATION ANALYSIS

City assessment provides a reality check for visioning, through a basic understanding of the
city, its environment and various resources, the context for strategy formulation, a baseline
for assessment of the demand-supply gap, past trends to influence projections for the future
and a basis for measurement of achievement of the plan. Thus various aspects of the city’s
development should have been examined and understood – from a macro as well as a micro
perspective which are stated in this chapter.

PLANITECH CONSULTANTS 21
ALANDI CITY DEVELOPMENT PLAN

DEMOGRAPHIC PROFILE

PLANITECH CONSULTANTS 22
ALANDI CITY DEVELOPMENT PLAN

4.1 Demography

4.1.1 Growth Pattern

Alandi has grown over years, total area of Alandi Municipal Council is 287.25 Ha, and the
population density is 130 persons / Ha.

As per census 2011 population of Alandi town is 28,645. The population of town was 17,565 in
year 2001 and 10,429 in 1991. The last two decade showed considerable growth rate of 71% and
63%. The increase in the population since 1991 is mainly due expansion in the commercial and
economic activities in and around the Alandi town.

4.1.2 Floating Population

As mentioned earlier, Alandi is an important pilgrim centre in Maharashtra. The floating


population in the town is attributable mainly to the large number of pilgrims visiting the town.
On an average, 12-15 lakh pilgrims visit Alandi annually. On normal days, about 10,000 to 12,000
pilgrims visit Alandi daily. However, on Thursdays and weekends this figure goes to as high as
25000. On the Ekadashi days (twice in a month) about 60,000 to 70,000 people visit Alandi. On
the two annual events of Ashadhi and Kartiki Ekadashi, as many as 3 to 5 lakh pilgrims visit Alandi.
Last one decade has seen significant increase in pilgrim flow to Alandi which may be attributed
to the overall increase in religious tourism in the country, and also to the increase in the
population of the Pune and Mumbai metropolitan regions, and hence the inflow of devotees
from there.

Table 4-1Floating Population overview


Important events Months Days of Visit Devotees inflow

Ashadhi Palakhi Prasthan July – Aug 2 3-5 Lakh

Kartiki Prasthan Oct – Nov 5 3- 5 Lakh

Monthly Ekadashi (12) 1 60 – 70 Thousand

Makar Sankrant (Mainly Lady


Jan 1 50 – 60 Thousand
Devotees)

PLANITECH CONSULTANTS 23
ALANDI CITY DEVELOPMENT PLAN

Gokul Ashtami, Adhik Pornima Aug-Sept 1 15- 20 Thousand

Daily Floating Population 1 10 – 12 thousand

Thursdays and Weekends 1 25000

Yearly 12-15 Lakh

Table 4-2: Population of Alandi –year 1971 to 2011


Year Population Growth Rate

1971 4788

1981 7523 57.12

1991 10249 36.24

2001 17565 71.38

2011 28645 63.08

Source: Census of India

Decadal Growth Trend of Alandi Municipal Council


35000 71.38 80.00

30000 63.08 70.00


57.12

% Growth Rate
60.00
25000
Population

50.00
20000
36.24
40.00
15000
30.00
10000
20.00
5000 10.00
0 0.00
1971 1981 1991 2001 2011

Population Growth Rate

4.1.3 Population Projection

Looking at the growth trend of the town, it is found that the growth rate is versatile as a result of
floating population. The graphical method for population projection show gradual increasing

PLANITECH CONSULTANTS 24
ALANDI CITY DEVELOPMENT PLAN

trend. As we know, Alandi is an important pilgrim centre in Maharashtra. The large number of
floating population attributes the Alandi.

Also urbanization is accumulative in Alandi, As such the population projection by Arithmetic


increase method is not an appropriate method. An average of Incremental increase and
Geometric mean is found to be most suitable for Alandi. The population of the town is projected
up to 2037 with 5 years of intervals. The population at 2037 is 73534. At present 70% area is in
residential use and there is a large scope for developable area to accommodate more population
in future areas.

Graphical Demograhic Trend


140000
120000
100000
80000
60000
40000 28645
17565
20000 7523 10249
4788
0
* 1971 1981 1991 2001 2011 2021 2031 2041

Table 4-3 : Population projections


Projected Population

Year Average of Geometric


Arithmetic Geometric Increase Incremental Increase
and Incremental
method method method
increase

2017 32224 37297 33559 35428

2022 35206 46472 38419 42445

2027 38188 57905 43974 50939

2032 41170 72149 50224 61187

2037 44152 89898 57170 73534


Source: Census of India

PLANITECH CONSULTANTS 25
ALANDI CITY DEVELOPMENT PLAN

Population Projection -Alandi Municipal Council


80000

70000

60000

50000
Population

40000

30000

20000

10000

0
1971 1981 1991 2001 2011 2017 2022 2027 2032 2037
Year
`

4.1.4 House Hold Size

The Average household size for Alandi is 3.98 according to 2011 census.

4.1.5 Sex Ratio

Sex ratio reflects the socioeconomic and demographic characteristics. Higher sex ratio denotes
higher out-migration of the male population and lower sex ratio is the sign of immigration of
single male population. Better economic opportunities have a dominant effect on in a migration
and vice-versa. Also the awareness amongst the people in terms of gender equality also affects
the sex ratio. Alandi has 775 females for every thousand males which is less than that of state
and district in 2011. Generally, rural areas have a higher proportion of females than the urban
areas as a higher degree of urbanization and more employment opportunity results in a lower
sex ratio due to single male in migration. The sex ratio figures for rural and urban areas are 933
and 904 for Pune district and that of Alandi is 775 in 2011. The Sex ratio in Alandi has been 904,
810, 830, 788 and 775 in 1971, 1981, 1991, 2001 and 2011 respectively.

PLANITECH CONSULTANTS 26
ALANDI CITY DEVELOPMENT PLAN

Table 4-4: Sex ratio comparisons (state, district and town)


Maharashtra Pune District Alandi Municipal Council

Total 930 915

Rural 952 933 775

Urban 904 904

Source: Census of India

Sex Ratio per 1000 males


1000
No of Females per thousand Males

900
800
700
600
500
400
300
200
100
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Ward No.

4.1.6 Child Sex Ratio

The Sex ratio worked out on the basis of population of all ages is not indicative of any clear picture
to know whether it is favourable for female or not. The sex composition at different ages of the
population is affected by a number of factors. Differential mortality rates and sex specific
migration are the two important factors to distort the natural sex ratio. When the net migration
rate for both male and female is equal, but still the sex ratio is distorted, then there is concern to
check whether there is any interference in natural sex ratio or the mortality rates are overriding.
With the limited data available we will only consider the age 0 to 6. Though the child mortality
rate is prevalent this sex ratio is not affected by any sort of migration. This sex ratio is very close
to sex ratio at birth. Any variation in this sex ratio depicts the differential child mortality rate and

PLANITECH CONSULTANTS 27
ALANDI CITY DEVELOPMENT PLAN

extent of medical interference with pregnancies in the form of selective sex abortion also known
as female feticide.

The Crude sex ratio at birth for Alandi is 799 in 2011 it has decreased as compared to that of 913
in 2001.

Table 4-5: Population 0-6 Age Group for Last Three Decades
Year Total 0-6 T 0-6_M T 0-6_F Sex Ratio
1991 1432 753 679 901
2001 2281 1192 1089 913
2011 3552 1974 1578 799
Source: Census of India

4.1.7 Literacy

A person who can both read and write with understanding in any language is to be taken as
literate by the Indian census. A person, who can merely read but cannot write, is not literate. It
is not necessary that a person who is literate should have received any formal education or should
have passed any minimum educational standard. In addition to this for the 1991 census, all
children of age 6 years or less are treated as illiterates even though they may be going to school
and can read and write a few odd words. In earlier census, this limitation was up to the age of 4.
It has been also decided to use only effective literacy rates for the 1991 census, i.e. the ratio of
literates and population excluding the age group of 0-6. Factors such as location, proximity to
urban centers, caste composition, settlement pattern, level of social and economic development,
attitude of towns towards literacy and female education, availability of school and teachers, etc.
are quite important factors and each one of these factors exert considerable influence on the
literacy rate.

The Male literacy rate had increased from 89.31% to 95.04% and female literacy rate had
increased from 67.57% to 85.92% from 1991 to 2011. The male and female literacy rate shows
increment of 5.72% and 18.34% this reflects increasing awareness among people regarding
male–female equality and importance of education.

PLANITECH CONSULTANTS 28
ALANDI CITY DEVELOPMENT PLAN

100.00
LITERACY RATE %
95.00

90.00

85.00

80.00

75.00
Persons Literacy Rate Male Literacy Rate Female Literacy Rate
Maharashtra (Urban) 88.69 92.12 84.89
Pune District (Urban) 89.45 92.46 86.12
Alandi 91.07 95.04 85.92

Table 4-6: Literacy rate comparison (state, district and town)


Literacy Rate (%)

Maharashtra Pune District Alandi

Total Male Female Total Male Female Total Male Female

2011
Total 82.34 88.38 75.87 86.15 90.84 81.05

Rural 77.01 85.15 68.54 80.98 88.25 73.25 91.07 95.04 85.92

Urban 88.69 92.12 84.89 89.45 92.46 86.12


Source: Census of India

Ward wise Literacy Rate


2500
No. of Literates

2000
1500
1000
500
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Ward No.

PLANITECH CONSULTANTS 29
ALANDI CITY DEVELOPMENT PLAN

On comparison with the urban literacy rate of Maharashtra and Pune District literacy rate of
Alandi is at a greater side.

4.1.8 Scheduled Caste

The Scheduled Caste population accounts for 9.84% of the total population in Alandi. The Sex
ratio is 826 as on 2011. The SC Sex ratio has decreased from 935 to 826 which reflect less
awareness among people.

Table 4-7: Population of scheduled caste (1971 to 2011)

SC % of Total Growth
Year SC Male SC Female SC Sex Ratio
Population Population Rate ( % )

1971 112 2.34 59 53 899

1981 295 3.92 163.39 143 152 1063

1991 1082 42.62 266.78 567 515 909

2001 1451 8.26 34.10 750 701 935

2011 2819 9.84 94.28 1544 1275 826


Source: Census of India

Scheduled Caste Population


3000

2500

2000

1500

1000

500

0
1971 1981 1991 2001 2011
SC Female 53 152 515 701 1275
SC Male 59 143 567 750 1544

PLANITECH CONSULTANTS 30
ALANDI CITY DEVELOPMENT PLAN

4.1.9 Scheduled Tribes

The Scheduled tribe’s population accounts for 1.69 % of the total population in Alandi. The Sex
ratio is 745 as of 2011.

Table 4-8: Population of scheduled tribes (1971-2011)

ST % of Total Growth
Year ST Male ST Female ST Sex Ratio
Population Population Rate ( % )

1971 2 0.04 2 0 0
1981 31 0.41 0.00 18 13 723
1991 89 3.51 187.10 41 48 1171
2001 177 1.01 98.88 96 81 844
2011 485 1.69 174.01 278 207 745
Source: Census of India

Scheduled Tribe Population

600
500
400
300
200
100
0
1981 1991 2001 2011
ST Female 175 215 228 246
ST Male 164 202 233 246

Table 4-9 Demography Analysis of Town


No. Factor Impact on Population Case of Alandi

Higher the Birth Rate , Higher the Nothing Exceptional anticipated


1 Fertility Rates
growth Rate in Alandi.

Higher the death Rate , Lower the Nothing Exceptional anticipated


2 Mortality Rate
growth Rate in Alandi.

Inclusion of new areas within the


Change in
3 city/ village limits increase the No new areas have been added.
Boundaries
population for city and vice- versa

PLANITECH CONSULTANTS 31
ALANDI CITY DEVELOPMENT PLAN

Economic Economic growth brings Increasing Importance as an


4
development immigration and vice versa Pilgrimage centre.

Quality of life is resultant of many


different factors. However in the
Indian context the availability of
water, education, health, power
and sanitation facilities are critical The huge quantum of daily
determinant of the perceived visitors and the floating
quality of life. population at the time of
5 Quality of Life
festivals create lot of unhygienic
All other factors remaining the conditions hampering the
same, when QOL improves, in overall environment.
migration increases and when QOL
deteriorates in- migration
decreases and out-migration
increases.

This factor is often overlooked.


Large scale real estate
developments such as new Residential development as well
Real Estate
townships, which have the as Marriage hall development is
6 market
required scale to implement their increasing in the Alandi town to
operations
own infrastructure solutions great extent.
effectively , can attract new
population

PLANITECH CONSULTANTS 32
ALANDI CITY DEVELOPMENT PLAN

SOCIAL & CULTURAL ENVIRONMENT

PLANITECH CONSULTANTS 33
ALANDI CITY DEVELOPMENT PLAN

4.2 Social and cultural Environment

Socio-economic development can be facilitated and accelerated by the presence of social and
economic infrastructures. To assess the social and cultural environment; social infrastructure,
cultural traditions, and lifestyle in the context of the development are studied. The parameters
are covered and their significance are as below:

4.2.1 Educational Facilities

Education is a very important source of economic growth. Even though education may be a social
investment, it is also an economic investment since it enhances the stock of human capital. Alandi
is well equipped with public as well as private educational institutions and schools providing good
infrastructure for Primary education facilities. Four government schools are observed in Alandi.

Addition to the education facilities of Alandi is on account of establishment of an Engineering


College - MIT Academy of Engineering and three other colleges.

Figure 4-1 ZP Primary and secondary Schools

PLANITECH CONSULTANTS 34
ALANDI CITY DEVELOPMENT PLAN

Figure 4-2 Private primary, secondary high school and Colleges.


Key issues

The sanitation facilities at ZP schools are observed satisfactory but have lot of scope for
improvement. The drinking water facility, playground facilities, computer lab facilities are seen
inadequate. Awareness of sanitation facilities is absent in few educational institutes.

4.2.2 Health Facilities

Like education; health is another important argument in the socio-economic production function.
Health is one of the major determinants of labour productivity and efficiency. Public health deals
with the environment in which economic activities take place.

Public health measures consists of the improvement of environmental sanitation, removal of


stagnant and polluted water, slum clearance, clean water supply, better sewage facilities, Control
of communicable diseases, provision of medical and health services, especially in maternal and

PLANITECH CONSULTANTS 35
ALANDI CITY DEVELOPMENT PLAN

child welfare, health education, family planning, and above all, for the training of health and
medical personnel.

Figure 4-3 Facilities & Utilities in Town


There is a Rural Hospital situated in near chawadi chowk road which have 30 no. of beds for
various patients.In addition to these there are various private dispensaries and clinics in the town.
Also there are few hospitals in Alandi which have facility of admitting.

4.2.3 Cremation and Burial Facilities-

The sites of burial ground/Cremation grounds have adequate facilities like toilet facilities,
compound wall, water etc. There is problem of success which is from bus stand near the old
bridge.

4.2.4 Playgrounds and Parks

Gardens and Play Grounds: Alandi is deficient in respect of play grounds, gardens and open
spaces. Also there is no place for public meeting as well as playground in the town except the
ground near school no 4.

PLANITECH CONSULTANTS 36
ALANDI CITY DEVELOPMENT PLAN

TRAFFIC & TRANSPORTATION

PLANITECH CONSULTANTS 37
ALANDI CITY DEVELOPMENT PLAN

4.3 Traffic and Transportation

In physical sense, town is a static phenomenon. But town is not ultimately a cluster of physical
structures, walls, roofs or trees. It is obviously a base for the co-related and manifold life of the
human society which itself is a dynamic phenomenon. So the soul of the so-called physically static
town are the dynamic interactions of the social life of the human beings. Therefore the transport
and communication pattern of any town is one of the dynamic factors of the circulation system,
of which communication routes are as important as the blood circulating veins in a human body.

4.3.1 Connectivity

Alandi is connected to the District Head Quarter Pune and nearby main urban centres. It is also
connected to the Moshi village on the NH-50 by a road leading to Dehu, another religious town.
Chakan, a village also situated on the NH-50, is connected to Alandi by a MDR passing through
the town.

Internally, the entire Alandi town is connected by various small roads and lanes. The internal
roads are mostly 3 to 7m wide. However, the effective width is significantly reduced due to
roadside parking, shops. Also, the roads are irregular and of awkward shape.

The major roads in the Alandi town are as below. These roads cater to the demand of the
commercial traffic through the town.

At the time of the Ashadhi and Kartiki Ekadashi days, vehicles are not permitted within Pilgrim
zone. However, on normal days vehicles are permitted upto the temple entrance and can be seen
parked in the small open area in front of the temple.

The Pune – Markal road, witnesses movement of heavy commercial vehicles such as trucks,
trailers and containers, carrying goods, machinery and materials for the industrial area near
Markal village. Indiscriminate parking of vehicles is seen along this road, particularly in front of
the AMC office, where the road takes a sharp turn. As a result, traffic jams are common in this
area even though the traffic volume could be relatively less.

Mahadwar Road provides connectivity to the temple premises and is one of the major roads in
Alandi town.

PLANITECH CONSULTANTS 38
ALANDI CITY DEVELOPMENT PLAN

Similarly, the Pradakshina Road from the Wadgaon Chowk to Chakan Chowk witnesses traffic
congestions due to indiscriminate parking of vehicles along roadside, movement of heavy
vehicles and more pedestrian traffic due to location of the Holy Wall and other important temples
as well as many Dharma Shalas (Guest Houses) on this stretch.

The stretch from Wadgaon Chowk to Chakan Chowk is an important road in the town since it
forms part of the circular route for the holy walk around the temple and also has the other
important temples, religious places and Dharmashalas located along the road.

During the time of the Ashadhi and Kartiki Ekadashi lakhs of pilgrims take a walk along the
circular route from Nagar Parishad Chowk-Markal Chowk-Rath-Wadgaon Chowk-Bharav Rasta-
Indrayani River bank and Nagar Parishad chowk. This circular route is called Pradakshina Marg.
The length of the road is about 2 km. The heavy vehicles to Markal and Chakan industrial area
and the PMT buses also ply via the Nagar Parishad Chowk-Markal Chowk-Rath-Wadgaon Chowk
stretch.

The nearest railway station is Akurdi and the nearest airport is Lohegaon. Alandi has good
accessibility to the district headquarters Pune through the Pune –Alandi Road.

Alandi-Dehu Road: This is the major road in Alandi Town along which the major commercial land
use is present.

Alandi- Bhosari Road: The road provides connectivity with Wadmukhwadi, Choviswadi and
Alankapuram.

Chakan –Alandi Road: The road provides connectivity with Chakan.

Alandi- Wadgaon and Alandi- Padmavati roads are also important roads which form the arterial
roads in Alandi.

As per the traffic flow and connectivity the roads within the municipal limit can be categorized
by the hierarchy of Arterial roads i.e. carrying major heavy traffic, the major roads provide
internal connectivity and major commercial activity is along these roads, the village roads provide
connectivity with the Alandi Gaothan and adjoining areas and act as collector roads. Roads which
connects residential pockets and newly developed colonies to collector roads are Local

PLANITECH CONSULTANTS 39
ALANDI CITY DEVELOPMENT PLAN

roads/street. There is lack of organized marketing facilities like vegetable market and shopping
centre which give rise to traffic congestion.

The internal roads in the Alandi Gaothan area are in organic pattern and have width varying from
1.5m to 4.5 m in the core areas. The newly developed areas in Alandi area have widths varying
from 3m to 7.5m. The village roads/ collector roads have width varying from 6m to 12m.

