I DESIGN OF STORM WATER DRAIN.

BAN600, Bangaluru- South Campus


ZONE 1- UG sump, Kitchen, courts (West of spine road)
Area in sqm 16800
in hectares 1.68
Intensity of rain fall in mm 100
c1= 0.95 Paved area 0.95
% of Paved area to the total area. 90%
c2= 0.60 Unpaved area-open ground 0.6
% of unPaved area to the total area. 10%

Paved area of the total area. In hectares 1.512


Q1 = CIA/360 in cumecs 0.3990

Unpaved area of the total area. In hectares 0.168


Q2 = CIA/360 in cumecs 0.0280

Total run off Q = Q1 + Q2 cumecs 0.4270

Actual discharge in cumecs 0.4270 15.06456

Trial 1. Assume some depth


Design of RCC drain
B diameter 0.7 2.296
B mtrs assumed (Trapz. Sect / Rect. Sect.) 0.55 1.804
B' mtrs assumed (Only for Trapz. Sect ) 0.7
Y mtrs (Trapz. Sect / Rect. Sect.) 0.55 0.168
Area = 'a' sqm for trapz.sect =((B+B')/2)*Y 0.34375
Area = 'a' sqm for rect. Sect = B*Y 0.3025 3.2549
Area = 'a' sqm for circular . Sect = (3.142*B*B)/4 0.38465 4.13821856
Trapz sect P= B + 2 x √2 x Y in m 2.11
OR Rect. Sect P= B + 2Y in m 1.65 5.412
OR Circular Section P =2*3.14*(B/2) 2.198 7.20944
R = a/P for trapz.sect 0.163
R = a/P for rect.sect 0.183
R = a/P for Circular.sect 0.175 0.574
Hydraulic radius m 0.175 0.5740
S = bed slope in m/m 0.0025 0.0033 0.002 Usage% Vel.m/s
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Traps.sect. 0.59 72.8 1.707
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; rect.sect. 0.56 76.5 1.844
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Circular sect. 0.69 24.27 cft/s 62.1 1.788

Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.7
Width of drain mtrs ; rect.sect. 0.55
Dia of drain mtrs ; Circular sect. 0.7 OR, 0.5-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.55
I DESIGN OF STORM WATER DRAIN. BAN600, Bangaluru
ZONE 2- East spine road & shops 110,111,112=Zone2
Area in sqm 32150
in hectares 3.215
Intensity of rain fall in mm 100
c1= 0.95 Paved area 0.95
% of Paved area to the total area. 90%
c2= 0.60 Unpaved area-open ground 0.6
% of unPaved area to the total area. 10%

Paved area of the total area. In hectares 2.8935


Q1 = CIA/360 in cumecs 0.7636

Unpaved area of the total area. In hectares 0.3215


Q2 = CIA/360 in cumecs 0.0536

Total run off Q = Q1 + Q2 cumecs 0.8171

Actual discharge in cumecs 0.8171 28.828905

Trial 1. Assume some depth


Design of RCC drain
B diameter 0.8 2.624
B mtrs assumed (Trapz. Sect / Rect. Sect.) 0.6 1.968
B' mtrs assumed (Only for Trapz. Sect ) 0.75
Y mtrs (Trapz. Sect / Rect. Sect.) 0.8 0.244
Area = 'a' sqm for trapz.sect =((B+B')/2)*Y 0.54
Area = 'a' sqm for rect. Sect = B*Y 0.48 5.1648
Area = 'a' sqm for circular . Sect = (3.142*B*B)/4 0.5024 5.40502016
Trapz sect P= B + 2 x √2 x Y in m 2.86
OR Rect. Sect P= B + 2Y in m 2.2 7.216
OR Circular Section P =2*3.14*(B/2) 2.512 8.23936
R = a/P for trapz.sect 0.189
R = a/P for rect.sect 0.218
R = a/P for Circular.sect 0.200 0.656
Hydraulic radius m 0.200 0.6560
S = bed slope in m/m 0.0025 0.0020 0.002 Usage% Vel.m/s
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Traps.sect. 1.02 80.5 1.880
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; rect.sect. 0.99 82.2 2.071
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Circular sect. 0.9820 34.65 cft/s 83.2 1.955

Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.75
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.8 OR, 0.6-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.8
I DESIGN OF STORM WATER DRAIN. BAN600, Bangaluru
ZONE 3- Central Ph-3 RnD bldgs=Zone3
Area in sqm 15156
in hectares 1.5156
Intensity of rain fall in mm 100
c1= 0.95 Paved area 0.95
% of Paved area to the total area. 90%
c2= 0.60 Unpaved area-open ground 0.6
% of unPaved area to the total area. 10%

