You are on page 1of 4

IC-L CONSTRUCTION CONSULTING PVT LTD.

BAN-600, BANGALORE
CALCULATION OF RAIN WATER TANK
AVRAGE ANNUAL INTENSITY OF RAINFALL : MTRS./HR
Building No.

AREA OF ROOF Bldg 603 SQM.


AREA OF ROOF Bldg 605 SQM.

RUN-OFF COEFFICIENTS :

LAND SCAPE
ROAD & PAVING
ROOF
UNPAVED AREA

DISCHRARGE (Q)
ROOF Bldg 603 CUM./ HR.
ROOF Bldg 605 CUM./ HR.
TOTAL

ASSUMING RETENSION TIME Mins

Minimum Water Harvested Per Day CUM


0.1
603

1550
3950

0.15
0.8
0.9
0.3

139.5
355.5
495.0

15

123.75
IC-L CONSTRUCTION CONSULTING PVT LTD.
BAN-600, BANGALORE
CALCULATION OF RAIN WATER TANK R0
AVRAGE ANNUAL INTENSITY OF RAINFALL : MTRS./HR 0.1
Building No. 603

AREA LAND SCAPE SQM. 0


AREA ROAD AND PAVING SQM. 0
AREA OF ROOF SQM. 1550
AREA UNPAVED SQM. 0

RUN-OFF COEFFICIENTS :

LAND SCAPE 0.15


ROAD & PAVING 0.8
ROOF 0.9
UNPAVED AREA 0.3

DISCHRARGE (Q)
LAND SCAPE CUM./ HR. 0.0
GROUND CUM./ HR. 0.0
ROOF CUM./ HR. 139.5
UNPAVED CUM./ HR. 0.0
TOTAL 139.5

ASSUMING RETENSION TIME Mins 15

Minimum Water Harvested Per Day CUM 34.88


IC-L CONSTRUCTION CONSULTING PVT LTD.
BAN-600, BANGALORE
CALCULATION OF RAIN WATER TANK

AVRAGE ANNUAL INTENSITY OF RAINFALL : MTRS./HR 0.1


Building No. 605

AREA LAND SCAPE SQM. 0


AREA ROAD AND PAVING SQM. 0
AREA OF ROOF SQM. 3950
AREA UNPAVED SQM. 0

RUN-OFF COEFFICIENTS :

LAND SCAPE 0.15


ROAD & PAVING 0.8
ROOF 0.9
UNPAVED AREA 0.3

DISCHRARGE (Q)
LAND SCAPE CUM./ HR. 0.0
GROUND CUM./ HR. 0.0
ROOF CUM./ HR. 355.5
UNPAVED CUM./ HR. 0.0

TOTAL 355.5

ASSUMING RETENSION TIME Mins 15

Minimum Water Harvested Per Day 88.88