OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

Ship's Particulars
Vessel's Name:
Port of Registry
IMO Number:
Call Sign:
Master's Name:
Officer's Name: (name/rank)
Review: (name/rank)
Review: (name/rank)

Voyage Information
Voyage Number:
From:
To:
Ref. No.:
Date:

Ship's Characteristics
Length Over All (LOA)
Breadth (mtrs):
Length betw. Perp. (LBP):
Density: (observed)
Static Draft (fwd):
Static Draft (mid):
Static Draft (aft):
Trim (mtrs): 0.00 (+ by stern / - by head)
Heel (deg): Draft Increase (mtrs): 0.00

Point of Interest Information


Waypoint or Area:
Depth (chart datum)
Date of passage:
Time (Local):
Time (UTC):
Tide Area: (from ATT as optimal)
Tide Height (mtrs):
OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

Exp. Barometric Press.: (in mbars) Correction (mtrs): 0.00


Sagging / Hogging (mtrs): (on departure - Hog. / + Sag.)
Exp. Sagging / Hogging: (when passing from point of interest - Hog. / + Sag.)
Difference (mtrs): 0.00 (diffrence between -Hog. / +Sag. )
Exp. Waves / Swell: (when passing from the point of interest)
Nature of bottom (mtrs): (sandwaves, siltations etc.)
Pipelines / Obst. (mtrs): (reduced depths over pipelines and other obstructions)

Squat
State of Water: #DIV/0! (confined or open) H/T: #DIV/0!
Width of River (mtrs): (if river passage, otherwise 0) FB: 0.00
Max. Draft (mtrs): 0.00
Speed (kts):
Block Coefficient (Cb): Squat (mtrs): #DIV/0!
Speed Open Water Confined Water
0 0.00 0.00
2 0.00 0.00
4 0.00 0.00
6 0.00 0.00
8 0.00 0.00
10 0.00 0.00
12 0.00 0.00
14 0.00 0.00
16 0.00 0.00

CATZOC and UKC policy


Zone of Confidence: (type A1, A2, B, C, D, U or leave it blank if not applicable)
CATZOC correction mtrs): 0.00
Condition: (according to min. UKC requirements condition i
Min. UKC required: 0.00 (as per company's policy) or Min. UKC Third Party requirement

Maximum Allowable Speed


Associated Squat (mtrs): #DIV/0!
Max. Speed (knots) #DIV/0!

Hydrostatic Elements
Observed Denisty: 0.000 (density at which the static drafts are corresponding)
Δ (Displacement): (for mid draft 0.00 , check hydrostatic tables)
OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

MCT1 (MT-m/cm): (for mid draft 0.00 , check hydrostatic tables)


LCB1: (for mid draft 0.00 , check hydrostatic tables)
Displacement (MT): 0.00 (for density 1,025 - Salt Water)
Mid Draft: (corresponding to displacement 0.00
MTC2 (MT-m/cm): (for mid draft 0.00 , check hydrostatic tables)
LCB2: (for mid draft 0.00 , check hydrostatic tables)
LCF2: (for mid draft 0.00 , check hydrostatic tables)
TPC2: (for mid draft 0.00 , check hydrostatic tables)
Trim Corr. (cm) #DIV/0!
δH'(cm): #DIV/0!
Draft (fwd): #DIV/0!
Draft (aft): #DIV/0! Max. Draft: #DIV/0!

Density
Density: (corresponding to UKC and / or OHC calculation)
FWA: #DIV/0!
Change in draft (cm): #DIV/0!
Mid draft: #DIV/0! Increase to draft: #DIV/0!
Displacement: (for mid draft #DIV/0! , check hydrostatic tables)
MCT3: (for mid draft #DIV/0! , check hydrostatic tables)
LCF3: (for mid draft #DIV/0! , check hydrostatic tables)
LCB3: (for mid draft #DIV/0! , check hydrostatic tables)
Trim Corr. (cm) #DIV/0!
δH'(cm): #DIV/0!
Draft (fwd): #DIV/0! Increase to draft: #DIV/0!
Draft (aft): #DIV/0! Increase to draft: #DIV/0!
Increase Draft: #DIV/0! Maximum Draft: #DIV/0!

