Professional Documents
Culture Documents
Original PDF
Original PDF
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
1- Plan Scope Management (Planning Process)
Only How you can define and manage and control Scope & Only How Selecting the requirements. The
key benefit of this process is that it provides guidance and direction on how scope will be managed
throughout the project. This process is performed once or at predefined points in the project.
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
1- Plan Scope Management (Planning Process)
A- Product Scope: Features & Functions of the Product or Service / Completion Against Product Specs
ويتم اعتماده بناءاً علي مواصفات المنتج المطلوب/ هو خصائص المنتج المطلوب مثل عدد غرف او ارتفاع او الوان:نطاق المنتج
B- Project Scope: Work Performed to Deliver Product or Service / Completion Against Proj. Manag. Plan
ويتم اعتماده بناءاً علي خطة إدارة المشروع/ هو العمل المطلوب النتاج المنتج مثل اعمال التنفيذ واالستالمات:نطاق المشروع
OUTPUTS
Including the procedures and all steps to define, manage, verify & control the project & product scope
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
2- Collect Requirements (Planning Process)
Determining, documenting, and managing stakeholder needs and requirements to meet objectives.
The key benefit of this process is that it provides the basis for defining the product scope and project
scope. This process is performed once or at predefined points in the project.
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
2- Collect Requirements (Planning Process)
2- Affinity Diagram: Large No. of ideas to be Classified into Groups for review & analysis
T&T
Context Diagram Detailed Description
T&T
Prototypes Early Feedback & Reduce Risk & as Mock-Ups
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
2- Collect Requirements (Planning Process)
OUTPUTS
Links product requirements from their Origin to the Deliverables ربط المتطلبات بالمنتج
Provides a structure for Managing Changes to the Product Scope ادارة التغييرات في نطاق المنتج
2- Requirements Documentations
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
3- Define Scope (Planning Process)
Developing a detailed description of the project and product. The key benefit of this process is that it
describes the product, service, or result boundaries and acceptance criteria. This process is
performed once or at predefined points in the project
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
3- Define Scope (Planning Process)
OUTPUTS
- Acceptance Criteria
- Exclusions
- Constraints
- Assumptions
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
3- Define Scope (Planning Process)
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
4- Create WBS (Work Breakdown Structure) (Planning Process)
Subdividing project deliverables and project work into smaller, more manageable components. The
key benefit of this process is that it provides a framework of what has to be delivered. This process is
performed once or at predefined points in the project.
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
4- Create WBS (Work Breakdown Structure) (Planning Process)
- Decomposition
is a technique used for dividing and subdividing the project scope and project deliverables
into smaller, more manageable parts.
- Account Control
is the Higher Level of WBS
- Planning Package
is level of details between Account Control & Work Package without Schedule details
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
4- Create WBS (Work Breakdown Structure) (Planning Process)
OUTPUTS
1- Scope Baseline
- Approved version of a scope statement, WBS, and its associated WBS dictionary
- Changed only through Formal Change Control Procedures (CCB)
- Basis for comparison
- Part of the Project Management Plan
- Its Components include:
B- WBS
D- Work Packages
E- Planning Packages
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
5- Validate Scope (M&C Process)
Formalizing acceptance of the completed project deliverables. The key benefit of this process is that it
brings objectivity to the acceptance process and increases the probability of final product, service, or
result acceptance by validating each deliverable. This process is performed periodically throughout
the project as needed.
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
5- Validate Scope (M&C Process)
T&T
1- Inspection:
OUTPUTS
1- Accepted Deliverables:
- Deliverables that meet the acceptance criteria are formally signed off and approved by the
customer or sponsor
وتسمي بعد المرور منControl Quality يتم عمل مراجعة اولية لها بواسطة فريق العمل بالموقع خالل عمليةDeliverables الحظ ان ال
) (التسليمات المحققةVerified Deliverables هذه العملية بـ
وتخرجSponsor & Customer للتحقق من التسليمات بواسطة الـValidate Scope الي عملية الـVerified Deliverables يتم ادخال الـ
Formal Accepted Deliverables التسليمات بمسمي
Final Accepted Deliverables لتصبحClose Project/Phase الي عملية الـFormal Accepted Deliverables تذهب الـ
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
6- Control Scope (M&C Process)
Monitoring the status of the project and product scope and managing changes to the scope baseline.
The key benefit of this process is that the scope baseline is maintained throughout the project. This
process is performed throughout the project.
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Chapter 5 – Scope Management
6- Control Scope (M&C Process)
- Used to compare the baseline to the actual results and determine if the variance is within the
threshold amount or if corrective or preventive action is appropriate.
OUTPUTS
1- Work Performance Information:
- Including categories and analysis for all project measurements that were mentioned in Work
Performance Data
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com
Dr. Ahmed AbdelHady - PMP Preparation Course (6th Edition)
Chapter Pages – PMBOK 6th Edition Status
1- Introduction 1 - 36 Done
2- Projects Environment 37 - 50 Done
3- PM Roles 51 - 68 Done
4- Integration 69 - 128 Done
5- Scope 129 - 172 Done
6- Schedule 173 - 230 Not Yet
7- Cost 231 - 270 Not Yet
8- Quality 271 - 306 Not Yet
9- Resource 307 - 358 Not Yet
10- Communication 359- 394 Not Yet
11- Risk 395- 458 Not Yet
12- Procurement 459- 502 Not Yet
13- Stakeholder 503 - 536 Not Yet
Dr. Ahmed AbdelHady - PMP Course 6th Edition – 00966-541541970 – 002-01093674327 – Ahmedah251@gmail.com