S.NO.

DESCRIPTION LOCATION BEFORE AFTER BEFORE AFTER REMARKS


BOILER VENTS
1 ROOF BY PASS TUBE VENT 30 30 176.2 86.2
2 SEPERATOR CONNECTING PIPE 34 28 66.4 56.2
3 DOWN COMER MIV 180 82 86.5 81.2

4 ROOD TUBE INLET HDR VENT 100 45 64.1 50.2

5 PLATEN SH I/L HDR VENT 30 28 36.5 36.2


6 PLATEN SH I/L PIPE VENT 32 30 36.4 36.2
7 PLATEN SH O/L PIPE (R) 72 MTR LEFT SIDE 34 29 36.5 36.8

8 RH FINISHING O/L HDR 30 27 36.8 36.5

9 RH FINISHING CONNECTING VENT 31 28 36.5 36.3


10 FSH O/L PIPE (L) 34 30 37.1 36.8
11 RH FINISHING O/L HDR 32 28 37.2 37.9

12 BACK PASS DIVISIONAL I/L HDR 28 28 38.1 37.9


13 BACK PASS DIVISIONAL O/L HDR 30 28 38 37.9
BOILER DRAINS
1 BOTTOM RING HDR 8 MTR 105 55 95 53

2 APH SOOT BLOWING DRAIN 13 MTR 83


3 OVER FLOW TO FLASH TANK 13 MTR 34 30 120 75
4 BACK PASS DIVISIONAL HDR 30 30 37 36

5 BACK PASS RING HEADER 80 38 36 35

6 SH ATTEMPERATION DRAIN 120 50 38 36

7 SH ATTEMPERATION DRAIN 70 35 39 35
25 MTR RT SIDE
8 INTERMIDIATE HDR DRAIN 55 38 52 37

9 ARC INLET HDR DRAIN 52 42 39 36

10 RH ATTEMPERATION DRAIN 80 56 38 36
11 ECO I/L HDR DRAIN 84 50 37.5 65

12 LRSB DRAIN 40 50 82 52
13 WALL BLOWER DRAIN HEADER CHARGED FOR BLOWING