You are on page 1of 22

Project: 

     Atate Mazoria – Gunchire – Kose– Geja – Lera


Client:                       Ethiopia
                       
Road authority
Consultant:              WhiteNight
                       
Contructor Shan Dong Highway Engineering Construction Group Co.,LTD
Section Gunchire mazoria to church
Design Discharge
Locations Design Recommended Pipe size Exising Pipe size
calculations
Area pipe D No. of pipe D No. of
Sr.No. Station Q10yr Q25 yr D (mm)
(km2) (Inches) Barrels (Inches) Barrels

1 0+310 0.00 0.00 0.00 48 1 1067

2 0+127 0.8*0.8

Side Draiange

Location Hydrology
Ditch
Station chainage
Length
Max
Avg. Contribut Drainage
Ditch ary Area Avg Cross Length
Serial No. Road Area
Type + Road Slope (m)
From To m gradient (Ha.)
widthWi
dth (m)

1 0+000 0+200 200 3% Paved TR-Shape20.00 3% 200.00 0.40


2 0+200 0+310 110 3% Paved TR-Shape20.00 3% 110.00 0.22

3 0+310 0+600 290 3% Paved TR-Shape20.00 3% 290.00 0.58

4 0+600 0+800 200 3% Paved TR-Shape20.00 3% 200.00 0.40


5 0+800 1+000 200 3% Paved TR-Shape20.00 3% 200.00 0.40
6 1+000 1+200 200 3% Paved TR-Shape20.00 3% 200.00 0.40

7 1+200 1+400 200 3% Paved TR-Shape20.00 3% 200.00 0.40

8 1+400 1+600 200 3% Paved TR-Shape20.00 3% 200.00 0.40


Exising Pipe size
Remark
D (mm)

New
Around round
about to Divert
the side drain to
Bridge location

Ditch Schedule
Hydrology Hydraulics Analysis
Dimenstion

Runoff Water
Time of Conc. I10 yr RFIntenity Coefficie Q10yr
(min.) (mm/hr) (m3/sec) Depth of Depth + Side
nt BW (m) Water Free Bord Free Slope
(m) board and (1H:1V)
As per ER

15.00 95.95 0.85 0.091 0.60 0.10 0.30 0.80 0.00


15.00 95.95 0.85 0.050 0.60 0.07 0.30 0.80 0.00

15.00 95.95 0.85 0.585 0.60 0.30 0.30 0.80 0.00

15.00 95.95 0.85 0.453 0.60 0.26 0.30 0.80 0.00

15.00 95.95 0.85 0.363 0.60 0.23 0.30 0.80 0.00


15.00 95.95 0.85 0.272 0.60 0.19 0.30 0.80 0.00

15.00 95.95 0.85 0.181 0.60 0.15 0.30 0.80 0.00

15.00 95.95 0.85 0.091 0.60 0.10 0.30 0.80 0.00


draulics Analysis
Check Discharge

Flow Ditch on Out let


Manning Q Direction road side Location
TW coefficien Designed Velocity
(m/s)
t (n) (m3/sec)

0.60 0.023 0.09 1.27 RHS


0.60 0.023 0.05 1.05 RHS
Out fall
0.60 0.023 0.58 2.03 RHS to SC-
23+819
Turn out
at
0.60 0.023 0.45 1.93 RHS Turn out
30+552 to
at
RHS
0.60 0.023 0.36 1.83 RHS
30+780L
0.60 0.023 0.27 1.71 RHS HS
Pipe at
0.60 0.023 0.18 1.55 RHS Sta.29+91
4
0.60 0.023 0.09 1.27 RHS
Project:      Atate Mazoria – Gunchire – Kose– Geja – Lera
Client:                       Ethiopia
                       
Road authority
Consultant:              WhiteNight
                       
Contructor Shan Dong Highway Engineering Construction Group Co.,LTD
Section Gunchire mazoria Junction

Design Discharge
Locations Design Recommended Pipe size Exising Pipe size
calculations
Area pipe D No. of pipe D No. of
Sr.No. Station Q10yr Q25 yr D (mm)
(km2) (Inches) Barrels (Inches) Barrels
1 0+840 0.00 0.00 0.00 48 1 1067

Side Draiange

Location Hydrology
Ditch
Station chainage
Length
Max
Contribut
Avg. Drainage
Ditch ary Area Avg Cross Length
Serial No. Road Area
Type + Road Slope (m)
From To m gradient (Ha.)
widthWi
dth (m)

1 0+000 0+200 200 3% Paved TR-Shape20.00 3% 200.00 0.40


2 0+200 0+310 110 3% Paved TR-Shape20.00 3% 110.00 0.22

3 0+310 0+600 290 3% Paved TR-Shape20.00 3% 290.00 0.58

4 0+600 0+800 200 3% Paved TR-Shape20.00 3% 200.00 0.40

5 0+800 1+000 200 3% Paved TR-Shape20.00 3% 200.00 0.40

6 1+000 1+200 200 3% Paved TR-Shape20.00 3% 200.00 0.40

7 1+200 1+400 200 3% Paved TR-Shape20.00 3% 200.00 0.40

8 1+400 1+600 200 3% Paved TR-Shape20.00 3% 200.00 0.40


xising Pipe size
Remark
D (mm)

