Check List For Pre Commissioning of MV Switchgear
Check List For Pre Commissioning of MV Switchgear
SUBCONTRACTOR X CONTRACTOR
Mechanical
checks 6. Mechanical tightening inspection (electrical
jointing, power and earthing circuits etc.).
SUBCONTRACTOR X CONTRACTOR
For S/C QA/QC: Date: FOR CONTRACTOR Date: For Cons. Rep.: Date:
QA/QC: