START TIME : 9:00 AM
Gene
ral
NUMBER OF WORKERS ON SITE
SKILLED UNSKILLED
19 14
ACTIVITIES DET
ACTIVITIES PERFORMED TODAY
EXCAVATION work for boundry wall
NAME OF TPI
MOHSIN RAZA MANSOORI
LY CONSTRUCTION INSPECTION REPORT TEMPLATE
INSPECTION DETAILS
1
CGS STATION, MORADABAD
CGS STATION, MORADABAD
TORRENT GAS PRIVATE LIMITED
I.C.S PRIVATE LIMITED
M/S. POTALIYA ENTERPRISES
RAINY AND 15 DEG.
1/16/2020
END TIME:
✘ Civil
ACTIVITIES DETAILS
QUANTITY
90.38
17.55
6
SPECTION REPORT TEMPLATE
TION DETAILS
6:30PM
REMARKS
FOR BOUNDRY WALL EXCAVATION
FOR BOUNDRY WALL EXCAVATION
TIES DETAILS
ACTIVITIES PLANNED FOR TOMORROW
3 FOOTING CONCRETE POURING IS PLANNED
A B C
FIELD ACTIVITIES
BOUNDARY WALL
1 Excavation upto 1.5m depth from NGL Cum 702.98 90.38
2428.13
2 Excavation beyond 1.5depth from NGL Cum
3 PCC Cum 56.89 3.51 17.55
4 Footing Nos 74 6 5
5 Column upto GRADE BEAM Bottom Nos 74 0 4
6 Back Filling Cum 1 0
7 Ground Beam Rm 1.0 0
8 Brick Masonry upto PB Bottom Cum 1 0
8 Column upto PB Bottom Nos 1 0
9 Plinth bea Pcc Cum 1 0
10 Plinth Beam steel Kg 1 0
11 Plinth Beam shuttring Sqm 1 0
12 Plinth Beam castingl Cum 1 0
13 Column on PB Kg 1 0
14 Column on PB Shuttring Sqm 1 0
14 Column on PB casting Cum 1 0
15 Column on PB shuttring Nos 1 0
16 Brick Masonry upto Final Level Cum 1 0
17 Y - Post Nos 1 0
coping Rm 1 0
t, Moradabad at TGPL-MORADABAD GA
Cummulative Balance Balance complete
Achived Quantity quatity till quatity till quantity till
till Date Date Date in % date in %
TO DAY MANPOWER
DISCRIPTION Skilled Unskilled
MASON 8 14
CARPENTER 4 0
BAR BENDER 6 0
ELECTRICIAN 1 0
19 14
TOTAL 33