NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

`
BVELELA ENGINEERING - (REMEASURED)
Section 1 : General Requirements
PAYMENT
REFER ITEM NO DESCRIPTION UNIT QUANTITY QUANTITY RATE AMOUNT
TO

1 General requirements

1.1 Site establishment and de-establishment Sum 1 1 R 35,000.00 R 35,000.00

1.2 Transport on site Sum 1 1 R 70,000.00 R 70,000.00

1.3 Site store & storeman Mth 12 12 R 7,000.00 R 84,000.00

1.4 Site office & storage Mth 12 12 R 3,500.00 R 42,000.00

1.5 Staff food & accommodation Mth 12 12 R 4,000.00 R 48,000.00

1.6 Security Mth 12 12 R 3,000.00 R 36,000.00

1.7 Supervision Mth 12 12 R 4,500.00 R 54,000.00

1.8 Health and safety requirements Sum 1 1 R 3,500.00 R 3,500.00

1.9 As-built drawings for new electrical Sum 1 1 R 1,500.00 R 1,500.00


installation

1.10 Certificates of compliance for Sum 1 1 R 6,600.00 R 6,600.00


complete installation

1.11 12 month equipment and installation Sum 1 1 R 30,000.00 R 30,000.00


guarantee period

1.12 Any other charge that may be necessary


(specify)

Total carried forward to summary : Section 1 R 410,600.00

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 2 : Low voltage cable installation & Distribution Kiosks

PAYMENT DESCRIPTION
REFER UNIT QUAN-TITY QUAN-TITY RATE AMOUNT
TO ITEM NO

2.1 Construct cable trenches:

2.1.1 Excavate in all materials for trenches, m³ 195 195 R 152.50 R 29,737.50
backfill, compact and dispose surplus R -
materials R -
R -
2.2 Supply and delivery of PVC Cable Sleeves R -
R -
2.2.1 110mm dia PVC Sleeve m 180 180 R 134.40 R 24,192.00
R -
2.2.2 50mm dia PVC Sleeve m 30 30 R 100.18 R 3,005.40

2.3 Supply and delivery of PVC Cable Sleeves

2.3.1 110mm dia PVC Sleeve m 180 180 R 24.50 R 4,410.00

2.3.2 50mm dia PVC Sleeve m 30 30 R 24.50 R 735.00

2.4 Supply and delivery of manholes

2.4.1 800mm x 800mm x 1000mm deep No 10 10 R 1,232.00 R 12,320.00

2.5 Supply and delivery of PVC Cable Sleeves

2.5.1 800mm x 800mm x 1000mm deep No 10 10 R 245.00 R 2,450.00

2.6 Supply and delivery of PVC/SWA/PVC


Cu low-voltage cable:

2.6.1 150 mm², 4-core m 400 400 R 626.40 R 250,560.00

2.6.2 95 mm², 4-core m 10 10 R 476.00 R 4,760.00

2.6.3 70 mm², 4-core m 280 280 R 315.00 R 88,200.00

2.6.4 50 mm², 4-core m 0 0 R -

2.6.5 35 mm², 4-core m 500 500 R 189.00 R 94,500.00

2.6.6 25 mm², 4-core m 0 0 R -

2.6.7 16 mm², 4-core m 0 0 R -

2.6.8 16 mm², 3-core m 600 600 R 91.84 R 55,104.00

2.7 Install LV cable:

2.7.1 150 mm², 4-core m 400 400 R 24.40 R 9,760.00

Carried forward R 579,733.90

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 579,733.90

2.7.2 95 mm², 4-core m 10 10 R 21.79 R 217.90

2.7.3 70 mm², 4-core m 280 280 R 22.00 R 6,160.00

2.7.4 50 mm², 4-core m 0 0 R -

2.7.5 35 mm², 4-core m 500 500 R 16.00 R 8,000.00

2.7.6 25 mm², 4-core m 0 0 R -

2.7.7 16 mm², 4-core m 0 0 R -

2.7.8 16 mm², 3-core m 600 600 R 12.20 R 7,320.00

2.8 Supply and deliver bare copper earth conductors:

2.8.1 70 mm² m 400 400 R 118.66 R 47,464.00

2.8.2 50 mm² m 10 10 R 89.91 R 899.10

2.8.3 35 mm² m 280 280 R 45.47 R 12,731.60

2.8.4 16 mm² m 500 500 R 12.87 R 6,435.00

2.9 Install bare copper earth conductor

2.9.1 70 mm² m 400 400 R 17.50 R 7,000.00

2.9.2 50 mm² m 10 10 R 12.25 R 122.50

2.9.3 25 mm² m 280 280 R 12.25 R 3,430.00

2.9.4 16 mm² m 500 500 R 14.48 R 7,240.00

2.10 Terminate low voltage cable:

2.10.1 150 mm², 4-core No 10 10 R 1,105.43 R 11,054.30

2.10.2 95 mm², 4-core No 2 2 R 723.12 R 1,446.24

2.10.3 70 mm², 4-core No 10 10 R 568.98 R 5,689.80

2.10.4 35 mm², 4-core No 20 20 R 543.29 R 10,865.80

2.10.5 16 mm², 3-core No 10 10 R 543.29 R 5,432.90

Carried forward R 721,243.04

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 721,243.04

2.11 Terminate bare copper earth


conductors:

2.11.1 50 mm² No 12 12 R 821.00 R 9,852.00


R -
2.11.2 25 mm² No 16 16 R 334.62 R 5,353.92
R -
2.11.3 16 mm² No 16 16 R 272.98 R 4,367.68
R -
2.11.4 10 mm² No 10 10 R 272.98 R 2,729.80
R -
2.12 Cable marking with Gravoplast at either end Lump 1 1 R 1,680.00 R 1,680.00
end, below termination shroud Sum R -
R -
2.13 Supply and deliver distribution R -
kiosks as specified on drawings R -
R -
2.13.1 KIOSK1 No 1 1 R 26,592.16 R 26,592.16
R -
2.13.2 KIOSK2 No 1 1 R 26,592.16 R 26,592.16
R -
2.13.3 KIOSK3 No 1 1 R 26,592.16 R 26,592.16
R -
2.14 Install distribution boards R -
R -
2.14.1 KIOSK1 No 1 1 R 9,125.00 R 9,125.00
R -
2.14.2 KIOSK2 No 1 1 R 9,125.00 R 9,125.00
R -
2.14.3 KIOSK3 No 1 1 R 9,125.00 R 9,125.00
R -
2.15 Construct plinth for distribution R -
kiosk R -
R -
2.15.1 KIOSK1 No 1 1 R 7,632.50 R 7,632.50
R -
2.15.2 KIOSK2 No 1 1 R 7,632.50 R 7,632.50
R -
2.15.3 KIOSK3 No 1 1 R 7,632.50 R 7,632.50

rried forward to summary : Section 2 R 875,275.42

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 3 : AREALIGHTING

PAYMENT DESCRIPTION
REFER ITEM NO UNIT QUAN-TITY QUAN-TITY RATE AMOUNT
TO

3.1 Construct cable trenches:

3.1.1 Excavate in all materials for trenches, m 180 180 R 305.00 R 54,900.00
backfill, compact and dispose surplus
materials