Figure 4-4Road Hierarchy of Town

4.3.2 Road condition

Area of Alandi Municipal Council is 273.15 Ha. As per the primary survey approximately 50 % of
the total roads in Alandi are surfaced.

Table 4-10 Rod Details


Type of Road Total

PLANITECH CONSULTANTS 40
ALANDI CITY DEVELOPMENT PLAN

Sr. Name of the Name of the


Bitumen Concrete WBM/kuccha
No. District Municipal Council

Alandi (As per primary


1) Khed 9.86 15 25.14 50
survey)

Alandi (As per


5 15 30 50
Municipal Council)

The road network in Alandi is about 50 km, of which Approx 10 km are Bitumen Topped (BT)
roads and about 15 km are Concrete roads. About 25.14 km of roads are Water Bound Macadam
(WBM) roads and Kutcha roads.

Figure 4-5 Road Condition Map

Table 4-11Existing Road condition

PLANITECH CONSULTANTS 41
ALANDI CITY DEVELOPMENT PLAN

Sr.
Name of Area Existing Road condition
No
 Alandi Bridge (Both bridge) mainly comprises of the tar road
1 Alandi bridge pavement.
 Old bridge is newly surfaced

 Most of the sopanji- park, sai palace road and remaining


Adjacent roads to adjacent roads to charoli roads comprises of Concrete roads,
2 Alandi-Charoli
there are some stretches of WBM roads along some streets.
Road
 Longitudinal ruts and potholes are found in WBM roads.

 Along Kegaon road compromise of WBM roads.


3 Along-Kegaon Road  Joint spalling of rigid pavements at joint is observed on
concrete surface.

PLANITECH CONSULTANTS 42
ALANDI CITY DEVELOPMENT PLAN

 The parking on the street reduces the effective right of way.

 This roads are concrete paved.


 Potholes and slippage is a foremost issue for adjacent
Road adjacent to roads to Dehu road.
4
Dehu Road  Also soil deposition on concrete roads is major concern.

 The main connecting roads are deteriorated Tar roads.


5 Bharav Rasta  Erosion of tar roads is found predominantly everywhere in
this area.

PLANITECH CONSULTANTS 43
ALANDI CITY DEVELOPMENT PLAN

 Newly constructed concrete road are observed along the


Chakan Road.
6 Chakan Road  At some junctions pavers are also used.

 The area consists mainly of Concrete road.


7 Chimbali Road  This road is newly constructed with good underground
drainage system along roadside.

PLANITECH CONSULTANTS 44
ALANDI CITY DEVELOPMENT PLAN

 Major internal roads are WBM/ Kuccha Roads which are in


bad condition and create problem during Commutation.
 The internal and collector lanes lack pavement and circulation
is major problem due to water logging.
Road along
8  Most of the main roads comprises of Concrete and Paved tar
K.T.WEIR
roads, there are some stretches of Kuccha roads along some
streets.
 Unfinished work left after repair works is observed in some
streets.

Datta Mandir  Datta Mandir road mainly compromise of concrete roads.


9 Road(Near school
No.4)

PLANITECH CONSULTANTS 45
ALANDI CITY DEVELOPMENT PLAN

 Dehu Alandi road is Tar road.


 Distributary roads are concrete road, this
 Spalling of rigid pavements at joint is observed on
10 Dehu Alandi Road
concrete surface.
 Severe Scaling of concrete has taken place resulting in
loss of road surface.

 The roads mainly are Kuccha Roads. Due to lack of drainage


11 Near Dehu Phata
system flooding of roads is noticed.

PLANITECH CONSULTANTS 46
ALANDI CITY DEVELOPMENT PLAN

 All internal roads are WBM Roads which are in bad condition
Dnyaneshwar
12 and create problem during Commutation.
Paduka road
 Some internal roads are concrete roads.

Dnyaneshwari  At certain stretches there are Kuccha road.


13
Mandir road  Construction of new concrete road is in progress.

PLANITECH CONSULTANTS 47
ALANDI CITY DEVELOPMENT PLAN

 Major internal roads in Ghundare Galli are Tar Roads which


are in bad condition and create problem during
Commutation.
14 Ghundare Galli
 Swelling and rutting of roads has taken place, number of
potholes and slippage cracks along the Waghapur roads are
noticed.

 Indrayani Park, Wadgaon Road mainly comprises of the WBM


roads.
Indrayani Park,
15
Wadgaon Road  There is need of up gradation of this road.

PLANITECH CONSULTANTS 48
ALANDI CITY DEVELOPMENT PLAN

 Most of the main roads in Kale Colony-3 comprises of


Concrete, there are some stretches of Kuccha roads along
some internal streets.
16 Kale coloney-3  Water logging of WBM and Kuccha roads is also a concern.
 Potholes and ruptures on concrete roads serve the kale
colony-3.
 There are potholes observed during survey.

 Kale coloney-2 mainly compromise of Tar roads. Some parts


17 Kale coloney-2 of this area consists of WBM and Kuccha roads.
 Building material scattered on road is observed.

PLANITECH CONSULTANTS 49
ALANDI CITY DEVELOPMENT PLAN

 Markal road is bituminous in nature.


 Corrugation of Markal road is observed.
18 Markal Road
 Raveling of top road surface is a measure problem due to
poor binding material and weather conditions.

PLANITECH CONSULTANTS 50
ALANDI CITY DEVELOPMENT PLAN

 Most of the roads in this area consists of Concrete roads.


 At certain stretch there are roads which have not undergone
any treatment (Kuccha).
Opposite Kale
19  Scaling of road is prominent problem in this area, water
Petrol pump
logged surface area were observed during the survey.

 The roads mainly are Unpaved i.e. WBM road.


20 Padmavati Road  Uneven road surface and rock loss along the stretch is
observed.

PLANITECH CONSULTANTS 51
ALANDI CITY DEVELOPMENT PLAN

 The area consists mainly of Tar road and Concrete road.


21 Pradakshina Road  Water logged on edges of concrete road is observed. Similarly
water is logged on drainage chamber.

PLANITECH CONSULTANTS 52
ALANDI CITY DEVELOPMENT PLAN

 The area consists mainly of Tar road and Concrete road.


22
Adjacent road to  At certain stretches there are WBM and Kuccha road.
Pune –Alandi Road

PLANITECH CONSULTANTS 53
ALANDI CITY DEVELOPMENT PLAN

 Pune Alandi road is tar road. Shoving of tar road all over the
23 Pune-Alandi Road stretch has taken place.
 Potholes and rutting is also observed on this road.

 Major streets are tar road and some are concrete. Some
internal streets are Water Bound Macadam.
24 Near School No.4
 Unfinished work after repair is observed in most of the
streets.

PLANITECH CONSULTANTS 54
ALANDI CITY DEVELOPMENT PLAN

Source: Primary survey

4.3.3 Major Junctions

Major Junctions in Alandi are as follows: Chakan Chowk, Dehu Phata, Bhairavnath Chowk, Vitthal
Rukmini Chowk and Kelgaon Chowk.

Figure 4-6: Map showing Major Junctions

PLANITECH CONSULTANTS 55
ALANDI CITY DEVELOPMENT PLAN

4.3.4 Public Transport system

The Maharashtra State Road Transport Corporation (MSRTC) operates bus services to & from
Alandi every day. However, good bus and rail connectivity is available from Pune, which is well
connected by city bus services to Alandi.

The Pune Municipal Transport (PMT) and Pimpri-Chinchwad Municipal Transport (PCMT) run
local bus services for Alandi from Pune and Pimpri - Chinchwad, respectively. Open parking for
buses and waiting shelters for the passengers are provided near the old bridge near the
Municipality office for the PMT and PCMT buses, respectively. By virtue of the location of their
bus stations the PCMT buses do not enter the core area of the town, whereas the PMT buses
take Pradakshina Marg to enter/exit the town. The MSRTC bus station is located along the Pune
Road before the new bridge on the Indrayani River.

Figure 4-7 Alandi Bus Stand and Depot


4.3.5 Parking

Vehicle parking is a major area of concern in Alandi. At present there is only one parking lot
owned by the Alandi Municipality located near the Chakan Chowk. It is an open ground which is
also used for vehicle parking, and temporary vegetable shops and small restaurants along its
boundary.

The PCMT buses are parked at the PCMT bus stand located near the old river bridge.

PLANITECH CONSULTANTS 56
ALANDI CITY DEVELOPMENT PLAN

However, the bus stand is located on the designated road to the existing crematorium along the
river bank. The PMT buses are parked at the PMT bus stand at the Chakan Chowk.

In addition to the above, the open area in front of the Shri Dnyaneshwar Maharaj Samadhi
Temple is also used for vehicle parking Vehicles and auto rickshaws are also seen parked near the
PCMT bus stand, Chakan chowk, Wadgaon chowk and also along the road sides.

At the time of the Ashadhi and Kartiki Ekadashi days, vehicles are not permitted within a radius
of 3 km of the Dnyaneshwar Maharaj Temples. However, on normal days vehicles are permitted
upto the temple entrance and can be seen parked in the small open area in front of the temple.

Parking spaces are not available in the town. People utilize the open land and curb sides of roads
for parking purpose.

Figure 1.4-8: Road side parking


4.3.6 Street lighting

Provision and maintenance of streetlights is an obligatory function of Alandi Municipality. There


are 1075 streetlights in the city. There are LED, CFL’s, Metal Halide and High mast in Alandi town.

Table 1.4-12: Street Light


Type of Light LED Sodium Tube light Total

No. of Lights 800 125 150 1075

PLANITECH CONSULTANTS 57
ALANDI CITY DEVELOPMENT PLAN

Figure 1.4-9: Street Lights


4.3.7 SWOT

Table 4-13 SWOT Analysis of Transportation


STRENGTHS WEAKNESSES OPPORTUNITIES THREATS

Lack of Street Informal activities


Furniture like Speed Widening of existing along roads and
encroachment has
Almost 50 % of the Breakers and traffic road network.
Signals. resulted in
roads are Paved. Provision of Traffic hindrances in
Absence of dedicate Management. smooth flow of
parking areas. traffic.

4.3.8 Issues

 Present road network is inadequate.


 The existing roads in Alandi are WBM or Kuccha roads to a major extent.
 There is lack of organized marketing facilities like vegetable market and shopping centre
which give rise to traffic congestion in core area.
 No sufficient parking spaces in the town.
 No traffic controlling devices, Street Furniture and Signages in the town
 The existing road surface condition exhibits distress such as cracks, potholes, and
undulations.
 The new residential development is not sufficiently covered by streetlights

PLANITECH CONSULTANTS 58
ALANDI CITY DEVELOPMENT PLAN

URBAN GROWTH SCENARIO

PLANITECH CONSULTANTS 59
ALANDI CITY DEVELOPMENT PLAN

4.4 Urban Growth Scenario

The existing pattern of the land use is the result of the past growth and the present activities of
the town. Thus the survey of land use provides the knowledge about how much land is put to the
various uses and what are the factors in fixing the extent of land uses for the particular activities
and how much more is needed for providing future growth and to what scale.

4.4.1 Development Plan

The Development Plan (Second revision) was sanctioned on 30th September, 2015. The plan
follows the standard planning process based on UDPFI Planning norms and the guidelines of the
MRTP Act 1965.

Figure 4-10 Land Use as per Development Plan

PLANITECH CONSULTANTS 60
ALANDI CITY DEVELOPMENT PLAN

4.4.2 Physical Constraints to Growth of Town

The Alandi Town is located in close proximity of two major cities. The part of the town towards
the north of river is dense and that towards south is newly developing and has scope for future
development.

4.4.3 Future Growth Direction

The future growth direction can be envisaged based on existing growth pattern and population
projection. Another factor deciding the direction of growth is proposed land use as per the
revised development plan. The town is majorly sprawling along the major roads i.e. along the
Pune, Chakan, Markal, Padmavati, Chimbali roads in all direction.

Figure 4-11 Map Showing Growth Trend and Growth Constraints

PLANITECH CONSULTANTS 61
ALANDI CITY DEVELOPMENT PLAN

4.4.4 SWOT

STRENGTHS WEAKNESSES OPPORTUNITIES THREATS

 Alandi lies
within the  High Density in
Pune district the core city
and has close causes  Good
proximity to congestion and Possibility of
Pune and pressure on developmen
Pimpri existing t to the
Chinchwad. Infrastructure. south of
 Alandi is an  Lack of Indrayani
important Infrastructural river in The
religious development Alandi town Increasing
place which which can cater along the level of
carriers its pollution in
to the huge Pune Alandi
identity. the Indrayani
pilgrim floating road
river is a
 The population.  Developme major threat
industrial  Very less nt of Alandi to the town.
area of recreational as a full-
Chakan is activities are fledged
also close present in Pilgrim town
hence there Alandi. in
are many  Congested Maharashtr
employment roads are a.
opportunitie present in core
s in and city area.
around
Alandi
4.4.5 Issues, Strategies and Potential Projects

Table 4-14 Issues Related to Land Use


Sr.
Aspects Issues Strategies and Potential Projects
No.

PLANITECH CONSULTANTS 62
ALANDI CITY DEVELOPMENT PLAN

 Presently, there is  Planned development


ribbon development with the help of Town
1 Spatial Growth
along the major planning schemes can be
roads. an efficient Tool.
 The new development in
 The core and the outer areas other
Gaothan area are than Gaothan can open
2 Density Pattern
densely populated new avenues which can
with narrow roads. help decongest the core
area.
 For overall development
of the town, the
proposals in the revised
Land Use  Development plan DP should be
Distribution and of Alandi (Second implemented at a rapid
3
Development of revision) has been pace.
Alandi sanctioned in 2015.  Various implementation/
execution modules like
BOT, PPP, etc. could be
considered.

PLANITECH CONSULTANTS 63
ALANDI CITY DEVELOPMENT PLAN

HOUSING AND URBAN POOR

PLANITECH CONSULTANTS 64
ALANDI CITY DEVELOPMENT PLAN

4.5 Housing

Housing constitutes the major investment in contributing to the up gradation of the level of living
of people. Good housing improves the living standard especially of lower income groups, whose
living conditions are generally poor. It plays a multiple role in creating employment facilities,
accelerating economic growth maintaining health and social stability and preserving the values
of a decent family life. Housing data from Census 2011 is analysed and observations are made
based on the primary survey conducted in the town during the preparation of CDP.

Table 2.5: Housing Details-1


HOUSING:STATISTICAL OVERVIEW

Total population (census 2011) 28645

Total No. of households(census 2011) 7193

Average household size 3.98


Source: Census of India, 2011

The area under residential use is Approx 50 % of the total developed area of the Alandi town. The
present population is accommodated in the residential area. The overview of the city is discussed
in context of the housing characteristics in this section.

Table 2.6: Housing Details-2


Type of Structure (%) Condition of Census House (%)
Permanent 92.8 Total 100
Semi-permanent 5.1 Good 80.4
Total temporary 0.8 Liveable 17.4
Serviceable 0.2 Dilapidated 2.2
Non-Serviceable 0.6
Unclassifiable 1.2
Source: Census of India, 2011

PLANITECH CONSULTANTS 65
ALANDI CITY DEVELOPMENT PLAN

Condition of Houses
Dilapidated
2%

Livable
18%

Good
80%

Good Livable Dilapidated

Figure 4-12 Housing condition

Table 4-15Housing Details


% of HH having Household size
% of HH having Number of Dwelling Rooms
Household size % of HH

No of exclusive rooms 5.6 1 9.1

One room 63.6 2 13.9

Two rooms 18.8 3 18.5

Three rooms 7.5 4 28.8

Four rooms 2.4 5 15.2

Five rooms 1 6-8 11.6

Six rooms and above 1.1 9+ 3


Source: Census of India, 2011

From the above table it can be observed that maximum houses consisted of one room. Thus, we
can conclude that maximum people belongs to middle and lower income groups and people
belonging to high income group is less. Also, the household size is 3.98

PLANITECH CONSULTANTS 66
ALANDI CITY DEVELOPMENT PLAN

4.5.1 Housing overview

Congested area (Gaothan area): Alandi Gaothan or core area is densely populated among all the
villages. In terms of Height, G+2, G+1 and ground floor structures is observed. Some old
structures existed a long way back. The condition of houses ranges in Between semi-permanent-
kuccha. In terms of material of construction, mostly the structures are of brick masonry plastered
with cement-concrete

Figure 4-13: Housing Typology in Alandi

PLANITECH CONSULTANTS 67
ALANDI CITY DEVELOPMENT PLAN

Peripheral Area: In areas other than the core, G+4 storied structures were mainly observed
certain ne building also stretch upto G+11 storey Buildings. A mixed land use of residential and
commercial is observed along the major roads.

4.5.2 Issues, Strategies and Potential Projects

Table 4-16 Issues, Strategies and Potential Projects in Housing Sector


Sr. Strategies and Potential
Aspects Issues
No. Projects

Old, dilapidated structures Potential areas for


creates congestion. redevelopment can be
Lack of implementation of identified and decongestion
development control rules can be achieved by
Housing
1 resulted in congestion and implementation of DC rules.
condition
haphazard development, This aspect can be considered
restricting the scope of further while preparing the
development in providing development plan of Alandi
necessary infrastructure. town.

The Housing demand is Housing schemes and slum


Housing significant in slum areas as well up-gradation, rehabilitation
2
Demand as few areas with economically schemes can be
weaker population. implemented.

Provision of required
Poor access to following infrastructure wherever
services: needed
 Tapped Water supply Improving and upgrading
Infrastructure  Sanitation facilities current practices in the
3
Provision  Solid waste delivery of basic
infrastructure services
management
 Drainage system Generating awareness
 Access roads amongst people about
sanitation

4.6 Slum / Urban Poor

The existing urbanisation process and the new development trend will have direct implications
on the infrastructure and its environs of a city. The industrialisation creates the need of skilled

PLANITECH CONSULTANTS 68
ALANDI CITY DEVELOPMENT PLAN

and unskilled labours; workers etc. and the socio-economic differences create slum areas within
the city. Slums are semi-permanent shelters, constructed with common locally available
materials .There are slums adjoining the city .The nature and condition of these slums vary from
place to place.

The Operational definition of slum is as follows:

 Inadequate access to safe water


 Inadequate access to sanitation and other infrastructure facilities
 Poor structural quality of housing
 Overcrowding and insecure residential status.
Table below indicates the slum areas and their details in Alandi.

Table 4-17 Slum Details


No of
Sr. No. Location Status Population
Households
1 Wadgaon Road Illegal 160 850
3 Chakan Chowk Illegal 80 600
4 Kalewadi Road Illegal 75 500
Total 315 1950

Alandi town has approximately 6 % of population residing in 3 major slums pockets mentioned
in the above table. As per information given by Municipal Council Alandi slums at Wadgaon Road,
Chakan Chowk and Kalewadi road are the major slum settlements apart from the small hutments
observed in the peripheral areas.

4.6.1 Condition of slums

The slum pockets are spread in the city in such a way that it adversely affects the city’s
infrastructure. Unhygienic conditions are the main cause of spread of various diseases,
epidemics. Most of the slum areas have temporary structures.

PLANITECH CONSULTANTS 69
ALANDI CITY DEVELOPMENT PLAN

Figure 4-14 Condition of Slums

Figure 4-15Roads and Drains in slums

PLANITECH CONSULTANTS 70
ALANDI CITY DEVELOPMENT PLAN

4.6.2 Issues, Strategies and Potential Projects

Table 4-18 Issues, Strategies and Potential Projects of Slum Areas


Sr.
Aspects Issues Strategies and Potential Projects
No.