Air draft
Height of Bridge (mtrs):
True Height (mtrs): 0.00
Keel to Masthead (mtrs):
DM-A (mtrs): (the measured distance between the frames of aft draft scale and the fr
A-F (mtrs): (the measured distance between the frames of aft draft scale and fwd d
Correction (mtrs): #DIV/0!
Reference: (Bridge or Power Cables)
Min. Required(mtrs): (as per company's policy) or Min. required as per Third Party:
OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

Required by: Third Party requirements) 0.00


OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

###
0

Minimu
Open Sea (50% of static draft or 3.0 m whicheve
Coastal Waters (20% of static draft):
requirements condition i.e., Fairways, Channels, Port Approaches) Fairways, Channels, Port Approaches (10% stati
Third Party requirement: (blank when not required) Alongside (1,5% ship's breadth or 0,6 m whichev
SBM, CBM, SPM (10% of static draft or 0,6 m wh
At Anchor, Unprotected (20% of static draft or 2
At Anchor, Protected (10% of static draft or 1,0 m
Adrift, Unprotected (20% of static draft or 2,0 m
Adrift, Protected (10% of static draft or 1,0 m wh
Malacca, Singapore (3.5 m for vessel with draft m
Eastern Bank (4,0 m for vessel with draft more th
static tables)
OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

static tables)
static tables)

, check hydrostatic tables)


static tables)
static tables)
static tables)
static tables)

static tables)
static tables)
static tables)
static tables)

f aft draft scale and the frame in line where the main mast is)
f aft draft scale and fwd draft scale)

d as per Third Party: (blank when not required)


OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

Minimum UKC Requirements


draft or 3.0 m whichever is greater): 3.00 mtrs
tatic draft): 0.00 mtrs
Approaches (10% static draft or 0,6 m whichever is greater): 0.60 mtrs
eadth or 0,6 m whichever is greater): 0.60 mtrs
static draft or 0,6 m whichever is greater): 0.60 mtrs
(20% of static draft or 2,0 m whichever is greater): 2.00 mtrs
% of static draft or 1,0 m whichever is greater): 1.00 mtrs
% of static draft or 2,0 m whichever is greater): 2.00 mtrs
static draft or 1,0 m whichever is greater): 1.00 mtrs
m for vessel with draft more than 15 m): 0.00 mtrs
vessel with draft more than 15 m): 0.00 mtrs
Static Draft: 0.00 mtrs
OPS-27 ANTICIPATED UNDERKEEL CLEARANCE CALCULATION
ISSUE No.07/Date: 03.05.2023 PROCEDURE: FIM SEC. E

by Company
0.00
Vessel: 0 Date: 30 December 1899
IMO No.: 0 Ref. No.: 0

UKC Calculation Initial


Recalculation

Voyage Number: 0 WayPoint / Area: 0


From: 0 Date: 30 December 1899
To: 0 Time: 0:00 LT 0:00 UTC

Water Level (depth) #DIV/0!


Depth Chart Datum at 0
0.00 mtrs
The predicted height of tide (from ATT as optimal): 0
0.00 mtrs
Changes in the predicted tidal height (wind, atmospheric pressure influence):
+/- 0.00 mtrs
Corrections:
Nature and Stability of bottom (e.g., sand waves, siltation etc.):
- 0.00 mtrs
Accuracy of hydrographic data (CATZOC on ENCs):
- 0.00 mtrs
Increase in draught due to change of water density: 0.000 to 0
+/- #DIV/0! mtrs
Increase of draught due to heel: 0.00 degrees
- 0.00 mtrs
Wave response allowance (due to roll and pitch motions):
- 0.00 mtrs
Reliability of draught observations (incl. estimates of hogging and sagging):
+/- 0.00 mtrs
Reduced depths over pipelines and other obstructions:
- 0.00 mtrs
Total Corrections:
= #DIV/0! mtrs
Depth Actual (at passing time): #DIV/0! mtrs

Squat #DIV/0!
Static Draught (maximum):
0.00 mtrs
Squat: Block Coefficient (Cb): 0.00 Speed: 0.00 kts #DIV/0! mtrs
Dynamic Draught (vessel's actual draught): - #DIV/0! mtrs

Under Keel Clearance (UKC) = #DIV/0! mtrs


Min. UKC required by Company 0.00 mtrs
0
Is the requirement for minimum UKC respected: #DIV/0!
Maximum permissible speed:
#DIV/0! kts

Prepared by: Reviewed by: Reviewed by: Approved by:


0 0 0 0
Vessel: 0 Date: 30 December 1899
IMO No.: 0 Ref. No.: 0

UKC Calculation Initial ✘

Recalculation

Voyage Number: 0 WayPoint / Area: 0


From: 0 Date: 30 December 1899
To: 0 Time: 0:00 LT 0:00 UTC

Water Level (depth) #DIV/0!