3.1.2 Extra over item 2.1.1 for excavating in hard m 1 1 R 844.83 Rate only
material

3.2 Supply and deliver low voltage cable

3.2.1 4mm², 3 core PVC/SWA/PVC m 600 600 R 34.16 R 20,496.00

3.3 Plastic warning tape

3.3.1 Supply m 600 600 R 0.90 R 540.00

3.3.2 Install m 600 600 R 7.40 R 4,440.00

3.4 Streetlights

3.4.1 Supply and delivery of area lighting No 40 34 R 3,118.85 R 106,040.90


luminaires: Type L

3.4.2 Supply and delivery of facade lighting No 0 0 R -


luminaires: Type

3.4.3 Excavate in all materials for holes for m³ 128 128 R 305.00 R 39,040.00
poles, backfill and dispose surplus
material

3.4.4 Planting of streetlight poles No 40 34 R 305.00 R 10,370.00

3.4.5 Mounting and connection of streetlighting No 40 34 R 185.00 R 6,290.00


luminaire

3.4.6 Supply 5A 5kA miniature circuit No 40 34 R 120.96 R 4,112.64


breaker

3.4.7 Install 5A 5kA miniature circuit No 40 34 R 98.00 R 3,332.00


breaker

3.4.8 Supply Pratley end termination for No 40 34 R 442.21 R 15,035.14


streetlighting poles

3.4.9 Install end termination for streetlighting No 40 34 R 74.00 R 2,516.00


poles

Total carried forward to summary : Section 3 R 267,112.68

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 4 : Student Rooms

PAYMENT DESCRIPTION

REFER ITEM NO UNIT QUAN-TITY QUAN-TITY RATE AMOUNT


TO

4.2 Supply and delivery of PVC/SWA/PVC


Cu low-voltage cable:

4.2.2 25 mm², 4-core m 12 12 R 103.04 R 1,236.48

4.2.3 16 mm², 4-core m 20 20 R 91.84 R 1,836.80

4.3 Install LV cable:

4.3.2 25 mm², 4-core m 12 12 R 37.00 R 444.00

4.3.3 16 mm², 4-core m 20 20 R 37.00 R 740.00

4.4 Supply and deliver bare copper


earth conductors:

4.4.1 16 mm² m 12 12 R 20.71 R 248.52

4.4.2 10 mm² m 20 20 R 12.87 R 257.40

4.5 Install bare copper earth conductor

4.5.1 16 mm² m 12 12 R 18.50 R 222.00

4.5.2 10 mm² m 20 20 R 18.50 R 370.00

4.6 Terminate low voltage cable:

4.6.1 25 mm², 4-core No 4 4 R 220.57 R 882.28

4.6.2 16 mm², 4-core No 4 4 R 137.20 R 548.80

4.7 Terminate bare copper earth conductors:

4.7.1 16 mm² No 4 4 R 137.20 R 548.80

4.7.2 10 mm² No 4 4 R 137.20 R 548.80

4.8 Cable marking with Gravoplast at either Lump 1 1 R 1,680.00 R 1,680.00


end, below termination shroud Sum

4.9 Supply and deliver distribution


boards as specified on drawings

4.9.1 DB GF No 1 1 R 20,202.56 R 20,202.56

4.9.2 DB FF No 1 1 R 14,629.44 R 14,629.44

4.9.3 DB SF No 1 1 R 14,629.44 R 14,629.44

Carried forward R 59,025.32

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 59,025.32

4.10 Install distribution boards

4.10.1 DB GF No 1 1 R 5,444.44 R 5,444.44

4.10.2 DB FF No 1 1 R 5,444.44 R 5,444.44

4.10.3 DB SF No 1 1 R 5,444.44 R 5,444.44

4.11 Supply and deliver light switches

4.11.1 16A single lever one way No 87 87 R 26.99 R 2,348.13

4.11.2 16A two lever one way No 5 5 R 41.44 R 207.20

4.11.3 16A single lever two way No 24 24 R 57.12 R 1,370.88

4.11.4 10A dual infrared & ultrasonic motion sensor No 102 102 R 46.14 R 4,706.28

4.11.5 Photocell complete installed inside IP55 No 2 2 R 145.60 R 291.20


Beka bulk luminaire enclosure

4.12 Install light switches

4.12.1 16A single lever one way No 87 87 R 37.00 R 3,219.00

4.12.2 16A two lever one way No 5 5 R 37.00 R 185.00

4.12.3 16A single lever two way No 24 24 R 37.00 R 888.00

4.12.4 10A dual infrared & ultrasonic motion sensor No 102 102 R 46.25 R 4,717.50