The slum is encroached on the


Slum government land, housed in Need of slum rehabilitation is
1
Scenario dilapidated or temporary significant.
structure.

Clear demarcation of slum areas


Detailed survey and mapping of
is missing
slum areas is necessary.
2 Settlement The slum sprawl create
Redevelopment projects can be
unhygienic conditions causing
identified based on the surveys.
many health problems.

Water Supply- Improper


connections leading to Provision of authorised water
3 Water Supply inadequate water supply or connections with a proper system
water losses at some locations for collection of water related tax.
No collection of water taxes

Negligence in use of community/


Public toilets results in slum
dwellers practising open
defecation; polluting the
environment. As an immediate intervention,
Very less coverage of individual public level sanitation facilities
toilets. should be provided
Drainage and
4 Discharge of waste water in the Slum dwellers should be made
sanitation
open areas is common. aware of the sanitation practices
and use of individual toilets.
Area around the public toilets is
surrounded by faeces and drain
sludge creating unhygienic
conditions near the access
reducing the willingness of the
people for usage.

Solid waste Overall scenario in Alandi is Improvement in the current


5
management satisfactory w.r.t. solid waste system of collection of waste is

PLANITECH CONSULTANTS 71
ALANDI CITY DEVELOPMENT PLAN

collection, but there are still necessary to avoid open dumping


cases of open dumping. and health hazards.

PLANITECH CONSULTANTS 72
ALANDI CITY DEVELOPMENT PLAN

WATER SUPPLY

PLANITECH CONSULTANTS 73
ALANDI CITY DEVELOPMENT PLAN

4.7 Water Supply

4.7.1 Source

Alandi Town is facilitated with K.T. Weir on Indrayani River, The storage capacity of the dam is
0.769 TMC. In case of additional water requirements during festivals water is sourced from the
Vadivale Dam on upstream of the River. The water supply scheme is functional from 1981.

Intake well of 3m diameter and 2.75m depth and Inspection well of 3m Diameter and 7m depth
is constructed on Indrayani river.

Jack well is situated near Dam and its dimension are 6m x 9.6m. While pumping is carried with 4
pumps at raw water pumping house measuring 7.60m x 6.10m constructed of stone masonry.

Water Treatment Plant:

The rising main transmits water to WTP from the pump house. Raw water rising main is of C.I
pipe and 300mm diameter. Two unconventional type WTP serves Alandi. The capacity of old WTP
is 2 MLD and new WTP is 10 MLD. The WTP consists of aeration fountain, Flocculator and Clarifier,
Multi bottom setter unit, filter and pure water tank of 1.26LL (old) + 5.00 LL (New).

4.7.2 Elevated Service Reservoir

The water is pumped and transmitted from the WTP to the ESR from the pure water rising mains
and then distributed to the city with the piped network. There are four ESR’s in Alandi Municipal
Council.

The details of the ESR as below:

Table 4-19Details Of ESR/ GSR


Sr. No Location ESR/GSR Capacity
1 Pradarshana Rasta 5.00LL
2 Pradarshana Rasta 4.50LL
3 Kalewadi GSR 2.00LL
4 Kalewadi 10.00LL

PLANITECH CONSULTANTS 74
ALANDI CITY DEVELOPMENT PLAN

Figure 4-16 ESR’s in Alandi

Figure 4-17 Map showing Location of ESR/ GSR

PLANITECH CONSULTANTS 75
ALANDI CITY DEVELOPMENT PLAN

4.7.3 Coverage of water supply

As per the Pre –Feasibility Water Audit Report of Alandi there is 55 % coverage of water supply
connections. As per census data (2011) 91.9 % of HH have tap water from treated source which
includes the public taps and stand posts.

Table 4-20 Sources of Water Supply


Sr. No. Sources of water supply Coverage of water supply in AMC (%)

1 Tap water from treated source 91.9

2 Untreated Source 1.5

3 Covered Well 0

4 Uncovered Well 0.1

5 Hand pump 0.6

6 Tube Well/ Bore Well 4.1

7 Tank and Pond 0.3

8 Others 1.4
Source: Census 2011

PLANITECH CONSULTANTS 76
ALANDI CITY DEVELOPMENT PLAN

% OF HH WITH TREATED WATER

17
16
15
14
13
12
WARD NUMBER

11
10
9
8
7
6
5
4
3
2
1
0 10 20 30 40 50 60 70 80 90
PERCENTAGE

Figure 4-18 Map Showing % of HH having Treated Water Supply


4.7.4 Distribution system

Length of distribution system network is 36.37 Km and consists of 100mm-400mm. LA pipes.


Following tables shows the details of pipe and length of distribution network:

Table 4-21 Distribution system Details


Sr. No Pipe Size Length (m)

1 400 mm 89

2 350 mm DI 89

3 300 mm CI 843

4 250 mm CI 1935

5 200 mm CI 1681

PLANITECH CONSULTANTS 77
ALANDI CITY DEVELOPMENT PLAN

6 150 mm CI 7551

7 100 mm CI 24188

Total 36,376

4.7.5 Existing water supply

The per capita per day water supply is 108 Litres in AMC. Water is supplied for 1 hour every day
in the city. As per the Pre-Feasibility Water Audit report Daily water supplied to AMC is 7123.29
cum.

4.7.6 Water supply in Slums/Economical Weaker Section (EWS) Areas

Slum/EWS is situated at Chakan Road, Wadgaon Road and Kalewadi road. House Holds in these
areas do not have any water supply connection and depend on public water sources like wells
and hand pumps for their daily water requirements.

4.7.7 Water charges

In all there are 2828 Domestic and 419 Non- Domestic Water Supply connections in AMC .At
present, the connections are not metered. The tariff is on flat rate basis. Water tariff in the town
is based on the size of pipe connection. For domestic users, the tariff is Rs. 1200 per annum, tariff
for non-domestic is between Rs. 3000 to Rs. 10000. The following table gives us details of the
water charges levied based on the pipe sizes.

Table 4-22 Water Charges


Sr. No. Category Conn Size Tariff (INR)

1 Domestic ½’’ 1200

2 Hotel ½’’ 7000

3 Dharmashala ½’’ 3000

4 Hospital ½’’ 8000

5 Lodge ½’’ 10000

PLANITECH CONSULTANTS 78
ALANDI CITY DEVELOPMENT PLAN

6 Marriage Hall ½’’ 10000

Outside Boundary ½’’


7 5000
Domestic
Source: Alandi Municipal Council

The Alandi Municipal Council spends Approx Rs 4.88 per cum as production cost, treatment cost
and distribution cost as per the data obtained from the municipal council, 2017.

4.7.8 Service adequacy

To analyse the existing scenario related to infrastructure catering with the water supply facilities
in the town, the data obtained from the Municipal Council has been compared along with
indicators mentioned in UDPFI guidelines and CPHEEO manuals. The limits/ vision set in these
guidance documents can be used as targets to achieve future goals.

Table 4-23 Service level Benchmarks


Desired Status at Gap at
Sr.
Indicators service base year base year
No.
level 2017 2017
01 Coverage of water supply connections (in %) 100% 55% 45%
Per capita availability of water at consumer
02 135 lpcd 108 lpcd 27 lpcd
end (lpcd)
03 Extent of metering of water connections (in %) 100% 0% 100%

04 Continuity of water supply (in hrs.) 24X7 1x7 23x7

05 Cost recovery in WS services (in %) 100% 75% 25%


Efficiency in collection of water supply related
06 100% 75% 25%
charges
07 Extent of Non-Revenue water(NRW) 20% 34.6% 14.6%
Source: Pre-Feasibility report on Water Audit Report for Alandi

PLANITECH CONSULTANTS 79
ALANDI CITY DEVELOPMENT PLAN

4.7.9 SWOT

Table 4-24 SWOT- Water Supply


STRENGTHS WEAKNESSES OPPORTUNITIES THREATS

Implementing Water
No adequate recycling and rain water
water supply at harvesting measures
Coverage of Insufficient water
present, only 108 Increase water supply
water supply supply.
lpcd is being coverage.
network is 55 %. supplied.
Recovery can be increased
(installation of billing
software)

4.7.10 Issues

 As per the service level benchmarking, the water supply should be 135 lpcd which is
only 108 lpcd at present.
 No metered connections. Water is supplied to the consumers on flat rate basis.

PLANITECH CONSULTANTS 80
ALANDI CITY DEVELOPMENT PLAN

ACCESS TO SANITATION FACILITIES

PLANITECH CONSULTANTS 81
ALANDI CITY DEVELOPMENT PLAN

4.8 Access to Sanitation Facilities

4.8.1 Household Sanitation

Alandi town, does not have a sewerage scheme. Most houses of the town have water seal latrines
with septic tank arrangement. The town has a predominant population belonging to the lower
economic strata and sanitation situation is inadequate in such areas. In many areas of the town,
sullage water and domestic sewage are let into storm water drains. As there is no Sewage
Treatment Plant (STP) in the town, untreated sewage from the open drains is discharged into
open areas and river resulting in unsanitary conditions. Overall, sanitation situation in the town
is not satisfactory and hence needs improvement.

As per census, there are 7193 residential properties out of which 86.2% of the households have
individual latrines and the rest rely on Public/Community toilets (CT) or practice open defecation.
Percentage of open defecation is as higher as 6.1% mostly observed in slum areas. The table
below indicated the household sanitation status as per the census 2011, very less number of HHs
have individual don’t have toilet facility.

Table 4-25 HOUSEHOLD SANITATION-TOILET FACILITY


Number of households having latrine facility within the premises 86.2
Piped sewer system 4.6
Flush/pour flush latrine
Septic tank 81.6
connected to
Other system 0
With slab/
0.1
Pit latrine ventilated improved pit
Without slab/ open pit 0
Night soil disposed into open drain 0
Night soil removed by human 0
Service Latrine
Night soil serviced by animal 0
Number of households not having latrine facility within the premises 13.8
Public latrine 7.7
Alternative source
Open 6.1
Source: Census of India, 2011

PLANITECH CONSULTANTS 82
ALANDI CITY DEVELOPMENT PLAN

Existing Sanitation Coverage


Public latrine Open
8% 6%

Number of
households having
latrine facility
within the premises
86%
Public latrine Open Number of households having latrine facility within the premises

Disposal of Black Water from Household Toilets


100
90
80
70
60
50
40
30
20
10
0
Number of Piped sewer Septic tank Other With slab/ Without Night soil Night soil Night soil Number of Public Open
households system system ventilated slab/ open disposed removed by serviced by households latrine
having improved pit into open human animal not having
latrine pit drain latrine
facility facility
within the within the
premises premises

PLANITECH CONSULTANTS 83
ALANDI CITY DEVELOPMENT PLAN

Number Of Household With Individual Toilets

17 78.2
16 77.6
15 87.9
14 93.8
13 98.4
12 92.7
WARD NUMBER

11 81.9
10 80.6
9 99
8 69.3
7 90.8
6 80.1
5 69.4
4 100
3 97.4
2 90.4
1 66.9
0 20 40 60 80 100 120
PERCENTAGE

Figure 4-19 % HHs Having Individual Toilets


Source: Census of India, 2011

As seen from the bar diagram; most of the houses have individual toilets with septic tank. From
the survey conducted it can be said that the grey water from the houses in the core zone that is
in Alandi are let into the open/closed drains.

4.8.1.1 Septage Management

At present, AMC owns suction machine but is in non-functional state currently.

4.8.1.2 Key observations about existing onsite treatment facility:

Survey of individual toilets were conducted in order to assess the availability and existing status
of onsite treatment and disposal of the waste in all these individual toilets by visiting household
toilets. Various factors such as location, Typology of onsite treatment facility, construction
techniques, cost incurred for construction and cleaning and maintenance practices followed. The
assessment revealed the following observations:

PLANITECH CONSULTANTS 84
ALANDI CITY DEVELOPMENT PLAN

Locations of toilets Mostly attached to dwelling unit in existing and new


construction. The toilets are located closer to access road.
Detached toilet blocks from the main housing unit are also
prominent.

Mostly, septic tanks are located below the superstructure. In


Location of septic
some of the dwelling units the septic tanks are under the
tanks/Pits
superstructure.

Brick masonry with plastered lining from inside, dado was


Construction and design done up to lintel/ sill level in few toilet blocks, tiled finish for
floor

The toilets are cleaned daily. Frequency of cleaning septic


Cleaning practices
tanks: Not before 3-5 years.

Knowledge about
Lack of knowledge about functioning of septic tanks and
functioning of pits/septic
periodical maintenance requirements.
tanks

4.8.1.3 Sanitation Status in Slums

The slum settlements at Wadgaon Road, Padmavati road and Kalewadi road are not considered
as legal and therefore these people do not want to expend for individual toilet construction.
People practice open defecation. AMC is under taking PMAY Project which is currently under
process of DPR preparation, it is considered that the sanitation problem for slums will be
completely resolved.

PLANITECH CONSULTANTS 85
ALANDI CITY DEVELOPMENT PLAN

4.8.1.4 Issues in Household Sanitation:

 86.2 % of the total households in Alandi Municipal Council (AMC) have Households/
Individuals Sanitation facilities remaining households depend on Public toilets and open
defecation.

 Open urination is commly observed almost the floating population

 Untreated effluents are discharged directly into open drains especially in slums.

 Insufficient sanitation facilities for the pilgrims

4.8.2 Public Level Sanitation:

Alandi is an important pilgrim centre. The census data recorded that 8 % of HH in Alandi rely on
Public toilets. On an average, 12-15 lakh pilgrims visit Alandi annually. On normal days, about
10,000 to 12,000 pilgrims visit Alandi daily. However, on Thursdays and weekends this figure goes
to as high as 25,000. On the Ekadashi days (twice in a month) about 60,000 to 70,000 people visit
Alandi. On the two annual events of Ashadhi and Kartiki Ekadashi, as many as 3 to 5 lakh pilgrims
visit Alandi.

Apart from the HH which do not have individual toilets the floating population is also dependent
on the Public level sanitation facilities. The details of the public toilets are listed below.

PLANITECH CONSULTANTS 86
ALANDI CITY DEVELOPMENT PLAN

At present there are 19 Public toilets in the Alandi. Out of which 14 Toilets were available free of
cost for usage and 5 toilets were functioning of Pay and Use basis. Some toilets are constructed
by the private institutions for the tourist and pilgrim usage.

Table 4-26List of Public Toilets in Town


Toilet Details
Sr.No No. of No. Of Bathroom
Location of Toilet Total
. Seats Urinals Units
FREE USE TOILETS
1 Bhagirathi Nala 16 5 2 23
2 Gopalpura Maruti Mandir 17 10 6 33
3 Padmavati Slum 24 3 4 31
4 Behind D.Y.Patil Hospital 24 3 4 31
5 Near Kate House(Dagdi Bridge) 24 0 4 28
6 Choupal Building 24 3 4
7 Janabai Dharmshala(ESR) 2 9 3 14
8 N.P. School No :1 Toilet 10 5 4 19
9 N.P. Scholl No: 3Toilet 20 9 4 33
10 Kelgao Road 17 10 6 33
11 Gund Talim 5 0 1 6
12 Tanaji Nagar 24 9 4 37
13 Dada Maharaj Satarkar 10 0 2 12
14 Ghundre Ali Toilet 16 7 2 25
PAY AND USE

15 Sulabh Toilet 66 66
16 Maulai Ghat 22 22
17 Chakan Chowk 26 26
MIT college constructed, Chakan
18 25 25
Chowk
19 P.M.T. Bus Stop 10 10
Total 382 505
In addition to these toilets there are 80 registered Dharmashalas in the town. The estimated
numbers of toilet seats available are considered at 200. Also the AMC installs around 100 mobile
toilets during the peak season for the floating population.

PLANITECH CONSULTANTS 87
ALANDI CITY DEVELOPMENT PLAN

Figure 4-20 Condition Of Public Toilets

Number Of Hh Using Public Toilet


17 1.8
0
15 0.2
0.9
13 0.8
WARD NUMBER

7.3
11 15.8
6.7
9 0
23.6
7 9.2
19.7
5 30.6
0
3 0.8
0
1 32.2
0 5 10 15 20 25 30 35
PERCENTAGE

Figure 4-21:% of HH Using Public Toilet


Source: Census of India, 2011

PLANITECH CONSULTANTS 88
ALANDI CITY DEVELOPMENT PLAN

4.8.2.1 Operation and maintenance of the Public Toilets:

Local authorities are responsible for cleaning and maintenance of the Public Toilets blocks.
Presently, the number of public toilets is inadequate in Alandi. At certain places Public toilets lack
in facilities such as water, electricity, doors etc. which makes them unfit for use.

4.8.2.2 Key Issues in Public level sanitation facility

 Inadequacy in terms of number of toilet blocks


 Improper onsite treatment mechanism, lacking in periodical cleaning of septic
tanks leading to unhygienic conditions
 Lack of maintenance and cleaning leading the toilet blocks in state of neglect
 Lack of infrastructure such as ruptured septic tanks and broken doors as well as
water taps and unavailability for water supply make toilet blocks defunct
 Lack of awareness towards using public level sanitation infrastructure
4.8.2.3 Open Defecation Practices

Percentage of open defecation is 6.1 % as per the census data, 2011. The major open defecation
areas ward wise as per the 2011 census data is as follows.

Number Of Household Defecating In Open


17 19.9
22.4
15 11.9
5.2
13 0.8
WARD NUMBER

0
11 2.3
12.8
9 1
7.1
7 0
0.2
5 0
0
3 1.8
9.6
1 0.9
0 5 10 15 20 25
PERCENTAGE

Figure 4-22 :% OF HH Performing Open Defecation


Source: Census of India, 2011

PLANITECH CONSULTANTS 89
ALANDI CITY DEVELOPMENT PLAN

Open defecation takes place under the new and old bridge and along the river banks which have
not been constructed. The open areas along the riverbank are used by a large number of pilgrims
for defecation during the fairs and festivals.

Figure 4-23Existing Sanitation Scenario


Solid waste such as garlands, flowers etc gets collected in the area and decompose at the same
location.

The stagnant water also leads to breeding of algae and other plants.

In general the river water in the stretch between old and new bridge shows a dark green color
with dense growth of algae and other weeds. The river section has never been dredged and the
river bed is believed to be significantly silted in this stretch due to presence of two weirs and
other structures.

The water quality results show presence of fecal coliforms in the river water, which is dangerous
to public health as people drink the same water as ‘Tirth’.

PLANITECH CONSULTANTS 90
ALANDI CITY DEVELOPMENT PLAN

The Old Bridge is an important entry point to Alandi from Pune side and the solid waste dumped
on either side and poor water quality gives an unpleasant appearance as one enters the town.

In particular, the left bank of the river behind the temple is in an unhygienic condition, which is
not in tune with that a clean and pious surrounding expected near a temple.

PLANITECH CONSULTANTS 91
ALANDI CITY DEVELOPMENT PLAN

WASTE WATER, SEPTAGE AND STORM WATER


MANAGEMENT

PLANITECH CONSULTANTS 92
ALANDI CITY DEVELOPMENT PLAN

4.9 Waste Water, Septage and Storm Water Management

The current section discusses existing wastewater and storm water management practices
highlighting conveyance and disposal system in the town.