Depth Chart Datum at 0
0.00 mtrs
The predicted height of tide (from ATT as optimal): 0
0.00 mtrs
Changes in the predicted tidal height (wind, atmospheric pressure influence):
+/- 0.00 mtrs
Corrections:
Nature and Stability of bottom (e.g., sand waves, siltation etc.):
- 0.00 mtrs
Accuracy of hydrographic data (CATZOC on ENCs):
- 0.00 mtrs
Increase in draught due to change of water density: 0 to 0
+/- #DIV/0! mtrs
Increase of draught due to heel: 0.00 degrees
- 0.00 mtrs
Wave response allowance (due to roll and pitch motions):
- 0.00 mtrs
Reliability of draught observations (incl. estimates of hogging and sagging):
+/- 0.00 mtrs
Reduced depths over pipelines and other obstructions:
- 0.00 mtrs
Total Corrections:
= #DIV/0! mtrs
Depth Actual (at passing time): #DIV/0! mtrs
Static Draught (maximum):
0.00 mtrs
Under Keel Clearance (UKC)
Speed: 0 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 2 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 4 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 6 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 8 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 10 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 12 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 14 kts Squat: #DIV/0! mtrs #DIV/0! mtrs
Speed: 16 kts Squat: #DIV/0! mtrs #DIV/0! mtrs

Prepared by: Reviewed by: Reviewed by: Approved by:


0 0 0 0

UKC / Squat Graph


12

10

8
Metres

0
0 2 4 6 8 10 12 14 16
Speed in knots

Squat UKC
Vessel: 0 Date: 30 December 1899
IMO No.: 0 Ref. No.: 0

Squat Calculation Initial ✘

Recalculation

Voyage Number: 0
From: 0
To: 0

State of Water: #DIV/0!


Block Coefficient (Cb): 0.00
Speed: 0.00 kts
Squat: #DIV/0! mtrs

Squat Graph
1

0.9

0.8

0.7

0.6
Squat in Meters

0.5

0.4

0.3

0.2

0.1

0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00


0 2 4 6 8 10 12 14 16
Speed in knots

Open Waters Confined Waters

Prepared by: Reviewed by: Reviewed by: Approved by:

0 0 0 0
Vessel: 0 Date: 30 December 1899
IMO No.: 0 Ref. No.: 0

Overhead Clearance Calculation Initial ✘

Recalculation

Voyage Number: 0 WayPoint / Area: 0


From: 0 Date: 30 December 1899
To: 0 Time: 0:00 LT 0:00 UTC
Water Denisty at passing time: 0

Height of Transit Power Cables and/or Lines 0.00 mtrs


Tide (from ATT as Optimal) 0 0.00 mtrs
Changes in predicted tide +/- 0.00 mtrs
Corrected Height of Transit Power Cables and/or Lines = 0.00 mtrs
= 0.00 feet

Keel to Masthead (KM) 0.00 mtrs


(Vertical Distance from Keel to the top of Main Mast)

Trim (aft draft: #DIV/0! mtrs) #DIV/0! mtrs


(Aft-Forward Draft at water density of passing time)

DM-A 0.00 mtrs


(The measured distance between frames of aft draft scale in line where the main mast is)

A-F 0.00 mtrs


(the measured distance between the frames of aft draft scale and fwd draft scale)

Correction #DIV/0! mtrs


(Calculated correction due to vessel's trim)

Air Draft = #DIV/0! mtrs


= #DIV/0! feet

Overhead Clearance (OHC) = #DIV/0! mtrs


= #DIV/0! feet
Min. Required OHC for Transit Power Cables and/or Lines 0.00 mtrs
(According to Third Party requirements)
Is the Minimum Air Draft policy respected? #DIV/0!

Prepared by: Reviewed by: Reviewed by: Approved by: