10135 OBV Sai Peng --> Chiong / Chin Ching --> Design dev't done.
Paramanathan
Mr.Wong Tasnim
10147 Nursing Home Wen Kai Myo All drawings issued for production
(SJSM)
10148 Glory Jaric --> Vee Rafizah L32-39 issued for prod.
Pending L40-49 layout for drafing
10157 HDB Eunos Ave Wen Kai Dwg until Lvl 6 subm Approved.
Rf not drawn yet as CAD file not
given (requested since Oct'19)
10167 Punggol Town Wen Kai Abdul Kader All (except C49 and C50) L3 column
Hall (PTH) issued for prodn
L4 zone 4 columns pending approval
L4 zone 3 columns not yet drawn
10169 FVCC Saiful Sukri Col: LVl 1 & Lvl2 issued for prodn; Lvl
3 pending approval. L4 dwg in
progress
10176 JTCWNC Saiful Asri Beam : Level 7 &8- for prod. Level
LR-shop dwg in progress(trgt issue by
ths week)
10193 Kranji camp Jaric ---> Vee Rafizah Resubmitted for approval on
3/1/2020 due to design loading
changed. Approval received on
4/1/2020. Preparing HCS panel
drawings based on latest layouts for
production.
10197 Potong Pasir Vee Nora B/Tapan Panel 2000-2008 issued for
production on 31/12/19. Remaining
panels are subjected to changes for
M&E opening positions, however still
pending revised M&E opening layout
based on consultant's comment.
Tower wall mould dwgs issued to Tower wall mould dwgs issued to
factory factory 8/1/20. Now Tapan preparing
Tower A walls shop dwgs for
approval & production.
Refer attachment
4-sty L3 - 50% approved column & 4-sty L3 - 50% approved column &
balance pending approval. balance pending approval.
10-sty L3 - 50% approved 10-sty L3 - 90% approved
column & balance pending approval. column & balance pending approval.
Lvl 4 submitted on 20/12 & pending Lvl 4 submitted on 20/12 & pending
approval. approval.
Lvl 5 submitted on 20/12 & pending Lvl 5 submitted on 20/12 & pending
approval. approval.
Lvl 6 preparing HCS layout& target Lvl 6 submitted on15/1 & pending
for approval submission next week. approval.
But waiting for CPB drawings more Lvl 7 submitted on 15/1 & pending
than 1 month+. approval. Lvl 8 preparing
HCS layout & target for approval
submission this week. But still
waiting for CPB from Lvl 5 -8
drawings more than 1 month+.
All completed
Switchgear status B.
L2 Core Area remaining beams
pending IFC approval
Dwg completed
Dwg completed