5” Section:
While drilling 8.5” Section. The section was started with 1.28 Sg and after losses reduced the
weight to 1.25 Sg. Loaded active sytem with 40 ppb LCM with Baracarb 25/50/150 and CaCO3 F
(Non damaging material). While complete loss swept 60 ppb LCM frequently. The conc of
specalized chemicals are as follow.
Clay Seal = 3 %
Soltex = 2 ppb
KCL = 7 %
Diesel / Torq Trim ll = 2.5 %