DAILY CONSTRUCTION INSPEC

INSPECTION DE
INSPECTION REPORT #
PROJECT NAME
PURCHASE ORDER NO.
NAME OF CLIENT
NAME OF TPI COMPANY
NAME
WEATHER ANDOF CONTRACTOR(NOTE:
TEMPERATURE
AM OR PM)
INSPECTION DATE
START TIME : 9:00 AM

Gene
ral
NUMBER OF WORKERS ON SITE
SKILLED UNSKILLED
19 14

ACTIVITIES DET
ACTIVITIES PERFORMED TODAY
EXCAVATION work for boundry wall

PCC WORK FOR FOOTING


4 nos of footing and 4 nos of column upto
1.750m height CONCRETE POURING IS
COMPLETED. (26 CUM)

NAME OF TPI
MOHSIN RAZA MANSOORI
LY CONSTRUCTION INSPECTION REPORT TEMPLATE
INSPECTION DETAILS
1
CGS STATION, MORADABAD
CGS STATION, MORADABAD
TORRENT GAS PRIVATE LIMITED
I.C.S PRIVATE LIMITED
M/S. POTALIYA ENTERPRISES
RAINY AND 15 DEG.
1/16/2020
END TIME:

✘ Civil

EQUIPMENT ON SITE TODAY


1 JCB
1 TRACTOR TROLLY
2 DG SET
1 BAR Cutter

ACTIVITIES DETAILS
QUANTITY
90.38

17.55

6
SPECTION REPORT TEMPLATE
TION DETAILS

6:30PM

REMARKS
FOR BOUNDRY WALL EXCAVATION
FOR BOUNDRY WALL EXCAVATION

TIES DETAILS
ACTIVITIES PLANNED FOR TOMORROW
3 FOOTING CONCRETE POURING IS PLANNED

PCC FOR EXCAVATED AREA

NAME OF CONTRACTOR'S AUTHORISED PERSON


MR. OM PRAKASH
Page 12 of 13

DPR OF CGS Station for CGS Project, Moradabad at TGPL-MOR


Up to Achived
Total Scope
Sr. No. Activity Unit previous day quantity
of Work
quantities (Today)

A B C
FIELD ACTIVITIES
BOUNDARY WALL
1 Excavation upto 1.5m depth from NGL Cum 702.98 90.38
2428.13
2 Excavation beyond 1.5depth from NGL Cum
3 PCC Cum 56.89 3.51 17.55
4 Footing Nos 74 6 5
5 Column upto GRADE BEAM Bottom Nos 74 0 4
6 Back Filling Cum 1 0
7 Ground Beam Rm 1.0 0
8 Brick Masonry upto PB Bottom Cum 1 0
8 Column upto PB Bottom Nos 1 0
9 Plinth bea Pcc Cum 1 0
10 Plinth Beam steel Kg 1 0
11 Plinth Beam shuttring Sqm 1 0
12 Plinth Beam castingl Cum 1 0
13 Column on PB Kg 1 0
14 Column on PB Shuttring Sqm 1 0
14 Column on PB casting Cum 1 0
15 Column on PB shuttring Nos 1 0
16 Brick Masonry upto Final Level Cum 1 0
17 Y - Post Nos 1 0
coping Rm 1 0

NOTE:- 1 is denoted for only calcuation of % column .


and the quantity is not as per JMR only for reference .
Any how the mesurment as per JMR
TO DAY MANPOWER
SR.NO.
1
2
3
4
Page 13 of 13

t, Moradabad at TGPL-MORADABAD GA
Cummulative Balance Balance complete
Achived Quantity quatity till quatity till quantity till
till Date Date Date in % date in %

D=B+C E=A-D F=E/A G=D/A


ACTIVITIES

793.3625 1635 67% 33%

21.06 36 63% 37%


11 63 85% 15%
4 70 95% 5%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%
0 1 100% 0%

TO DAY MANPOWER
DISCRIPTION Skilled Unskilled
MASON 8 14
CARPENTER 4 0
BAR BENDER 6 0
ELECTRICIAN 1 0
19 14
TOTAL 33