4.9.1 Generation of wastewater

At domestic level, wastewater is generated mainly through individual toilets, bathrooms, kitchen
and wash areas (known as Mori - a place for washing and cleaning of clothes, etc.). The water
supply for the town at present is 108 lpcd. Considering 80% of waste water generation, the total
wastewater generated per capita is 86.4 lpcd.

Following sketch shows schematic flow of domestic wastewater management practices across
the town.

USER INTERFACE COLLECTION / CONVEYANCE / CONVEYANCE / DISPOSAL /


STORAGE TRANSPORTATIO TRANSPORTATIO REUSE
N N NALLA / RIVER /
POUR FLUSH PIT/ SEPTIC OPEN/ CLOSED
TOILETS TANKS NO TREATMENT OPEN AREA
DRAIN

GREY WATER

4.9.2 Existing Conveyance System

At present there is underground sewerage system in certain parts of the town mostly towards
the eastern part of the Indrayani River the town, there are open drains which are covered with
available material at various places. The sewage disposal is based on septic tank system. A sullage
scheme was developed and executed in the year 1985 consisting of collecting sewer, sump well,
dry well and sump house, pumping machinery etc. The collecting sewer was laid along the left
bank of the river and it received sewage sullage from the Bhagirath Nala and other parts of the
town. However, the intercepting sewer is broken near the new bridge and the scheme is not
functional now. The scheme had been planned to utilise the sullage water for agricultural
purposes after primary treatment. A new intercepting sewer has been laid from behind the

PLANITECH CONSULTANTS 93
ALANDI CITY DEVELOPMENT PLAN

Samadhi Mandir near Dnyaneshwar Ghat. The sewage and wastewater is let off in the Indrayani
River near the old bridge.

The rainwater run-off is drained through open gutters on the roadside. The drains carry both
sewage and storm water. The town has about 50 Kms of drains on both sides of the road. The
break-up of drains is given below in the following. The kutcha drains get blocked and led to
spillage of sewage on the roads. The drains finally lead to Bhagirathi nallah and river Indrayani.
Grey water from Kitchen and other wash areas is also directly discharged into the drains.

As per Census 2011 data 79.8 % HH have their waste water outlet in closed drains, 6.6% HH in
open drains and 13.7% HH do not have any waste water outlet or completely lack conveyance
system.

Table 4-27 Details of Drains


Sr. No Type of Gutter Length (Km)
1 Open Drains 25
2 Closed Drains 15
3 Underground Drains 10
Total Drain Length 50
Source: Municipal Council (2017)

Table 4-28Existing Conveyance System Condition


Sr.
Name of Area Existing Conveyance System
No

 The Existing Conveyance system is newly constructed in


form of network of Underground Drains.
1 Chimbali Road
 Openings are kept at chamber for storm water and surface
water to flow.

PLANITECH CONSULTANTS 94
ALANDI CITY DEVELOPMENT PLAN

Along KT Weir Dam  The Existing Conveyance system is mainly in the form of
2
road network of Underground Drains.

 The Existing Conveyance system is mainly in the form of


Dnyaneshwar
3 Underground Drain.
Paduka Road
 Few locations were found to have misplaced chambers.

PLANITECH CONSULTANTS 95
ALANDI CITY DEVELOPMENT PLAN

 The Existing Conveyance system is in the form of Open


Drains and very few locations were found to have no
Near Dehu-Alandi
4 drains.
Road
 The open drains lack technical design and need repair
works.

PLANITECH CONSULTANTS 96
ALANDI CITY DEVELOPMENT PLAN

 The Existing Conveyance system is mainly in the form of


5 Datta Mandir Road Underground Drains.
 The water is flowing smoothly from this drains.

 Dnyaneshwari Mandir Road is undergoing laying of piped


Dnyaneshwari drains.
6
Mandir  Few drains are seen to have House-hold outlets connected
to them.

PLANITECH CONSULTANTS 97
ALANDI CITY DEVELOPMENT PLAN

 The Existing Conveyance system is mainly in the form of


Open and closed drains.
Indrayani Park
7  In some parts of the Indrayani Park Vegetation and debris
Wadgaon Road
blocking the drains is seen and lack technical design.
 Water clogged drain are seen in this areas.

 The Existing Conveyance system is mainly in the form of


8 Kale Colony
Underground Drains.

PLANITECH CONSULTANTS 98
ALANDI CITY DEVELOPMENT PLAN

 The Existing Conveyance system is mainly in the form of


9 Pradakshina road. Underground drains.
 Some closed drain are also present on Pradakshina road.

 The Existing Conveyance system is mainly in the form of


10 Market
Underground Drains.

PLANITECH CONSULTANTS 99
ALANDI CITY DEVELOPMENT PLAN

 The Existing Conveyance system is mainly in the form of


11 Wadgaon Road
Underground Drains.

This network collects the waste water at particular locations which ultimately are let into the
natural drains or in the adjoining plots. The open drains were not cleaned regularly hence
clogging is observed at certain locations.

PLANITECH CONSULTANTS 100


ALANDI CITY DEVELOPMENT PLAN

% Of HH With No Waste Water Drainage System


17 46.1
18.4
15 5.9
10.8
13 0.4
0
11 0.6
WARD NO.

19.2
9 0.8
33.6
7 0.7
32.8
5 0
0
3 3.8
23.9
1 29.2
0 5 10 15 20 25 30 35 40 45 50
PERCENTAGE

% OF HH With Waste Water Discharge In Closed Drainage


17 39.9
16 76.2
15 92.9
14 86.9
13 96.5
12 99
11 78.5
WARD NO.

10 75
9 95.5
8 64.3
7 96.1
6 64.8
5 98.6
4 100
3 95.6
2 74.2
1 33.5
0 20 40 60 80 100 120
PERCENTAGE

PLANITECH CONSULTANTS 101


ALANDI CITY DEVELOPMENT PLAN

% OF HH With Waste Water In Open Drainage

17 14
16 5.4
15 1.2
14 2.2
13 3.1
12 1
11 20.9
WARD NO.

10 5.8
9 3.7
8 2.1
7 3.3
6 2.3
5 1.4
4 0
3 0.6
2 1.9
1 37.4
0 5 10 15 20 25 30 35 40
PERCENTAGE

4.9.3 Existing Treatment and disposal system

There is no system in existence to treat domestic waste water generated in town. Having septic
tanks as the only means of primary treatment (that too, not in all the households) the black water
and grey water is directly discharged into open drains or closed drains or let in adjoining open
lands or discharged in the Indrayani River.

4.9.4 Storm water management

Collection and Conveyance

The storm water of the entire city flows through the existing drains. There are no separate
storm water drains provided alongside the roads. Through the available natural drains
(Bhagirath & Mankarnika Nallahs) the storm water from both north and south side of city
drains directly into the Indrayani River. The stretch of Bhagirath Nallah is covered. The
drains at other places are partially covered and few stretches of drains are open and
therefore outfall of each connecting drains cannot be traced.

PLANITECH CONSULTANTS 102


ALANDI CITY DEVELOPMENT PLAN

4.9.4.1 Water logging or Flooding and Storm water pumping station

There is no major incidence of water logging in the city. There are incidence rise in water level
of Indrayani River and the flood lines are defined in the Development plan of the town. The area
inside the flood line are defined as no development zone.

4.9.4.2 Disposal arrangements

The storm of the entire city flows through the existing drains. The overall topography of the town
is sloping towards Indrayani River and there are hardly any incidences of water logging in the city.

Table 4-29SWOT Analysis


STRENGTHS WEAKNESSES OPPORTUNITIES THREATS
 Absence of
treatment s
 Absence of  Provision of ystem and
treatment sewage network decentralized
 At present System. to improve waste
86.3% of the  Inadequate urban management
HH are water supply environment. leads to
covered with (Lpcd) for  Low cost unhygienic
conveyance provision of treatment conditions and
system. underground system e.g. diseases.
drainage system DEWATs  Ground and
surface water
contamination
4.9.5 Issues

 Lack in technical designs of conveyance system and open drain channels along the
streets causing unhygienic environment.
 No Separate system of grey and black water, both discharged into open drain channels
along streets.
 Lack of conveyance system for newly developing areas and waste water after primary
treatment through septic tanks is discharged into open areas.
 No Separate conveyance system for storm and waste water.
 No treatment facility for domestic waste water. Discharge of waste water into
Indrayani river via Bhagirathi Nallah

PLANITECH CONSULTANTS 103


ALANDI CITY DEVELOPMENT PLAN

 The conveyance system is in bad condition, the drains are broken at various locations
and some are in the rehabilitation phase.
 Drainage chamber are fitted improperly and need immediate refitting.

PLANITECH CONSULTANTS 104


ALANDI CITY DEVELOPMENT PLAN

SOLID WASTE MANAGEMENT

PLANITECH CONSULTANTS 105


ALANDI CITY DEVELOPMENT PLAN

4.10 Solid Waste Management

Solid Waste is the unwanted or useless solid materials generated from combined residential,
industrial and commercial activities in a given area. It may be categorized according to its origin
(domestic, industrial, commercial, construction or institutional); according to its contents
(organic material, glass, metal, plastic, paper etc.). Management of solid waste reduces or
eliminates adverse impacts on the environment and human health and supports economic
development and improved quality of life. A number of processes are involved in effectively
managing waste from any urban / rural local body. These include monitoring, collection,
transport, processing, recycling and disposal. The activities associated with solid wastes from the
point of generation to final disposal can be grouped into six functional elements:
 Waste generation
 Waste handling and sorting,
 storage and processing at the source
 Collection
 Sorting, processing and transformation
 Disposal

4.10.1 Waste Generation

The total waste generated in the city is about 18 MT/day. However, as per discussion with the
local authority, the total waste collected by means of available vehicles and resources is about
15 MT/day.

The municipal solid waste mainly comprises waste from the Shri Dnyaneshwar Maharaj Samadhi
Temple complex and other religious places in the town, households, markets & commercial
establishments, hotels & restaurants, guest houses (Dharmashalas) which are also used as
marriage halls, and hospitals in the town. AMC’s Health Department, headed by a Sanitary
Inspector, is responsible for the solid waste management in the town.

During the Ashadhi and Kartiki fairs, about 5 lakh pilgrims stay in Alandi for 2 days. The waste
generated during the fair season is estimated to be 30 tons during the two days.

PLANITECH CONSULTANTS 106


ALANDI CITY DEVELOPMENT PLAN

4.10.1.1 Composition of Waste

Based on the field visit, discussions with the health department officials and the Consultant’s
understanding, it has been estimated that the organic content in the waste is about 50 percent.
The higher organic content is due to the organic waste generated from the religious activities
taking place in the town.

4.10.2 Existing Waste Collection

In Alandi Town, collection of solid waste in three sources:

 Door to Door (D2D) collection through Ghantagadi on a daily basis.


 Collection of waste from community bins, and
 Collection of waste through street sweeping and cleaning of roadside drains/ nallah.

A) Door to Door Collection: Collection of waste directly from generators (door to door
step collection). Primary collection is mainly the house to house / property - to -
property, majority of Households and Commercial establishments are covered under
D2D collection. The approximate quantity of waste collected and transported is 15
TPD. The 3 wheeler (Ghant Gadi) collecting vehicles are engaged for Door to Door
collection of MSW. In all 17 wards primary collection is covered. The Door to Door
collection is managed by AMC with the help of labours on contract basis. Places which
remain unserved by the Ghanta Gadi practice open dumping.

Table 4-30Employee Details of SWM

PLANITECH CONSULTANTS 107


ALANDI CITY DEVELOPMENT PLAN

Sr. No Employee Type Municipal Council Contract Basis

1 Driver 1 13

Road Sweepers
2 8 62
and Nala Cleaning

4 Toilet Cleaning 3 -

Total 12 75
Source: Alandi Municipal Council

Additional employees are engaged at the time of festivals

B) Secondary Collection, Waste collection from community bins:


Secondary collection follows the primary waste collection and is characterized by transfer of
waste collected from doorstep to community collection bins and bulk transportation of waste
from community collection units to centralized / decentralized processing units. Most of the
domestic waste is done by door to door collection.

There are dust-bins for the secondary storage of solid waste, there are 50 dust-bins for the
secondary storage of solid waste each with capacity of 1 MT. Dust-bins are placed at the
commercial and market places. Dustbins have been provided on all major and minor roads and
the average spacing of the dustbins is about 150 to 200 m. However, this spacing is not uniform
throughout the town and it varies from place to place depending on the density and locality.

Figure 4-24: Community Bins (Existing conditions)

PLANITECH CONSULTANTS 108


ALANDI CITY DEVELOPMENT PLAN

C) Collection of Waste through street sweeping and cleaning of road side drains

One of the major activities in the solid waste management is the street sweeping activity, which
is time consuming, and labour intensive. In addition to street sweeping, due to the open drainage
system in some part of the town, drain desilting is also essential. AMC carries out street sweeping
and drain de-silting in the entire town. The total length of municipal roads and streets in Alandi
is 50 km. The total length of open drains 50Km.

Due to lack of sufficient manpower with the local body, frequency of the street sweeping and de-
silting activities is not uniform all over the town. Depending on the locality and necessity, street
sweeping is undertaken on the priority basis. However, main residential and other important
areas are swept daily and some of the areas are swept occasionally.

Frequency of Collection The frequency of waste collection from the dustbins and other dumping
points in the town varies depending on the quantity of waste accumulation and the locality. The
waste from prime residential locations, commercial areas, public places like markets, bus stand
etc is collected every day.

4.10.3 Garbage Transport System

At present, the ULB is having, 3 Tractors, 10 No’s of Ghantagadi and 2 Compactor for solid waste
collection. The Ghantagadi are used to collect the waste from HH. The solid waste is collected on
daily basis in major part. Tractors and Dumpers are used to collect solid waste from bins, open
areas, waste collected from street sweeping and cleaning of drains. There is no transfer station
in the city. The collected waste is directly dumped at dumping site located on Sr .No.193.

The details of the vehicles are listed below:

Table 4-31Details of SWM Vehicles


Sr.No Type Number Capacity (MT)
Automatic 3 wheeler
1 10 0.6
(Ghanta Gadi)
2 Tractor 3 1
3 Compactor 2 4

PLANITECH CONSULTANTS 109


ALANDI CITY DEVELOPMENT PLAN

4 Dumper Placer 1

Figure 4-25SWM Vehicles

PLANITECH CONSULTANTS 110


ALANDI CITY DEVELOPMENT PLAN

4.10.4 Garbage Treatment and Disposal System

Dumping along Ghat

Dumping in core city

Dumping in outskirts of town


Figure 4-26 Open Dumping Locations in Alandi
4.10.5 Medical Waste

The Bio-Medical waste is collected by a private agency. The various institutions and trusts in
Alandi also run charitable dispensaries and nursing homes.

PLANITECH CONSULTANTS 111


ALANDI CITY DEVELOPMENT PLAN

4.10.6 Service level Benchmarking

Table 4-32 Service Level Benchmark for SWM


Sr. Desired Status at base Gap at base
Indicators
No. service level year 2017 year 2017
Household level coverage of solid waste
01 100% 85% 15%
management services
Efficiency of collection of Municipal Solid
02 100% 80% 20%
Waste
Extent of segregation of Municipal Solid
03 100% 0% 100%
Waste
Extent of Municipal Solid Waste recovered
04 80% 0% 80%
/recycled
Extent of Scientific disposal of Municipal
05 100% 0% 100%
Solid Waste
Extent of cost recovery in solid waste
06 100% 0% 100%
management services
Efficiency in Redressal of customer
07 80% 80% 0%
complaints
08 Efficiency in collection of user charges 90% NA NA
Extent of processing and treatment of
09 100% 0% 100%
MSW

4.10.7 SWOT

STRENGTHS WEAKNESSES OPPORTUNITIES THREATS


 Provision of Bins  Non
 No
 Encourage awareness
segregation
efficient among
 Good practices
composting, people
coverage observed.
segregation and regarding
of Solid  Open
scientific segregation
Waste Dumping Of
disposal of and
Collection. waste at
waste. reluctant
lacking solid
 Religious Tourist nature of
waste
and people for

PLANITECH CONSULTANTS 112


ALANDI CITY DEVELOPMENT PLAN

collection Dharmashala good


coverage solid waste practices.
 No method by  The waste
scientific organic dumped by
disposal of composting / the pilgrims
waste. Windrow in open
technique as areas along
the organic the banks of
waste river can be
generated is to a major
higher extent. threat if not
addressed.

4.10.8 Key Issues in Solid waste management

 Lack of awareness regarding segregation of waste majorly in all areas except the core
area.
 Also, the community bins are not present in all areas and are located at large distance.
 Only single type of community bin provided leading to all type of waste (wet waste, dry
waste, and medical waste) in one single bin.
 Need based mobilization of field staff for various works including solid waste
management and Nallah cleaning.
 The dumping site is in bad condition with no treatment and disposal activity found. Also
there is no management of persons allotted for the site. Animals are found grazing on
waste which may hamper them severely.

4.11 Tourism

4.11.1 Important places in Alandi Town

The temple and Samadhi of Sant Dnyaneshwar Maharaj is situated on the north bank of the
Indrayani River. In addition to the temple of Sant Dnyaneshwar the other temples in the
Devasthan premises are:

• Haybatbaba Mandir

PLANITECH CONSULTANTS 113


ALANDI CITY DEVELOPMENT PLAN

• Siddheswar Mandir

• Laxminath Mandir
• Muktai Mandir

• Vital Rukhmini Mandir


• Pundlik Mandir

• Nath par

• Suvarna Pimpal
• Ajan Vruksh

• The famous wall on which Dnyaneshwar sat and flew the wall to meet Changdev
• Dhyan Mandir

• Prasadalay


Figure 4-27Dnyaneshwar Maharaj Holy Wall
4.11.2 Festivals in Alandi

The most important festivals and events that are celebrated in Alandi are the “Palakhi from Alandi
to Pandharpur” in the month of Ashadha, and the “Annual Fair on Kartik Purnima”. These events
are attended by thousands of devotees. The Palakhi, which is in the month of Ashadha, goes from
Alandi to Pandharpur almost 150 km of distance by walk. Thousands of devotees take part in this
Palakhi. Palakhi, a unique feature of Maharashtrian culture, is a 1000-year-old tradition followed
by the Varkari (people who follow the vari, a fundamental ritual). People collectively go singing

PLANITECH CONSULTANTS 114


ALANDI CITY DEVELOPMENT PLAN

and dancing, chanting “Dnyanba-Tukaram” in what are called as “Dindi” (organised group of
Varkaris) to the holy town of Pandharpur in Hindu months of Ashadha (June-July) and Kartik
(November-December). The Palakhi starts in the month of Jyeshtha (June) and the whole process
lasts a total of 22 days. Every year on the eleventh day of the first half of the month of Ashadh,
the Palakhi reaches Pandharpur. The Ashadhi Ekadashi falls in the month of July – August,
whereas the Kartiki Ekadashi falls in the month of November - December. (Period may vary
slightly as per the Lunar Calendar). Annual fairs (melas) are held on the Ashadhi and Kartiki
Ekadashi. A large number of the Varkaris gather on the banks of the Indrayani River during these
festivals. On important festival days the number of pilgrims visiting Alandi reaches to almost half
a million.

Figure 4-28 Ghat of Indrayani River

PLANITECH CONSULTANTS 115


ALANDI CITY DEVELOPMENT PLAN

Figure 4-29 Temples in Alandi


4.11.3 Tourist Accommodation

There are about 80 registered Dharmashalas and 10 hotels in the town, which cater to the need
of the pilgrims visiting Alandi throughout the year and in particular during the Kartiki Fair.
However discussion with temple officials, local residents and AMC officials revealed that there
are about 350 Dharmashalas in the town. These include small houses and old “wadas” (Houses)
converted into Dharmashalas.

Figure 4-30 Tourist Parking near Old Bridge.

PLANITECH CONSULTANTS 116


ALANDI CITY DEVELOPMENT PLAN

CITY GOVERNANCE & REFORMS

PLANITECH CONSULTANTS 117


ALANDI CITY DEVELOPMENT PLAN

4.13 CITY GOVERNANCE FRAMEWORK AND REFORMS

The Alandi Municipal Council is a ‘C’ Class Council category with a population of 28645 as per
census 2011.

The Directorate of Municipal Administration sanctions establishment posts of the Municipal


Councils. The cadre related posts are filled by the DMA directly and the rest of the posts are filled
by the ULB.

As per DMA orders, the sanctioned posts in each department were classified into two categories-
permanent and provisional (provisional post held by people who do not meet the current
qualification norms). Once the staff-holding provisional post retires, the post will not be filled
again.

A summary of the roles and responsibilities of different departments of the council are
highlighted below. But due to staff crunch and being a newly formed municipal council, staff
members in each department handle multiple responsibilities of their own and also other
departments.

Table 4-33: Roles and responsibilities of AMC


ULB Department Roles and Responsibilities
Record maintenance
General Administration Public relations
Grievance Redressal.
Levying of taxes, tax collection
Revenue and Tax Department
Assessment of fees and charges
Accounting
Water supply to the town
Repairs and maintenance
Water Works Department
New connections
Construction and civil works related to water works
Maintaining cleanliness and hygiene through
Garbage collection and disposal
Public Health Street Sweeping
Nallah cleaning and disinfecting
Maintaining gardens

PLANITECH CONSULTANTS 118


ALANDI CITY DEVELOPMENT PLAN

4.14 Deliberate Wing

There are 17 census wards. The Council is led by a President (Nagaradhyaksha) and elected
members, directly elected by the people. The Council, through the President, the advisory
committees for different departments and consultative committees appointed by the General
Body, is responsible for the administration of the urban area. Assisting the general body in its
functioning are various committees, the chief being the standing committee. In addition to the
standing committee, the various committees of AMC are:

1. Standing Committee
2. Planning and Development Committee
3. Education Committee
4. Water Supply and Sewerage Committee
5. Public Health and Sanitation Committee
6. Public Works Committee
The standing committee consists of corporators and is elected by the corporators from among
themselves at their first meeting after the general elections. The standing committee has
unlimited financial powers and is subject to supervision by the state government.

4.15 Administrative Wing

The executive wing for this elected body is led by Chief Officer (CO), an officer belonging to the
State Services (Executive Cadre). The CO is the key figure in local self-government and is the
administrative head of AMC; is assisted by senior officials in discharging his functions. The CO
manages the day-to-day affairs of the Council subject to approvals and sanctions from the
standing committee and the Council. The CO is supported by officers heading various
departments. The key departments include – Public Health, Accounts and tax, Administration,
Water Supply, Public works, sanitation etc.

4.16 Reforms Being Undertaken by AMC

Government of Maharashtra envisages a mechanism that delivers majority of the services


through the Urban Local Bodies (ULBs) with the use of Information Technology and
Communication (ICT) by transferring horizontally the E-Governance Solution at KDMC (Kalyan

PLANITECH CONSULTANTS 119


ALANDI CITY DEVELOPMENT PLAN

Dombiwali Municipal Corporation), (MAINet) at all ULBs in Maharashtra. AMC is about to initiate
the implementation of reforms.

A list of modules to be considered for implementation by the municipal council under E-


Governance Project is as follows:

 Birth and Death Module


 Water Tax Module
 Accounts Module
 CARE Module (Complaints and Grievance Redressal Management)
 EIP Module (Enterprise Information Portal) with services as operational at AMC
 CFC Module (Citizen Facilitation Center)
 Town Planning Module
 Property tax Module.

PLANITECH CONSULTANTS 120


ALANDI CITY DEVELOPMENT PLAN

VISION FORMATION FOR TOWN

PLANITECH CONSULTANTS 121


ALANDI CITY DEVELOPMENT PLAN

5 VISION FORMATION FOR ALANDI

5.1 Approach

Several stakeholder consultations were organized to finalize the CDP. The stakeholder
consultations were held at the organization level, in core groups pertaining to particular sectors,
and finally in the form of workshops to bring together the stakeholders on one platform. This
enabled them to voice their opinions and come to a consensus on strategies and actions for each
identified priority sector. The stakeholders included educationists, environmentalists,
councillors, and representatives of the informal sector, NGOs, and industry associations. The
stakeholder consultations also involved representatives from the Departments of Transport and
City Planning, non-governmental officers, and municipal council officials. Various rounds of
consultations in the form of workshops and focus group discussions, city surveys were held
during the period November 2017. The outcome of each discussion and workshop are
summarized in the following section and has been incorporated to formulate strategies and the
action plan for Alandi.

5.2 Consultation with Municipal Council

The consultation was basically a kick-off meeting with the RMC officials to make them aware of
the CDP process. The objective of the consultation was to get the implementing agency’s views
on issues such as the importance of city, the strengths of the city and the desired focus areas for
the development of the city and the region. Various officials, including the Chief Officer,
engineers, heads of departments, elected representatives, and citizens were consulted.

5.3 Consultation with People

This was held to bring together the stakeholders to define the vision for the city and the various
areas of Alandi. The stakeholders were from various background and the meetings were collected
in their areas. This gave the area wise disintegrated information. The Consultation fostered an
understanding amongst the stakeholders regarding the importance of CDP, the key facts that
need to be kept in mind during envisioning and the present status of city. The views received
from stakeholders are tabulated under following heads

PLANITECH CONSULTANTS 122


ALANDI CITY DEVELOPMENT PLAN

 Economic development and municipal finance


 Information technology, communication and network development
 Growth management and land management
 Infrastructure improvement
 Traffic and transport
 Water, sewerage and storm water management
 Solid waste management
 Environment management
 Health and education improvement
 Social infrastructure improvement and rehabilitation
 Poverty reduction
 Tourism Development
 Culture and Heritage Preservation
5.4 SWOT Analysis

Table 5-1: SWOT Analysis for Alandi town


Strengths Opportunities

Alandi lies within the Pune district and has


Development of Alandi as a full-fledged Pilgrim
close proximity to Pune and Pimpri
town in Maharashtra.
Chinchwad.

Good Possibility of development to the south


Alandi is an important religious place which
of Indrayani river in Alandi town along the
carriers its identity.
Pune Alandi road

The industrial area of Chakan is also close


Acceptance as well as Willingness of Reform by
hence there are many employment
People
opportunities in and around Alandi

Good coverage of Solid Waste Collection and Implementing Water recycling and rain water
availability of good Sanitation facilities for the harvesting measures
Public.

PLANITECH CONSULTANTS 123


ALANDI CITY DEVELOPMENT PLAN

Weaknesses Threats

No segregation of waste practices observed.


Non awareness among people regarding
Open Dumping Of waste at lacking solid waste
segregation and reluctant nature of people for
collection coverage. No scientific disposal of
good practices.
waste.

The waste dumped by the pilgrims in open


High Density in the core city causes congestion
areas along the banks of river can be a major
and pressure on existing Infrastructure
threat if not addressed.

Informal activities along roads and


Lack of Street Furniture like Speed Breakers
encroachment has resulted in hindrances in
and traffic Signals.
smooth flow of traffic.

Insufficient administrative staff lack of social awareness in society

Solid Waste dumping creates Pollution due to


Lack of parking spaces
unavailability of Scientific Landfill Site

5.5 Vision Statement for Alandi

A vision or vision statement is the collective understanding of the ideal future of a community. It
establishes a tone for the plan and the planning process. The entire City Development Plan must
start with and relate back to the vision.

Vision for Alandi was formulated on the basis of discussions and emerging strengths,
current issues, concerns, problems and desirable future focus areas. Based on the Town’s
strengths, futuristic desires and perspectives, the vision that emanates is–

“Development of Alandi as a Self Sufficient pilgrimage centre with support of all Social
& physical infrastructure to cater the residents and pilgrims with better quality of life.”

PLANITECH CONSULTANTS 124


ALANDI CITY DEVELOPMENT PLAN

CITY INVESTMENT PLAN

PLANITECH CONSULTANTS 125


ALANDI CITY DEVELOPMENT PLAN

6 CITY INVESTMENT PLAN

The City Investment Plans (CIP) in line with the identified vision for Alandi have been prepared
through a comprehensive process of assessment of the physical and social infrastructure sectors
and stakeholder consultations. The CIP for the city flows from the action plan recommended in
the previous chapter.

These capital investment requirements are dovetailed in the financial projections that factor the
growth in income and expenditures for AMC. A review of the Detailed Project Reports for various
projects already in place has also led to the identification of sector specific strategies,
implementation actions and associated reforms. This chapter would discuss various projects that
would be taken up by AMC as well as the financial projections of the budgets of AMC.

The strategies adopted primarily have three dimensions -- improving the service delivery by
efficiency measures, improving service delivery by creating infrastructure assets and improving
the governance aspects of AMC. This section summarizes the capital investments required for
creating infrastructure assets and various strategic interventions required in the implementation
of such projects.

The City Investment Plan (CIP) is the multi-year scheduling of identified and prioritized
investments. The scheduling or phasing of the plan is based on studies of fiscal resources
availability (for new investments and O&M), technical capacity for construction and O&M, and
the choice of specific improvements to be constructed for a period of five years in five phases.
The CIP is necessary to record:

 Assessment of city/ town growth and infrastructure needs (to be carried out once
every five years);
 Detailed feasibility/ engineering studies carried out for new projects;
 Scheduling of investments of ongoing projects due to cost and/or time overruns; and
 Assigning of priorities within the constraints of available financial resources.
The City Investment Plan is an important element of the CDP and significant in terms of the city’s
management process and sustainability with regard to the delivery of basic services. As a part of
CIP prepared for the CDP, the consultant for AMC has:

PLANITECH CONSULTANTS 126


ALANDI CITY DEVELOPMENT PLAN

 Analyzed and discussed with the stakeholders, the existing applicable norms and
standards for infrastructure services;
 Agreed and recommended a reasonable and realistic option;
 Justified and provided rationales if the chosen option is not within the existing service
level standards; and
 Identified the roles and responsibilities of various stakeholders in the implementation
of identified projects.
6.1 Capital Facilities, Investment Phasing and Implementation

6.1.1 Long Term Planning

The City Investment Plan involved the identification of public capital facilities to cater to the
demand of the city population by the year 2022, 2027, 2032 and 2037 according to their short,
medium and long-term infrastructure needs.

Further project prioritization and strategizing of the investments/ phasing of investment is based
on the strategies listed out under each service sector as identified through stakeholder
consultations. The projects derived are aimed at ensuring the optimal and efficient utilization of
the existing infrastructure systems and enhancing the capacity of the systems/ services to cater
to the demands of future population additions. Certain other projects listed as part of the CIP
include developmental projects other than those addressing the core service sectors.

Such projects are also based on lists and/ or reports prepared by and for Municipal Council.

Table 6-1: Capital Facilities, Investment Phasing and Implementation- Long Term Plan
Long Term Plan
Investment till
2020
Phase 1 Phase 2 Phase 3 Phase 4 Total
Sr. %
Sectors (2017- Escalat (2023- (2028- (2033- (2017-
No Sector
22) ed 27) 32) 37) 37)
wise
cost*
Total
1 Water Supply 3221 3736 23% 0 0 0 3221
2 Sewerage and Sanitation 2386 2768 17% 2524 5 5 4920
3 Transportation 3175 3683 23% 680 558 652 5066
Solid Waste
4 1143 1326 8% 30 30 30 1233
Management
5 Slums and Urban Poor 568 659 4% 20 20 10 618

PLANITECH CONSULTANTS 127


ALANDI CITY DEVELOPMENT PLAN

6 Urban Governance 90 104 1% 35 30 20 175


7 River Front Development 1473 1709 11% 1473 0 0 5543
Growth Management
8 1763 2045 13% 1319 644 300 4025
and land Use
Total Cost on
13819 16030 100% 6081 1287 1017 24801
Infrastructure
* Escalated cost includes physical contingencies and technical assistance at 10% of total cost and 6 %
cost escalation due to inflation
All Values in Lakhs Rupees

The following bar chart shows Investment requirement for 20 years. It can be seen that for long
term goal, Water Supply requires maximum investment followed by transportation. Sewerage
and sanitation and land use. The urban governance requires least investment but it has given
priority.

Sectoral Investments for 20 Years in Lakh Rupees.

Growth Management and land Use

River Front Development

Urban Governance

Slums and Urban Poor

Solid Waste Management

Transportation

Sewerage and Sanitation

Water Supply

0 1000 2000 3000 4000 5000 6000

The total estimated cost infrastructural development in first phase is Rs 138.19 Crores under
which, water supply, growth management, transportation and environmental development are
given priority. The sanitation may seem less investment demanding sector in the graph, however
the said sector must be given proper attention according to detailed proposal recommended in
this report.

PLANITECH CONSULTANTS 128


ALANDI CITY DEVELOPMENT PLAN

6.1.2 Short Term Planning

In short term Plan of Capital investment for Alandi town is discussed below. In this plan the capital
investment of first five year is discussed.

Table 6-2: Capital Facilities, Investment Phasing and Implementation- Short Term Plan
Short Term Plan
Investment till
2017 Pha
Phas Phas Phas Phase
% se 5 Total
Sr. e1 e2 e3 4
Sectors Escala Secto (202 (201
No (2017 (2018 (2019 (2020-
ted r 1- 7-22)
-18) -19) -20) 21)
cost* wise 22)
Total
644. 3221.
1 Water Supply 644.2 747.3 0.3 644.2 644.2 644.2
2 0
466. 2385.
2 Sewerage and Sanitation 484.6 562.2 0.2 484.6 484.6 466.0
0 8
296. 3175.
3 Transportation 258.8 300.2 0.1 852.6 802.6 965.1
3 4
173. 1143.
4 Solid Waste Management 412.7 478.7 0.2 365.3 18.3 173.5
5 3
154.
5 Slums and Urban Poor 17.0 19.7 0.0 87.8 154.4 154.4 568.0
4
6 Urban Governance 35.0 40.6 0.0 25.0 18.0 6.0 6.0 90.0
Environmental and Tourism 1228. 614. 3070.
7 0.0 0.0 0.0 614.2 614.2
Development 4 2 9
Growth Management and 352. 1762.
8 352.5 408.9 0.2 352.5 352.5 352.5
land Use 5 5
2204. 2557. 4040. 3088. 3375. 270 1541
Total Cost on Infrastructure 1.0
8 5 4 9 8 7.0 6.9
* Escalated cost includes physical contingencies and technical assistance at 10% of total cost and 6
% cost escalation due to inflation
All Values in Lakhs Rupees

PLANITECH CONSULTANTS 129


ALANDI CITY DEVELOPMENT PLAN

Investment in Lakh Rupees in Phase 1- 2017-22

Growth Management and land Use

River Front Development

Urban Governance

Slums and Urban Poor

Solid Waste Management

Transportation

Sewerage and Sanitation

Water Supply

0 1000 2000 3000 4000

Following graph shows the investment on various sectors in the first year of first phase of CDP
(2017-18). The total estimated cost of first year is Rs 22.04 Cr. under which Water supply, Solid
waste Management, Transportation, sewerage and sanitation requires major investment.

Investment in Lakh Rupees in Year 2017-18

Growth Management and land Use

Environmental and Tourism Development

Urban Governance

Slums and Urban Poor

Solid Waste Management

Transportation

Sewerage and Sanitation

Water Supply

0.0 100.0 200.0 300.0 400.0 500.0 600.0 700.0

PLANITECH CONSULTANTS 130


ALANDI CITY DEVELOPMENT PLAN

6.2 Water supply

Augmentation scheme is proposed up-to design stage of 2046 considering 135 lpcd supply for
the town and the DPR has been prepared accordingly and has been sanctioned under Sujal Nirmal
Abhiyan. The development of water supply infrastructure is the most important sector in Alandi
CDP.

6.2.1 Strategies

 Augment system for increased drawl from source in line with long-term planning and
equitable distribution of potable water to all through piped supply which can
eradicate the water supply shortage.
 Develop supply system to the unserved zones and regulate the water supply in served
areas.
 Revamp the outdated distribution system and imply 100% metering system
throughout the town.
 The billing system needs to be established. Billing should be done on the basis of
number of family members. Consumption must be calculated depending upon the
number of family members and accordingly the bill should be raised. Also, a slab
system can be introduced, wherein the rate of water tariff depends on the range in
which the consumption lies. Thus, more the consumption, higher will be the tariff rate.
Volumetric billing must be implemented. People using excess water lavishly must be
heavily charged.
 Adopt system to calculate and record water distributed in each ward/zone.
 Rain water harvesting should be encouraged.
 Facilitate regular checking of internal plumbing and storage systems at the consumers
end by licensing service providers.
6.2.2 Expected Outcomes

 Assured ability to meet the year 2046’s demand


 Per capita availability of water at consumer end (lpcd) - 135 lpcd
 Equitable distribution of water supply
 Water supply to be 24 X 7
6.2.3 Investment

There is requirement of INR 32.21 Crores (at 2013-14 SOR) to establish 24x7 water supply system
to satisfy the need of town for next 30 years.

PLANITECH CONSULTANTS 131


ALANDI CITY DEVELOPMENT PLAN

Table 6-3: Water Supply- Action Plan


WATER SUPPLY: Action Plan for Implementation (2017-2037)
Phase 1 Phase 2 Phase 3 Phase 4 Total
Investment

(2017- (2023- (2028- (2033- (2017-


Rs 32.21 Cr.
22) 27) 32) 37) 37)
3221.00 0 0 0 3221.00
Construction of Intake well     
Inspection Well     
Connecting mains     
Raw Water Rising Mains     
Capital Facilities

Jack well     
Approach Bridge     
Raw Water Mains     
Water Treatment Plant     
Pure Water Mains     
Elevated Service Reservoir     
Distribution System     
Other Supporting Infrastructure     
Regularize unauthorized connections,
Sustenance Measures
Support & System

Check distribution leaks and reduce     


UFW
Improve collections to reach 90%
90% 90% 100% 100% 100%
collection efficiency by 2017-18
Revise tariff every five years starting
2017-18

• Prepare an asset inventory and map the water supply systems for effective monitoring
• Make land reservations for zones that are good for water recharge and water
Other actions/ Measures

conservation
• Implement findings of ongoing water audit and leak detection study w.r.t identified
leaks, UFW and worn-out networks
• Facilitate regular checking of internal plumbing and storage systems at the consumers’
end by licensing service providers
• Ensure that high-volume non-domestic users compulsorily fit ISP meters
• Promote individual group water connections in slum locations and discourage PSPs as a
policy measure and to increase accountability
• Identify potential and existing polluting sources

PLANITECH CONSULTANTS 132


ALANDI CITY DEVELOPMENT PLAN

Sector Notes
• AMC shall be responsible for the implementation of all the suggested actions
• Capital investments on system refurbishment and replacements shall happen only after
concluding the Water Audit and identification of Unaccounted Flow of Water sources.
• Improvement of collection efficiency is applicable to both arrears and current demand.
Performance

• Daily per-capita water supply (min of 135 lpcd)


Monitoring
Indicators

• Elevated storage capacity w.r.t Supply (33%)


• Distribution network reach as % of road length (min 85%)
• Cost recovery through user charges (100% O&M expenses)
All Values in Lakhs Rupees
6.2.4 Priority Needs

Alandi Town does not receive 135 LPCD water supply as per the data collected from municipal
council in 2017. Town is facing water supply problems due to the insufficient and old water
infrastructure which is the main cause for considerable leakages in the distribution system and
the existing water supply is 108 lpcd.