4.12.5 Photocell complete installed inside IP55 No 2 2 R 92.50 R 185.00


Beka bulk luminaire enclosure

4.13 Supply and deliver light fittings complete


with lamps and electronic control gear

4.13.1 Type A No 81 81 R 2,800.00 R 226,800.00

4.13.2 Type B No 102 102 R 931.33 R 94,995.66

4.13.3 Type C No 81 0 R 1,078.53 R -

4.13.4 Type D No 57 57 R 647.38 R 36,900.66

4.13.5 Type E No 11 11 R 3,043.08 R 33,473.88

4.13.6 Type K No 21 21 R 1,010.64 R 21,223.44

Carried forward R 506,870.47

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 506,870.47

4.13.7 Emergency lights No 30 30 R 2,441.89 R 73,256.70

4.14 Install light fittings complete with lamps

4.14.1 Type A No 81 81 R 122.50 R 9,922.50

4.14.2 Type B No 102 102 R 122.50 R 12,495.00

4.14.3 Type C No 81 0 R 81.67 R -

4.14.4 Type D No 57 57 R 81.67 R 4,655.19

4.14.5 Type E No 11 11 R 122.50 R 1,347.50

4.14.6 Type K No 21 21 R 70.00 R 1,470.00

4.14.7 Emergency lights No 30 30 R 52.86 R 1,585.80

4.15 Supply and deliver powerskirting


mounted socket outlets

4.15.1 16A 3-pin single switched socket outlet No 0 0 Rate only

4.15.2 16A 3-pin dedicated single switched socket No 0 0 Rate only

4.16 Install socket outlets

4.16.1 16A 3-pin single switched socket outlet No 0 0 Rate only

4.16.2 16A 3-pin dedicated single switched socket No 0 0 Rate only

4.17 Supply and deliver flush mounted


socket outlets

4.17.1 16A 3-pin single switched socket outlet No 102 102 R 56.49 R 5,761.98

4.17.2 16A 3-pin double switched socket outlet No 174 174 R 87.68 R 15,256.32

4.17.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

4.18 Install socket outlets

4.18.1 16A 3-pin single switched socket outlet No 102 102 R 12.33 R 1,257.66

4.18.2 16A 3-pin double switched socket outlet No 174 174 R 12.33 R 2,145.42

Carried forward R 636,024.54

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 636,024.54

4.18.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

4.19 Supply and deliver isolators for fixed


equipment

4.19.1 60A Triple pole surface mounted IP56 No 0 0 R -

4.19.2 60A Double pole flush mounted No 6 6 R 106.40 R 638.40

4.19.3 20A Triple pole flush mounted No 6 6 R 99.68 R 598.08

4.19.4 20A Double pole surface mounted No 0 0 R -

4.20 Install isolators for fixed equipment

4.20.1 60A Triple pole surface mounted IP56 No 0 0 R -

4.20.2 60A Double pole flush mounted No 6 6 R 185.00 R 1,110.00

4.20.3 40A Double pole flush mounted No 6 6 R 185.00 R 1,110.00

4.20.4 20A Double pole surface mounted No 0 0 R -

4.21 Connect fixed equipment (including


1m kopex spraque and connectors)

4.21.1 3-phase plus earth No 0 0 R -

4.21.2 Single phase plus earth wire No 0 0 R -

4.22 Supply and deliver PVC insulated


stranded copper conductors

4.22.1 2,5mm² m 9000 9000 R 2.84 R 25,560.00

4.22.2 4mm² m 6480 6480 R 4.48 R 29,030.40

4.22.3 6mm² m 3200 3200 R 6.72 R 21,504.00

4.23 Install PVC insulated stranded copper


conductors drawn into wire ways

4.23.1 2,5mm² m 9000 9000 R 1.85 R 16,650.00

4.23.2 4mm² m 6480 6480 R 1.85 R 11,988.00

4.23.3 6mm² m3200 3200 R 1.85 R 5,920.00

Carried forward R 750,133.42

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 750,133.42

4.24 Supply and deliver bare stranded


copper earth conductors

4.24.1 2,5mm² m 15480 15480 R 3.11 R 48,142.80

4.24.2 4mm² m 3200 3200 R 16.80 R 53,760.00

4.25 Install bare stranded copper earth


conductors drawn into wire ways

4.25.1 2,5mm² m 15480 15480 R 0.93 R 14,396.40

4.25.2 4mm² m 3200 3200 R 0.93 R 2,976.00

4.26 Supply and deliver insulated copper


earth conductors

4.26.1 6mm² m 1 1 R 6.13 Rate only

4.26.2 10mm² m 1 1 R 6.13 Rate only

4.27 Install insulated copper earth


conductors

4.27.1 6mm² m 1 1 R 0.93 Rate only

4.27.2 10mm² m 1 1 R 0.93 Rate only

4.28 Supply and deliver conduit complete


with accessories

4.28.1 25mm Ø galvanized steel with raised m 1 1 R 5.00 Rate only


hospital saddles

4.28.2 20mm Ø galvanized steel with raised m 1 1 R 5.00 Rate only


hospital saddles

4.28.3 32mm Ø PVC m 1500 1500 R 6.72 R 10,080.00

4.28.4 25mm Ø PVC m 2250 2250 R 4.48 R 10,080.00

4.28.5 20mm Ø PVC m3000 3000 R 2.24 R 6,720.00

4.29 Install conduit complete with


accessories

Carried forward R 896,288.62

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 896,288.62

4.29.1 25mm Ø galvanized steel with raised m 1 1 R 3.70 Rate only


hospital saddles

4.29.2 20mm Ø galvanized steel with raised m 1 1 R 3.70 Rate only


hospital saddles

4.29.3 32mm Ø PVC m 1500 1500 R 3.70 R 5,550.00

4.29.4 25mm Ø PVC m 2250 2250 R 3.70 R 8,325.00

4.29.5 20mm Ø PVC m 3000 3000 R 3.70 R 11,100.00

4.30 Supply and deliver 2-compartment


PVC power skirting complete with
covers and all accessories

4.30.1 Cabstrut Jupiter 2-compartment modular m 0 0 R -


PVC power skirting

4.31 Install power skirting complete with


covers and all accessories

4.31.1 Cabstrut Jupiter 2-compartment modular m 0 0 R -


PVC power skirting

4.32 Lightning Protection Ststem

4.32.1 Measuring of earth resistance by an Lump 0 0 R -


earthing specialist and issueing of a Sum
report

4.32.2 Design, supply and install lightning Lump 1 1 R 11,440.00 R 11,440.00


protection and earthing system Sum

4.33 Bonding

4.33.1 Provide lift and geyser, piping, taps Lump 1 1 R 8,960.00 R 8,960.00
sanitary ware and waste pipe earthing Sum
and bonding in ablutions and kitchens

4.34 Crows foot earth

4.34.1 Supply and install No 1 1 R 5,600.00 R 5,600.00

Total carried forward to summary : Section 4 R 947,263.62

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 5 : Study Room & Computer Room

