You are on page 1of 8

Discharge

Cumulative Intensity
Catchment Run Off Co- From Roof Slope
Sr No. IC SD No Catchment
Area sqm mm/hr Eficient To the Drain (1:X)
Area sqm cm/s

1 18 to 21 1103 1103 100 0.8 0.025 300


A20:A22
Mannings Flow Depth Dia of Pipe Radius R Area of flow Wetted
Surface Material "n" m (70%) m m sqm Perimeter m

Concrete (Cement) - 0.012 0.24 0.3 0.15 0.061 0.665


finished
Actual
Hydraulic Velocity Discharge Velocity Discharge
from the Check V>1 Status AD >
Radius m m/s drain & V<3 RD

0.091 0.975 0.059 1.000 1.000


Chamber No L (m) B (m) Catchment Area sqm Cumulative Catchment Intensity
Sr No Area sqm mm/hr

1 21 6 126 126 100


Discharge From Roof To the Length of Slope Surface Material Mannings "n" Flow Depth m
Drain cum/s channel m

0.0035 300 Asbestos cement 0.011 0.25


Flow Width Area of flow Wetted Hydraulic Radius Velocity m/s Discharge from
m sqm Perimeter m m the drain

0.3 0.075 0.8 0.09375 1.0831639693 0.0812372977


Velocity Check Actual Discharge
V>1 & V<3 Status AD > RD

1.000 1.000