The present system has old AC, PVC, old CI pipes with reduced hydraulic efficiency. Presently the
distribution system receives an intermittent water supply for average half to one hour per day
per consumer. There are no metered connections. Also there are cases of unauthorized
connections.

The intermittent water supply leads to:

 Inability to practice effective supply management;


 Inability to practice effective demand management; operational inadequacies, which
unduly weaken the physical infrastructure;
 Customer inconvenience, resulting in an unwillingness to pay for a sub-standard
service, and serious risk to public health, resulting from the ingress of contaminated
ground water into the distribution system.
Thus, in order to address the above problems, AMC has proposed the augmentation of the water
supply system as well as improvement of the distribution network.

The scheme is designed for immediate stage in the year 2031 and 2046.

PLANITECH CONSULTANTS 133


ALANDI CITY DEVELOPMENT PLAN

Population forecast and the demand projection has being made the water demand calculated
for immediate stage of 2031 is 9.25 LD and for Ultimate stage is 15.00 MLD considering the
growth trend.

6.3 Sewerage and Sanitation System

6.3.1 Sewerage

6.3.1.1 Sanctioned Sewerage Scheme

The DPR for the North Drainage District (ward 1 to 9, 11 to 14) has been approved by Maharashtra
Jeevan Pradhikaran in Jan 2015. The scheme is proposed for implementation in near future and
4.00 MLD STP is proposed under the scheme.

6.3.1.2 Proposed augmentation to the sanctioned scheme

The augmented scheme was proposed to extend the coverage prominently in the South
Drainage District (ward 9, 10, 15, 16, 17). The construction of drain networks is under execution.

The DPR has been prepared considering design period of 30years considering projected
population of 2047.

6.3.1.3 Sewage Generation

Considering the future water supply of 135 lpcd per capita, the per capita sewage generation is
considered to be 80% of the water supply i.e. 108lpcd. The total sewage generation is expected
to be 4.87 MLD in 2017 and 14.38 MLD in 2047.

6.3.1.4 Sewage Treatment Plant

As per the DPR STP of 3MLD based on sequential batch reactor (SBR) is proposed in the south
drainage district and 0.5MLD SIBF type STP is proposed on Bhagirathi nallah near the existing KT
wier. Sewage Pumping is proposed at lowest level to lift the sewage upto STP

PLANITECH CONSULTANTS 134


ALANDI CITY DEVELOPMENT PLAN

6.3.2 Sanitation

6.3.2.1 Individual Toilet and Sanitation

The concept of sanitation was expanded to include personal hygiene, home sanitation, safe
water, garbage disposal, excreta disposal and waste water disposal.

6.3.2.2 Household level sanitation

Forty percent of the world’s people do not have access to a basic level of sanitation; one in five
of us practices open defecation. This crisis in sanitation has clear consequences. Diarrhoea kills
more than 1.5 million children each year, and 88 percent of these deaths are attributed to faecal
contamination from inadequate sanitation, hygiene, and water supply. The cost of these
problems is high in economic as well as human terms.

Sanitation solutions are not cheap for the poor, who make up the vast majority of those without
sanitation. Like housing, on-site sanitation is often viewed as a private good and the basic
responsibility of the beneficiaries themselves. Yet sector professionals have long argued that
some public finance of sanitation can be justified by its inherent externalities: construction and
use of a family latrine protects others at least as much as it reduces disease transmission within
the family. However, the large number of poor households without sanitation makes it difficult
for strained government budgets to contribute a large fraction of the cost. In addition,
economists and sector professionals are generally sceptical of subsidy schemes, having seen how
inefficient and counterproductive some poorly designed programs can be.

Promotion of household level sanitation and introducing low cost toilets like Gramalaya,
Sulabh International, Bio Toilet, Eco-San Systems

Household level sanitation needs to be promoted in slums as well as non-slums areas. This will
result into reducing reliance on community toilet and open defecation. Maharashtra Swaccha
Bharat Abhiyan is acting as an effective tool to provide individual level sanitation facilities in the
city. In slum as well as non-slum areas, low cost toilets like Gramalaya can be initiated.

PLANITECH CONSULTANTS 135


ALANDI CITY DEVELOPMENT PLAN

Initiate Promoting household sanitation through IEC campaigns in slum areas

It was observed during the survey as well as from the people’s perceptions, people would prefer
the individual sanitation facilities rather than public or community level sanitation facilities. To
initiate awareness; campaign for the importance of the hygienic improved sanitation facilities,
management of sanitation services and give the knowledge about the sanitation schemes which
is applicable in slum as well as non-slum areas. About 86.2 % HHs have individual toilets and rest
practice open defecation. In order to make the city OD free household level sanitation should be
promoted. Thus, construction of individual toilets and promotion of HH level sanitation is given
priority and it is suggested to be completed in the first phase of the action plan.

6.3.2.3 Community level sanitation

Constructing Community Toilet Blocks for total eradication of Open defecation Practice

At present; the town has sufficient number of community toilet blocks and there is only
requirement of toilet facilities around the slum areas those present are poorly maintained and
thus the percentage of open defecation is increased.

As an immediate intervention it is suggested to rehabilitate the existing Community Toilet blocks


as well as provide new community toilet blocks with improved level of sanitation, water supply,
and infrastructure, regular cleaning of septic tank, etc. and enhance the hygiene level so as to
reduce the practices of open defecation. Especially for the onsite management system it is
necessary to assess the condition and functioning of all the septic tanks and if required; to rebuild
the same with proper technical design and detailing.

The areas having EWS and slum population should be given priority for construction of
community toilets.

Introduce O and M of CTs on pilot basis through involvement of local CBOs/ NGOs

The local authority has to initiate O and M (Operation and maintenance) of community block
through involvement of CBOs to ensure regular O and M of CT blocks. This can be initiated on
pilot basis for 1 or 2 slums in which O and M will be outsourced to private operator or through
building capacity of the community to take in charge of O and M of community toilet blocks. In

PLANITECH CONSULTANTS 136


ALANDI CITY DEVELOPMENT PLAN

such activity, local women welfare groups also can be involved for regular maintenance of toilet
blocks.

6.3.2.4 Suggested improvements for public level sanitation

It has been noticed that, lack of hygienic, well maintained public sanitation facility near temple
premises, market and commercial places in core areas is a main concern especially during the
festival and fair period’s .There are ample number of public toilets present. Policies should be
framed so that such toilets are brought to proper use by the floating population.

Therefore, as short term action plan, it is suggested to construct public toilet near the market
area, along main road as per the availability of space. It can be managed on user fee basis.

6.3.3 Total Investment

The total investment required for developing sewerage and sanitation facilities in town up to
2036 requires capital investment of INR 49.20 Crores of rupees.

Table 6-4: Sewerage and Sanitation- Action Plan


Phase 1 Phase 2 Phase 3 Phase 4
Total
Action Plan for Sewerage and Sanitation (2017- (2023- (2028- (2033-
(2017-37)
22) 27) 32) 37)
Investment

49.20 Cr 2385.80 2524.20 5.00 5.00 4920.00

Sewerage System and Drainage


Sewage collection network in south
900.00 0.00 0.00 0.00 900.00
Capital Investment on

drainage district
STP of SBR Technology and Pumping
Sewerage

670.00 0.00 0.00 0.00 670.00


Station

SIBF plant of 0.5 MLD 120.00 0.00 0.00 0.00 120.00

Construction of Strom Water Drain 629.80 2519.20 0.00 0.00 3149.00

Total Investment on sewerage system and drainage 2319.80 2519.20 0.00 0.00 4839.00

PLANITECH CONSULTANTS 137


ALANDI CITY DEVELOPMENT PLAN

Investment on Rehabilitation and cleaning of drains  


Sewerage Development of Nallah and Rain Water
Capital

  
Harvesting System
Construction of UGD System   
Construction of Strom Water Drain    
Individual and Community Sanitation
Capital Investment

Promote household level sanitation


10.00 5.00 5.00 5.00 25.00
on Sewerage

through IEC campaigns


Up gradation of existing Community
26.00 0.00 0.00 0.00 26.00
Toilets
Construction of Public toilet 30.00 0.00 0.00 0.00 30.00

Total of Individual and Community Sanitation 66.00 5 5 5 81.00

Promote household level sanitation


Investment on

    
Sanitation

through IEC campaigns


Capital

Up gradation of existing Community


    
Toilets
Construction of Public toilet     

Isolate sewerage system from drinking water and storm water lines
Other Action

Eradicate conditions for malaria, dengue and other water-borne diseases


Measures

Decentralize the system of operations for effective service delivery


Improve and ensure access to sanitary facilities for the urban poor and slum dwellers
Encourage pay & use category of public conveniences with community involvement in the
maintenance of the same
Sectoral
notes

Cost recovery on service is possible only through the introduction of sewerage charges directly
or in the form of tax, which however is in want of political will.

Collection network reach as % of road length (min 85%)


Monitoring Indicators

Population coverage with sewerage network (min 70%)


Performance

System coverage – UGD HSCs as % of PT assessments (min 85%)


UGD Network & Rising mains/ Road Length Covered (80%)
Sewerage treatment (Against generation) (100%)
% of Treatment capacity w.r.t water supplied (85%)
Cost recovery through user charges (100% O&M expenses)
All Values in Lakhs Rupees

PLANITECH CONSULTANTS 138


ALANDI CITY DEVELOPMENT PLAN

6.4 Transportation

Alandi is a pilgrim town in Khed Taluka of Pune district. Also it is located in proximity to the major
growth centres like Pune and Pimpri Chinchwad. Looking at the growth potential and religious
importance the connectivity to the town from various destinations is very important as large
number of floating population visit the pilgrim place. Hence Alandi acts as religious tourist centre.
Hence improvement of inter and intra roads and transportation facilities is important.

The survey inferences and analysis brought to the transportation strategy which is stated as
follows:

 Up gradation of internal roads of core area (Pilgrim premises) and development of


roads in outer areas.
 Development of new road as per growth trend
 Widening of roads as per the need.
 Junction improvement and signalling.
 Development of Parking spaces.
 Dedicated lanes for pedestrian and hawkers in core area.
6.4.1 Strategies

Increase carrying capacity through widening and improve riding quality through strengthening of
existing roads. Create new roads to cater missing links and develop areas and present the urban
face of the city. Institute an efficient, safe and accessible transportation system for the entire
region.

Redesigning of major junctions for better management of traffic and safety of pedestrian.

Providing necessary street furniture for better traffic movement and functioning of roads.

Parking spaces should be developed on pay and park basis, involving private developers (PPP
basis).

Pedestrian traffic management during the festival period by converting certain motorized roads
to pedestrian pathways by providing barricades to stop the flow of traffic along that road.

PLANITECH CONSULTANTS 139


ALANDI CITY DEVELOPMENT PLAN

6.4.2 Total Investment

The block estimate of total investment required on Road, Street Lights, Transportation and Traffic
would be INR 50.66 Crore at current prices.

6.4.3 Outcome

Hassle-free travel on the roads and effective transportation system convenient to everyone in
consideration with the large floating population.

6.4.4 Priority Needs

6.4.4.1 Converting WBM/kuccha road to Bitumen Surfaced road:

Total road network of Alandi is 50 km (excluding the highway and village connecting roads) as
per the survey. Out of that 25.14 km of roads are WBM/Kuccha roads.

It is proposed that all the WBM and kuccha roads to be upgraded to bitumen roads. In the first
phase all the kuccha roads are to be completely upgraded and resurfacing of the existing
deteriorated roads is proposed.

In first phase, 25.1 Km of these category of roads are to be converted which mainly include all
the Kuccha and WBM. In further phases the roads to be developed as per the development trend.
The DPR for the road should be made by expert consultants before initiating development in road
conditions, and the project and safety must be given the utmost priority

6.4.4.2 Major Junction Improvement:

According to the primary survey, some of the junctions in the town needs to be improve on
priority basis for vehicle as well as pedestrian safety and smooth flow of traffic. The improvement
would be in terms of improving islands as per standards and signalizing considering pedestrian
safety.

6.4.4.3 Parking Facility:

Parking spaces are not adequate in the town. People utilize the open land and curb sides of roads
for parking purpose. Parking areas must be developed in the town to reduce the on street

PLANITECH CONSULTANTS 140


ALANDI CITY DEVELOPMENT PLAN

parking. The tourists attract large number of vehicles which create junction blocking. New parking
spaces should be proposed in the commercial areas to avoid congestion and traffic problems.

6.4.4.4 Street Light Augmentation:

As per the road length and required street light ratio it is observed that total coverage is not
100%. In the survey many people complained about the poor distribution and coverage of street
lights facility. Also the important squares should be well lit. The proposals are given accordingly.

With development of new roads in the boundary of Municipal council, it is necessary to install
additional street lights according to the requirement. The cost proposed for installation of street
lights for new development is 2.57 Crores.

6.4.4.5 Street Furniture and Beautification:

Street furniture is an important element for people to hang around and meet or gather together
for relaxing and chatting. Hence, street benches should be provided wherever necessary. Also for
the fresh air to breathe and reduce the impact of vehicular pollution on humans as well as
environment, plants should be planted on the road sides. Dustbins should be placed at sufficient
distances along the roads for maintaining the cleanliness of the road. For road safety, signages
should be placed where ever required. Information boards must also be installed with
information of major roads and important places.

Table 6-5 Action Plan-Transportation and Traffic Management

Action Plan- Road, Street Lights, Transportation and Traffic Management (2017-2037)

Phase 2 Phase 3 Phase 4


Phase 1 Total
Investment

(2023- (2028- (2033-


(2017-22) (2017-37)
50.66 Cr 27) 32) 37)

3,175.36 679.98 558.44 652.34 5,066.13

Construction of New Roads and


Converting WBM/Kuccha road
to Bitumen Road and 2506 356 429 517 3809
construction of future required
area.

PLANITECH CONSULTANTS 141


ALANDI CITY DEVELOPMENT PLAN

Street Lighting + Automation


169 24 29 35 257
(SCADA)
Junction improvement, signage,
200 200 0 0 400
section improvement
Tree Plantation along roads 125 0 0 0 125
CCTV Camera 75 0 0 0 75
Parking Development, Street
100 100 100 100 400
Furniture
Converting WBM/ kuccha roads
    
Capital Facilities

in Bitumen
Street Lighting     
Junction improvement, signage,
    
section improvement
Parking Development     

Public transport improvements like provisions for bus stops with signages, street furniture,
signages, etc. shall be planned and implemented.
Coordination
Measures

A regional traffic and transportation study shall be conducted for integrated planning and
development of ring roads, bypass roads, and other regional connecting roads. The study shall
form the basis for the fixing of alignment, land acquisition if any, and other such regional
projects to be implemented.
PPP options O&M may be explored

Hawker zones must be created as part of the land use policy, and continuous efforts made to
Other Measures

avoid encroachments
Create parking spaces and increase parking charges in prime areas and congested zones.
Provide for pedestrian facilities like pedestrian plazas and footpaths.
It must be ensured that at least 60 percent of the roads have footpaths (i.e., roads of 20 feet
and above)

Public transport improvements shall include identifying and locating bus bays, developing
dedicated bus lanes on major roads, etc. Location of city bus stops shall be always such that
Sectoral Notes

no bus stop is within 100 m distance of a junction/ intersection.


Coordinated efforts between JNP and the respective traffic police departments need to be
made for effective traffic management and to ensure disciplined travel and behaviour.

Street lighting systems shall constitute of automated switching, dimming mechanism, etc.

PLANITECH CONSULTANTS 142


ALANDI CITY DEVELOPMENT PLAN

Road network – Degree of connectivity in terms of area under roads (in conformity with DP
Performance

proposal when prepared)


Indicators
Monitor

Road condition – percentage of municipal roads surfaced (100% - CC/ BT surfacing)


Road condition - roughness (Max. permissible 2000mm/km); rutting (20 mm) max.
Permissible (1 %)
All Values in Lakhs Rupees

6.5 Solid Waste Management

The solid waste generation for future population in Alandi is worked out at the rate of 450
gm/capita/day for permanent resident and 200 gm/capita/day for floating population. For
analysis purpose the percentage of organic and in-organic wastes generated in solid waste is
considered as 50 % each.

The total waste generated is 19.85 MT in 2017 and projected waste is 28.53 MT, 41.18 MT and
59.56 MT in 2027, 2037 and 2047 respectively.

The waste collection in AMC is satisfactory in most of the areas of Alandi Village. But it has been
noticed that, the routes of Ghantagadi are not defined according to solid waste generation in the
newly added villages and few areas of Alandi. Hence, to have 100% coverage of solid waste
collection; route rationalization for collection and transportation of solid waste is suggested as
an immediate intervention and augmentation of vehicles is also proposed as per the
requirements in respective phases. Recruitment of the sweepers and Labour is suggested for
achieving 100% coverage and source segregation in Door to Door collection and sweeping.
Additional handcarts and tricycles are proposed to be acquired for house to house collection in
congested and narrow areas. It includes modifications and addition of routes on the basis of
existing scenario of solid waste collection and transportation. There are insufficient waste bins/
community bins placed in the public areas. Hence; it is suggested to place new dustbins. Provision
and development of landfill site is suggested, as during survey it was observed that the landfill
site is not scientifically designed and need basic improvements like compound wall, access road,

PLANITECH CONSULTANTS 143


ALANDI CITY DEVELOPMENT PLAN

etc. Accordingly at present; midterm and long term interventions for treatment and disposal of
solid waste are suggested.

As an immediate intervention; rag pickers and informal groups can be involved for collection of
recyclable waste and segregation of waste. Such intervention requires only IEC campaign to
generate awareness amongst them and ULB will not require sharing huge amount on
infrastructure. This involves regularization of informal activity performed by rag pickers within
the town.

The investments will comply with the SWM rules 2016 by reducing manual handling and provision
of landfill site. The number of waste collection vehicles may be augmented from time to time in
accordance to the pattern of land use development.

Based on the data analysis and key issues identified in the above sections, the projects have been
identified for the improvement of the solid waste management system in Alandi.