PAYMENT DESCRIPTION
REFER ITEM NO UNIT QUANTITY QUANTITY RATE AMOUNT
TO

5.1 Supply and deliver distribution


boards as specified on drawings

5.1.1 DB SC.A No 1 1 R 13,660.64 R 13,660.64

5.2 Install distribution boards

5.2.1 DB SC.A No 1 1 R 5,444.44 R 5,444.44

5.3 Supply and deliver light switches

5.3.1 16A single lever one way No 3 3 R 26.99 R 80.97

5.3.2 16A two lever one way No 2 2 R 41.44 R 82.88

5.3.3 16A single lever two way No 6 6 R 57.12 R 342.72

5.3.4 10A dual infrared & ultrasonic motion sensor No 4 4 R 46.14 R 184.56

5.3.5 Photocell complete installed inside IP55 No 1 1 R 145.60 R 145.60


Beka bulk luminaire enclosure

5.4 Install light switches

5.4.1 16A single lever one way No 3 3 R 37.00 R 111.00

5.4.2 16A two lever one way No 2 2 R 37.00 R 74.00

5.4.3 16A single lever two way No 6 6 R 37.00 R 222.00

5.4.4 10A dual infrared & ultrasonic motion sensor No 4 4 R 46.25 R 185.00

5.4.5 Photocell complete installed inside IP55 No 1 1 R 92.50 R 92.50


Beka bulk luminaire enclosure

5.5 Supply and deliver light fittings complete


with lamps and electronic control gear

5.5.1 Type B No 10 10 R 940.37 R 9,403.70

5.5.2 Type F No 25 25 R 894.94 R 22,373.50

5.5.3 Type K No 10 10 R 1,020.45 R 10,204.50

5.5.4 Emergency Lights No 4 4 R 2,465.60 R 9,862.40

Carried forward R 72,470.41

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 72,470.41

5.6 Install light fittings complete with lamps

5.6.1 Type B No 10 10 R 2,450.00 R 24,500.00

5.6.2 Type F No 25 25 R 122.50 R 3,062.50

5.6.3 Type K No 10 10 R 98.00 R 980.00

5.6.4 Emergency Lights No 4 4 R 74.00 R 296.00

5.7 Supply and deliver powerskirting


mounted socket outlets

5.7.1 16A 3-pin single switched socket outlet No 40 40 R 56.49 R 2,259.60

5.7.2 16A 3-pin dedicated single switched socket No 1 1 R 122.75 Rate only

5.7.3 Install socket outlets

5.7.4 16A 3-pin single switched socket outlet No 40 40 R 92.50 R 3,700.00

5.7.5 16A 3-pin dedicated single switched socket No 1 1 R 92.50 Rate only

5.8 Supply and deliver flush mounted


socket outlets

5.8.1 16A 3-pin single switched socket outlet No 5 5 R 56.49 R 282.45

5.8.2 16A 3-pin double switched socket outlet No 12 12 R 93.52 R 1,122.24

5.8.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

5.8.4 16A 3-pin dedicated double switched No 1 1 R 226.27 Rate only


socket outlet including red male plug top

5.9 Install socket outlets

5.9.1 16A 3-pin single switched socket outlet No 5 5 R 92.50 R 462.50

5.9.2 16A 3-pin double switched socket outlet No 12 12 R 92.50 R 1,110.00

5.9.3 16A 3-pin dedicated double switched No 1 1 R 92.50 Rate only


socket outlet including red male plug top

Carried forward R 110,245.70

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 110,245.70

5.10 Supply and deliver surface mounted


socket outlets in an weatherproof cover

5.10.1 16A 3-pin single switched socket outlet No 5 5 R 56.49 R 282.45

5.11 Install surface mounted socket outlets

5.11.1 16A 3-pin single switched socket outlet No 5 5 R 92.50 R 462.50

5.12 Supply and deliver isolators for fixed


equipment

5.12.1 60A Triple pole surface mounted IP56 No 4 4 R 120.00 R 480.00

5.12.2 60A Double pole flush mounted No 2 2 R 106.40 R 212.80

5.12.3 40A Double pole flush mounted No 4 4 R 99.68 R 398.72

5.12.4 20A Double pole surface mounted No 4 4 R 99.69 R 398.76

5.13 Install isolators for fixed equipment

5.13.1 60A Triple pole surface mounted IP56 No 4 4 R 185.00 R 740.00

5.13.2 60A Double pole flush mounted No 2 2 R 185.00 R 370.00

5.13.3 40A Double pole flush mounted No 4 4 R 185.00 R 740.00

5.13.4 20A Double pole surface mounted No 4 4 R 123.30 R 493.20

5.14 Connect fixed equipment (including


1m kopex spraque and connectors)

5.14.1 3-phase plus earth No 4 4 R 900.00 R 3,600.00

5.14.2 Single phase plus earth wire No 10 10 R 750.40 R 7,504.00

5.15 Supply and deliver PVC insulated


stranded copper conductors

5.15.1 2,5mm² m 1000 1000 R 4.48 R 4,480.00


R -
5.15.2 4mm² m 1500 1500 R 7.84 R 11,760.00
R -
5.15.3 6mm² m 500 500 R 10.75 R 5,375.00

Carried forward R 147,543.13

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 147,543.13

5.16 Install PVC insulated stranded copper


conductors drawn into wire ways

5.16.1 2,5mm² m 1000 1000 R 1.85 R 1,850.00

5.16.2 4mm² m 1500 1500 R 1.85 R 2,775.00

5.16.3 6mm² m 500 500 R 1.85 R 925.00

5.17 Supply and deliver bare stranded


copper earth conductors

5.17.1 2,5mm² m 1500 1500 R 3.11 R 4,665.00

5.17.2 4mm² m 250 250 R 31.16 R 7,790.00

5.18 Install bare stranded copper earth


conductors drawn into wire ways

5.18.1 2,5mm² m 1500 1500 R 1.85 R 2,775.00

5.18.2 4mm² m 250 250 R 1.85 R 462.50

5.19 Supply and deliver insulated copper


earth conductors

5.19.1 6mm² m 1 1 R 6.13 Rate only

5.19.2 10mm² m 1 1 R 6.13 Rate only

5.20 Install insulated copper earth


conductors

5.20.1 6mm² m 1 1 R 1.85 Rate only

5.20.2 10mm² m 1 1 R 1.85 Rate only

5.21 Supply and deliver conduit complete


with accessories

5.21.1 32mm Ø PVC m 200 200 R 11.09 R 2,218.00

5.21.2 25mm Ø PVC m 400 400 R 6.65 R 2,660.00

5.21.3 20mm Ø PVC m 800 800 R 4.41 R 3,528.00

Carried forward R 177,191.63

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 177,191.63

5.22 Install conduit complete with


accessories

5.22.1 32mm Ø PVC m 200 200 R 3.70 R 740.00

5.22.2 25mm Ø PVC m 400 400 R 3.70 R 1,480.00

5.22.3 20mm Ø PVC m 800 800 R 3.70 R 2,960.00

5.23 Supply and deliver 2-compartment


PVC power skirting complete with
covers and all accessories

5.23.1 Cabstrut Jupiter 2-compartment modular m 50 50 R 352.26 R 17,613.00


PVC power skirting

5.23 Install power skirting complete with


covers and all accessories

5.23.1 Cabstrut Jupiter 2-compartment modular m 50 50 R 245.00 R 12,250.00


PVC power skirting

5.24 Lightning Protection Ststem

5.24.1 Measuring of earth resistance by an Lump 1 1 R 4,480.00 R 4,480.00


earthing specialist and issueing of a Sum
report

5.24.2 Design, supply and install lightning Lump 1 1 R 11,440.00 R 11,440.00


protection and earthing system Sum

5.25 Bonding

5.25.1 Provide lift and geyser, piping, taps Lump 1 1 R 8,960.00 R 8,960.00
sanitary ware and waste pipe earthing Sum
and bonding in ablutions and kitchens

Carried forward R 237,114.63

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 237,114.63

5.26 Crows foot earth

5.26.1 Supply and install No 1 1 R 5,600.00 R 5,600.00

5.27 Telephone termination panel (Telkom


approved; lockable with wooden back
panel)