New

Ditch Schedule
Hydrology Hydraulics Analysis
Dimenstion

Time of Runoff Water


Q10yr
Conc. I10 yr RFIntenity (mm/hr) Coefficie Depth of Depth + Side
(m3/sec)
(min.) nt BW (m) Water Free Bord Free Slope
(m) board and (1H:1V)
As per ER

15.00 95.95 0.85 0.091 0.60 0.10 0.30 0.80 0.00


15.00 95.95 0.85 0.050 0.60 0.07 0.30 0.80 0.00

15.00 95.95 0.85 0.585 0.60 0.30 0.30 0.80 0.00

15.00 95.95 0.85 0.453 0.60 0.26 0.30 0.80 0.00

15.00 95.95 0.85 0.363 0.60 0.23 0.30 0.80 0.00

15.00 95.95 0.85 0.272 0.60 0.19 0.30 0.80 0.00

15.00 95.95 0.85 0.181 0.60 0.15 0.30 0.80 0.00

15.00 95.95 0.85 0.091 0.60 0.10 0.30 0.80 0.00


draulics Analysis
Check Discharge

Flow Ditch on Out let


Manning Q Direction road side Location
Velocity
TW coefficien Designed
(m/s)
t (n) (m3/sec)

0.60 0.023 0.09 1.27 RHS


0.60 0.023 0.05 1.05 RHS
Out fall
0.60 0.023 0.58 2.03 RHS to SC-
23+819

Turn out
at
0.60 0.023 0.45 1.93 RHS
30+552 to
RHS

Turn out
at
0.60 0.023 0.36 1.83 RHS
30+780L
HS
0.60 0.023 0.27 1.71 RHS
Pipe at
0.60 0.023 0.18 1.55 RHS Sta.29+91
4
0.60 0.023 0.09 1.27 RHS
Project:      Atate Mazoria – Gunchire – Kose– Geja – Lera
Client:                                               
Ethiopia Road authority
Consultant:                                      
WhiteNight
Contructor Shan Dong Highway Engineering Construction Group Co.,LTD
Section Gunchire mazoria

Locations Design Discharge calculations Design openning R

Sr.No. Station Area (km2) Q10yr Q25 yr Q50yr Q100 yr Span

1 7+757 29.75 52.96 62.31 73.30 86.60 14

Location
Ditch
Station chainage
Length
Max
Contributary
Avg. Road Avg Cross
Serial No. Ditch Type Area + Road
gradient Slope
From To m widthWidth
(m)

1 7+580 7+600 20 3% Paved TR-Shape 150.00 3%


2 7+600 7+700 100 3% Paved TR-Shape 150.00 3%

3 7+700 7+757 57 3% Paved TR-Shape 150.00 3%


BR Plan: Plan 01 4/5/2020

.035 .035
2070

2069

2068
Elev ation (m)

2067

2066

2065
7720 7730 7740 7750 7760 7770
Station (m)
A l up ds 0.1d 0.85d
29747488 29.74748804 22438.93169 2840.1 2073.300049 2114.699951 2776.5
Design openning Recommended Exising Openning
Remark
pipe D No. of
No. of Cell Depth R.Bed HWM D (mm)
(Inches) Barrels

Bridge Shall Be
1 3.35 2065.61 2067.76 12 1 3
Replaced

Ditch Schedule
Hydrology

Drainage Time of I10 yr


Runoff
Length (m) Area Conc. RFIntenity Q10yr (m3/sec)
Coefficient
(Ha.) (min.) (mm/hr)

20.00 0.30 15.00 95.95 0.85 0.159


100.00 1.50 15.00 95.95 0.85 0.499

57.00 0.86 15.00 95.95 0.85 0.693


.035
Legend

EG PF 1
WS PF 1
Crit PF 1
Ground
Bank Sta

7760 7770 7780 7790


Hydraulics Analysis
Dimenstion Check Discharge

Water
Depth of Depth + Side Manning Q
Velocity
BW (m) Water Free Bord Free Slope TW coefficien Designed
(m/s)
(m) board and (1H:1V) t (n) (m3/sec)
As per ER

0.60 0.14 0.30 0.80 0.00 0.60 0.023 0.16 1.49


0.60 0.27 0.30 0.80 0.00 0.60 0.023 0.50 1.97

0.60 0.33 0.30 0.80 0.00 0.60 0.023 0.69 2.10


Flow Ditch on Out let
Direction road side Location

RHS
RHS
Out fall
RHS to SC-
23+819
Project:      Atate Mazoria – Gunchire – Kose– Geja – Lera
Client:                       Ethiopia
                       
Road authority
Consultant:              WhiteNight
                       
Contructor Shan Dong Highway Engineering Construction Group Co.,LTD
Section Miqea LHS
Design Discharge
Locations Design Recommended Pipe size Exising Pipe size
calculations
Area pipe D No. of pipe D No. of
Sr.No. Station Q10yr Q25 yr D (mm)
(km2) (Inches) Barrels (Inches) Barrels