Paved area of the total area. In hectares 1.36404


Q1 = CIA/360 in cumecs 0.3600

Unpaved area of the total area. In hectares 0.15156


Q2 = CIA/360 in cumecs 0.0253

Total run off Q = Q1 + Q2 cumecs 0.3852

Actual discharge in cumecs 0.3852 13.5903852

Trial 1. Assume some depth


Design of RCC drain
B diameter 0.6 1.968
B mtrs assumed (Trapz. Sect / Rect. Sect.) 0.5 1.640
B' mtrs assumed (Only for Trapz. Sect ) 0.65
Y mtrs (Trapz. Sect / Rect. Sect.) 0.5 0.152
Area = 'a' sqm for trapz.sect =((B+B')/2)*Y 0.2875
Area = 'a' sqm for rect. Sect = B*Y 0.25 2.69
Area = 'a' sqm for circular . Sect = (3.142*B*B)/4 0.2826 3.04032384
Trapz sect P= B + 2 x √2 x Y in m 1.91
OR Rect. Sect P= B + 2Y in m 1.5 4.92
OR Circular Section P =2*3.14*(B/2) 1.884 6.17952
R = a/P for trapz.sect 0.150
R = a/P for rect.sect 0.167
R = a/P for Circular.sect 0.150 0.492
Hydraulic radius m 0.150 0.4920
S = bed slope in m/m 0.0025 0.0020 0.002 Usage% Vel.m/s
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Traps.sect. 0.46 83.0 1.615
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; rect.sect. 0.43 89.0 1.731
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Circular sect. 0.4560 16.09 cft/s 84.5 1.613

Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.65
Width of drain mtrs ; rect.sect. 0.5
Dia of drain mtrs ; Circular sect. 0.6 OR, 0.45-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.5
I DESIGN OF STORM WATER DRAIN. BAN600, Bangaluru
ZONE 5- S campus66Kv s/s, testTrack=Z5
Area in sqm 37440
in hectares 3.744
Intensity of rain fall in mm 100
c1= 0.95 Paved area 0.95
% of Paved area to the total area. 90%
c2= 0.60 Unpaved area-open ground 0.6
% of unPaved area to the total area. 10%

Paved area of the total area. In hectares 3.3696


Q1 = CIA/360 in cumecs 0.8892

Unpaved area of the total area. In hectares 0.3744


Q2 = CIA/360 in cumecs 0.0624

Total run off Q = Q1 + Q2 cumecs 0.9516

Actual discharge in cumecs 0.9516 33.572448

Trial 1. Assume some depth


Design of RCC drain
B diameter 0.9 2.952
B mtrs assumed (Trapz. Sect / Rect. Sect.) 0.6 1.968
B' mtrs assumed (Only for Trapz. Sect ) 0.75
Y mtrs (Trapz. Sect / Rect. Sect.) 0.6 0.183
Area = 'a' sqm for trapz.sect =((B+B')/2)*Y 0.405
Area = 'a' sqm for rect. Sect = B*Y 0.36 3.8736
Area = 'a' sqm for circular . Sect = (3.142*B*B)/4 0.63585 6.84072864
Trapz sect P= B + 2 x √2 x Y in m 2.30
OR Rect. Sect P= B + 2Y in m 1.8 5.904
OR Circular Section P =2*3.14*(B/2) 2.826 9.26928
R = a/P for trapz.sect 0.176
R = a/P for rect.sect 0.200
R = a/P for Circular.sect 0.225 0.738
Hydraulic radius m 0.225 0.7380
S = bed slope in m/m 0.003333333 0.0020 0.002 Usage% Vel.m/s
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Traps.sect. 0.84 113.2 2.075
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; rect.sect. 0.81 117.1 2.257
Calucalated discharge in cumecs =Q = a x 1.486/n x R2/3 x S1/2; Circular sect. 1.5523 54.78 cft/s 61.3 2.441

Calculated discharge is higher than the actual discharge. Calculated discharge is higher than the
actual discharge.
Provided size of drain okay
Widths of drain mtrs (top width B') ; Traps.sect. 0.75
Width of drain mtrs ; rect.sect. 0.6
Dia of drain mtrs ; Circular sect. 0.9 OR, 0.7-2nos
Depth of drain mtrs (Trapz. Sect / Rect. Sect.) 0.6