5.27.1 Supply Telkom approved panel in No 1 1 R 1,290.46 R 1,290.46


equipment room or Telkom services shaft

5.27.2 Install Telkom panel No 1 1 R 980.00 R 980.00

5.28 RJ45 Shuttered telephone and


data outlets including shroud and
mounting plate

5.28.1 Supply No 44 0 R 112.56 R -

5.28.2 Install No 44 0 R 70.00 R -

5.29 RJ11 Shuttered telephone and


data outlets including shroud and
mounting plate

5.29.1 Supply No 2 0 R 5.43 R -

5.29.2 Install No 2 0 R 70.00 R -

Total carried forward to summary : Section 5 R 244,985.09

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 6 : Tuck Shop & Laundry

PAYMENT DESCRIPTION

REFER ITEM NO UNIT QUANTITY QUANTITY RATE AMOUNT


TO

6.1 Supply and deliver distribution


boards as specified on drawings

6.1.1 DB REC No 1 1 R 13,405.28 R 13,405.28

6.2 Install distribution boards

6.2.1 DB REC No 1 1 R 5,444.44 R 5,444.44

6.3 Supply and deliver light switches

6.3.1 16A single lever one way No 6 6 R 26.99 R 161.94

6.3.2 16A two lever one way No 1 1 R 41.44 R 41.44

6.3.3 16A single lever two way No 1 1 R 57.12 R 57.12

6.3.4 10A dual infrared & ultrasonic motion sensor No 1 1 R 46.14 R 46.14

6.3.5 Photocell complete installed inside IP55 No 1 1 R 145.60 R 145.60


Beka bulk luminaire enclosure

6.4 Install light switches

6.4.1 16A single lever one way No 6 6 R 37.00 R 222.00

6.4.2 16A two lever one way No 1 1 R 37.00 R 37.00

6.4.3 16A single lever two way No 1 1 R 37.00 R 37.00

6.4.4 10A dual infrared & ultrasonic motion sensor No 1 1 R 37.00 R 37.00

6.4.5 Photocell complete installed inside IP55 No 1 1 R 92.50 R 92.50


Beka bulk luminaire enclosure

6.5 Supply and deliver light fittings complete


with lamps and electronic control gear

6.5.1 Type B No 4 4 R 940.37 R 3,761.48

6.5.2 Type D No 4 4 R 894.94 R 3,579.76

6.5.3 Type E No 20 20 R 3,072.63 R 61,452.60

6.5.4 Type K No 10 10 R 1,020.45 R 10,204.50

6.5.5 Emergency lights No 2 2 R 2,465.60 R 4,931.20

Carried forward R 103,657.00

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 103,657.00

6.6 Install light fittings complete with lamps

6.6.1 Type B No 4 4 R 245.00 R 980.00

6.6.2 Type D No 4 4 R 245.00 R 980.00

6.6.3 Type E No 20 20 R 245.00 R 4,900.00

6.6.4 Type K No 10 10 R 98.00 R 980.00

6.6.5 Emergency lights No 2 2 R 74.00 R 148.00

6.7 Supply and deliver powerskirting


mounted socket outlets

6.7.1 16A 3-pin single switched socket outlet No 0 0

6.7.2 16A 3-pin dedicated single switched socket No 1 1 R 122.75 Rate only

6.8 Install socket outlets

6.8.1 16A 3-pin single switched socket outlet No 0 0

6.8.2 16A 3-pin dedicated single switched socket No 1 1 R 92.50 Rate only

6.9 Supply and deliver flush mounted


socket outlets

6.9.1 16A 3-pin single switched socket outlet No 15 15 R 56.49 R 847.35

6.9.2 16A 3-pin double switched socket outlet No 15 15 R 93.52 R 1,402.80

6.9.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

6.9.4 16A 3-pin dedicated double switched No 1 1 R 226.27 Rate only


socket outlet including red male plug top

6.10 Install socket outlets

6.10.1 16A 3-pin single switched socket outlet No 15 15 R 92.50 R 1,387.50

6.10.2 16A 3-pin double switched socket outlet No 15 15 R 92.50 R 1,387.50

6.10.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

Carried forward R 116,670.15

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 116,670.15

6.10.4 16A 3-pin dedicated double switched No 1 1 R 92.50 Rate only


socket outlet including red male plug top

6.11 Supply and deliver flush mounted


socket outlets

6.11.1 16A 3-pin single switched socket outlet No 15 15 R 56.49 R 847.35

6.11.2 16A 3-pin double switched socket outlet No 15 15 R 93.52 R 1,402.80

6.11.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

6.11.4 16A 3-pin dedicated double switched No 1 1 R 226.27 Rate only


socket outlet including red male plug top

6.12 Install socket outlets

6.12.1 16A 3-pin single switched socket outlet No 15 15 R 92.50 R 1,387.50

6.12.2 16A 3-pin double switched socket outlet No 15 15 R 92.50 R 1,387.50

6.12.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

6.12.4 16A 3-pin dedicated double switched No 1 1 R 92.50 Rate only


socket outlet including red male plug top

6.13 Supply and deliver surface mounted


socket outlets in an weatherproof cover

6.13.1 16A 3-pin single switched socket outlet No 4 4 R 52.00 R 208.00

6.14 Install surface mounted socket outlets

6.14.1 16A 3-pin single switched socket outlet No 4 4 R 92.00 R 368.00

6.15 Install surface mounted socket outlets

6.15.1 16A 3-pin single switched socket outlet No 4 4 R 120.00 R 480.00

6.16 Supply and deliver isolators for fixed


equipment

6.16.1 60A Triple pole surface mounted IP56 No 4 4 R 120.00 R 480.00

6.16.2 40A Double pole flush mounted No 8 8 R 99.68 R 797.44

6.16.3 20A Double pole surface mounted No 4 4 R 99.69 R 398.76

Carried forward R 124,427.50

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 124,427.50

6.17 Install isolators for fixed equipment

6.17.1 60A Triple pole surface mounted IP56 No 4 4 R 185.00 R 740.00

6.17.2 40A Double pole flush mounted No 8 8 R 185.00 R 1,480.00

6.17.3 20A Double pole surface mounted No 4 4 R 123.33 R 493.32

6.18 Connect fixed equipment (including


1m kopex spraque and connectors)