1 0+280 0.00 0.00 0.00 48 1 1067

Side Draiange

Location Hydrology
Ditch
Station chainage
Length
Max
Contribut
Avg. Drainage
Ditch ary Area Avg Cross Length
Serial No. Road Area
Type + Road Slope (m)
From To m gradient (Ha.)
widthWi
dth (m)

1 0+000 0+200 200 2% Paved TR-Shape20.00 3% 200.00 0.40


2 0+200 0+280 80 2% Paved TR-Shape20.00 3% 80.00 0.16

3 0+280 0+400 120 1% Paved TR-Shape20.00 3% 120.00 0.24

4 0+400 0+600 200 6% Paved TR-Shape20.00 3% 200.00 0.40


5 0+600 0+800 200 6% Paved TR-Shape20.00 3% 200.00 0.40
6 0+800 1+000 200 1% Paved TR-Shape20.00 3% 200.00 0.40
Exising Pipe size
Remark
D (mm)

New

Ditch Schedule
Hydrology Hydraulics Analysis
Dimenstion

Runoff Water
Time of Conc. I10 yr RFIntenity Q10yr
Coefficie Depth of Depth + Side
(min.) (mm/hr) (m3/sec)
nt BW (m) Water Free Bord Free Slope
(m) board and (1H:1V)
As per ER

15.00 95.95 0.85 0.091 0.60 0.10 0.30 0.80 0.00


15.00 95.95 0.85 0.036 0.60 0.06 0.30 0.80 0.00

15.00 95.95 0.85 0.326 0.60 0.27 0.30 0.80 0.00

15.00 95.95 0.85 0.272 0.60 0.15 0.30 0.80 0.00

15.00 95.95 0.85 0.181 0.60 0.12 0.30 0.80 0.00


15.00 95.95 0.85 0.091 0.60 0.12 0.30 0.80 0.00
draulics Analysis
Check Discharge

Flow Ditch on Out let


Manning Q Direction road side Location
Velocity
TW coefficien Designed
(m/s)
t (n) (m3/sec)

0.60 0.023 0.09 1.21 RHS


0.60 0.023 0.04 0.91 RHS
Out fall
0.60 0.023 0.33 1.29 RHS to SC-
23+819
Turn out
at
0.60 0.023 0.27 2.23 RHS Turn out
30+552 to
at
RHS
0.60 0.023 0.18 1.99 RHS
30+780L
0.60 0.023 0.09 0.98 RHS HS
Project:      Atate Mazoria – Gunchire – Kose– Geja – Lera
Client:                       Ethiopia
                       
Road authority
Consultant:              WhiteNight
                       
Contructor Shan Dong Highway Engineering Construction Group Co.,LTD
Section Miqea LHS
Design Discharge
Locations Design Recommended Pipe size Exising Pipe size
calculations
Area pipe D No. of pipe D No. of
Sr.No. Station Q10yr Q25 yr D (mm)
(km2) (Inches) Barrels (Inches) Barrels

1 0+360 0.00 0.00 0.00 48 1 1067

Side Draiange

Location Hydrology
Ditch
Station chainage
Length
Max
Contribut
Avg. Drainage
Ditch ary Area Avg Cross Length
Serial No. Road Area
Type + Road Slope (m)
From To m gradient (Ha.)
widthWi
dth (m)

1 0+000 0+200 200 3.42%Paved TR-Shape20.00 3% 200.00 0.40


2 0+200 0+360 160 3.42%Paved TR-Shape20.00 3% 160.00 0.32
4 0+360 0+600 240 0.56%Paved TR-Shape20.00 3% 240.00 0.48
5 0+600 0+800 200 0.56%Paved TR-Shape20.00 3% 200.00 0.40
6 0+800 1+015 215 4.42%Paved TR-Shape20.00 3% 215.00 0.43
Exising Pipe size
Remark
D (mm)

New

Ditch Schedule
Hydrology Hydraulics Analysis
Dimenstion

Runoff Water
Time of Conc. I10 yr RFIntenity Q10yr
Coefficie Depth of Depth + Side
(min.) (mm/hr) (m3/sec)
nt BW (m) Water Free Bord Free Slope
(m) board and (1H:1V)
As per ER

15.00 95.95 0.85 0.091 0.60 0.09 0.30 0.80 0.00


15.00 95.95 0.85 0.073 0.60 0.08 0.30 0.80 0.00
15.00 95.95 0.85 0.297 0.60 0.32 0.30 0.80 0.00

15.00 95.95 0.85 0.188 0.60 0.25 0.30 0.80 0.00


15.00 95.95 0.85 0.097 0.60 0.09 0.30 0.80 0.00
draulics Analysis
Check Discharge

Flow Ditch on Out let


Manning Q Direction road side Location
Velocity
TW coefficien Designed
(m/s)
t (n) (m3/sec)

0.60 0.023 0.09 1.37 RHS


0.60 0.023 0.07 1.28 RHS Turn out
at
0.60 0.023 0.30 0.94 RHS Turn out
30+552 to
at
RHS
0.60 0.023 0.19 0.86 RHS
30+780L
0.60 0.023 0.10 1.53 RHS HS