6.5.1 Strategy

 Source segregation and door-to-door collection, effective transportation and


environmentally safe disposal.
 Implement 100 % door-to-door collection of solid waste.
 Training to the sanitation workers regarding collection, handling of waste, safety
measures, etc.
 Women, especially housewives, should be given training in solid waste management.
 Segregate waste at three levels -- solid recyclable waste, biodegradable waste and toxic
waste and train sanitation workers in segregation of waste.
 Create awareness on the impact of improper solid waste management, the importance
of segregation of waste and the means to do it.
 Start up the practice among societies of giving prizes to individuals for segregating waste
regularly.
 Primary collection of waste
Door-to-door collection:

 Door-to-door collection of waste is recommended in the core area near the temple
premises due to high population density and narrow lanes with the help of Push carts
wherever the circulation of the motorized Ghanta Gadi is difficult. The waste collection in
this area shall be carried out by using push carts. The push cart for door to door collection

PLANITECH CONSULTANTS 144


ALANDI CITY DEVELOPMENT PLAN

will be provided with a bell so that the residents will be alerted of the arrival of the cart for
emptying their waste containers into the containers of the cart. The sanitary workers shall
collect the waste from domestic, commercial and temple area in their push carts. Similarly,
the street sweepers shall make heaps of waste on the side of the roads. In the areas other
than the congested zone Door to door collection shall be practiced with the help of Ghanta
Gadi to achieve 100% coverage
 Refuse Collection Bins (RCB):
 The existing practice of using RCBs can be continued Alandi town while increasing the
number of bins, so as to minimize dumping along road side and in open areas at the major
public places where there is flow of floating population. Separate RCBs for collection of the
dry and wet waste must be provided, so as to achieve segregation of the waste at the
source itself. Nirmalya Kalash are proposed to be installed along the ghats. Waste from the
bins in the temple premises and the major pilgrimage area shall be collected thrice a day in
times of peak hour.
Street Sweeping:

Street sweepers shall be assigned with fixed individual beats and ‘pinpoint’ work according to
the density of the area to be swept. The main roads and the town center areas shall be cleaned
every day. The low-density areas can be cleaned on alternate days. Drain de-silting will be done
on need basis.

Treatment and Disposal

The characteristics and quantity of solid waste generated in the town primarily influence the
disposal options. A review of the solid waste analysis results for Alandi indicate that nearly 50%
of the waste generated by the town is organic in nature.

The current practice of open dumping of waste is unsafe and unhygienic. In view of the large
share of organic waste in the town, Composting and Secured Land Filling are considered as the
most feasible option of solid waste processing in Alandi. The organic component of the waste (50
percent of the total waste) shall be composted and the rest of the inert waste shall be land filled.

6.5.2 Investment

Total investment proposed under Solid Waste Management is INR 12.33 crores.

PLANITECH CONSULTANTS 145


ALANDI CITY DEVELOPMENT PLAN

6.5.3 Outcome

Reduce Waste generation, hygienic condition and clean town.

Table 6-6: SWM-Action Plan

Action Plan for Solid Waste Management (2017-2037)


Phase Phase Phase Phase
Total
1 2 3 4
Investment

(2017-
(2017- (2023- (2028- (2033-
12.33 Cr. 37)
22) 27) 32) 37)
1143.26
30 30 30 1233.26
1
Rationalization of routes of vehicles
used for door to door collection to
achieve maximum collection and
transportation of solid waste and 30 20 20 20 90.00
additional vehicles required, for
100% coverage of solid waste
Capital Facilities

collection.
Providing new waste bins 32 0 0 0 32.35
Initiating maximum segregation
10 10 10 10 40.00
through IEC activity
Development of compost site
(Installation of 10MT automatic
compost plant, Construction of Shed
724 0 0 0 724.00
fro compost plant, Construction of
WBM approach and internal roads ,
Retaining wall around the plot )
Development of the landfill site 346.91 0 0 0 346.91

Rationalization of routes of vehicles


used for door to door collection to
achieve maximum collection and
Capital Facilities

transportation of solid waste and     


additional vehicles required, for
100% coverage of solid waste
collection.
Replacing existing bins and
    
introducing new waste bins
Initiating maximum segregation
    
through IEC activity

PLANITECH CONSULTANTS 146


ALANDI CITY DEVELOPMENT PLAN

Development of compost site     


Development of the landfill site     

Create a separate multi-disciplinary SWM cell with expertise in Engineering Human


Resources/Personnel Management, Awareness Generation/ Social Behaviour, Health.
Other actions/ Measures

Increase the ambit of Solid Waste Management to include “recycling” and to facilitate
and regulate the sector accordingly.
Ensure optimum utilization of existing fleet.
Initiate I-E-C campaigns to create awareness among the urban poor and slum dwellers
of better SWM practices
Initiate steps to share the responsibility of primary collection of segregated garbage
with citizens. Also, institutionalize rag pickers associations and integrate them with the
system to carry out primary collection activities.
Develop transfer stations in a scientific and eco-friendly manner to act as
decentralized waste processing sites for different types of material.

Source segregation- reduction of waste to be collected (Min 70% of waste generated)


Performance
Monitoring
Indicators

Door to door collection as percentage of households covered (100%)


Optimum fleet utilisation of (No. of trips/vehicle/day - average min of 2.5
Vehicle capacity as percentage of rated capacity to waste generated (min 100%)
All Values in Lakhs Rupees

6.6 Poverty Reduction and Basic Services for Urban Poor

AMC’s strategy to improve the economic conditions in the slums and thereby eradicate the word
‘slum’ and poverty from Alandi town, various developments works and improvement programs
are suggested. The infrastructure requirements in the sector are of immediate priority.
Accordingly, investments are identified. PMAY can be implemented for making Alandi Slum free
city.

6.6.1 Strategy

Rehabilitation of slum dwellers currently staying in vulnerable areas, in-site improvements and
access to basic services and amenities. It is proposed that the development of the Slums be
carried out under the PMAY scheme.

PLANITECH CONSULTANTS 147


ALANDI CITY DEVELOPMENT PLAN

6.6.2 Housing for All

The scheme of government which assures housing for all PMAY can be implemented to provide
basic services and housing for urban poor, Economically Weak Section (EWS), Low Income Group
(LIG). The scheme involves:

 Slum rehabilitation of Slum Dwellers with participation of private developers using


land as a resource
 Promotion of Affordable Housing for weaker section through credit linked subsidy
 Affordable Housing in Partnership with Public and Private sectors
 Subsidy for beneficiary-led individual house construction Use of land as a resource and
redevelopment of slums
 The mission will support construction of houses up to 30 square meter carpet area
with basic civic infrastructure. Slum redevelopment projects and Affordable Housing
projects in partnership should have basic civic infrastructure like water, sanitation,
sewerage, road, electricity etc. ULB should ensure that individual houses under credit
linked interest subsidy and beneficiary led construction should have provision for
these basic civic services.
The minimum size of houses constructed under the mission under each component should
conform to the standards provided in National Building Code (NBC). If available area of land,
however, does not permit building of such minimum size of houses as per NBC and if beneficiary
consent is available for reduced size of house, a suitable decision on area may be taken by
State/UTs with the approval of SLSMC. All houses built or expanded under the Mission should
essentially have toilet facility.

The houses under the mission should be designed and constructed to meet the requirements of
structural safety against earthquake, flood, cyclone, landslides etc. conforming to the National
Building Code and other relevant Bureau of Indian Standards (BIS) codes.

The houses constructed/acquired with central assistance under the mission should be in the
name of the female head of the household or in the joint name of the male head of the household
and his wife, and only in cases when there is no adult female member in the family, the house
can be in the name of male member of the household.

PLANITECH CONSULTANTS 148


ALANDI CITY DEVELOPMENT PLAN

State/UT Government and Implementing Agencies should encourage formation of associations


of beneficiaries under the scheme like RWA etc. to take care of maintenance of houses being
built under the mission.

The development and proposals must conform to the guidelines prescribed by Pradhan Mantri
Awas Yojana (PMAY)

6.6.3 Investment

Total investment proposed under Housing for all is INR 6.18 Crores.

6.6.4 Outcome

 Improvement in quality of services for the urban poor.


 Preservation of sensitive geographies and environment of town.
 Reduced vulnerability of urban poor.
Table 6-7: Slums and Urban Poor-Action Plan
Phas Phas Phas Phas
Total
e1 e2 e3 e4
SLUMS & URBAN POOR: Action Plan for Implementation (201
(201 (202 (202 (203
(2017 to 2037) 7-
7- 3- 8- 3-
37)
22) 27) 32) 37)
Investment
568 20 20 10 618
Rs. 6.18 Crores
Housing and infrastructure(Street Light, Roads,
508 0 0 0 508
Tap) development for slum rehabilitation
Capital Facilities

Inventory and geographical mapping of all slums


and infrastructure in the slums of AMC area and 50 10 10 0 70
Socio-Economic Survey of all slums in AMC area
Training for slum women and the urban poor in
self-employment and other income-generating
10 10 10 10 40
activities. AMC shall assume a secondary/
supportive role

Housing and infrastructure development for slum


    
Facilities

rehabilitation
Capital

Inventory and geographical mapping of all slums


and infrastructure in the slums of AMC area and     
Socio-Economic Survey of all slums in JNP area

PLANITECH CONSULTANTS 149


ALANDI CITY DEVELOPMENT PLAN

Training for slum women and the urban poor in


self-employment and other income-generating
    
activities. AMC shall assume a secondary/
supportive role

• Take up slum networking, involving mapping and integrating slum locations and the
natural drainage paths of the town with parks, playgrounds etc. to form a continuous
network of a green corridor. The approach is to help build infrastructure in an
economical way and also target the environmental improvement of the
surroundings.
Other actions/ Measures

• Provision of reserved lands for Slum improvement schemes, EWS in or near each
type of commercial/ industrial/ residential land use in the Development Plan is
suggested.
• Facilitate access to credit for urban poor. AMC can explore the option of acting as a
guarantor.
• Create a registration system for all the workers in the informal sector and also a
specific cell with facilities and options for training, etc. for the workers.
• Hold frequent meetings with slum dwellers to encourage their participation in slum
development programs, create awareness amongst them on beneficiary contribution
to project development, and also goad them to assume responsibility for
implementing the projects.
• Facilitate and encourage the neighbourhood concept in slums to carry out
recreational activities such as reading, sports and drama.
· Infrastructure and basic services’ provision in slums shall not in isolation but in
conjunction and in line with the overall infrastructure development in the respective
city.
Sector
Notes

· Awareness on education, health and hygiene shall be created among slum


dwellers in line with the long-term goal of moving towards individual toilets and
doing away with public convenience systems.

· Prepare Plan of Action for Housing for All.


Performance
Monitoring

Road network – Degree of connectivity in terms of accessibility, road condition


Indicators

Water Supply: 100% households with water supply of 135 LPCD


Literacy rate: 100%
Sanitation: 100% (every HH with individual toilets, 100% collection of solid waste)
All Values in Lakh Rupees

PLANITECH CONSULTANTS 150


ALANDI CITY DEVELOPMENT PLAN

6.7 Urban Governance

A sum of INR 1.75 Crores has been proposed to be spent over the next five phases towards
system implementation, modernization, e-Governance and GIS projects. These projects would
involve administrative reforms implementation, computerization efforts, improvement and
additions to the e-Governance project, GIS-based systems development, etc. These capital
investments are expected to bring in more accountability and transparency in the administration
of Municipal Council. Being a newly formed urban local body & in order to get rapid pace of
administration works, the share of first phase investment is more considering implementation
cost required.

Table 6-8 Action Plan for Urban Governance


Phase Phase Phase Phase
Total
1 2 3 4
Action Plan for Urban Governance (2017-2037) (2017-
(2017- (2023- (2028- (2033-
37)
22) 27) 32) 37)
Investment

1.75 Crores 90 35 30 20 175

Urban Governance (Training and Skill


20 5 20 5 50
Improvement)
Capital Facilities

GIS System for tax Collection and land use


20 10 0 0 30
survey
Electronic Data Processing 20 10 5 5 40
Grievance Redressal System (SMS System) 20 5 0 5 30
Implementation of Double Entry System of
10 5 5 5 25
Accounting and System Modernization

Urban Governance     
Capital Facilities

GIS System for tax Collection and land use


    
survey
Electronic Data Processing     
Grievance Redressal System (SMS System)     
Implementation of Double Entry System of
    
Accounting and System Modernization

PLANITECH CONSULTANTS 151


ALANDI CITY DEVELOPMENT PLAN

Identify training needs of the staff of all departments (HR, administration, financial
management, urban governance, service delivery, citizens communication, IT)
Involve city-based institutions in imparting training
Publish property tax records at the ward level and bring in transparency in the system
Carry out a cost audit of all expenditures incurred service-wise and identify and assess
sector-wise expenditures to categories specific expenditure control measures
Other Actions/Measures

Communicate with the public and within the organisation to build popular support for
the reform initiatives
Outsource high energy consuming maintenance works of municipal services to target
energy efficiency with revenue sharing Model
Outsource non-administrative and non-technical operations of most of the municipal
functions like property tax database management, demand notices generation, arrears
collection, etc.
Create funds like the depreciation fund, infrastructure fund and disaster management
fund to meet unplanned and emergency expenses to ensure prudent financial
management.
Establish a discriminatory pricing policy.
Take up benchmarking of services and adopt a performance monitoring system.
All Values in Lakhs Rupees
6.8 Growth Management and Land Use

AMC intends to facilitate availability of planned and serviced land with all required infrastructure
for development of residential, commercial and socio-economic activities in the town, newly
developing areas of the Alandi town as well as in the newly added village areas. The land use and
growth management analysis reveal the present status of development in the town. Based on
the analysis, proposals for socio-economic infrastructure are given to have a planned
development of Alandi town. A sum of Rs. 40.25crores is the identified investment for the
various proposals considered. Considering the immediate need for AMC is recommended to
prepare a development plan on priority basis. For the preparation of development plan the
necessary land use surveys, base map preparation, etc. are suggested.

PLANITECH CONSULTANTS 152


ALANDI CITY DEVELOPMENT PLAN

6.8.1 Sector Strategies & Investment Need

The land acquisition cost is considered approximately by reviewing the proposals of comparable
and similar nature.

The proposals suggested are according to the standards prescribed in the set guidelines.

6.8.2 Strategy

Facilitate planned development of town through implementation of Development plan


supplemented by DC Rules and applicable norms considering the growth trends.

AMC proposes to play a proactive role in facilitating and supporting the economy and religious
character through identified projects from time to time. Initiatives like decongesting the core
area through relocation of specific economic infrastructure (wholesale markets and trade centers
to appropriate locations on the periphery) are proposed and planned pilgrim corridor is proposed
to be developed.

6.8.3 Investment

Infrastructure Development Cost for Land Use is INR 40.25 Crores. Land acquisition cost is not
included in the cost given.

6.8.4 Outcomes

Planned, orderly development of the peripheral areas contributing to overall development of


town.

Table 6-9: Land Use- Action Plan


Action Plan for Implementation (2017 to 2037)
Phase
Phase 1 Phase 2 Phase 3 Total
4
Land Use / Development Planning (2017- (2023- (2028- (201
(2033-
22) 27) 32) 7-37)
37)

Investment
1,763 1,319 644 300 4025
Rs. 40.25 Cr.

PLANITECH CONSULTANTS 153


ALANDI CITY DEVELOPMENT PLAN

Capital
Facilities Development of the proposals suggested as
4,02
per the standards and guidelines for Alandi 1,763 1,319 644 300
5
Town area
Facilities

Development of the proposals suggested as


Capital

per the standards and guidelines for Alandi     


Town area

Inventory and geographical mapping of all


Sustenance

   
Support &

Measures

town areas and infrastructure present


System

Linking with central and states schemes for


  
financial support.
• Identification of gap in social infrastructure.
• Identification of inventory in Governance infrastructure.
• Identification of Health facilities
• Identification of Education infrastructure and finding gap according to the benchmarks.
• Identification of Parking Requirements and Development of such spaces as reserved in DP.
Other actions/ Measures

• Identification of Market Spaces Requirements and Development of such spaces as reserved in


DP
• Identification of Cremation/Burial grounds Requirements and Development of such spaces as
reserved in DP.
• Compatibility of land uses (compatibility with transportation & other utilities) is necessary.
• Assess the carrying capacity of the city at the ward/ Prabhag level and identify actions
accordingly.
• Encourage new schools, market places to be developed in the peripheral areas to reduce
traffic in the core city.
• Housing for students & the EWS/ LIG population
• To prevent the growth of the slums from city, encourage builders to develop housing schemes
for urban poor under schemes like housing for All (HFA).
• Hostels for students, working women’s hostels need to be developed along with the
educational & research institutes.
Sector Notes

AMC needs to have a coordination cell to plan functions (land use and major infrastructure) in
line with the 74th CAA and modify the DCR accordingly.
Area for open spaces in the DP needs to be increased through identification of such potential
areas. Development control & regulation is necessary considering the public & semi-public
reservations & the areas reserved for residential land use instead of the Eco park reservations.

All Values in Lakh Rupees

PLANITECH CONSULTANTS 154


ALANDI CITY DEVELOPMENT PLAN

6.9 Tourism

The survey reveals that except near the Dnyaneshwar Ghat and the Coliseum there is very little
interface between the town and the river. Traditionally many pilgrim places in India have
developed along riverbanks. The interface between the settlement and the river has evolved over
the years and manifested in strong architectural expressions in the form of Ghats, Chattris, Kiosks
and Pavilions along the river. These served the function of pleasure as well as a place for
performing all the rituals such as bathing, praying etc. The Ghats of Varanasi and Vrindavan are
considered as most exemplary edifices of Indian riverfront architecture. The Ghats of Varanasi
have been declared as UNESCO World Heritage site. Alandi does not seem to have a recorded
history of such riverfront architecture. But very recent interventions to this aspect has been made
by the Alandi Dehu Parisar Vikas Samiti which has constructed four Ghats, two on either bank on
the Indrayani River. Riverfront development in Alandi assumes more significance as it is at a
strategic location at the entry point to the town from Pune side. If developed properly the
riverfront could give a new image to the town. The riverfront development in Alandi would target
at preventing the pollution and maintaining clean & hygienic conditions. It will also serve the
purpose of beautification of the riverfront to give a pleasing appearance and help the pilgrims in
carrying out the rituals such as bathing, praying etc.

6.9.1 Strategies

Removal of old structures from riverbed and dredging:

The flow of the river should be maintained by dredging and removal of the unwanted obstructing
structures in the riverbed. Only the necessary weirs for maintaining adequate water depth near
the Ghats should be kept. The riverbed can be deepened by dredging the bottom sediments
settled over many years. However, the quantum of dredging required cannot be estimated at
this stage. Hence, the cost of dredging has not been included in this report.

Construction of mid-stream fountains:

In order to maintain the cleanliness of water three fountains one in each part will be installed.
The fountains will aerate the water and also add to beauty of the area.

PLANITECH CONSULTANTS 155


ALANDI CITY DEVELOPMENT PLAN

Construction of Ghats

The new ghat development proposed may be continued with the same design to maintain
uniformity, Construction of steps, boat landing facility and walkway.

Gardens and soft landscaping

The area behind the Ghats and in between the Ghats on the back side of the temple is proposed
to be developed as small greenbelts with shadow giving trees. The trees can be provided with
seating platforms around. Ornamental plants are proposed along the parapet walls. These will
act as resting areas for the pilgrims as well as give the much-needed green spaces to the town.
Similarly, a green belt of tall evergreen trees such as Ashoka or other suitable trees, is proposed
to be developed near the Old Bridge, to create visual barrier to block the ugly look of the backside
of the shops. These will also create a sense of semi-enclosed space. The same arrangement would
be repeated on the right bank.

Construction of Toilet Blocks

Changing Rooms, Toilet, washrooms and drinking water facilities are proposed on both sides of
the ghat

Lighting on river banks

At present there are sodium vapour lamps near the coliseum and the Dnyaneshwar Ghat. Similar
lighting is proposed in the entire stretch of the zone between the old and new bridge.