6.18.1 3-phase plus earth No 4 4 R 980.00 R 3,920.00

6.18.2 Single phase plus earth wire No 12 12 R 750.00 R 9,000.00

6.19 Supply and deliver PVC insulated


stranded copper conductors

6.19.1 2,5mm² m 1200 1200 R 4.48 R 5,376.00

6.19.2 4mm² m 1200 1200 R 7.84 R 9,408.00

6.19.3 6mm² m 800 800 R 10.75 R 8,600.00

6.20 Install PVC insulated stranded copper


conductors drawn into wire ways

6.20.1 2,5mm² m 1200 1200 R 1.85 R 2,220.00

6.20.2 4mm² m 1200 1200 R 1.85 R 2,220.00

6.20.3 6mm² m 800 800 R 1.85 R 1,480.00

6.21 Supply and deliver bare stranded


copper earth conductors

6.21.1 2,5mm² m 1200 1200 R 3.11 R 3,732.00

6.21.2 4mm² m 400 400 R 31.16 R 12,464.00

6.22 Install bare stranded copper earth


conductors drawn into wire ways

6.22.1 2,5mm² m 1200 1200 R 1.85 R 2,220.00

6.22.2 4mm² m 400 400 R 1.85 R 740.00

6.23 Supply and deliver conduit complete


with accessories

6.23.1 32mm Ø PVC m 200 200 R 11.09 R 2,218.00

Carried forward R 190,738.82

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 190,738.82

6.23.2 25mm Ø PVC m 400 400 R 6.65 R 2,660.00

6.23.3 20mm Ø PVC m 800 800 R 4.41 R 3,528.00

6.24 Install conduit complete with


accessories

6.24.1 32mm Ø PVC m 200 200 R 1.85 R 370.00


R -
6.24.2 25mm Ø PVC m 400 400 R 1.85 R 740.00

6.24.3 20mm Ø PVC m 800 800 R 1.85 R 1,480.00

6.25 Lightning Protection Ststem

6.25.1 Measuring of earth resistance by an Lump 0 0 R -


earthing specialist and issueing of a Sum
report

6.25.2 Design, supply and install lightning Lump 0 0 R -


protection and earthing system Sum

6.26 Lightning Protection Ststem

6.26.1 Measuring of earth resistance by an Lump 1 1 R 4,480.00 R 4,480.00


earthing specialist and issueing of a Sum
report

6.27.2 Design, supply and install lightning Lump 1 1 R 11,400.00 R 11,400.00


protection and earthing system Sum

6.28 Bonding

6.28.1 Provide lift and geyser, piping, taps Lump 1 1 R 8,960.00 R 8,960.00
sanitary ware and waste pipe earthing Sum
and bonding in ablutions and kitchens

6.29 Crows foot earth

6.29.1 Supply and install No 1 1 R 5,600.00 R 5,600.00

6.30 Telephone termination panel (Telkom


approved; lockable with wooden back
panel)

6.30.1 Supply Telkom approved panel in No 0 0 R -


equipment room or Telkom services shaft

6.30.2 Install Telkom panel No 0 0 R -

Carried forward R 229,956.82

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 229,956.82

6.31 RJ45 Shuttered telephone and


data outlets including shroud and
mounting plate

6.31.1 Supply No 1 0 R 112.56 R -

6.31.2 Install No 1 0 R 70.00 R -

6.32 RJ11 Shuttered telephone and


data outlets including shroud and
mounting plate

6.32.1 Supply No 1 0 R 5.43 R -

6.32.2 Install No 1 0 R 70.00 R -

Total carried forward to summary : Section 6 R 229,956.82

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 7 : Warder's House

PAYMENT DESCRIPTION
REFER ITEM NO UNIT QUANTITY QUANTITY RATE AMOUNT
TO

7.1 Supply and deliver distribution


boards as specified on drawings

7.1.1 DB WH No 1 1 R 10,915.52 R 10,915.52

7.2 Install distribution boards

7.2.1 DB WH No 1 1 R 4,900.00 R 4,900.00

7.3 Supply and deliver light switches

7.3.1 16A single lever one way No 6 6 R 26.99 R 161.94

7.3.2 16A two lever one way No 4 4 R 41.44 R 165.76

7.3.3 16A single lever two way No 2 2 R 57.12 R 114.24

7.3.4 10A dual infrared & ultrasonic motion sensor No 0 0 R -

7.3.5 Photocell complete installed inside IP55 No 0 0 R -


Beka bulk luminaire enclosure

7.4 Install light switches

7.4.1 16A single lever one way No 6 6 R 37.00 R 222.00

7.4.2 16A two lever one way No 4 4 R 37.00 R 148.00

7.4.3 16A single lever two way No 2 2 R 37.00 R 74.00

7.4.4 10A dual infrared & ultrasonic motion sensor No 0 0 R -

7.4.5 Photocell complete installed inside IP55 No 0 0 R -


Beka bulk luminaire enclosure

7.5 Supply and deliver light fittings complete


with lamps and electronic control gear

7.5.1 Type B No 2 2 R 1,012.70 R 2,025.40

7.5.2 Type E No 2 2 R 3,308.98 R 6,617.96

7.5.3 Type I No 3 3 R 2,083.20 R 6,249.60

7.5.4 Type J No 3 3 R 19.04 R 57.12

7.5.5 Type K No 3 3 R 1,098.94 R 3,296.82

7.5.6 Emergency lights No 0 0 Rate Only

Carried forward R 34,948.36

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 34,948.36

7.6 Install light fittings complete with lamps

7.6.1 Type B No 2 2 R 245.00 R 490.00

7.6.2 Type E No 2 2 R 245.00 R 490.00

7.6.3 Type I No 3 3 R 245.00 R 735.00

7.6.4 Type J No 3 3 R 74.00 R 222.00

7.6.5 Type K No 3 3 R 245.00 R 735.00

7.6.6 Emergency lights No 0 0 R 74.00 Rate Only

7.7 Supply and deliver powerskirting


mounted socket outlets

7.7.1 16A 3-pin single switched socket outlet No 0 0 R -

7.7.2 16A 3-pin dedicated single switched socket No 1 1 R 122.75 Rate only

7.8 Install socket outlets

7.8.1 16A 3-pin single switched socket outlet No 0 0 R -

7.8.2 16A 3-pin dedicated single switched socket No 1 1 R 92.50 Rate only

7.9 Supply and deliver flush mounted


socket outlets

7.9.1 16A 3-pin single switched socket outlet No 5 5 R 56.49 R 282.45

7.9.2 16A 3-pin double switched socket outlet No 10 10 R 93.52 R 935.20

7.9.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

7.9.4 16A 3-pin dedicated double switched No 1 1 R 226.27 Rate only


socket outlet including red male plug top

7.10 Install socket outlets

7.10.1 16A 3-pin single switched socket outlet No 5 5 R 92.50 R 462.50

7.10.2 16A 3-pin double switched socket outlet No 10 10 R 92.50 R 925.00

7.10.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

7.10.4 16A 3-pin dedicated double switched No 1 1 R 92.50 Rate only


socket outlet including red male plug top

7.11 Supply and deliver surface mounted


socket outlets in an weatherproof cover

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Carried forward R 40,225.51

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 40,225.51

7.11.1 16A 3-pin single switched socket outlet No 0 0 R -

7.12 Install surface mounted socket outlets

7.12.1 16A 3-pin single switched socket outlet No 0 0 R -

7.13 Supply and deliver isolators for fixed


equipment

7.13.1 60A Triple pole surface mounted IP56 No 0 0 R -

7.13.2 60A Double pole flush mounted No 1 1 R 106.40 R 106.40

7.13.3 40A Double pole flush mounted No 0 0 R -

7.13.4 20A Double pole surface mounted No 1 1 R 99.69 R 99.69

7.14 Install isolators for fixed equipment

7.14.1 60A Triple pole surface mounted IP56 No 0 0 R -

7.14.2 60A Double pole flush mounted No 1 1 R 185.00 R 185.00

7.14.3 40A Double pole flush mounted No 0 0 R -

7.14.4 20A Double pole surface mounted No 1 1 R 123.33 R 123.33

7.15 Connect fixed equipment (including


1m kopex spraque and connectors)

7.15.1 3-phase plus earth No 0 0 R -

7.15.2 Single phase plus earth wire No 2 2 R 750.00 R 1,500.00

7.16 Supply and deliver PVC insulated


stranded copper conductors

7.16.1 2,5mm² m 1000 1000 R 4.48 R 4,480.00

7.16.2 4mm² m 800 800 R 7.84 R 6,272.00

7.16.3 6mm² m 100 100 R 10.75 R 1,075.00

7.17 Install PVC insulated stranded copper


conductors drawn into wire ways

7.17.1 2,5mm² m 1000 1000 R 3.70 R 3,700.00

7.17.2 4mm² m 800 800 R 3.70 R 2,960.00

7.17.3 6mm² m 100 100 R 3.70 R 370.00

7.18 Supply and deliver bare stranded


copper earth conductors

7.18.1 2,5mm² m 1000 1000 R 3.11 R 3,110.00

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

7.18.2 4mm² m 50 50 R 31.16 R 1,558.00

Carried forward R 65,764.93

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 65,764.93

7.19 Install bare stranded copper earth


conductors drawn into wire ways

7.19.1 2,5mm² m 1000 1000 R 3.70 R 3,700.00

7.19.2 4mm² m 50 50 R 3.70 R 185.00

7.20 Supply and deliver insulated copper


earth conductors

7.20.1 6mm² m 1 1 R 6.13 Rate only

7.20.2 10mm² m 1 1 R 6.13 Rate only

7.21 Install insulated copper earth


conductors

7.21.1 6mm² m 1 1 R 3.70 Rate only

7.21.2 10mm² m 1 1 R 3.70 Rate only

7.22 Supply and deliver conduit complete


with accessories

7.22.1 32mm Ø PVC m 1 1 R 11.09 R 11.09

7.22.2 25mm Ø PVC m 50 50 R 6.65 R 332.50

7.22.3 20mm Ø PVC m 500 500 R 4.41 R 2,205.00

7.23 Install conduit complete with


accessories

7.23.1 32mm Ø PVC m 1 1 R 3.70 R 3.70

7.23.2 25mm Ø PVC m 50 50 R 3.70 R 185.00

7.23.3 20mm Ø PVC m 500 500 R 3.70 R 1,850.00

7.24 Lightning Protection Ststem

7.24.1 Measuring of earth resistance by an Lump 1 1 R 4,480.00 R 4,480.00


earthing specialist and issueing of a Sum
report

7.24.2 Design, supply and install lightning Lump 1 1 R 12,320.00 R 12,320.00


protection and earthing system Sum

7.25 Bonding

7.25.1 Provide lift and geyser, piping, taps Lump 1 1 R 8,960.00 R 8,960.00
sanitary ware and waste pipe earthing Sum
and bonding in ablutions and kitchens

7.26 Crows foot earth

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

7.26.1 Supply and install No 1 1 R 5,600.00 R 5,600.00

Total carried forward to summary : Section 7 R 105,597.22

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 8 : Guard House

PAYMENT DESCRIPTION
REFER ITEM NO UNIT QUANTITY QUANTITY RATE AMOUNT
TO

8.1 Supply and deliver distribution


boards as specified on drawings

8.1.1 DB GH No 1 1 R 4,732.00 R 4,732.00

8.2 Install distribution boards

8.2.1 DB GH No 1 1 R 1,633.33 R 1,633.33

8.3 Supply and deliver light switches

8.3.1 16A single lever one way No 4 4 R 29.99 R 119.96

8.4 Install light switches

8.4.1 16A single lever one way No 4 4 R 37.00 R 148.00

8.5 Supply and deliver light fittings complete


with lamps and electronic control gear

8.5.1 Type B No 2 2 R 940.37 R 1,880.74

8.5.2 Type E No 2 2 R 3,072.63 R 6,145.26

8.5.3 Type K No 6 6 R 1,020.45 R 6,122.70

8.5.4 Emergency lights No 0 0 R -

8.6 Install light fittings complete with lamps

8.6.1 Type B No 2 2 R 245.00 R 490.00

8.6.2 Type E No 2 2 R 245.00 R 490.00

8.6.3 Type K No 6 6 R 245.00 R 1,470.00

8.6.4 Emergency lights No 0 0 R -

8.7 Supply and deliver powerskirting


mounted socket outlets

8.7.1 16A 3-pin single switched socket outlet No 0 0 R -

8.7.2 16A 3-pin dedicated single switched socket No 1 1 R 122.75 Rate only

8.8 Install socket outlets

8.8.1 16A 3-pin single switched socket outlet No 0 0 R -

8.8.2 16A 3-pin dedicated single switched socket No 1 1 R 92.50 Rate only

Carried forward R 23,231.99

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 23,231.99

8.9 Supply and deliver flush mounted


socket outlets

8.9.1 16A 3-pin single switched socket outlet No 2 2 R 56.49 R 112.98

8.9.2 16A 3-pin double switched socket outlet No 4 4 R 93.52 R 374.08

8.9.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

8.9.4 16A 3-pin dedicated double switched No 1 1 R 226.27 Rate only


socket outlet including red male plug top

8.10 Install socket outlets

8.10.1 16A 3-pin single switched socket outlet No 2 2 R 92.50 R 185.00

8.10.2 16A 3-pin double switched socket outlet No 4 4 R 92.50 R 370.00

8.10.3 16A 3-pin dedicated single switched No 0 0 R -


socket outlet including red male plug top

8.10.4 16A 3-pin dedicated double switched No 1 1 R 92.50 Rate only


socket outlet including red male plug top

8.11 Supply and deliver surface mounted


socket outlets in an weatherproof cover

8.11.1 16A 3-pin single switched socket outlet No 0 0 R -

8.12 Install surface mounted socket outlets

8.12.1 16A 3-pin single switched socket outlet No 0 0 R -

8.13 Supply and deliver isolators for fixed


equipment

8.13.1 60A Triple pole surface mounted IP56 No 0 0 R -


R -
8.13.2 60A Double pole flush mounted No 1 1 R 106.40 R 106.40

8.13.3 40A Double pole flush mounted No 0 0 R -

8.13.4 20A Double pole surface mounted No 1 1 R 99.69 R 99.69

8.14 Install isolators for fixed equipment

8.14.1 60A Triple pole surface mounted IP56 No 0 0 R -

Carried forward R 24,480.14

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 24,480.14

8.14.2 60A Double pole flush mounted No 1 1 R 185.00 R 185.00

8.14.3 40A Double pole flush mounted No 0 0 R -

8.14.4 20A Double pole surface mounted No 1 1 R 123.33 R 123.33

8.15 Connect fixed equipment (including


1m kopex spraque and connectors)

8.15.1 3-phase plus earth No 0 0 R -

8.15.2 Single phase plus earth wire No 2 2 R 750.00 R 1,500.00

8.16 Supply and deliver PVC insulated


stranded copper conductors

8.16.1 2,5mm² m 500 500 R 4.48 R 2,240.00

8.16.2 4mm² m 300 300 R 7.84 R 2,352.00

8.16.3 6mm² m 0 0 R -

8.17 Install PVC insulated stranded copper


conductors drawn into wire ways

8.17.1 2,5mm² m 500 500 R 1.85 R 925.00

8.17.2 4mm² m 300 300 R 1.85 R 555.00

8.17.3 6mm² m 0 0 R -

8.18 Supply and deliver bare stranded


copper earth conductors

8.18.1 2,5mm² m 400 400 R 3.11 R 1,244.00

8.18.2 4mm² m 0 0 R -

8.19 Install bare stranded copper earth


conductors drawn into wire ways

8.19.1 2,5mm² m 400 400 R 1.85 R 740.00

8.19.2 4mm² m 0 0 R -

8.20 Supply and deliver insulated copper


earth conductors

Carried forward R 34,344.47

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Brought forward R 34,344.47

8.20.1 6mm² m 1 1 R 6.13 Rate only

8.20.2 10mm² m 1 1 R 6.13 Rate only

8.21 Install insulated copper earth


conductors

8.21.1 6mm² m 1 1 R 1.85 Rate only

8.21.2 10mm² m 1 1 R 1.85 Rate only

8.22 Supply and deliver conduit complete


with accessories

8.22.1 32mm Ø PVC m 0 0 R -

8.22.2 25mm Ø PVC m 0 0 R -

8.22.3 20mm Ø PVC m 300 300 R 4.41 R 1,323.00

8.23 Install conduit complete with


accessories

8.23.1 32mm Ø PVC m 0 0 R -

8.23.2 25mm Ø PVC m 0 0 R -

8.23.3 20mm Ø PVC m 300 300 R 1.85 R 555.00

8.24 Lightning Protection Ststem

8.24.1 Measuring of earth resistance by an Lump 0 0 R -


earthing specialist and issueing of a Sum
report

8.24.2 Design, supply and install lightning Lump 0 0 R -


protection and earthing system Sum

8.25 Bonding

8.25.1 Provide lift and geyser, piping, taps Lump 1 1 R 8,960.00 R 8,960.00
sanitary ware and waste pipe earthing Sum
and bonding in ablutions and kitchens

8.26 Crows foot earth

8.26.1 Supply and install No 1 1 R 5,600.00 R 5,600.00

Total carried forward to summary : Section 8 R 50,782.47

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 9 : Generator installation

PAYMENT DESCRIPTION
REFER ITEM NO UNIT QUANTITY QUANTITY RATE AMOUNT
TO

9.1 Supply, deliver and install


630kVA enclosed generator, complete
with all equipment as specified

9.1.1 Supply and deliver No 1 1 R 448,592.00 R 448,592.00


R -
9.1.2 Install No 1 1 R 10,166.67 R 10,166.67
R -
9.2 Construct generator plinth No 1 1 R 6,797.60 R 6,797.60
R -
9.3 Change-over panel, complete with all R -
equipment as specified R -
R -
9.3.1 Supply No 1 1 R 44,280.00 R 44,280.00
R -
9.3.2 Install No 1 1 R 4,625.00 R 4,625.00
R -
9.4 Compilation of Operation and Set 4 4 R 112.00 R 448.00
Maintenance Manuals R -
R -
9.5 Training to generator end users Hrs 4 4 R 257.60 R 1,030.40
R -
9.6 12 Month Maintenance No 1 1 R 5,936.00 R 5,936.00

Total carried forward to summary : Section 9 R 521,875.67

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 10 : Minisub installation

PAYMENT DESCRIPTION
REFER ITEM NO UNIT QUANTITY QUANTITY RATE AMOUNT
TO

10.1 Supply, delivery, installation and


commissioning of a full automated 630kVA,
minisub, complete with motorized C/B,
RM6 with SEPAM S10 relay and other
accessories

10.1.1 Supply and deliver No 1 1 R 297,108.00 R 297,108.00

10.1.2 Install No 1 1 R 10,166.67 R 10,166.67

10.2 Construct minisub plinth No 1 1 R 6,797.60 R 6,797.60

10.3 11kV MV Cables

10.3.1 Supply and deliver 95mm² Cu XPLE cable m 300 300 R 577.13 R 173,139.00

10.3.2 Install 95mm² Cu XPLE cable m 300 300 R 49.00 R 14,700.00

10.3.3 Joint 95mm² Cu XPLE cable No 2 2 R 613.76 R 1,227.52

10.3.4 Terminate 95mm² Cu XPLE cable No 2 2 R 1,344.00 R 2,688.00

10.4 Construct MV cable trenches:

10.4.1 Excavate in all materials for trenches, m³ 45 45 R 365.00 R 16,425.00


backfill, compact and dispose surplus
materials

10.4.2 Extra over item 2.1.1 for excavating in hard m³ 1 1 R 392.00 Rate only
material

Total carried forward to summary : Section 10 R 522,251.79

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014


NEW MALE STUDENTS RESIDENCE ELECTRICAL INSTALLATION

Section 11 : Electronic Installations

PAYMENT DESCRIPTION
REFER ITEM NO UNIT QUANTITY QUANTITY RATE AMOUNT
TO

11.1

11.1 Provide the sum of R 970 000.00 (nine No 1 0.3 R 970,000.00 R 291,000.00
hundred and seventy thousand rand) for
CCTV and Access Control installation by
specialist.

Total carried forward to summary : Section 11 R 291,000.00

UNIVERSITY OF VENDA INFRASTRUCTURE DEVELOPMENT October 2014