Agenda
• Background
• LNG Lifecycle
• Design Challenges
• Dynamic Simulation
• Case Study - DYNSIM
Modeling of Liquefaction process
Controls
Scenarios
Results
• Conclusion
• Q&A
Slide 4
LNG
Slide 5
Natural Gas Lifecycle
Production
Liquefaction Unit
Transportation
Re-gasification Terminal
Distribution
Consumption
Existing:
•26 terminals –export LNG
•31 Liquefaction plants
Slide 8
Design Challenges
• Unit requires high availability
• Reliable controls and Safety systems
• Expensive turbo-machinery equipments
• Natural Gas flaring
• Cryogenic service
• Expensive piping metallurgy
Slide 9
Design Challenges
Impact of controls
Slide 10
Dynamic Simulation - DYNSIM
• Process Simulation Tool
• System hold-up dynamics
• Control dynamics
• Process variables Vs Time
Time
• Applicable through a Project Lifecycle
Slide 11
DYNSIM in LNG Applications
Production
Liquefaction Unit
Distribution
Consumption
Slide 12
Case Study – LNG Liquefaction Plant
Slide 13
Objectives
• Verify compressor controls
• Verify anti-surge valves’ design
• Verify cold bypass valves’ design
• Verify isolation valves’ design
• Verify settle out pressures and re-start
• Verify start-up/shutdown scenarios
• Evaluate “What-if?” scenarios
• Trip
• Discharge/Suction blockages
• Load changes etc…
Slide 14
C3MR Process (APCI)
• Feed Treatment
• Liquefaction
• Two refrigeration loops
• C3 (Propane) – Pre-cooling Natural Gas
• MR (Mixed Refrigerant) – Condensation/Sub-cooling
• Two refrigeration compressors
• Loops are heat integrated
Slide 15
C3MR Process (APCI)
• Chillers
• Propane Boilers
• Pre-cooling Natural Gas feed
• Condensation of MR
Slide 16
C3MR Process (APCI)
C3 LOOP
MR LOOP
Slide 17
Modeling Notes - DYNSIM
• Compressors
• Performance maps, MW
changes
Curves Validation
Slide 18
Modeling Notes - DYNSIM
S07
S11
• MCHE
VL02
S06
S10
S03
• Multi-exchanger, VL03
• C3 Chillers S08
S01
• Non-equilibrium
S05
LNGHX01
scenarios S04
• Compressor controls
• Basic CCC Controls
modeled in DYNSIM
• Non-dimensional
operating maps
Slide 19
Scenarios
• 2 steady state ICs
• 4 startup ICs
• 35 case scenarios
• Trip cases
• Startup cases
• Load Change cases
• Process upsets
Compressor Trip
Slide 20
Results– FEED Stage
• ASV Sizing
• Compressor trip case
• C3 MP Surge
• Original design of C3 LP ASV
was oversized
• Original design of MP ASV
was under-sized
• C3 Compressor
isolation valves
• Stroke time reduced to
route more flow to recycle
loop
Compressor coast-down
Slide 21
Results- EPC stage
• Start-up scenarios
• Available driver power verified
Speed
• Helper motor design verified
• ASV Sizing verified
• Bypass valves’ design verified
• Controls verified
Start-up scenario
Control Lines
Slide 22
Results- EPC stage
• Increase stroke time on
cold bypass (CBP) valve
• Capital Savings
• Coast-down scenarios
• Vacuum on C3 suction
• Drop C3 speed to 75% if one of
MR compressors trip
• Low Press override/ Cascade to
ASC required on C3
Slide 23
Conclusion
Dynamic Simulation in Liquefaction Plant
Design helps:
Slide 24
Q&A
Slide 25
Thank you
Abhilash Nair
Principal Consultant
Invensys SimSci-Esscor
Carlsbad, California CA 92008
+1 760-268-7748
Abhilash.Nair@invensys.com
Slide 26
C3MR Process (APCI)
ASV Opens
Hot C3 Vapor
C3 Boilers
Cryogenic C3 Liquid
Slide 27