Drinking water fountains

The new gardens along the Ghats are proposed to be provided with drinking water fountains.
This will provide the pilgrims clean drinking water in hygienic conditions. The Alandi Dehu Parisar
Vikas Samiti has provided similar fountains near the Dyanenshwar ghat. It is proposed to provide
five such additional water fountains, three would be on the right bank and two on the left bank.
Each fountain will have two taps. The water for the same will be the treated water from the
Alandi Municipal Council.

PLANITECH CONSULTANTS 156


ALANDI CITY DEVELOPMENT PLAN

Provision of Nirmalya Kalash

In order to take care of solid waste such as flowers, garlands etc being dumped in the river, a
‘Nirmalya Kalash’ will be installed along the river banks. These would be containers of sufficient
size such as 200 liters plastic drum or any other containers decorated to give a look of ‘Kalash’.
In all six such ‘Nirmalya Kalash’ are proposed to be installed on both the banks of the river. The
pilgrims will have to be sensitized to put all floral waste in these containers. The organic waste
collected from these containers will be used for composting pits proposed to be set up in the
Mauli Bagh or in the gardens developed along the Ghats. The concept of ‘Nirmalya Kalash’ has
been successful in Mumbai and Pune areas during the Ganesh Festivals where such containers
were installed near rivers lakes and other immersion sites. The containers are also a permanent
feature around these water bodies.

Removal of solid waste dumped along river bank

The municipal solid waste dumped along the left bank of the river on both the sides of the old
bridge should be removed immediately. This waste can be disposed off on to the existing solid
waste dumping site.

Development of approach roads along sides of ghats and development of provision for parking

Hawkers Zone Development

Establish permanent structure of low cost constructed market for hawkers. The stalls can be
leased out. Hawker’s zone can act as supporting infrastructure to tourism activities around the
temple premises.

6.9.2 Investment

The total cost of tourism development is estimated to INR 55.42 Crores.

6.9.3 Outcome

Enhancing tourism infrastructure in a planned way can support the economic development of
the town.

PLANITECH CONSULTANTS 157


ALANDI CITY DEVELOPMENT PLAN

Table 6-10Action Plan for Tourism development


Phase Phase
Phase 1 Phase 2 Total
3 4
Action Plan for (Tourism) River Front development (2017- (2023- (2017-
(2028- (2033-
22) 27) 37)
32) 37)
Investment
1473 1473 0 0 5542.73
Rs. 55.42 Crores.
Construction of Ghat of North and South
side including Stamped Concrete and 1473.00 1473.00 0.00 0.00 2946.00
seating arrangement
RCC road along the ghat 275.90 0.00 0.00 0.00 275.90
Capital Facilities

Big size Sanitation block at the ghats 998.80 998.80 0.00 0.00 1997.60
Construction of platform for cultural
52.73 0.00 0.00 0.00 52.73
activities and allied landscape
midstream fountains 60.00 0.00 0.00 0.00 60.00
repair of KT Wier and provision of
210.50 0.00 0.00 0.00 210.50
filteration for river water

Construction of Ghat of North and South


side including Stamped Concrete and     
seating arrangement
Capital Facilities

RCC road along the ghat     

Big size Sanitation block at the ghat     


Construction of platform for cultural
    
activities and allied landscape
midstream fountains     
repair of KT Wier and provision of filtration
    
for river water

Beautification and available Physical


Infrastructure inventory need to be    
Sustenance
Support &

created.
Measures
System

Local business and hawkers can resettled   

PLANITECH CONSULTANTS 158


ALANDI CITY DEVELOPMENT PLAN

• Street Lights need to be provided at tourism sites


• Parking Facilities need to be created.
Other actions/

• Cleaning and maintenance can be carried out through PPP model.


Measures

• Hotels, restaurants, hawkers business need to be given fast track clearance.


• Specific regulations -- Accommodation Reservation
• Web site creation.
• Encouraging local people to start/develop business targeting tourist customers.
• Efficient Tax collection from the tourism business
Sector Notes

AMC need to setup a special committee out of statutory body of ULB for encouraging
tourism activities through local support. PPP model can be introduced for faster and proper
implementation of tourism plan. AMC can also prepare Tourism Master Plan for strategic
development of business in tourism

All Values in Lakh Rupees

PLANITECH CONSULTANTS 159


ALANDI CITY DEVELOPMENT PLAN

Annexure I- Capital Investment Plan- Long Term Plan (2017-2037)

Phas Phas Phas Phas


Total
e1 e2 e3 e4
Type of Infrastructure (201
(201 (202 (202 (203
7-37)
7-22) 3-27) 8-32) 3-37)
Water Supply
Augmentation to Alandi water Supply Scheme 3221 0 0 0 3221
Sewerage & Sanitation
1 Sewage collection network in south drainage district 900 0 0 0 900
2 STP of SBR Technology and Pumping Station 670 0 0 0 670
3 SIBF plant of 0.5 MLD 120 0 0 0 120
4 Construction of Strom Water Drain 630 2519 0 0 3149
TOTAL 2320 2519 0 0 4839
Individual and Community Sanitation
1 Promote household level sanitation through IEC campaigns 10 5 5 5 25
2 Up gradation of existing Community Toilets 26 0 0 0 26
3 Construction of Public toilet 30 0 0 0 30
TOTAL 66 5 5 5 81
Transportation
Construction of New Roads and Converting WBM/Kuccha
1 road to Bitumen Road and construction of future required 2506 356 429 517 3809
area.
2 Street Lighting + Automation (SCADA) 169 24 29 35 257
3 Junction improvement, signage, section improvement 200 200 0 0 400
4 Tree Plantation along roads 125 0 0 0 125
5 CCTV Camera 75 0 0 0 75
6 Parking Development, Street Furniture 100 100 100 100 400
TOTAL 3175 680 558 652 5066
Solid Waste Management
Rationalization of routes of vehicles used for door to door
collection to achieve maximum collection and
1 30 20 20 20 90
transportation of solid waste and additional vehicles
required, for 100% coverage of solid waste collection.
2 Providing new waste bins 32 0 0 0 32
3 Initiating maximum segregation through IEC activity 10 10 10 10 40
Development of compost site (Installation of 10MT
automatic compost plant, Construction of Shed for
4 724 0 0 0 724
compost plant, Construction of WBM approach and
internal roads , Retaining wall around the plot )
5 Development of the landfill site 347 0 0 0 347

PLANITECH CONSULTANTS I
ALANDI CITY DEVELOPMENT PLAN

TOTAL 1143 30 30 30 1233


Slums and Urban Poor
Housing and infrastructure(Street Light, Roads, Tap)
1 508 0 0 0 508
development for slum rehabilitation
Inventory and geographical mapping of all slums and
2 infrastructure in the slums of AMC area and Socio- 50 10 10 0 70
Economic Survey of all slums in AMC area
Training for slum women and the urban poor in self-
3 employment and other income-generating activities. AMC 10 10 10 10 40
shall assume a secondary/ supportive role
TOTAL 568 20 20 10 618
Urban Governance
1 Urban Governance (Training and Skill Improvement) 20 5 20 5 50
2 GIS System for tax Collection and land use survey 20 10 0 0 30
3 Electronic Data Processing 20 10 5 5 40
4 Grievance Redressal System (SMS System) 20 5 0 5 30
Implementation of Double Entry System of Accounting and
5 10 5 5 5 25
System Modernization
TOTAL 90 35 30 20 175
River Front Development
Construction of Ghat of North and South side including
1 1473 1473 0 0 2946
Stamped Concrete and seating arrangement
2 RCC road along the ghat 276 0 0 0 276
3 Big size Sanitation block at the ghats 999 999 0 0 1998
Construction of platform for cultural activities and allied
4 53 0 0 0 53
landscape
5 Midstream fountains 60 0 0 0 60
6 repair of KT Wier and provision of filtration for river water 211 0 0 0 211
TOTAL 1473 1473 0 0 5543
Growth Management and land Use
Development of Proposals as per the standards and
1763 1319 644 300 4025
guidelines for Alandi town and villages

1381 2480
TOTAL CAPITAL INVESTMENT PLAN 6081 1287 1017
9 1

PLANITECH CONSULTANTS II
ALANDI CITY DEVELOPMENT PLAN

Annexure II- Capital Investment Plan- Short Term Plan (2017-2022)

2017- 2018- 2019- 2020- 2021-


Type of Infrastructure 2017-22
18 19 2020 21 22
Water Supply
Augmentation to Alandi water
644.2 644.2 644.2 644.2 644.2 3221.0
Supply Scheme
Sewerage and Sanitation
Sewage collection network in south
1 180.0 180.0 180.0 180.0 180.0 900.0
drainage district
STP of SBR Technology and Pumping
2 134.0 134.0 134.0 134.0 134.0 670.0
Station
3 SIBF plant of 0.5 MLD 24.0 24.0 24.0 24.0 24.0 120.0
4 Construction of Strom Water Drain 126.0 126.0 126.0 126.0 126.0 629.8
Total 464.0 464.0 464.0 464.0 464.0 2319.8
Individual and Community Sanitation
Promote household level sanitation
5 2.0 2.0 2.0 2.0 2.0 10.0
through IEC campaigns
Up gradation of existing Community
6 8.7 8.7 8.7 0.0 0.0 26.0
Toilets
7 Construction of Public toilet 10.0 10.0 10.0 0.0 0.0 30.0
Total 20.7 20.7 20.7 2.0 2.0 66.0
Transportation
Construction of New Roads and
Converting WBM/Kuccha road to
1 125.3 751.8 751.8 751.8 125.3 2506.1
Bitumen Road and construction of
future required area.
Street Lighting + Automation
2 8.5 50.8 50.8 50.8 8.5 169.3
(SCADA)
Junction improvement, signage,
3 0.0 0.0 0.0 100.0 100.0 200.0
section improvement
4 Tree Plantation along roads 0.0 0.0 0.0 62.5 62.5 125.0
5 CCTV Camera 75.0 0.0 0.0 0.0 0.0 75.0
Parking Development, Street
6 50.0 50.0 0.0 0.0 0.0 100.0
Furniture
Total 258.8 852.6 802.6 965.1 296.3 3175.4
Solid Waste Management
Rationalization of routes of vehicles
used for door to door collection to
achieve maximum collection and
1 transportation of solid waste and 15.0 0.0 15.0 0.0 0.0 30.0
additional vehicles required, for
100% coverage of solid waste
collection.

PLANITECH CONSULTANTS III


ALANDI CITY DEVELOPMENT PLAN

2 Providing new waste bins 32.4 0.0 0.0 0.0 0.0 32.4
Initiating maximum segregation
3 3.3 3.3 3.3 0.0 0.0 10.0
through IEC activity
Development of compost site
(Installation of 10MT automatic
compost plant, Construction of Shed
4 362.0 362.0 0.0 0.0 0.0 724.0
for compost plant, Construction of
WBM approach and internal roads ,
Retaining wall around the plot )
5 Development of the landfill site 0.0 0.0 0.0 173.5 173.5 346.9
Total 412.7 365.3 18.3 173.5 173.5 1143.3
Slums and Urban Poor
Housing and infrastructure(Street
1 Light, Roads, Tap) development for 0.0 50.8 152.4 152.4 152.4 508.0
slum rehabilitation
Inventory and geographical mapping
of all slums and infrastructure in the
2 slums of AMC area and Socio- 15.0 35.0 0.0 0.0 0.0 50.0
Economic Survey of all slums in AMC
area
Training for slum women and the
urban poor in self-employment and
3 other income-generating activities. 2.0 2.0 2.0 2.0 2.0 10.0
AMC shall assume a secondary/
supportive role
Total 17.0 87.8 154.4 154.4 154.4 568.0
Urban Governance
Urban Governance (Training and
1 4.0 4.0 4.0 4.0 4.0 20.0
Skill Improvement)
GIS System for tax Collection and
2 14.0 6.0 0.0 0.0 0.0 20.0
land use survey
3 Electronic Data Processing 0.0 10.0 10.0 0.0 0.0 20.0
Grievance Redressal System (SMS
4 12.0 2.0 2.0 2.0 2.0 20.0
System)
Implementation of Double Entry
5 System of Accounting and System 5.0 3.0 2.0 0.0 0.0 10.0
Modernization
Total 35.0 25.0 18.0 6.0 6.0 90.0
Action Plan for River Front development
Construction of Ghat of North and
1 South side including Stamped 0.0 589.2 294.6 294.6 294.6 1473.0
Concrete and seating arrangement
2 RCC road along the ghat 0.0 110.4 55.2 55.2 55.2 275.9
3 Big size Sanitation block at the ghats 0.0 399.5 199.8 199.8 199.8 998.8

PLANITECH CONSULTANTS IV
ALANDI CITY DEVELOPMENT PLAN

Construction of platform for cultural


4 0.0 21.1 10.5 10.5 10.5 52.7
activities and allied landscape
5 Midstream fountains 0.0 24.0 12.0 12.0 12.0 60.0
repair of KT Wier and provision of
6 0.0 84.2 42.1 42.1 42.1 210.5
filtration for river water
TOTAL 0.0 1228.4 614.2 614.2 614.2 3070.9
Growth Management and land Use
Development of Proposals as per the
standards and guidelines for Alandi 352.5 352.5 352.5 352.5 352.5 1762.5
town and villages
Total 352.5 352.5 352.5 352.5 352.5 1762.5

Total Cost on Infrastructure 1740.8 3576.5 2624.9 2911.8 2243.0 15416.9


All Values in Lakhs Rupees

PLANITECH CONSULTANTS V
ALANDI CITY DEVELOPMENT PLAN

Annexure III- POSSIBLE OPTIONS FOR PPP

Building O&M as a part of the construction contract:

This would be a typical Design Built and Operate (DBO) contractual arrangement, and would
involve;

1. Developing the contractual structure and contract documents for the project
2. Designing developer selection process and evaluation criteria.
The DBO method of project delivery offers a practical solution, when,

a) Public funding is possible,

b) Project risks make it unsuitable for implementation under a traditional private investment
framework (BOT or a Concession type) and

c) All possible efficiencies of PPP can be brought in the form of EPC and O&M contracts.

NP needs to look at the warranty period, in which the operator would train and handhold the
staff. The main issues for concern that will need to be addressed by NP in DBO projects, is the
high cost of bidding and the extent of design work required, as these may prove to be deterrents
to wider participation and, thus, may serve to offset the benefits of the DBO approach.

Providing incentives for billing efficiency etc. on a sharing basis:

NP should implement automated meter reading systems (handheld devices) with


computerization for all water billing. The installation of flow meter for each ESR to match the
quantity of water supplied and billed would prove them with the amount of losses during this
activity. For 100% cost recovery, NP should convert all the non-metered connections/PSPs to
metered connections. It should also create kiosks for collection (for all payments to the
corporation including water charges). NP needs to implement a mechanism for having staggered
water charges. This would essentially mean paying minimum tariff up to a certain quantity. The
tariff would be increased exponentially for the quantity used beyond this. This would ensure and
justify the price that one pays. This will also serve as a key for controlling the usage of water.

PLANITECH CONSULTANTS VI
ALANDI CITY DEVELOPMENT PLAN

Outsourcing pumping, transmission and distribution activities:

NP plans to undertake projects of around Rs. 7 crores, which mainly includes augmentation and
improving the water supply network. The bigger challenge for NP is to maintain these assets once
created. NP therefore needs to explore the outsourcing some of these activities, such as,
pumping, transmission, distribution etc., either to one operator or multiple operators.

Towards achieving 24x7 water supply:

NP needs to carry out and implement a water and energy audit including a leak detection study
after every 5 years. It will ensure reduction in raw water transportation losses and better water
management. NP also needs to take a step towards augmentation of water source and
encouraging water reuse.

PLANITECH CONSULTANTS VII


ALANDI CITY DEVELOPMENT PLAN

Annexure IV - E- GOVERNANCE

Introduction

Last decade has witnessed special focus on good governance. This is particularly evident among
cities and towns, which are experiencing a rapid pace of urbanization along with increasing
mismatch between demand and supply of municipal services. The increasing complexity of facing
local government has prompted many Urban Local Bodies in India to discover creative and
innovative solutions with varying degrees of success. The most important development in this
area has been the increasing use of information technology for municipal governance.
Traditionally municipal governance has been based on manual platform, being paper and labor
intensive. However, with the increasing demand on the municipal administration, the current
way of functioning is turning out to be grossly inadequate. Information technology increases the
efficiency and the spread of the existing processes, thereby enhancing the capacity of the
administration manifold.

Current system

The traditional system has the following features

 Information in manual records


 Retrieval and analysis is very difficult
 Systematic data base not available
 Generation of useful management reports are time consuming and difficult
 Controlling the leakage of information is difficult
 Longer service fulfilment duration and delays in approvals
 Complicated steps
 Large number of levels
 Frequent loss of files
 Cumbersome process in tax calculations and reconciliation
 Manual calculation and reconciliation
 Validation and review is very difficult
 Inefficient mechanism to track citizen grievances
 No higher level tracking of grievances
 Redressal at the discretion of operating level officials
 Lack of transparency in service fulfilment

PLANITECH CONSULTANTS VIII


ALANDI CITY DEVELOPMENT PLAN

 Real time information not available


 Fixing accountability is not possible
Objectives of E-Governance System

Based on the limitations of the traditional and existing processes, the users of the system will
desire the following incremental benefits from the e-governance system.

 Improving the quality of service to the citizens


 Facilitation of citizens with easy and quick access to department information
and services
 Infusion of transparency in providing the services to citizens
 Efficiency in administration
 Facilitation of quicker processing of the citizen service requests
 Facilitation of easy maintenance of citizen’s records
 Making citizen tax and other critical records tamper proof
 Efficient approval and processing of files
 Simplified processes of assessment
 Information management
 Real time capture of information
 Facilitation of analysis and review
 Real time exception reporting
 Preventing loss and leakage of information
 Management Information System
 Generation of customized reports
 Clear accountability
Scope of an E-Governance System

An organization wide municipal e-governance system has the following components

Administrative system

This part of system facilitates the normal administrative processes of the municipal corporation.
The objective of this component is to reduce the time required and steps involved for the normal
operating decisions of departments of the corporation, while capturing the data related to tax
collection, service delivery and citizen records in real time.

PLANITECH CONSULTANTS IX
ALANDI CITY DEVELOPMENT PLAN

Management Information System

This part of the system facilitates the decisions taken at higher levels of the departments by
supplying the decision maker with relevant information at the relevant time. This component
allows the user to define the information required to facilitate the decision.

Citizen Interface

This part of the system creates linkages between the corporation and the citizens to provide them
with the information that affects them.

The components are schematically shown below:

Implementing E-Governance System

The E Governance system implementation process, involves the following entities: -

Municipal Administration

The system is defined based on the mapping of the municipal administration processes and
decision flows. The commitment of the municipal administration is the most important
prerequisite for the e governance system.

PLANITECH CONSULTANTS X
ALANDI CITY DEVELOPMENT PLAN

System consultants

Since the municipal body would not have the knowledge base to map the processes against the
system requirements, therefore a consultant is appointed for process mapping and subsequent
system design.

Employees

The process mapping is done based on the inputs given by the employees to the system
consultant. Moreover the system has to be designed as per the capacity and the need of the
actual users of the system, the employees.

Citizens

The purpose of the e-governance system is to improve the activities of the municipal corporation
with a view of increasing the quality of the service delivered to the citizens of the corporation.

PLANITECH CONSULTANTS XI